Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Hazard Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Cincinnati & Covington Urban Development II: Assessing Flooding and Landslide Susceptibility Along the Ohio-Kentucky Border

Landslides and flooding are reoccurring environmental hazards that lead to health risks and economic burdens in the urban areas of Cincinnati, Ohio and Covington, Kentucky. These communities share underlying natural and artificial conditions that make them vulnerable to these hazards, including excessive precipitation, weak lithology, high impervious surface levels, and steep slopes. Despite the human and economic risks associated with these environmental hazards, the areas of highest vulnerability within the region remain unknown. NASA DEVELOP partnered with Groundwork USA and Groundwork Ohio River Valley (ORV) to assess the region’s susceptibility to landslides and flooding. The team utilized NASA Earth observations, including the Landsat 8 Operational Land Imager (OLI), Landsat 8 Thermal Infrared Sensor (TIRS), and Global Precipitation Measurement (GPM) Integrated Multi-satellitE Retrieval for GPM (IMERG), alongside ancillary datasets to map landslide susceptibility and exposure throughout the study area. The team also used ancillary data to map surface runoff and runoff retention using the Natural Capital Project’s Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Flood Risk Mitigation Model. The resulting landslide susceptibility and exposure maps highlight the neighborhoods around Avondale and Fairmount as areas of particularly high landslide exposure. Meanwhile, the InVEST outputs demonstrate that Downtown Cincinnati and the Queensgate neighborhood retain the least amount of rainfall. This research provides partners with a more complete hazard analysis of the greater Cincinnati area while also producing refined methodologies to enhance future flood and landslide vulnerability mapping throughout Groundwork USA’s nationwide network of communities.

Paxton LaJoie↗

Aggregate Risk Tool for Human Space Flight

This project utilized Data fusion capabilities developed from the 2020-2022 Information Fusion (IFDA) IRAD to enhance functionality of a Human Spaceflight (HSF) Aggregate Risk Product developed by the JSC Flight Safety Office. The tool compiles and presents risk data from multiple Program and Commercial Provider vehicles to provide a holistic assessment of residual risk to Program Managers and Technical Authorities prior to HSF Launches. The aggregation or coupling of risks from multiple sources (Examples: PRA, variances, anomaly data bases, Program Risk Management data bases, technical review board minutes, Hazard Analysis, etc.) when analyzed, identify potential areas of elevated risk in components, systems or mission phases that would otherwise be undetected by nonintegrated program risk management tools and possesses.

Patrick Huckaby↗

Aggregate Risk Tool for Human Space Flight

This tool utilizes Data fusion capabilities developed from the 2020-2022 Information Fusion (IFDA) IRAD to enhance functionality of a Human Spaceflight (HSF) Aggregate Risk Product developed by the JSC Flight Safety Office. The tool compiles and present risk data from multiple Program and Commercial Provider sources to provide a holistic assessment for Program Managers and Technical Authorities to evaluate residual risk prior to HSF Launches. The aggregation, or coupling of risks from multiple sources (Ex: PRA, variances, anomaly data bases, CRM data, technical review board minutes, Hazard Analysis, etc.) identifies areas of elevated risk in components, systems or mission phases that would otherwise be undetected by non-integrated program risk management tools and possesses. Data is then displayed in an interactive user interface/dashboard that enables users to see potential areas of concern requiring more in-depth analysis.

Patrick M Huckaby↗

Safety & Mission Assurance (SMA) Activities in Support of Artemis I and Plans for Artemis II

