Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LEACHATES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

2015 Site Environmental Report Fernald Preserve

The Fernald Preserve 2015 Site Environmental Report provides stakeholders with the results from the Fernald, Ohio, Site’s environmental monitoring programs for 2015; a summary of the U.S. Department of Energy’s (DOE’s) activities conducted onsite; and a summary of the Fernald Preserve’s compliance with the various environmental regulations, compliance agreements, and DOE policies that govern site activities. This report has been prepared in accordance with the “Integrated Environmental Monitoring Plan,” which is Attachment D of the Comprehensive Legacy Management and Institutional Controls Plan (LMICP) (DOE 2016). Remediation of the Fernald Preserve has been successfully completed with the exception of the groundwater. During 2015, activities at the Fernald Preserve included: environmental monitoring activities related to direct radiation, groundwater, and surface water; ecological restoration monitoring and maintenance as well as inspections, care, and monitoring of the site and the OSDF to ensure that provisions of the LMICP are fully implemented; OSDF leak detection monitoring and collection, monitoring, and treatment of leachate from the OSDF; extraction, monitoring, and treatment of contaminated groundwater from the Great Miami Aquifer (Operable Unit 5); ongoing operation of the Fernald Preserve Visitors Center, associated outreach, and educational activities; and monitoring as specified in the site’s National Pollutant Discharge Elimination System (NPDES) permit. Environmental monitoring programs were developed to ensure that the remedy remains protective of the environment. The requirements of these programs are described in detail in the LMICP and reported in this Site Environmental Report.

54 ENVIRONMENTAL SCIENCES↗

Solid State Characterizations of Long-Term Leached Cast Stone Monoliths

This report describes the results from the solid phase characterization of six Cast Stone monoliths from the extended leach tests recently reported on (Serne et al. 2016),that were selected for characterization using multiple state-of-the-art approaches. The Cast Stone samples investigated were leached for > 590 d in the EPA Method 1315 test then archived for > 390 d in their final leachate. After reporting the long term leach behavior of the monoliths (containing radioactive 99 Tc and stable 127 I spikes and for original Westsik et al. 2013 fabricated monoliths, 238 U), it was suggested that physical changes to the waste forms and a depleting inventory of contaminants of potential concern may mean that effective diffusivity calculations past 63 d should not be used to accurately represent long-term waste form behavior. These novel investigations, in both length of leaching time and application of solid state techniques, provide an initial arsenal of techniques which can be utilized to perform such Cast Stone solid phase characterization work, which in turn can support upcoming performance assessment maintenance. The work was performed at Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions (WRPS) to characterize several properties of the long- term leached Cast Stone monolith samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site 2015 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site, Nye County, Nevada. Groundwater samples from the aquifer immediately below the Area 5 RWMS have been collected and analyzed and static water levels have been measured in this aquifer since 1993. This report updates these data to include the 2015 results. Analysis results for leachate contaminants collected from the mixed-waste cell at the Area 5 RWMS (Cell 18) are also included.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of an MCU HEPA filter

A series of direct analyses on three portions (inlet, center, and outlet) of the High Efficiency Particulate Air (HEPA) filter material from the Modular Caustic-Side Solvent Extraction Unit (MCU) have been performed; this includes x-ray methods such as X-Ray Diffraction (XRD), Contained Scanning Electron Microscopy (CSEM) and X-Ray Fluorescence (XRF), as well as Fourier Transform InfraRed spectroscopy (FTIR). Additionally, two leaching studies (one with water, one with dichloromethane) have been performed on three portions (inlet, center, and outlet) of the HEPA filter material, with the leachates being analyzed by Inductively-coupled plasma emission spectroscopy (ICPES), Semi-Volatile Organic Analysis (SVOA) and gammascan. From the results of the analyses, SRNL feels that cesium-depleted solvent is being introduced into the HEPA filter. The most likely avenue for this is mechanical aerosolization of solvent, where the aerosol is then carried along an airstream into the HEPA filter. Once introduced into the HEPA filter media, the solvent wicks throughout the material, and migrates towards the outlet end. Once on the outlet end, continual drying could cause particulate flakes to exit the filter and travel farther down the airstream path.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Summary of the Integrated Disposal Facility Performance Assessment 2008

