Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LOCATION CLOSURE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

A Monte Carlo Rectangle Packing Algorithm for Identifying Likely Spatial Distributions of Final Closure Cap Subsidence in the E-Area Low-Level Waste Facility

A Monte Carlo rectangle packing algorithm, summarized in Figure ES-1, has been developed to provide insights into the likely spatial distribution of subsided areas or holes in the final closure cap for the E-Area Low-Level Waste Facility (ELLWF) resulting from the placement of non-crushable waste containers within slit and engineered trench disposal units. Using historical records provided by Solid Waste Management as an indicator of future waste streams, a probability distribution of unique waste containers was constructed, and Monte Carlo sampling was used to sequentially select waste containers for placement in a rectangular region bounded by the disposal unit footprint. Within this Monte Carlo approach, the probability of any container type being selected is weighted by the fractional abundance relative to all other container types. For each Monte Carlo realization, the frequency of non-crushable waste containers appearing at each location on a spatially discretized mesh is updated. After many realizations, the location(s) with the highest frequencies of non-crushable waste containers are regarded as the most likely locations to experience subsidence (i.e., for a hole to form). Utilizing this approach has enabled the down-selection of a computationally intractable set of subsidence hole combinations to be explored in three-dimensional finite element groundwater flow and contaminant transport models. Such an approach can be applied to a number of different packaging problems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hybrid LES/RANS Simulation of Transverse Sonic Injection into a Mach 2 Flow

A computational study of transverse sonic injection of air and helium into a Mach 1.98 cross-flow is presented. A hybrid large-eddy simulation / Reynolds-averaged Navier-Stokes (LES/RANS) turbulence model is used, with the two-equation Menter baseline (Menter-BSL) closure for the RANS part of the flow and a Smagorinsky-type model for the LES part of the flow. A time-dependent blending function, dependent on modeled turbulence variables, is used to shift the closure from RANS to LES. Turbulent structures are initiated and sustained through the use of a recycling / rescaling technique. Two higher-order discretizations, the Piecewise Parabolic Method (PPM) of Colella and Woodward, and the SONIC-A ENO scheme of Suresh and Huyhn are used in the study. The results using the hybrid model show reasonably good agreement with time-averaged Mie scattering data and with experimental surface pressure distributions, even though the penetration of the jet into the cross-flow is slightly over-predicted. The LES/RANS results are used to examine the validity of commonly-used assumptions of constant Schmidt and Prandtl numbers in the intense mixing zone downstream of the injection location.

Boles, John A.↗

Predicting tungsten erosion and leakage properties for the new V-shaped small angle slot divertor in DIII-D

Impurity transport modeling of the new tungsten (W)-coated, V-shaped small angle slot (SAS) divertor in the DIII-D tokamak was conducted using the SOLPS-ITER plasma edge code package and the DIVIMP impurity tracking code. The inboard baffle of the current SAS divertor will be shifted closer to the outboard baffle, creating a V-corner at the slot vertex. In addition, the outboard baffle will be coated with 10–15 μm of W for experiments studying high-Z sourcing and leakage in a closed divertor. Modeling of the 'SAS-VW' divertor predicts that these changes to the inner baffle will reduce W gross erosion by 40× relative to the existing SAS divertor when the outer strike point (OSP) is at the V-corner and the ion B × ∇B drift is towards the divertor, driven primarily by significant cooling near the slot vertex. Most W erosion in SAS-VW is expected to occur near the slot entrance, which may pose a higher risk to core contamination than W eroded deeper in the slot. Furthermore, adding a new sheath-based prompt redeposition model increases the sensitivity of redeposition estimates to near-target plasma conditions and may provide more accurate predictions of net erosion. Moving the OSP outboard from the slot vertex ~4 cm onto the W-coated region yields a 40× increase in the gross erosion rate and a 50% decrease in the core leakage fraction. Thus slight variations in strike point location may counteract the potential benefits of the tightly-baffled V slot on minimizing erosion. This impurity transport modeling provides useful guidance for future experiments on the SAS-VW divertor focused on high-Z erosion/redeposition, scrape-off layer transport, and core leakage.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Center for Gyrokinetic/MHD Hybrid Simulation of Energetic Particle Physics in Toroidal Plasmas (Final Report)

