Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Modernization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Application of eye tracking for measurement and evaluation in human factors studies in control room modernization - 309

An important element of human factors engineering (HFE) pertains to measurement and evaluation (M and E). The role of HFE-M and E should be integrated throughout the entire control room modernization (CRM) process and be used for human-system performance evaluation and diagnostic purposes with resolving potential human engineering deficiencies (HEDs) and other human machine interface (HMI) design issues. NUREG-0711 describes how HFE in CRM should employ a hierarchical set of measures, particularly during integrated system validation (ISV), including plant performance, personnel task performance, situation awareness, cognitive workload, and anthropometric/ physiological factors. Historically, subjective measures have been primarily used since they are easier to collect and do not require specialized equipment. However, there are pitfalls with relying solely on subjective measures in M and E such that negatively impact reliability, sensitivity, and objectivity. As part of comprehensively capturing a diverse set of measures that strengthen findings and inferences made of the benefits from emerging technologies like advanced displays, this paper discusses the value of using eye tracking as an objective method that can be used in M and E. A brief description of eye tracking technology and relevant eye tracking measures is provided. Additionally, technical considerations and the unique challenges with using eye tracking in full-scaled simulations are addressed. Finally, this paper shares preliminary findings regarding the use of a wearable eye tracking system in a full-scale simulator study. These findings should help guide future full-scale simulator studies using eye tracking as a methodology to evaluate human-system performance. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A business case for nuclear plant control room modernization - 352

This paper presents a generic business case for implementation of technology that supports Control Room Modernization (CRM) in existing nuclear power plants (NPPs). The business case is based on advanced digital instrumentation and control (I and C), human-system interface (HSI), and work process technologies that allow NPP operators to conduct control room operations with improved human factors and efficiency, and therefore operate with fewer operational events. Labor savings can be harvested in terms of reduced overtime and redistribution of work. Significant savings are also demonstrated as reduced time to bring the plant back on line after completion of outages. The benefits are quantified to a rough order of magnitude, providing directional guidance to NPPs that are interested in developing similar business cases. The technologies employed in CRM include large overview displays, task-based operator displays, computer-based procedures, advanced alarm systems, computerized operator support systems, and wireless networks, among others. The CRM business case is founded on the following categories of cost savings: - Integrated Computer-Based Procedures for Operators; - Reduction in Corrective Action Program Work Due to Operator Error; - Reduction in Outage Critical Path Time; - Operation of Local Control Panels; - Reduction in Control Room Support; - Reduction in Plant Events Resulting in Generation Loss; - Paperless Control Room Processes. In addition to cost savings, these technologies also offer improvements to indirect ways that have impact on key performance indicators of the plant. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Nuclear Power Plant Control Room Modernization - Simulation Based Design

As many plants age and equipment modifications are implemented, the industry has the opportunity to address the issue of control room obsolescence through technology application and enhanced engineering techniques using existing systems. This paper addresses the practice of Simulation Based Design (SBD) for control room modernization driven by plant modifications and upgrades.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Creating a Training Dataset for Semantic Segmentation of Canal Networks for Irrigation Modernization

Canal infrastructure has provided critical irrigation water to the western United States for over a century. To continue providing vital water resources to the semi-arid West, irrigation systems must undergo maintenance and modernization. Many canal companies are resource-constrained, and because funding opportunities often require detailed knowledge of existing infrastructure, they can struggle to secure financial capital. We address this problem by creating training data for a semantic segmentation deep learning model to map canal networks throughout the western United States. To create a diverse and robust training dataset, we labelled 1-m NAIP imagery with the locations of no canals, wet canals, and dry/vegetated canals. Since creating these datasets is time consuming, we first developed a preprocessing methodology to identify canals within our four study areas. We used NAIP imagery and provided canal centerline data to buffer, standardize, and cluster the imagery, automating the labeling process as much as possible. However, this still required manual cleaning and manual classification of canal type. Challenges arose when canals were interrupted (e.g., road culverts or piped sections) or when nearby features shared similar characteristics (e.g., irrigated fields, trees, and shadows). Combining automated preprocessing with manual refinement produced four detailed canal masks to be used in the semantic segmentation model developed by Richard Tapia.