The U.S. Department of Energy (DOE) order on radioactive waste management (DOE 1 999a) as well as the Maintenance Plan for the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (Mann 2004) require an annual summary on the adequacy of the Hanford Immobilized Low-Activity Tank Waste Performance Assessment (RLAW PA) in each year in which a performance assessment is not issued. The most recent approved PA is the Hanford Immobilized Low-Activity Waste Performance Assessment: 2001 Version (Mann et al 2001). The RLAW PA evaluated the adequacy of the ILAW disposal facility, now referred to as the Integrated Disposal Facility (IDF), to safely dispose vitrified Hanford Site tank waste. More recently, a preliminary evaluation for the disposal of offsite low-level and mixed low-level waste was considered in the Integrated Disposal Facility Risk Assessment (Mann et al. 2003a). The first phase of IDF construction was completed on April 28, 2006 and included the installation of the cell liners and leachate collection tanks. The IDF is now in a preoperational maintenance mode and will not receive treated tank waste for several years. In view of these circumstances, the RCRA Part B Permit for the Integrated Disposal Facility has been modified to recognize that the facility will not be receiving waste in the near future. A subsequent modification indicated transfer of the IiDF from the DOE Office of River Protection (DOE/ORP) operation to the DOE Richland Operations Field Office (DOE/RL). This summary is the latest in a succession of sumnmaries that have been published since 2000 (Mann, 2000b, 2002, 2003b, 2004, 2005, 2006 and 2007) and approved by the Field Manager, Office of River Protection (e.g., Schepens 2005c). This annual summary compares new data collected during Fiscal Year 2008 with the Hanford Immobilized Low-Activity Waste Performance Assessment: 2001 Version (Mann et al 2001), which has been approved by DOE (DOE 2003a). Most of the data collected during Fiscal Year 2008 pertained to long-term contaminant release from ILAW packages made at the Waste Treatment Plant. Results of data collection and additional analyses do not change the conclusions of the 2001 ILAW PA as they pertain to RLAW disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.

The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised and updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Silver-iodine secondary waste stabilization: multi-scale evaluation

Iodine-129 is a key risk driver in most low-level waste cementitious waste repositories. The objectives of this study were to determine iodine speciation in cementitious materials with slag (Grout+slag) and without slag (Grout–slag) and its impact on iodine immobilization. Additional studies were conducted to determine if grout was compatibility as a waste form for the most common adsorbent used to remove aqueous and gaseous radioiodine, silver-impregnated granular activated carbon (Ag-GAC). Rankings of iodine species by their tendency to bind to grout were: iodide << organo-iodine ≤ iodate. Similarly, ranking of grout formulations by their tendency to immobilize iodine were: Grout +slag < Grout -slag . Organo-iodine comprised >40% of the leachate solution from grout samples initially hydrated (cured) with iodide. The origin of the organic ligand comprising the organo-iodine was organic carbon in the grout material (~1200 mg/kg). Iodine in the solid phase, as determined by K-edge X-ray Absorption Near-Edge Spectroscopy, and aqueous phases were not in equilibrium and essentially no iodine speciation transformations occurred within the grout after one month of curing, irrespective of which iodine species was initially added to the mix. For the first time, these studies demonstrate that multiple iodine species can co-exist simultaneously in grout porewater, the iodine species initially added to the grout can greatly affect immobilization, and that Ag-GAC can be safely disposed in grout formulation, but not in the presence of slag. These results help explain previous data and reduce uncertainty associated with the disposal of nuclear waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical Composition Analysis and Product Consistency Tests of the ORP Phase 6 Nepheline Study Glasses