The Artemis I mission in 2022 accomplished humanity’s first venture beyond Low-Earth Orbit (LEO) with a human-rated spacecraft in over fifty years. Artemis comprises several key Program elements – Multi-Purpose Crew Vehicle (MPCV) Orion Crew Module, Service Module, Launch Abort System; the Space Launch System (SLS) and the Exploration Ground System (EGS). Much of our human spaceflight experience with crewed lunar missions is captured in historical program documents, but first-hand knowledge is limited to a few spaceflight veterans. Missions to LEO have offered the opportunity of direct, near-instantaneous communications and assistance, and the ability to return to Earth within a matter of hours in case of emergency. Outward-bound missions do not have these features and will require a more autonomous and reliable spacecraft. The assessment of compliance with applicable safety requirements and adequacy of hazard controls and verifications is the responsibility of the MPCV Safety and Engineering Review Panel (MSERP), along with a Joint [NASA/ESA] Safety and Engineering Review Panel (JSERP) for the review of the European Service Module (ESM). The MSERP has two features that are relatively unique amongst NASA safety panels. First, NASA Engineering was added as a Panel co-chair, which enhanced the Engineering organization’s engagement and level of understanding of hazard analysis methodology and results. The MSERP has representation from each office, including Flight Operations Directorate (FOD) and Health and Medical Technical Authority, supporting the Orion Program in addition to the Engineering and Safety Technical Authority co-chairs. Second, the JSERP has a second set of co-chairs from ESA Engineering and ESA Product Assurance and Safety organizations, which recognizes the international arrangement as one of partnership. This paper will focus on SMA processes, activities, and plans for the Orion element and explore unique challenges associated with Artemis II as we approach the flight of the first crewed Orion vehicle.

Paul J. Collier↗

A Safety-Driven Approach to Exploring and Comparing Air Traffic Management Concepts for Enabling Urban Air Mobility

There is broad recognition that the high tempo and density of Urban Air Mobility (UAM) operations will require identifying new Air Traffic Management (ATM) concepts to safely integrate UAM air traffic into the airspace alongside existing air traffic. However, the simulation models used to compare ATM concepts today are difficult to apply during the early stages of concept development and do not offer enough support in identifying potential new concepts. In addition, they have limited ability to evaluate ATM concepts in terms of safety, security, and other key emergent properties. Instead of using simulation to evaluate ATM concepts, this paper demonstrates how a safety-driven systems engineering approach based on Systems-Theoretic Accident Model and Processes (STAMP) can be used to design properties such as safety into an ATM system from the earliest stages of development. Using a hazard analysis technique called Systems-Theoretic Process Analysis (STPA), system requirements and the desired ATM behavior are derived. As an example, two possible ATM concepts to implement that behavior are compared to identify their safety-related benefits and tradeoffs. This new approach enables (1) systematic exploration of alternative ATM concepts and (2) identification of the safety-related tradeoffs between concepts as early as possible in the development process.

system safety↗

Why We Ventilate

It is widely accepted that ventilation is critical for providing good indoor air quality (IAQ) in homes. However, the definition of"good" IAQ, and the most effective, energy efficient methods for delivering it are still matters of research and debate. This paper presents the results of work done at the Lawrence Berkeley National Lab to identify the air pollutants that drive the need for ventilation as part of a larger effort to develop a health-based ventilation standard. First, we present results of a hazard analysis that identified the pollutants that most commonly reach concentrations in homes that exceed health-based standards or guidelines for chronic or acute exposures. Second, we present results of an impact assessment that identified the air pollutants that cause the most harm to the U.S. population from chronic inhalation in residences. Lastly, we describe the implications of our findings for developing effective ventilation standards.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Siting Solar Photovoltaics at Airports: Preprint

Airports present a significant opportunity for hosting solar technologies due to their open land; based on a 2010 Federal Aviation Administration study, the US Department of Agriculture, and the US Fish and Wildlife Service, there's potential for 116,704 MW of solar photovoltaics (PV) on idle lands at US airports. PV has a low profile and likely low to no impact on flight operations. This paper outlines guidance for implementing solar technologies at airports and airfields, focusing largely on the Federal Aviation Administration's policies. The paper also details best practices for siting solar at airports, provides information on the Solar Glare Hazard Analysis Tool, and highlights a case study example where solar has been installed at an airport.