At Colorado University-Boulder the primary task is to extend our gyrokinetic Particle-in-Cell simulation of tokamak micro-turbulence and transport to the area of energetic particle physics. We have implemented a gyrokinetic ion/massless fluid electron hybrid model in the global δƒ-PIC code GEM, and benchmarked the code with analytic results on the thermal ion radiative damping rate of Toroidal Alfvén Eigenmodes (TAE) and with mode frequency and spatial structure from eigenmode analysis. We also performed nonlinear simulations of both a single-n mode (n is the toroidal mode number) and multiple-n modes, and in the case of single-n, benchmarked the code on the saturation amplitude vs. particle collision rate with analytical theory. Most simulations use the f method for both ions species, but we have explored the full-ƒ method for energetic particles in cases where the burst amplitude of the excited instabilities is large as to cause significant re-distribution or loss of the energetic particles. We used the hybrid model to study the stability of high-n TAEs in ITER. Our simulations show that the most unstable modes in ITER lie in the rage of 10 < n < 20. Thermal ion pressure effect and alpha particles non-perturbative effect are important in determining the mode radial location and stability threshold. The thermal ion Landau damping rate and radiative damping rate from the simulations are compared with analytical estimates. The thermal ion Landau damping is the dominant damping mechanism. Plasma elongation has a strong stabilizing effect on the alpha driven TAEs. The central alpha particle pressure threshold for the most unstable n=15 mode is about β α (0) = 0.7% for the fully shaped ITER equilibrium. We also carried nonlinear simulations of the most unstable n = 15 mode and found that the saturation amplitude for the nominal ITER discharge is too low to cause large redistribution or loss of alpha particles. To include kinetic electron effects in the hybrid model we have studied a kinetic electron closure scheme for the fluid electron model. The most important element of the closure scheme is a complete Ohm’s law for the parallel electric field E || , derived by combining the quasi-neutrality condition, the Ampere’s equation and the v || moment of the gyrokinetic equations. A discretization method for the closure scheme is studied in detail for a three-dimensional shear-less slab plasma. It is found that for long-wavelength shear Alfvén waves the kinetic closure scheme is both more accurate and robust than the previous GEM algorithm using the split-scheme, whereas for the ion-gradient-driven instability the previous algorithm is more efficient. This kinetic electron closure scheme will be implemented in GEM in the future. We have studied the beam driven Reverse Shear Alfven Eigenmodes (RSAE) observed in DIII-D discharge 142111. For this purpose a new scheme for obtaining the electric potential is implemented, i.e., by solving the gyrokinetic moment (GKM) equation, which is essentially the equation for $∂\phi/∂t$ used in GEM’s split-weight scheme, and then integrating in time. Due to charge-neutrality the ExB motions of the equilibrium densities of all species cancel each other and do not cause charge separation if there is no finite Larmor radius effect. The advantage of solving the GKM equation is that this lowest-order cancellation can be made explicit. The GKM approach is found to be more accurate and robust. GEM simulations have reproduced many features of RSAE seen in the experiment, such as frequency chirping and the chirping range. It has been reported by other simulation codes that the shearing direction of the mode structure in the poloidal plane disagrees with observation. We found that the mode structure, including the shearing in the poloidal plane, is in general sensitive to the beam distribution. Using the same beam density profile as in other codes but with a slowing-down distribution in velocity, GEM simulations reproduce the mode shearing direction seen in the experiment. We have carried out extensive nonlinear simulations of RSAE.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY 2014 Fourth Quarterly Report