In this report, Savannah River National Laboratory (SRNL) provides chemical analyses and Product Consistency Test (PCT) results for a series of simulated high-level waste (HLW) glass compositions fabricated at Pacific Northwest National Laboratory (PNNL). The results of this effort will improve the ability to predict the impacts of glass composition and nepheline crystallization on the durability of HLW glasses. Chemical analyses were performed on a representative sample of each of the quenched glasses to allow for comparisons with the targeted compositions. A review of the individual glass composition measurements identified no analytical issues of concern. Minor differences between the targeted and measured concentrations of some of the baseline glass components were noted, including some high values for Fe 2 O 3 , and some low values for Al 2 O 3 , Li 2 O, Na 2 O and P 2 O 5 . The PCT Method-A was performed in triplicate on each of the quenched and canister centerline cooled (CCC) versions of the glasses to assess chemical durability. A review of the leachate analyses and standard solution data identified no issues with the analytical methods. Some of the CCC versions of the study glasses have normalized concentration for boron (NC B ) values that are higher than the Environmental Assessment glass benchmark NC B value of 16.695 g/L. For some of the study glasses, the NC B values were higher after the CCC heat treatment. The normalized concentrations for lithium and sodium (NC Li and NC Na ) followed this same trend. For many of these glasses, the changes in the normalized concentration for silicon (NC Si ) values were not congruent with the changes in NC B , NC Li , and NC Na values. It may be valuable for PNNL to perform a more complete review of the influence of composition and heat treatment on the PCT responses of the glasses described in this report to draw further conclusions, including any potential correlations with the methods used in selecting these glass compositions for study.

36 MATERIALS SCIENCE↗

Assessment of Pump-and-Treat System Impacts on 200 West Aquifer Conditions

The 200 West P&T system is one of the key components of the final remedy selected for the 200-ZP-1 Operable Unit (OU), and the interim remedial action selected for 200-UP-1 OU at the Hanford Site. In addition, the facility has been receiving water from several other sources, such as 200-DV-1 OU perched water, groundwater from the 200-BP-5 OU, and leachate from the Environmental Restoration Disposal Facility. It is anticipated that the P&T system will continue to receive water from other sources, which may include Modular Storage Unit (purge) water, groundwater near the Waste Management Area C, and Gable Gap. Furthermore, maintaining the injection capacity of the system has been a significant issue since the facility startup in 2012. Fouling issues at the injection wells have necessitated frequent well redevelopment, resulting in decrease in injection capacity and the need to construct new injection wells—with significant effects on system performance and operational costs. Given the evolving nature of treatment plant effluent due to changes in influent, combined with issues observed at the injection wells, it is important to understand the impacts of the P&T operations on the 200 West aquifer where the treated water is injected. This study aims at determining these impacts and providing a quantitative evaluation of aquifer capacity for both current and future conditions. This information will provide a technical basis for decisions related to the P&T system operations that support remedy optimization efforts and short- and long-term remedy decisions related to multiple OUs in the Central Plateau.

Demirkanli, Deniz I.↗

Results of the SRNL Studies of the MCU Strip Effluent Coalescers

Three potential causes of the strip effluent (SE) coalescer (SEC) failure were investigated: inorganic fouling, organic fouling, and biological fouling. From the analysis of the SEC and leachate samples from the SEC, there is no evidence that the fouling is caused by inorganic precipitates, solids, or salts. The analysis of the SEC shows the presence of organic material such as sec-butylphenol and Modifier (1-(2,2,3,3-Tetrafluoropropoxy)-3-(4-secbutylphenoxy)-2- propanol). The source of the sec-butylphenol would be from the decomposition of the Modifier in the solvent. The analysis of the SEC shows the presence of amide bonds that are likely from bacteria and other biological material. In addition, samples from the Strip Feed Tank (StFT) and the boric acid delivery tanker showed the presence of bacteria and other biological material. The most likely cause of the SEC fouling is biofouling by bacteria and other organisms that form a biofilm on the SEC fibers. The biofilm would sorb organic material in the feed to the SEC, and not readily release this material. The bacteria would use this trapped organic material to grow the biofilm, which would decrease the porosity of the SEC. The biofilm would thereby impede SEC operation through biofouling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Hanford LAW phase 3 glasses. Revision 2