13 - HYDRO ENERGY↗

A MODERN INTERPRETATION OF THE BARNEY DIAGRAM FOR ALUMINUM SOLUBILITY IN TANK WASTE

Experimental and modeling studies of aluminum solubility in Hanford tank waste have been developed and refined for many years in efforts to resolve new issues or develop waste treatment flowsheets. The earliest of these studies was conducted by G. Scott Barney, who performed solubility studies in highly concentrated electrolyte solutions to support evaporator campaign flowsheets in the 1970's. The 'Barney Diagram', a term still widely used at Hanford today, suggested gibbsite ({gamma}-Al(OH){sub 3}) was much more soluble in tank waste than in simple sodium hydroxide solutions. These results, which were highly surprising at the time, continue to be applied to new situations where aluminum solubility in tank waste is of interest. Here, we review the history and provide a modern explanation for the large gibbsite solubility observed by Barney, an explanation based on basic research that has been performed and published in the last 30 years. This explanation has both thermodynamic and kinetic aspects. Thermodynamically, saturated salt solutions stabilize soluble aluminate species that are minor components in simple sodium hydroxide solutions. These species are the aluminate dimer and the sodium-aluminate ion-pair. Ion-pairs must be present in the Barney simulants because calculations showed that there was insufficient space between the highly concentrated ions for a water molecule. Thus, most of the ions in the simulants have to be ion-paired. Kinetics likely played a role as well. The simulants were incubated for four to seven days, and more recent data indicate that this was unlikely sufficient time to achieve equilibrium from supersaturation. These results allow us to evaluate applications of the Barney results to current and future tank waste issues or flowsheets.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Next Generation Waste Tracking: Linking Legacy Systems with Modern Networking Technologies

This report describes results from a preliminary analysis to satisfy the Department of Energy (DOE) objective to ensure the safe, secure, efficient packaging and transportation of materials both hazardous and non hazardous [1, 2]. The DOE Office of Environmental Management (OEM) through Oak Ridge National Laboratory (ORNL) has embarked on a project to further this objective. OEM and ORNL have agreed to develop, demonstrate and make available modern day cost effective technologies for characterization, identification, tracking, monitoring and disposal of radioactive waste when transported by, or between, motor, air, rail, and water modes. During the past 8 years ORNL has investigated and deployed Web 2.0 compliant sensors into the transportation segment of the supply chain. ORNL has recently demonstrated operational experience with DOE Oak Ridge Operations Office (ORO) and others in national test beds and applications within this domain of the supply chain. Furthermore, in addition to DOE, these hazardous materials supply chain partners included Federal and State enforcement agencies, international ports, and commercial sector shipping operations in a hazardous/radioactive materials tracking and monitoring program called IntelligentFreight. IntelligentFreight is an ORNL initiative encompassing 5 years of research effort associated with the supply chain. The ongoing ORNL SmartFreight programs include RadSTraM [3], GRadSTraM , Trusted Corridors, SensorPedia [4], SensorNet, Southeastern Transportation Corridor Pilot (SETCP) and Trade Data Exchange [5]. The integration of multiple technologies aimed at safer more secure conveyance has been investigated with the core research question being focused on testing distinctly different distributed supply chain information sharing systems. ORNL with support from ORO have demonstrated capabilities when transporting Environmental Management (EM) waste materials for disposal over an onsite haul road. ORNL has unified the operations of existing legacy hazardous, radioactive and related informational databases and systems using emerging Web 2.0 technologies. These capabilities were used to interoperate ORNL s waste generating, packaging, transportation and disposal with other DOE ORO waste management contractors. Importantly, the DOE EM objectives were accomplished in a cost effective manner without altering existing information systems. A path forward is to demonstrate and share these technologies with DOE EM, contractors and stakeholders. This approach will not alter existing DOE assets, i.e. Automated Traffic Management Systems (ATMS), Transportation Tracking and Communications System (TRANSCOM), the Argonne National Laboratory (ANL) demonstrated package tracking system, etc

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Non-stationary precipitation design standards for stormwater infrastructure modernization at USAF installations

The resilience of defense infrastructure systems to a changing climate is critical for national security. Climate induced recurrent flooding is already impacting over 20 U.S. Air Force installations, underscoring the urgency of revisiting precipitation standards and stormwater infrastructure design. Despite growing scientific knowledge and an expanding set of tools for updating outdated precipitation standards based on the assumption of climate stationarity, the adoption of climate informed analyses remain limited in practice. This study utilizes an existing framework to update Intensity (or Depth)-Duration-Frequency (DDF) curves using an ensemble of future climate projections. Change factors in precipitation estimates are derived and applied to six USAF installations across the U.S. The analysis is further extended to evaluate the implications of climate-informed DDFs on stormwater infrastructure performance and flood analysis at Tyndall AFB. Results indicate that the current design precipitation estimates are likely to become obsolete in all six USAF bases by the end of the century. The wide range of change factors across 32 GCM ensembles highlights the need to integrate uncertainty and evolving scientific data into infrastructure planning. The study also finds that the impacts of a changing climate vary spatially and temporally, emphasizing the value of localized analysis for infrastructure decision-making. The work advances ongoing DoD and societal efforts to implement adaptation strategies aimed at enhancing infrastructure resilience.

Intensity-duration-frequency curves↗

Cost curve of large-scale deployment of CO2-enhanced water recovery technology in modern coal chemical industries in China

China has emerged as a world leader in the coal chemical industry, which requires large amount of water and results in considerable CO2 emissions. This situation has led to the challenge of the CO2-Water nexus for China and particularly for the sustainable development of its coal chemical industry. CO2-enhanced water recovery (CO2-EWR) technology can provide large-scale CO2 mitigation and additional water supply in an integrated manner, especially in arid areas. Meanwhile, CO2 streams from industrial separation processes in the coal chemical industries are amenable to separation and can dramatically simplify or even dispense with the capture process. This study presents the first systematic assessment of a cost curve for onshore CO2-EWR potential using CO2 streams from industrial separation processes by an evaluation framework encompassing CO2 emission inventory, site suitability evaluation, and source–sink matching with techno-economic models. Preliminary results focused on the full capacity of several coal chemical processes as of 2015 suggest that CO2-EWR technology can mitigate 269 million tons of CO2 from industrial separation processes at relatively low cost ranging from 12 to 30 USD/t CO2 in China. Furthermore, 404 million tons of underground water could be produced for further desalination and utilization. When additional capacity under development could become fully operational, the emissions of 878 million tons of CO2 could be mitigated and provide 1318 million tons of vital water resources. Therefore, CO2-EWR technology can be essential to clean and sustainable development of the coal chemical industry and may provide low-cost opportunities to accelerate the deployment of large-scale CCUS projects in China.