14 SOLAR ENERGY↗

Dry Cask Shipments of ATR Spent Nuclear Fuel at INL

The High Load Charger (HLC) cask will be replacing the Advanced Test Reactor (ATR) spent fuel transfer cask that has been used at Idaho National Laboratory (INL) to wet-transfer spent ATR fuel elements from ATR to Idaho Nuclear Technology and Engineering Center (INTEC) in order to support future plans at both facilities. INTEC intends to discontinue use of the CPP-666 storage pools in compliance with the Idaho Settlement Agreement and the basins will no longer be available to store spent ATR fuel elements. In order to support the core-internals change out in 2021 for ATR, spent ATR fuel elements must be removed from the canal and shipped to INTEC. INL contractors will use the HLC cask for safe, dry transfer of spent Advanced Test Reactor (ATR) fuel elements between the ATR Complex managed by Battelle Energy Alliance, LLC and the Idaho Nuclear Technology and Engineering Center (INTEC) managed by Fluor Idaho, LLC. The HLC cask (also known as the High Load Charging Cask or High Load Charger) is a lead-shielded, stainless steel transfer container originally designed in 1954 by the Idaho Nuclear Corporation to meet the radiation and contamination controls requirements of the time for shipment of spent nuclear fuel. The cask has been modified over the years and is currently used for wet-to-dry transfers at INTEC. It is approved only for out-of-commerce transfers. The cask will arrive at the ATR where eight spent ATR fuel elements will be loaded into two, newly-designed buckets. Each bucket is a quarter section, right-cylinder shape that has four compartments. The cask will be lifted out of the ATR canal allowing most of the water to drain from the cask. Processing the 12,500 kg cask will be completed in ATR and then transported on a tractor trailer to INTEC where the loaded buckets will be removed from the cask. The loaded buckets will undergo a drying process before placing the four buckets into a canister for long-term storage in the Irradiated Fuel Storage Facility (IFSF) at INTEC. A new transportation plan that was submitted to, and approved by, the U.S. Department of Energy to provide the cask safety basis, which describes the hazard analysis and accident analysis for the cask during transport. Supporting accident analysis include criticality, thermal, dose, and drop analyses. Of particular interest for this cask was the drop analysis from which was derived the speed limit for the transport. The drop analysis addressed drops in air onto an unyielding surface and in water onto an energy-absorbing pad for the cask in the ATR facility. These analyses are typically applied as the bounding drop scenarios during transport; however, this resulted in a safety basis speed limit of 12.9 kph. In order to more accurately represent the in-transit accident scenario, LS-DYNA software was procured and the model was updated to more closely represent the potential drop heights and impact surfaces of asphalt and soil for the cask while in transit. This analysis resulted in a safety basis speed limit of 48 kph. This safety basis speed limit is more practical to implement and control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Risk Methodology for Assessment of Fuel Debris Retrieval Options at the Fukushima Daiichi Nuclear Power Station

The mission of the Nuclear Damage Compensation and Decommissioning Facilitation Corporation (NDF) includes the mid-to-long-term decommissioning planning of the reactors at the Fukushima Daiichi Nuclear Power Station. To carry out its mission, NDF needs to be able to assess worker safety and public health risks that currently exist at the Fukushima Daiichi Nuclear Power Station and the implications of various actions that may be taken to reduce such risks. Pacific Northwest National Laboratory (PNNL) entered into a contract with NDF to support NDF’s mission by developing a risk assessment methodology that will support NDF’s evaluation of options for transitioning molten and solidified fuels within each unit into safer, more stable, configurations given the ever-changing state of knowledge and large uncertainties. The underpinning of this approach, which incorporates both expert elicitation and adapts probabilistic risk assessment and hazard analysis techniques, is its organization of potential release mechanisms and accident scenarios into a more manageable set of safety issues, which are systematically characterized to allow for useful comparison between fuel debris retrieval options as well as the identification of risk drivers and discriminators. The approach also lends itself to be easily updated as the general state of knowledge improves and will serve as a vital input to prioritizing future investigations associated with human health and safety at the Fukushima site. This paper describes the overall approach developed by PNNL to risk-inform the comparison between fuel debris retrieval strategies and discusses lessons learned from implementing the approach.