This report provides analyses of glass compositions, wash solution compositions, and Product Consistency Test (PCT) leachate compositions for a series of simulated low-activity waste (LAW) glasses fabricated at the Pacific Northwest National Laboratory (PNNL). These data will be used in the development of improved property/composition models for LAW glass at Hanford.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Intensified Flue Gas Desulfurization Water Treatment for Reuse, Solidification, and Discharge

The goal of this final project report is to summarize the work conducted on project DE-FE0031555. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UK CAER) (Recipient) developed a hybrid electrochemical-membrane technology for treating wet flue gas desulfurization (WFGD) blowdown from coal-fired power generation plants that (1) removes government-regulated species and total suspended solids (TSS) via electrocoagulation with solid/liquid separation to avoid further treatments by a biological method specifically for selenium, and (2) reduces total dissolved solids (TDS) in a nanofiltration unit to promote water recycle and reduce freshwater intake. Additional technological configurations were pursued, including (1) nanofiltration combined with zeolite dewatering for a near-zero liquid discharge (ZLD) scenario, and (2) polishing discharge from zeolite dewatering using capacitive deionization (CDI) with 90+% salt rejection to produce water with less than 100ppm TDS for more beneficial use. Project results verified that UK CAER’s hybrid approach addressed the complexities of WFGD blowdown with simplified unit operation at relatively low capital investment by demonstrating: (1) an effective in-situ generated solid sorbent material, green-rust (GR), that specifically removes regulated dissolved species in WFGD blowdown, including selenium, arsenic, and nitrates; (2) a low-cost, high flux nanofiltration treatment that removes both monovalent and divalent species at >80% rejection to adequately provide water recycle and extend the life of FGD equipment by mitigating chloride aided pitting corrosion mechanisms; and (3) a solidification and stabilization process using pozzolanic agents that retain regulated species and satisfy the Resource Conservation and Recovery Act (RCRA) leachate requirements. UK CAER proved electrocoagulation with GR to be an intensified solution for effluent limit guidelines (ELG), and based on preliminary techno-economic analysis (TEA), in comparison to DOE’s Case 1 for Biological Wastewater Treatment that had a purchased equipment cost (PEC) of $\$$5.26 million and a Total plant cost (TPC) of $\$$30.0 million, the EC process had a PEC of $\$$2.67 million and the TPC of $\$$17.0 million. While the electricity consumption for Case 1 was 53 kW, it was 110 kW for the EC process due to dissolving iron for a three-stage reaction design. However, electricity consumption for the EC process could be significantly reduced by adopting a counter-current reactor design for at least a 6-stage chemical reaction operation.

01 COAL, LIGNITE, AND PEAT↗

Coupled Hydrothermal Extraction and Ligand-Associated Swellable Glass Media Recovery of Rare Earth Elements from Coal Fly Ash (Final Report)