During the last quarter of FY 2014, the following technical progress has been made toward project milestones: 1) Autodesk, Inc. (Autodesk) has implemented a new fiber length distribution (FLD) model based on an unbreakable length assumption with Reduced Order Modeling (ROM) by the Proper Orthogonal Decomposition (POD) approach in the mid-plane, dual-domain and 3D solvers. 2) Autodesk improved the ASMI 3D solver for fiber orientation prediction using the anisotropic rotary diffusion (ARD) – reduced strain closure (RSC) model. 3) Autodesk received consultant services from Prof. C.L. Tucker at the University of Illinois on numerical simulation of fiber orientation and fiber length. 4) PlastiComp, Inc. (PlastiComp) suggested to Purdue University a procedure for fiber separation using an inert-gas atmosphere in the burn-off furnace. 5) Purdue University (Purdue) hosted a face-to-face project review meeting at Purdue University on August 6-7, 2014. 6) Purdue conducted fiber orientation measurements for 3 PlastiComp plaques: fast-fill 30wt% LCF/PP edged-gated, slow-fill 50wt% LCF/PP edge-gated, and slow-fill 50wt% LCF/PP center-gated plaques, and delivered the orientation data for these plaques at the selected locations (named A, B, and C) to PNNL. 7) PNNL conducted ASMI mid-plane analyses for the above PlastiComp plaques and compared the predicted fiber orientations with the measured data provided by Purdue at Locations A, B, and C on these plaques. 8) PNNL planned the project review meeting (August 6-7, 2014) with Purdue. 9) PNNL performed ASMI analyses for the Toyota complex parts with and without ribs, having different wall thicknesses, and using the PlastiComp 50wt% LCF/PP, 50wt% LCF/PA66, 30wt% LCF/PP, and 30wt% LCF/PA66 materials to provide guidance for tool design and modifications needed for molding these parts. 10) Magna Exteriors and Interiors Corp. (Magna) molded plaques from the 50% LCF/PP and 50% LCF/PA66 materials received from Plasticomp in order to extract machine purgings (purge materials) from Magna’s 200-Ton Injection Molding machine targeted to mold the complex part. 11) Toyota and Magna discussed with PNNL tool modification for molding the complex part.

36 MATERIALS SCIENCE↗

Analysis of Remote Sensing Data

A brief assessment of remote sensing applied to geological studies is given. An analysis of thematic mapping data on oak-hickory forests in southern Missouri is discussed. It was found that there is a control on the infrared reflectance (bands 4, 5, and 7 of the Thematic Mapper (TM) of the forests that correlates with rock and soil types. During the growing season, soils with low water retention capacities correlate with high infrared (band 4, lesser with band 5 and 7) signatures. A metamorphic core complex called the Meatiq located in the Eastern Desert of Egypt was studied. The dome provides exposure of most of the rock units of the Arabian-Nubian Precambrian Shield. The dome bears many resemblances to Cordilleran metamorphic complexes. LANDSAT TM data was used to improve on reconnaissance maps of the dome. The remote sensing data was interpreted in the context of field observations, petrographic, and chemical analysis of rock units in the dome, in order to map similar domes in the Eastern Desert from TM data. Mapping projects such as the one just described will help constrain the geologic evolution of the Arabian-Nubian Shield. Two particular hypotheses that researchers hope to test for the development of the shield are: (1) closure of a proto-Red Sea; and (2) accretion of a primitive island arc system onto the shield.

Guiness, E. A.↗

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

Salt Waste Processing Facility project lessons learned: Acquisition through construction - 15518

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar Liquid Radioactive Waste (LRW) processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. The SWPF facilitates DOE-EM clean-up at SRS by decontaminating the salt waste, which is the dominant volumetric component in the LRW tanks, thereby allowing the cleaned salt waste to be removed from the tanks and stabilized into an approved grout-based final waste form. The small volume of removed radionuclides is sent to the Defense Waste Processing Facility (DWPF) for vitrification. Emptied LRW storage tanks are then grouted into an approved configuration for final closure. The SWPF project is currently 100% complete with design, 80% complete with construction, and 10% complete with commissioning. To date there have been numerous lessons learned with regard to project acquisition, design, procurement, construction, and quality assurance (QA) approaches (both good practices and mistakes) that are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE enterprise. An overview of the current SWPF project status is provided and key lessons learned in the aforementioned areas are presented relative to improving future DOE major project execution performance. Specific areas to be addressed include strategies to optimize integration of design and nuclear safety, constructability tools for design and construction synchronization, commercial grade dedication (CGD) approaches to mitigate atrophy in the nuclear supply chain, and QA perspectives to facilitate effective and efficient project execution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

