Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Design and evaluation of an air traffic control Final Approach Spacing Tool

This paper describes the design and simulator evaluation of an automation tool for assisting terminal radar approach controllers in sequencing and spacing traffic onto the final approach course. The automation tool, referred to as the Final Approach Spacing Tool (FAST), displays speed and heading advisories for arriving aircraft as well as sequencing information on the controller's radar display. The main functional elements of FAST are a scheduler that schedules and sequences the traffic, a four-dimensional trajectory synthesizer that generates the advisories, and a graphical interface that displays the information to the controller. FAST has been implemented on a high-performance workstation. It can be operated as a stand-alone in the terminal radar approach control facility or as an element of a system integrated with automation tools in the air route traffic control center. FAST was evaluated by experienced air traffic controllers in a real-time air traffic control simulation. simulation results summarized in the paper show that the automation tools significantly reduced controller work load and demonstrated a potential for an increase in landing rate.

Davis, Thomas J.↗

Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) Spares Program Plan

This plan specifies the spare components to be provided for the EOS/AMSU-A instrument and the general spares philosophy for their procurement. It also address key components not recommended for spares, as well as the schedule and method for obtaining the spares. The selected spares list was generated based on component criticality, reliability, repairability, and availability. An alternative spares list is also proposed based on more stringent fiscal constraints.

Chapman, Weldon↗

Propulsive Small Expendable Deployer System (ProSEDS) Experiment

ProSEDS is a secondary (i.e. piggyback) payload on a Delta-11 GPS 8 mission scheduled for launch in August 2000. It will test the feasibility of generating generate electrodynamic thrust without propellant using a 5 kilometer conducting wire (tether). The ProSEDS obtains thrust as the tether cuts across the magnetic field, a voltage is induced across the wire. Electrons are attracted to the positively based far end of the wire. Electrons flow downward through the conductive tether. Earth's magnetic field exerts a drag force on the current in the tether segments, that is mechanically transferred via the wire to the stage. The primary objective for the ProSEDs mission is to demonstrate that a significant, measurable electrodynamic thrust through a tether in space. The primary mission will last one day, as the primary battery assures at least three orbits of data will be collected, the remaining power will be provided by the secondary battery, which uses tether generated power to recharge. The extended mission begins using the power provided through the tether, and wil terminate when a system ceases to function; (i.e., either degradation of the tether,through Atomic Oxygen contact, a micrometeoroid or other debris impact, or another malfunction.) The technology has many potential applications. Amongst the applications, which are reviewed in detail, are: (1) satellite deorbit, (2) reboost of the International Space Station, (3) propellantless reusable Orbit Transfer Vehicles, (4) Propulsion and power generation for future Jovian missions.

Johnson, Les↗

Waste Materials Recycling for In-Space Manufacturing

Logistics and resupply payloads for Lunar and Martian missions are significantly more cost and schedule prohibitive compared to LEO destinations. Recycling of waste and trash materials generated throughout the duration of a mission, as well as previous missions, will be critical for enabling sustained human presence beyond Earth. Currently, no solution exists for recycling waste materials back into feedstock form beyond entry-level hobbyist equipment, which is not suitable nor practical for space applications. There is already over 500,000 lbs of trash on the moon from previous missions, which will grow exponentially over the coming decade throughout the Artemis Campaign. Waste and trash materials are precious resources that, if recovered and properly processed, can be transformed back into usable feedstock form for on-demand manufacturing capabilities. Hence, it is prudent that a recycling solution be developed and infused into future missions.

additive↗

Evaluating power grid model hydropower feasibility with a river operations model

Production cost models (PCMs) simulate dispatch of generators across a large power grid and are used widely by planners to study the reliability of electricity supply. As energy systems transition away from the thermoelectric technologies that have traditionally balanced electricity supply and demand, hydropower and its representation in PCMs is of increasing importance. A limitation of PCMs applied to continental power grids with diverse generation portfolios is that hydropower generation is simulated without full consideration of complex river dynamics, leading to possible misrepresentation of grid flexibility and performance. In addition, data used in PCMs may reflect outdated operating policies. In this paper we propose a hydropower generation feasibility test for PCMs. The approach uses a detailed hydropower model to determine whether the hourly hydropower schedule from a PCM with simplified monthly parameterization can be attained after accounting for realistic river dynamics and operating policies, such as spill requirements and general water movement and balance through a cascade reservoir system. We perform this hydropower generation test for the ‘Big 10’ hydropower system on the Columbia River (part of the Western Interconnect of the United States), revealing 9% overestimation of available hydropower generation in a PCM solution in an average hydrologic year. Our evaluation provides insight on the cost and opportunities for better representing hydropower in PCMs.