Fukushima, Risk Assessmnet, Nuclear Decommissionin↗

Common Cause Failure Evaluation of High Safety-significant Safety-related Digital Instrumentation and Control Systems

Digital instrumentation and control (DI&C) systems in nuclear power plants (NPPs) have many advantages over analog systems but also pose different engineering and technical challenges, such as potential threats due to common cause failures (CCFs). This paper proposes a Platform for Risk Assessment of DI&C (PRADIC) developed by Idaho National Laboratory for dealing with potential software CCFs in DI&C systems of NPPs. The methodology development of PRADIC on the quantitative evaluation of software CCFs in high safety-significant safety-related DI&C systems in NPPs is illustrated in this paper. In PRADIC, qualitative hazard analysis and quantitative reliability and consequence analysis are successively implemented to obtain quantitative risk information, compare with respective risk evaluation acceptance criteria, and provide suggestions for risk reduction and design optimization. A comprehensive case study was also performed and documented in this paper. Results show that PRADIC can effectively identify potential digital-based CCFs, estimate their failure probabilities, and evaluate their impacts to system and plant safety.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Common Cause Failure Evaluation of High Safety Significant Safety-related Digital Instrumentation and Control Systems using IRADIC Technology

Digital instrumentation and control (DI&C) systems in nuclear power plants (NPPs) have many advantages over analog systems but also pose different engineering and technical challenges, such as potential threats due to common cause failures (CCFs). This paper proposes an integrated risk assessment technology for DI&C systems (IRADIC) developed by Idaho National Laboratory for dealing with potential software CCFs in DI&C systems of NPPs. The methodology development of the IRADIC technology on the quantitative evaluation of software CCFs in high safety-significant safety-related DI&C systems in NPPs is illustrated in this paper. In IRADIC, qualitative hazard analysis and quantitative reliability and consequence analysis are successively implemented to obtain quantitative risk information, compare with respective risk evaluation acceptance criteria, and provide suggestions for risk reduction and design optimization. A comprehensive case study was also performed and documented in this paper. Results show that the IRADIC technology can effectively identify potential digital-based CCFs, estimate their failure probabilities, and evaluate their impacts to system and plant safety.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Effect of the Presence of Ozone on the Lower Flammability Limit (LFL) of Hydrogen in Vessels Containing Savannah River Site High Level Waste - 12387