43-0434 Bridge Inspection Report 2021

The documentation includes the following: 1. 2021 NMDOT Bridge Inspection Report including Element Level Data Collection (in digital formats prepared by NMSU)--conforms to the National Bridge Inspection Standards and AASHTO Manual for Bridge Element Inspection; 2. 2021 Supplemental Report (in digital formats prepared by NMSU)--provides detailed information related to current condition of major bridge components; 3. 2021 Inspection Pictures (in digital format prepared by NMSU); 4. 2021 Delamination Map (in digital format prepared by LANL). During the 2021 inspection, three critical findings were reported to our LANL contact, Mr. Jonathan Stein, by text and/or email on June 26, 2021. 1. The south joint of the bridge had a modular section of the joint that could potentially come loose during the passing of vehicles. This was reported as a critical finding for safety. If the modular section becomes dislodged or deformed it could pose a serious hazard that could result in a punctured tire to vehicles, motorcyclists and/or bicyclist causing drivers/riders to lose control; 2. The bracket plate located at the north end of the bridge on the pedestrian walkway was corroded through and provides little protection to pedestrians and bicyclists. This was reported as a critical finding for safety to prevent injuries to people; 3. The north approach rail has three missing posts. These posts help ensure that traffic is redirected and the energy is absorbed by the rail. This was reported as a critical finding for safety. Additionally, the approach rail is on a curve with a nearby drop off. Immediate repair is recommended. Based on the 2021 inspection, the bridge deck is rated in "fair" condition. The chain drag performed on the deck identified several areas with delamination that are concentrated near the expansion joints, in the closure joint of the deck near the bridge centerline, and at the south end of the northbound lanes. The chain drag performed during the 2021 inspection revealed 215,333 sq. in. (1495 sq. ft) of delaminations and patched areas (not including the sidewalk). This is approximately a 600% increase from 2019. It is recommended that the delaminations and spalls with exposed rebar be repaired. The "delaminated area" map for the 2021 inspection is provided in the supplemental report.

42 ENGINEERING↗

River Corridor Closure at DOE's Hanford Site - 12503

The discussion of Hanford's River Corridor will cover work that has already been completed plus the work remaining to be done. This includes the buildings, waste sites, and groundwater plumes in the 300 Area; large-scale burial ground remediation in the 600 Area; plutonium production reactor dismantling and 'cocooning' along the river; preservation of the world's first full-scale plutonium production reactor; removal of more than 14 million tons of contaminated soil and debris along the Columbia River shoreline and throughout the River Corridor; and the excavation of buried waste sites in the river shore area. It also includes operating an EPA-permitted low-level waste disposal facility in the central portion of the site. At the completions of cleanup in 2015, Hanford's River Corridor will be the largest closure project ever completed by the Department of Energy. Cleanup of the River Corridor has been one of Hanford's top priorities since the early 1990's. This urgency has been due to the proximity of hundreds of waste sites to the Columbia River. In addition, removal of the sludge from K West Basin, near the river, remains a high priority. This 220-square-mile area of the Hanford Site sits on the edge of the last free-flowing stretch of the Columbia River. The River Corridor portion of the Hanford Site includes the 100 and 300 Areas along the south shore of the Columbia River. The 100 Areas contain nine retired plutonium production reactors. These areas are also the location of numerous support facilities and solid and liquid waste disposal sites that have contaminated groundwater and soil. The 300 Area, located just north of the city of Richland, contains fuel fabrication facilities, nuclear research and development facilities, and their associated solid and liquid waste disposal sites that have contaminated groundwater and soil. In order to ensure that cleanup actions address all threats to human health and the environment, the River Corridor includes the adjacent areas that extend from the 100 Area and 300 Area to the Central Plateau. For sites in the River Corridor, remedial actions are expected to restore groundwater to drinking water standards and ensure that aquatic life in the Columbia River is protected by achieving ambient water quality standards. It is intended that these objectives be achieved, unless technically impracticable, within a reasonable timeframe. In those instances where remedial action objectives are not achievable in a reasonable time frame, or are determined to be technically impracticable, programs are being implemented to contain the plume, prevent exposure to contaminated groundwater, and evaluate further risk reduction opportunities as new technologies become available. River Corridor cleanup work also removes potential sources of contamination, which are close to the Columbia River, and places them on the Central Plateau for final disposal. The intent is to shrink the footprint of active cleanup to within the 75-square- mile area of the Central Plateau by removing excess facilities and remediating waste sites. Cleanup actions are supporting anticipated future land uses consistent with the Hanford Reach National Monument, where applicable, and the Hanford Comprehensive Land- Use Plan (DOE 1999). The River Corridor has been divided into six geographic decision areas to achieve source and groundwater remedy decisions. These decisions will provide comprehensive coverage for all areas within the River Corridor and will incorporate ongoing interim action cleanup activities. Cleanup levels will be achieved in order to support anticipated future land uses of conservation and preservation for most of this area and industrial use for the 300 Area. At the conclusion of cleanup actions, the federal government will implement long-term stewardship activities to ensure protection of human health and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Neutronics Scoping for Ramp Testing in the Advanced Test Reactor