Wayne State University (WSU) researchers, in collaboration with the University of California-Los Angeles (UCLA) and Los Alamos National Laboratory (LANL), have successfully developed a new sorbent media used in a process that concentrated the rare earth content in a coal fly ash sample from southeast MI by >350×, resulting in >13 wt% REO powder. The project developed a new DTPA-associated media that was used to concentrate total REEs. This project demonstrated a coupled hydrothermal extraction and solid-liquid recovery process that produced REO powder from raw fly ash while nearly eliminating the use of organic solvents. The project successfully: 1) identified a commercially viable ash supply with >$2.5 M in REO value being deposited monthly, 2) hydrothermally extracted >77% of REEs in coal fly ash (20% more than acid alone), 3) developed a new sorbent media that was used to concentrate REEs, 4) and engineered a process that resulted in a >13 wt% REO powder. The media also demonstrates a selectivity for mid and heavy REEs over Ce and La and the potential for use in separating individual rare earth elements. An invention disclosure for the sorbent media has been filed with WSU and a patent application will be submitted in the near future. The project examined the potential to couple hydrothermal leaching of coal fly ash with the engineering of a custom ligand-associated media to provide an organic solvent-free method of extracting and recovering REEs. Fly ash feedstock was collected from Detroit area coal-fired power plants, characterized for REE content, and subjected to a bench-top batch hydrothermal leaching/dissolution process inside custom-build pressure reactors at Los Alamos National Laboratory (LANL). This process applied a dissolution technique previously developed to process spent nuclear fuel and other nuclear materials. The modified ash was acidified and the resulting leachate was enriched with REEs along with Ca, Al, and Si. Ligands known to be effective in lanthanide/actinide separation were evaluated based on a series of criteria such as selectivity and association to organosilica through hydrophobicity. Batch experiments were conducted to establish the best conditions (e.g., pH, eluent, etc.) and best ligand systems for the effective extraction of REEs from the alkaline feed solution obtained from the hydrothermal leaching process. Once the organosilica-ligand extraction media was developed for REE concentration, an acidic solution was used to back extract and concentrate the REEs into a heavily REE-laden strip solution. The REEs in the strip solution were precipitated with oxalate to produce rare earth oxides.

01 COAL, LIGNITE, AND PEAT↗

SDU7 Interior Liner Testing & Evaluation

The Saltstone Disposal Unit 7 (SDU7) project requested the Savannah River National Laboratory (SRNL), Materials Science & Engineering (MS&E) organization to evaluate an alternative bromobutyl liner and adhesives for potential use in SDU7 based on applicable ASTM testing standards. SRNL performed similar testing for the liner system used in SDU6. Bonded and non-bonded samples of the alternative liner (Blair Rubber Marflex™ RCHB60HT) were subjected to specific ASTM tests after immersion in two Saltstone leachate simulants, designated S1 and S2, for 1000 hours at 60 °C. Immersion exposures were performed at the Savannah River Ecology Laboratory (SREL). Post-immersion testing involved mechanical property and hardness testing of base material, lap-shear testing of bonded samples and rubber-to-concrete paver interrogation. The liner exhibited an approximate 40% drop in tensile strength and 25% drop in elongation at failure from baseline values after immersion, though final values are comparable to previous SDU6 liner values and are within liner manufacturer property ranges. Overall lap-shear strength behavior of the four adhesives showed a similar pattern, with short-term reduction and subsequent increase in peak load values. However, ranking of adhesives varied with the metric used for comparison. Two of the four adhesives tested (Normac 900 and REMA SC 4000) showed overall better behavior, collectively considering immersion performance, lap-shear data and bonded paver interrogation. Lap-shear samples bonded with the REMA adhesive showed the best combination of final retained bond strength, 6-week average bond strength and bond failure mode. Only one paver (REMA SC4000) was noted to have no defects after immersion. This document details the testing performed and provides conclusions and recommendations. The testing suggests that SDU liner performance is highly dependent upon seam integrity, which collectively depends on a combination of adhesive properties, installation workmanship and inspection/quality control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank 50 Simulant Grout and Toxicity Characteristic Leaching Procedure (TCLP) Results for Methyl Mercury Waste Acceptance Criteria (WAC) Limit