The Enhanced Chemical Cleaning (ECC) process uses ozone to effect the oxidation of metal oxalates produced during the dissolution of sludge in the Savannah River Site (SRS) waste tanks. The ozone reacts with the metal oxalates to form metal oxide and hydroxide precipitants, and the CO{sub 2}, O{sub 2}, H{sub 2}O and any unreacted O{sub 3} gases are discharged into the vapor space. In addition to the non-radioactive metals in the waste, however, the SRS radioactive waste also contains a variety of radionuclides, hence, hydrogen gas is also present in the vapor space of the ECC system. Because hydrogen is flammable, the impact of this resultant gas stream on the Lower Flammability Limit (LFL) of hydrogen must be understood for all possible operating scenarios of both normal and off-normal situations, with particular emphasis at the elevated temperatures and pressures of the typical ECC operating conditions. Oxygen is a known accelerant in combustion reactions, but while there are data associated with the behavior of hydrogen/oxygen environments, recent, relevant studies addressing the effect of ozone on the flammability limit of hydrogen proved scarce. Further, discussions with industry experts verified the absence of data in this area and indicated that laboratory testing, specific to defined operating parameters, was needed to comprehensively address the issue. Testing was thus designed and commissioned to provide the data necessary to support safety related considerations for the ECC process. A test matrix was developed to envelope the bounding conditions considered credible during ECC processing. Each test consists of combining a gas stream of high purity hydrogen with a gas stream comprised of a specified mixture of ozone and oxygen in a temperature and pressure regulated chamber such that the relative compositions of the two streams are controlled. The gases are then stirred to obtain a homogeneous mixture and ignition attempted by applying 10J of energy to a fuse wire. A gas combination is considered flammable when a pressure rise of 7% of the initial absolute pressure is observed. The specified testing methodology is consistent with guidelines established in ASTM E-918-83 (2005) 'Standard Practices for Determining Limits of Flammability of Chemicals at Elevated Temperature and Pressure'. The LFL of hydrogen in air was determined and is in good agreement with the literature data. Ozone-oxygen mixtures were found to be flammable at concentrations above 8.3 vol.% based on the ASTM E918 7% pressure rise criteria for flame propagation. This result is lower than previously reported values which can be explained through the variations in the test setup and procedure. It is believed that the lower values obtained in this work are a result of improvements of the test methodology. Tests performed with hydrogen in various concentrations of ozone in oxygen have shown that the LFL of hydrogen decreases as the concentration of ozone in the mixture increases. This testing was designed to provide data under the conditions considered most optimal to produce deflagration. The geometry and materials of construction of the testing vessel; the location of the fuse wire; the magnitude of the supplied energy; the careful minimization of diluents and other contaminants; and meticulous procedural detail to maintain integrity of the ozone to the maximum extent practical, result in data that reflect not the expected process conditions, but those that enhance the possibility of flame propagation. For this reason, there is believed to be considerable conservatism in the indicated results. Per the vendor, the maximum possible ozone concentration producible by the planned ECC Ozone generator is 8 volume percent (the typical maximum operating setpoint concentration is 6.8 vol%), less than the 8.3 minimum volume % concentration shown to be flammable in a 99.999% pure O{sub 2} environment at the optimally conservative conditions established in this testing. Further, the feed to the ECC ozone generator is only 87% oxygen, the remainder, water vapor and nitrogen, both powerful diluents. It is, thus, believed not credible that deflagration can occur at this maximum feed concentration condition. In addition, once the ozone stream contacts the waste stream, the many simultaneous oxidizing reactions will rapidly decompose available ozone to well below flammable levels. Further, because the radiolytically generated hydrogen quantity is negligible compared to the supplied ozone/oxygen stream (0.0004 moles per minute H{sub 2} vs 76 moles per minute ozone/oxygen), even the total H{sub 2}/O{sub 3} mixture, without crediting decomposition reactions, does not approach flammable concentrations. Finally, even at the 'end' of the ECC batch cycle, when most of the metal oxalates have been decomposed, testing has indicated that the ozone concentration in the vapor space of the ECC process vessel reaches a concentration of no more than 3 vol%, remaining well below concentrations of concern. The major issue for the ECC operation established by this testing is the impact of the data when applied to off normal conditions. While it is possible to discontinue ozone addition to the reaction vessel at any time, the radiolytic hydrogen generation rate continues, varying slightly as ambient pressures and temperatures change. Relative to the data generated and analyzed in this testing, the ECC hazards analysis team will re-evaluate off normal conditions (e.g. those during which process exhaust ventilation is lost) such that issues involving mixtures of hydrogen and ozone in the vapor space can be appropriately controlled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of Glycolic Acid Flowsheet in the Defense Waste Processing Facility (DWPF) - 17348

The disposition of high level waste (HLW) into canistered waste forms began at Savannah River Site (SRS) in 1996. For its entire processing history, DWPF has added formic acid as a pretreatment step in producing acceptable melter feed from incoming waste sludges sent from the HLW Tank Farms. While this process has been used to successfully produce more than 4,000 radioactive canisters, the addition of formic acid and its tendency to catalytically decompose in the presence of trace quantities of noble metals adds substantial process complexity in order to safely accommodate hydrogen generation and pH shifting during batch operations. Research efforts have been in progress for several years to identify a chemical surrogate for formic acid which performs the essential process functions without the associated negative consequences. The final analytical work to demonstrate the effectiveness of glycolic acid in the DWPF is nearly complete and a project team has been created to safely integrate the new acid into the chemical process. The project team is currently executing an implementation schedule which addresses safety basis development, revision to operations procedures and training, facility modifications, chemical procurement, and updated process monitoring. Introduction of glycolic acid into DWPF is currently scheduled to take place in early 2017, beginning with a blended flowsheet of glycolic and formic acid and ultimately transitioning to glycolic-only processing. This paper provides an overview of planned glycolic acid flowsheet implementation in the DWPF. This paper discusses several issues related to implementing such a significant change to the chemical process including: 1) Process chemistry differences between the two flowsheets with quantitative comparison for several properties of interest; 2) Technical approach to hazards analysis and safety basis development strategy; 3) Status of project execution for major deliverables; and 4) Path forward for facility modifications related to legacy formic acid support equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the Road to Achieving Safety Excellence at the Idaho Cleanup Project: The Initial Challenges, Solutions, and Positive Results of Striving to be the Best and Safest in the DOE Complex - 20518