With the closure of the Halden Boiling Water Reactor in 2018, the global capacity for in-reactor power ramp testing has been lost. As such tests provide valuable data for understanding pellet-cladding interaction (PCI) phenomena, finding new facilities for ramp testing is of interest to the United States Accident-Tolerant Fuel (ATF) Program. Several options at Idaho National Laboratory (INL) are being evaluated for adding ramp test capabilities. In the Transient Reactor Test Facility (TREAT), one option is testing inside a Transient Water Irradiation System in TREAT (TWIST) capsule. In the Advanced Test Reactor (ATR), one option under consideration is testing in an I-Loop toward the outer edge of the core. Another is testing in Loop-2A, located in the Center Flux Trap (CFT) of the ATR. In this paper, we examine the conceptual scoping for the Loop-2A experiment known as ATF-2Ramp.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Near Real-Time Two and Three-Dimensional Electrical Geophysical Monitoring of Natural and Engineered Processes Associated with Subsurface Remediation - 16052

Legacy soil and groundwater contamination associated with nuclear weapons production is projected to be one of the largest cleanup liabilities to the U.S. Department of Energy for the foreseeable future. Remediation of subsurface contaminants is complicated by the combined effects of geochemical heterogeneity, geological heterogeneity, and the difficulty and expense of adequate borehole access. Each of these complications contributes to uncertainty in the distribution of contaminants and the performance of in situ treatments, which increases risk to human health and the environment and cost to closure in general. Electrical resistivity tomography (ERT) is a method of remotely imaging the electrical properties of the subsurface, which are governed by both geochemical and geological structure, thereby providing useful proxies for understanding contaminant distribution and the behavior in situ remediation processes. Recent advancements in both data collection and data processing capabilities are enabling ERT monitoring to be executed and provided to site operators in near real-time. To summarize the process, ERT surveys are rapidly and continuously collected during a time-sensitive operation such as an amendment injection. At the completion of each survey, data are transferred by wireless internet to offsite supercomputing resources for parallel tomographic inversion. Inversion results are then transferred back to onsite operators and/or other locations for visualization. In this paper, we demonstrate the utility of time-lapse ERT for monitoring fluid transport (both gas and liquid phase). We then demonstrate two real-time imaging applications for monitoring both natural and engineered processes at the Hanford Site within the vadose and the saturated zones. We expect this new capability for autonomous real-time imaging to enable ERT to be used as a cost-effective, short-term rapid feedback mechanism for guiding subsurface remediation injections, in addition to longer term monitoring of post-injection performance and environmental impact, all using the same electrode array and instrumentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and D and D of PET Cyclotron and Radioisotope Production Facility - 17536