54 ENVIRONMENTAL SCIENCES↗

Interleaved Observation Execution and Rescheduling on Earth Observing Systems

Observation scheduling for Earth orbiting satellites solves the following problem: given a set of requests for images of the Earth, a set of instruments for acquiring those images distributed on a collecting of orbiting satellites, and a set of temporal and resource constraints, generate a set of assignments of instruments and viewing times to those requests that satisfy those constraints. Observation scheduling is often construed as a constrained optimization problem with the objective of maximizing the overall utility of the science data acquired. The utility of an image is typically based on the intrinsic importance of acquiring it (for example, its importance in meeting a mission or science campaign objective) as well as the expected value of the data given current viewing conditions (for example, if the image is occluded by clouds, its value is usually diminished). Currently, science observation scheduling for Earth Observing Systems is done on the ground, for periods covering a day or more. Schedules are uplinked to the satellites and are executed rigorously. An alternative to this scenario is to do some of the decision-making about what images are to be acquired on-board. The principal argument for this capability is that the desirability of making an observation can change dynamically, because of changes in meteorological conditions (e.g. cloud cover), unforeseen events such as fires, floods, or volcanic eruptions, or un-expected changes in satellite or ground station capability. Furthermore, since satellites can only communicate with the ground between 5% to 10% of the time, it may be infeasible to make the desired changes to the schedule on the ground, and uplink the revisions in time for the on-board system to execute them. Examples of scenarios that motivate an on-board capability for revising schedules include the following. First, if a desired visual scene is completely obscured by clouds, then there is little point in taking it. In this case, satellite resources, such as power and storage space can be better utilized taking another image that is higher quality. Second, if an unexpected but important event occurs (such as a fire, flood, or volcanic eruption), there may be good reason to take images of it, instead of expending satellite resources on some of the lower priority scheduled observations. Finally, if there is unexpected loss of capability, it may be impossible to carry out the schedule of planned observations. For example, if a ground station goes down temporarily, a satellite may not be able to free up enough storage space to continue with the remaining schedule of observations. This paper describes an approach for interleaving execution of observation schedules with dynamic schedule revision based on changes to the expected utility of the acquired images. We describe the problem in detail, formulate an algorithm for interleaving schedule revision and execution, and discuss refinements to the algorithm based on the need for search efficiency. We summarize with a brief discussion of the tests performed on the system.

Khatib, Lina↗

Managing schedule and financial risk in a faster, better, cheaper development

The X2000 Program is a technology development program that will provide next generation avionics for missions to deep space. The goal of the X2000 Program is to develop revolutionary flight and ground systems which can be replicated by missions at a low cost, affording timely new science and mission opportunities to investigators and institutions.

risk finance schedule↗

Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review

In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.

NPR 7120.5D↗

A Methodology for Robust Load Reduction in Wind Turbine Blades Using Flow Control Devices

Decades of wind turbine research, development and installation have demonstrated reductions in levelized cost of energy (LCOE) resulting from turbines with larger rotor diameters and increased hub heights. Further reductions in LCOE by up-scaling turbine size can be challenged by practical limitations such as the square-cube law: where the power scales with the square of the blade length and the added mass scales with the volume (the cube). Active blade load control can disrupt this trend, allowing longer blades with less mass. This paper presents the details of the development of a robust load control system to reduce blade fatigue loads. The control system, which we coined sectional lift control or SLC, uses a lift actuator model to emulate an active flow control device. The main contributions of this paper are: (1) Methodology for SLC design to reduce dynamic blade root moments in a neighborhood of the rotor angular frequency (1P). (2) Analysis and numerical evidence supporting the use of a single robust SLC for all wind speeds, without the need for scheduling on wind speed or readily available measurements such as collective pitch or generator angular speed. (3) Intuition and numerical evidence to demonstrate that the SLC and the turbine controller do not interact. (4) Evaluation of the SLC using a full suite of fatigue and turbine performance metrics.

17 WIND ENERGY↗

Compression of high spectral resolution imagery

The Earth Orbiting Satellite (EOS), scheduled for launch in the mid-1990s, will include a next-generation multispectral imaging system (HIRIS) having unprecedented spatial and spectral resolution. Its high resolution, however, comes at the cost of a raw data rate which exceeds the communication channel capacity assigned to the entire EOS mission. This paper explores noisy compression algorithms which may compress multispectral data by up to 30:1 or more. Algorithm performance is measured using both traditional and mission-oriented criteria (e.g., feature classification consistency). It is shown that vector quantization, merged with suitable preprocessing techniques, is the most viable candidate.

Baker, Richard L.↗

Constellation Program Life-cycle Cost Analysis Model (LCAM)

The Constellation Program (CxP) is NASA's effort to replace the Space Shuttle, return humans to the moon, and prepare for a human mission to Mars. The major elements of the Constellation Lunar sortie design reference mission architecture are shown. Unlike the Apollo Program of the 1960's, affordability is a major concern of United States policy makers and NASA management. To measure Constellation affordability, a total ownership cost life-cycle parametric cost estimating capability is required. This capability is being developed by the Constellation Systems Engineering and Integration (SE&I) Directorate, and is called the Lifecycle Cost Analysis Model (LCAM). The requirements for LCAM are based on the need to have a parametric estimating capability in order to do top-level program analysis, evaluate design alternatives, and explore options for future systems. By estimating the total cost of ownership within the context of the planned Constellation budget, LCAM can provide Program and NASA management with the cost data necessary to identify the most affordable alternatives. LCAM is also a key component of the Integrated Program Model (IPM), an SE&I developed capability that combines parametric sizing tools with cost, schedule, and risk models to perform program analysis. LCAM is used in the generation of cost estimates for system level trades and analyses. It draws upon the legacy of previous architecture level cost models, such as the Exploration Systems Mission Directorate (ESMD) Architecture Cost Model (ARCOM) developed for Simulation Based Acquisition (SBA), and ATLAS. LCAM is used to support requirements and design trade studies by calculating changes in cost relative to a baseline option cost. Estimated costs are generally low fidelity to accommodate available input data and available cost estimating relationships (CERs). LCAM is capable of interfacing with the Integrated Program Model to provide the cost estimating capability for that suite of tools.