When Fluor Idaho, LLC (Fluor Idaho) assumed the Idaho Cleanup Project Core contract (ICP Core) in mid-2016, it inherited the successful multi-faceted, employee-owned safety programs of two prior contractors supporting cleanup operations at the Idaho National Laboratory Site. Fluor Idaho incorporated the best of both safety programs along with Fluor Corporate's 106-year legacy of safety initiatives and successes. Fluor Idaho integrated the separate programs and cultures under a One Fluor approach - one project, one mission, One Fluor. Job changes, management changes, and procedures, processes, and system changes presented multiple challenges. Those challenges combined with the severe Winter of 2016/2017 resulted in numerous slips, trips, and falls first aids and reportable injuries. The road to safety excellence started off bumpy and stayed that way for some time. Since then, Fluor Idaho has successfully implemented several key initiatives including employee engagement; management engagement and time in the field; communications improvements; safety culture sustainment; injury/illness prevention; organizational learning; and DOE Voluntary Protection Program (VPP) readiness and preparation. Management became more engaged by making more workplace visits and increasing their supervision of 'life critical work' or complex activities. Additional training became mandatory for first-line supervisors and front-line workers. Most recently, Fluor Idaho increased its injury and illness prevention initiatives extensively. In the last year, things have turned around in a dramatic way. This shift is directly attributable to the significant number of initiatives launched in late 2017 and 2018. These initiatives addressed safety performance in the five key areas of the DOE VPP and promoted sustainability of the company's safety culture. The five key areas are: management leadership, employee involvement, work-site analysis, hazard prevention and control, and safety and health training. Employees and managers alike recommitted to making safety the highest value. The result of this laser-like focus on safety and accident and injury prevention is that injuries and first aids are a fraction of what they were. During FY 2019, employees worked more than 4.2 million hours without a serious injury or lost work-day and 1 million hours without a recordable injury. Fluor Idaho is proud of its safety trend. The company invested significant resources in improving its safety record, and that investment is paying off. Other contractors in the DOE Complex can learn and benefit from this discussion of the challenges Fluor Idaho faced, as well as its innovative safety initiatives that are producing results that are being recognized by our U.S. Department of Energy (DOE) customer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Visualizing a Vulnerability: Its Connections to Hardware and Software

All Hazards Analysis (AHA) is a framework developed by Idaho National Laboratory that provides capabilities to collect, store, analyze, and visualize critical infrastructure information. A core function of AHA is its ability to simulate faults or outages in networks of infrastructure originating from a plethora of causes, ranging from natural disasters to cyberattacks. AHA utilizes Hardware and Software Bills of Material (HBOM and SBOM, respectively) along with Known Exploited Vulnerabilities (KEVs) to document the potential attack vectors for each piece of infrastructure. The objective of this contribution to AHA was to create a visualization tool that could capture the small details held in each individual artifact as well as preserve the large-scale connections that link them together to aid threat modeling.

58 GEOSCIENCES↗

Technical Basis for Certification of Seismic Design Criteria for the Waste Treatment Plant, Hanford, Washington

In August 2007, Secretary of Energy Samuel W. Bodman approved the final seismic and ground motion criteria for the Waste Treatment and Immobilization Plant (WTP) at the Department of Energy’s (DOE) Hanford Site. Construction of the WTP began in 2002 based on seismic design criteria established in 1999 and a probabilistic seismic hazard analysis completed in 1996. The design criteria were re-evaluated in 2005 to address questions from the Defense Nuclear Facilities Safety Board (DNFSB), resulting in an increase by up to 40% in the seismic design basis. DOE announced in 2006 the suspension of construction on the pretreatment and high-level waste vitrification facilities within the WTP to validate the design with more stringent seismic criteria. In 2007, the U.S. Congress mandated that the Secretary of Energy certify the final seismic and ground motion criteria prior to expenditure of funds on construction of these two facilities. With the Secretary’s approval of the final seismic criteria this past summer, DOE authorized restart of construction of the pretreatment and high-level waste vitrification facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN↗