The State University of New York at Buffalo is in the process of the decontamination and decommissioning (D and D) of a cyclotron and radioisotope production facility located in Parker Hall on the South Campus. Many unique characterization activities are needed for compliant waste packaging, transportation, and disposal. In addition to the cyclotron used for successful production of radioisotopes, the facility features hot cells and glove boxes used for the purification and conditioning of the final product. Many challenges exist for the decommissioning of the cyclotron and the radioisotope production facility. These challenges include the proper characterization and management of the cyclotron, its associated equipment, and the remaining facility. Slightly activated concrete constitutes the majority of the remaining radioactive materials to be disposed of during the decommissioning. Challenges for this project include; - Regulatory interface between the New York Department of Health (NYDOH) and the New York Department of Environmental Conservation (DEC) for license closure; - Characterization of the cyclotron, its support equipment and the activated vault areas; - The most cost effective disposal options and the Data Quality Objectives needed for the various disposal options. The paper primarily focuses on challenges for characterization of the cyclotron and the remaining radioisotope production facility at the University at Buffalo. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102). The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in their respective CRs. The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b). The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) and its ensuing ROTC (DOE/EMNV, 2018), and the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). The Plan is implemented by the Environmental Program Services (EPS) contractor. Implementation of the Plan provides data to complete corrective actions prescribed by the FFACO to protect the public from groundwater contaminated by historical underground nuclear testing. The Plan’s scope comprises sample collection and analysis requirements for assessing the extent of groundwater contamination from underground nuclear testing. Sampling wells located in the communities surrounding the Nevada National Security Site (NNSS) is performed by other organizations (e.g., management and operating [M&O] contractor) and is therefore not included within the Plan. The results of the community sampling are presented in the annual NNSS environmental reports.

54 ENVIRONMENTAL SCIENCES↗

Assessment of defense-related uranium mines in the United States and other US DOE office of legacy management domestic and international uranium initiatives - 15335

US DOE's Office of Legacy Management (LM) has taken several initiatives to improve domestic uranium mining and milling operations in the United States and to contribute to the management of legacy uranium mining and milling sites around the world. Initiatives include completing the 2014 Report to Congress on Defense-Related Uranium Mines, managing the Title X Uranium and Thorium Program with the Office of Environmental Management, and assisting IAEA with uranium issues in member state countries. The 2014 Report to Congress identified abandoned uranium mines (AUMs) in the United States that provided uranium ore to the US Atomic Energy Commission (AEC) between 1947 and 1970. The report identified AUM locations, reclamation/remediation status, radiological risks and other hazards, costs for reclamation and remediation, and potential prioritization schemes for mine cleanup. To develop reclamation and remediation cleanup cost estimates and assess risks, AUMs were grouped into six categories by tons of uranium ore produced, ranging from Small (less than 91 metric tons [100 tons]) to Very Large (greater than 453,900 metric tons [500,000 tons]). Radiological risk was calculated using the RESRAD computer code for five exposure scenarios: offsite resident, onsite resident, occasional visitor, recreational visitor, and mine reclamation worker. Results indicate that 69 percent of the AUMs are in Colorado and Utah and 23 percent are in Arizona, Wyoming, and New Mexico; and that the majority of the AUMs (68 percent) were considered Small or Small/Medium production mines, producing less than 908 metric tons (1,000 tons) of uranium ore. Although New Mexico has fewer AUMs (247) than the other states in the Colorado Plateau region, AUMs in that state (primarily those in the Grants Mineral Belt) produced 45 percent of the 79.5 million tons of AEC-purchased uranium ore. About 50 percent of the AUMs are on public land managed by the US Bureau of Land Management; 435 AUMs are on the Navajo Nation. Risk estimates for the onsite resident scenario (plausible on tribal and non-federal land) could result in an incremental cancer risk greater than 10{sup -4}. Radon inhalation was the dominant contributor to radiological risk for the five exposure scenarios evaluated. Different state and federal agencies are conducting cleanup of some AUMs under various remedial and legal authorities. Activities constituting mine 'reclamation' may reduce radiological risks to humans to acceptable levels for many mines on federal public lands if the occasional visitor and recreational visitor exposure scenarios are assumed. Addressing physical hazards (e.g., open shafts) at mines where conditions could cause serious injuries is typically a priority of public land management agencies. At locations where mine-related groundwater contamination occurs, it is a significant contributor to cleanup costs. However, most Small and Small/Medium AUMs were likely developed above the water table, and some wet mines are located in areas where groundwater has high, naturally occurring levels of the same constituents (including radioactive elements) that are typically associated with uranium mines. LM is also administering, with the US DOE Office of Environmental Management, the Title X program, which was developed by Congress to reimburse private companies (i.e., those that held active operating licenses prior to 1978) for a portion of their reclamation costs for mill sites that processed ore sold to AEC. LM recently updated the program guidance document and established internal protocols for annually auditing companies. LM is assisting IAEA on two different initiatives: assisting developing countries with training on the basic steps to take to perform reclamation of uranium mines, and developing technical guidance and case studies related to safety and environmental assessments and post-closure management of uranium legacy sites as part of the IAEA Regulatory Supervision of Legacy Sites initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The AMPLATZER Vascular Plug 4: Preliminary Experience