CO2-enhanced water recovery, Modern coal chemical ↗

Energy Policy Case Study - Texas: Wind, Markets, and Grid Modernization

This document presents a case study of energy policies in Texas related to power system transformation, renewable energy and distributed energy resources (DERs). Texas has experienced a dramatic increase in installed wind capacity, from 116 MW in 2000 to over 15,000 MW in 2015. This achievement was enabled by the designation of Competitive Renewable Energy Zones (CREZs) and new transmission lines that transmit wind to load centers. This report highlights nascent efforts to include DERs in the ERCOT market. As costs decline and adoption rates increase, ERCOT expects distributed generation to have an increasing effect on grid operations, while bringing potentially valuable new resources to the wholesale markets.

17 WIND ENERGY↗

Report for 2.2.1 Task 2: Provide execution support for the human factors studies conducted for the LWRS Control Room Modernization project for PVNGS

INL contracted IFE to develop custom software functionality to support INL’s use of eye movement tracking in simulator studies. This includes the support of remote eye trackers, the support of dynamic Areas of Interest based on simulator events, and a general-purpose communication protocol between a simulator and the eye tracking software. The report summarises the task deliverables, which include a requirements identification workshop at INL, a software package, and instructional videos.

99 GENERAL AND MISCELLANEOUS↗

Addressing Nuclear I&C Modernization Through Application of Techniques Employed in Other Industries

This research focuses on presenting advancements that have been made by non-nuclear I&C OT vendors and potential savings that could be realized by their optimized nuclear industry application. To promote understanding and to bound the initial scope for this effort, a pilot vendor and an associated pilot implementation were chosen as an integrated, presentation example for illustration. This integrated example is unique in that a utility in the United States (Duke Energy) engaged a traditional non-nuclear vendor (Honeywell Process Solutions) to install a non-safety, Distributed Control System (DCS) in four of its nuclear units. Duke Energy is currently exploring performing a “technology refresh” of these installed systems as part of a program to address digital obsolescence. This research presents techniques developed by distributed control system vendors to enable such upgrades and potential methods to employ them in a nuclear industry context. The objectives of such an effort are to minimize the utility cost both to refresh the systems and to put the systems into a repeatable refresh cycle for future obsolescence management. This will enable the utility to maximize the benefits of expanded use of their DCS as part of a larger plant strategy to eliminate obsolete I&C systems, reduce Operating and Maintenance (O&M) costs, and improve operational performance through digitalization.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors: LMP Lessons Learned, Best Practices, and Frequently Asked Questions

This report captures lessons learned, best practices, and frequently asked questions with responses gleaned from the experiences of early adopters of the LMP RIPB process. Interviews were conducted in late 2019 with five non-LWR design organizations to gather their feedback on the application of the LMP RIPB process under real production conditions. The overall feedback from the reactor developers is that the LMP RIPB process can be successfully implemented with material benefits to the designer. As with any new processes, numerous challenges and questions were relayed by the designers. These challenges have been translated into lessons learned and best practices. Those two sections address both technical and organizational aspects of implementing the LMP RIPB process. Questions that were asked by multiple designers were turned into “frequently asked questions” and responses were provided by the LMP team.

42 ENGINEERING↗

Modernization of Technical Requirements for Licensing of Advanced Non-Light Water Reactors (Final Project Report)

Advanced (i.e., non-light-water) reactor technologies offer developers new opportunities to enhance the reliability, efficiency, and safety of nuclear power reactors through changes in fundamental design and operation. A variety of advanced design concepts are being developed that generally trend toward increased reliance on innovative, inherent, and passive safety features. Many of these features are substantially different from components now found in large light water reactors (LWRs) that dominate the commercial operating fleet. Similarly, non-light water reactor (non-LWR) suppliers are also pursuing market niches quite different from the regional baseload power generation sites typically associated with large LWR facilities.

42 ENGINEERING↗

Non-LWR Regulatory Framework Modernization- Fiscal Year 2024

This report provides an end-of-year summary that reflects the progress and status of Idaho National Laboratory’s (INL’s) activities concerning the development of an advanced-reactor regulatory framework and its implementation in the United States (U.S.). The report also provides recommendations for work to be performed in Fiscal Year (FY)-25 and beyond. This work was completed in FY-24 and was supported by the U.S. Department of Energy (DOE) Regulatory Development sub-program. These activities are managed by INL on behalf of DOE.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