Testing of simulated Tank 50 salt solution grout, spiked with methyl mercury (MeHg) and ionic mercury, used the Toxicity Characteristic Leaching Procedure (TCLP) to evaluate leaching performance with respect to Hg and the Waste Acceptance Criteria (WAC) limits for the Saltstone Production Facility (SPF). This report describes the test parameters for simulant preparation and confirmatory analysis, grout preparation, TCLP leach testing and subsequent leachate analyses. These scoping tests were designed to provide an initial evaluation of the effect of increased MeHg and ionic Hg on the TCLP and were requested by Savannah River Remediation LLC (SRR) through a Technical Assistance Request (TAR). It is expected that this preliminary testing will likely lead to future, more detailed, testing involving the mercury (Hg) WAC and Hg limits with respect to the Tank 50 TCLP for mercury. The TCLP concentrations for total Hg have approached 0.06 mg/L in recent years for Tank 50 radioactive solutions containing up to 105 mg/L of Hg in the form of ionic (Hg(I/II), elemental (Hg(0)) and organo-mercury such as MeHg. In discussions with SRR personnel, it was decided for this non-baseline work to target Hg spike concentrations, using predominately MeHg, in the range of 150 to 350 mg/L total Hg to investigate corresponding Hg TCLP leaching behaviors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Product Consistency Test Results for the HFG1 Glasses

The U.S. Department of Energy (DOE) is responsible for building the Hanford Tank Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to remediate 55 million gallons of radioactive waste that is temporarily stored in 177 underground tanks. The Office of River Protection (ORP) has requested that the Savannah River National Laboratory (SRNL) contribute in areas of recognized capabilities and expertise for glass waste form development to support successful startup of the WTP. As part of this effort, the Pacific Northwest National Laboratory (PNNL) is developing, batching, and fabricating simulated high-level waste (HLW) glasses to generate the associated property data needed to validate or identify areas of potential characterization improvement in the current glass property/composition models. Currently, the models cover only a small fraction of the waste compositions projected in the Hanford tank farm; therefore, the models must be expanded to include high fluoride compositions to successfully complete the WTP mission. SRNL support of this work is defined in the Task Technical and Quality Assurance Plan (TTQAP). This report provides the results of the Product Consistency Test (PCT) leachates from the High Fluoride Glasses-1 (HFG1), a series of simulated nuclear waste glasses fabricated at PNNL. The series included quenched (Q) and canister-centerline cooled (CCC) versions of the glasses. The glasses were selected as part of a broader study of the influence of glass composition on chemical durability, sulfur retention, and other properties. These data will be used to validate or identify areas of potential characterization improvements in the current glass property/composition models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Product Consistency Test Results for the LAW Phase 5 Glasses

This report provides the results of the Vapor Hydration Test solutions and the Product Consistency Test leachates from the Low-Activity Waste Phase 5 glasses, a series of simulated nuclear waste glasses fabricated at the Pacific Northwest National Laboratory. The series included quenched and canister-centerline cooled versions of the glasses. These data will be used in the development of enhanced property/composition models for waste glass vitrification at Hanford. Several of the blanks had detectable amounts of sodium and/or silicon. The measured concentrations (mg/L) of boron, sodium, and silicon for the low-activity test reference material glass included with the Product Consistency Tests were much lower than the expected low-activity test reference material test results. A review of the Product Consistency Test data indicated that there was generally little difference between the normalized values based on targeted or measured glass composition. Heat treatment had various impacts on the normalized concentration values. Most of the glasses had NC B , NC Na , and NC Si values that were greater than the Hanford Tank Waste Treatment and Immobilization Plant low-activity waste constraint of 4 g/L. The release rates for boron, sodium, and silicon were highly correlated for the study glasses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Product Consistency Test Results for the LAW ALG Glasses

This report provides the results of the Product Consistency Test leachates from the Low-Activity Waste Algorithm glasses, a series of simulated nuclear waste glasses designed and fabricated at the Pacific Northwest National Laboratory. The series included quenched and canister centerline cooled versions of the glasses. These data will be used in the development, validation, and implementation of enhanced property/composition models for waste glass vitrification at Hanford.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