The purpose of this communication is to describe our preliminary experience with the AMPLATZER Vascular Plug 4 (AVP 4) in peripheral vascular embolization. The AVP 4 was used for peripheral vascular embolization in five patients with renal pseudoaneurysm (n = 2), postsurgical peritoneal bleeding (n = 1), posttraumatic gluteal hemorrhage (n = 1), and intercostal pseudoaneurysm (n = 1). Occlusion time was recorded. Patients were followed up clinically and by imaging for 1 month after the procedure. All treated vessels or vascular abnormalities were successfully occluded within 3 min for low-flow circulation and over 8 min for high-flow circulation. At 1-month follow-up, all patients were symptom-free. All deployed devices remained in the original locations and desirable configurations. In conclusion, the AVP 4 seems to be safe and effective for occluding peripheral vessels and vascular abnormalities. Because of its compatibility with 0.038-in. catheters, it can be deployed through a diagnostic catheter following angiography without exchanging a sheath or guiding catheter. Compared with the previous generation of vascular plugs, the AVP 4 allows for faster procedure times and decreased exposure to radiation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) is for Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” which is located in Area 5 of the Nevada National Security Site (NNSS). CAU 577 includes five low-level waste cells at the Area 5 Radioactive Waste Management Site (RWMS) where buried waste received from Nuclear Fuel Services, Inc. (NFS), was subsequently determined to contain chromium that exceeded the Toxicity Characteristic Leaching Procedure regulatory limit, which would require the waste to carry hazardous waste code D007. To resolve issues related to this alleged violation of hazardous waste regulations, a Settlement Agreement was executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office on April 25, 2019, which identified agreed-upon mitigation measures. The Settlement Agreement required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO).

54 ENVIRONMENTAL SCIENCES↗

Remediation of Highland Drive Landfill: Technical Challenges of Segregating Co-Mingled LLRW and Municipal Solid Waste in an Urbanized Area - 13319

Highland Drive Landfill is an inactive Municipal Solid Waste (MSW) Landfill which received waste from the 1940's until its closure in 1991. During a portion of its active life, the Landfill received low-level radioactive waste (LLRW) which currently exists both in a defined layer and co-mingled with MSW. Remediation of this site to remove the LLRW to meet established cleanup criteria, forms part of the Port Hope Project being undertaken by Atomic Energy Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). The total volume of LLRW and co-mingled LLRW/MSW estimated to require removal from the Highland Drive Landfill is approximately 51,900 cubic metres (m{sup 3}). The segregation and removal of LLRW at the Highland Drive Landfill presents a number of unique technical challenges due to the co-mingled waste and location of the Landfill in an urbanized area. Key challenges addressed as part of the design process included: delineation of the extent of LLRW, development of cut lines, and estimation of the quantity of co-mingled LLRW in a heterogeneous matrix; protection of adjacent receptors in a manner which would not impact the use of adjacent facilities which include residences, a recreational facility, and a school; coordination and phasing of the work to allow management of six separate material streams including clean soil, MSW, co-mingled LLRW/MSW, LLRW, un-impacted water, and impacted water/leachate within a confined environment; and development of a multi-tiered and adaptive program of monitoring and control measures for odour, dust, and water including assessment of risk of exceedance of monitoring criteria. In addition to ensuring public safety and protection of the environment during remedy implementation, significant effort in the design process was paid to balancing the advantages of increased certainty, including higher production rates, against the costs of attaining increased certainty. Many of these lessons may be applicable to other projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