Prince, Andy↗

Monte Carlo Tree Search Methods for the Earth-Observing Satellite Scheduling Problem

This work explores on-board planning for the single spacecraft, multiple ground station Earth-observing satellite scheduling problem through artificial neural network function approximation of state–action value estimates generated by Monte Carlo tree search (MCTS). An extensive hyperparameter search is conducted for MCTS on the basis of performance, safety, and downlink opportunity utilization to determine the best hyperparameter combination for data generation. A hyperparameter search is also conducted on neural network architectures. The learned behavior of each network is explored, and each network architecture’s robustness to orbits and epochs outside of the training distributions is investigated. Furthermore, each algorithm is compared with a genetic algorithm, which serves to provide a baseline for optimality. MCTS is shown to compute near-optimal solutions in comparison to the genetic algorithm. The state–action value networks are shown to match or exceed the performance of MCTS in six orders of magnitude less execution time, showing promise for execution on board spacecraft.

Adam P. Herrmann↗

Risk Model for EM Decision Support Toolsets

The Government Office of Accountability (GAO) has published several reports identifying the need for the Department of Energy (DOE) Office of Environmental Management (EM) to address mounting costs for DoE's cleanup program. DOEEM could greatly benefit from independent decision tool-sets/models that would allow them to evaluate options and inform business decision at the enterprise level considering site-specific life cycle costs and system plans. Program goals: Develop a tool-set that enables EM to independently evaluate alternatives, assess outcomes from different contracting strategies, and inform critical decisions for the enterprise. Project goals: Adaption of a Risk Model for integration with complimentary tool-sets for project level decision making. Operational Events: Discrete event model that evaluates operational variables (e.g. capacity, throughput, maintenance constraints) and identify bottlenecks. Identifying and Bounding Project Risk: Identify risks that impact confidence in meeting goals (e.g. production). Life cycle Cost: Evaluate impacts of staffing levels, inventory, and capital investments on life cycle costs. Methods and approach: Monte Carlo Analysis is being executed to generate results: Input derives from Risk Register Data; Tied to Projected and Target Schedules; Incorporates float duration within the model. Assumes associated risk mitigation actions being completed within a timeline of five fiscal years. Metrics include: Confidence in Meeting Production Goal; Confidence in Safety Standards; Confidence in Continuous Operation; Other Metrics can be added as appropriate regarding specific site needs. The adapted risk model can be used as a stand alone decision tool or can be integrated complementary tool-sets (i.e. process and cost models) for project-specific decisions. These support tool-sets can then be integrated with others for site- and complex- level evaluations. Future work includes designing an adaptable and modular framework that would allow integration of multiple tool-sets for holistic and/or targeted evaluation of alternative strategies for decision making that could lead to risk and cost reduction across the enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enabling a New Planning and Scheduling Paradigm

The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm which can exploit timing flexibilities and constraint and relationship options. (3) A web-based architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Integrating Electric Vehicle Charging Infrastructure into Commercial Buildings and Mixed-Use Communities: Design, Modeling, and Control Optimization Opportunities: Preprint

This paper discusses modeling and field studies of controlled EV charging that have been performed with the goal of minimizing requirements for infrastructure upgrades, minimizing building peak demand charges, and maximizing the use of on-site generation. We present a large-scale workplace charging pilot of a demand-controlled scheduled EV charging system with over 250 active daily commuters, successfully demonstrating management of aggregate charging power to avoid new infrastructure investments, mitigate peak demand charges, and provide cost-effective workplace charging to users. In addition to understanding opportunities for demand management, integrating these controllable loads into the energy modeling process for new buildings will also be necessary. This paper then presents an example energy modeling process that evaluates the potential effects of EV charging on building load profiles and infrastructure requirements for a mixed-use community. Finally, we discuss an illustration of how EV charging can be controlled to be synergistic with other building loads and distributed generation.

buildings↗

Automated Planning and Scheduling for Planetary Rover Distributed Operations

Automated planning and Scheduling, including automated path planning, has been integrated with an Internet-based distributed operations system for planetary rover operations. The resulting prototype system enables faster generation of valid rover command sequences by a distributed planetary rover operations team. The Web Interface for Telescience (WITS) provides Internet-based distributed collaboration, the Automated Scheduling and Planning Environment (ASPEN) provides automated planning and scheduling, and an automated path planner provided path planning. The system was demonstrated on the Rocky 7 research rover at JPL.

Backes, Paul G.↗