Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FUEL ASSEMBLIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Co-Disposal Waste Package Loading Options for DOE SNF and HLW - 20331

The U.S. Department of Energy (DOE) is responsible for managing spent nuclear fuel (SNF) that is currently in, or will in the future come into, its possession. DOE must continue to safely store that SNF, transport it to an interim storage site or a repository, and dispose of it. These fuels come from a wide range of reactor types with various cladding materials and enrichments. Many of these reactors, now decommissioned, had unique design features, such as core configuration, fuel element and assembly geometry, moderator and coolant materials, operational characteristics, and neutron spatial and spectral properties, resulting in a large diversity of reactor and fuel designs. Because of the wide variety and conditions of SNF, a robust DOE Standard Canister was proposed that would confine radionuclides and preclude moderator. The DOE Standard Canister had four variations: 3.05-meter (10-foot) or 4.57-meter (15-foot) length, and 45.7-cm (18-inch) or 61.0-cm (24-inch) diameter. For ultimate disposal in the Yucca Mountain Repository, these canisters were to be grouped with 61.0-cm (24-inch) diameter high level waste (HLW) canisters in a 2.13-meter (84-inch) diameter co-disposal waste package. The smaller 45.7-cm (18-inch) diameter DOE Standard Canister could be placed in the middle of five HLW canisters. The larger 61.0-cm (24-inch) diameter DOE Standard Canister would take the place of one of the five HLW canisters on the outer ring in the co-disposal waste package. No DOE Standard Canisters have been loaded. A preliminary evaluation has estimated the number of elements of a fuel type that can fit into the different sizes of the DOE Standard Canister, but no definitive loading configuration has been selected. Changing the loading configuration could impact the number of loadable DOE Standard Canisters and the number of co-disposal waste packages needed for eventual disposition. This paper conveys the ranges of DOE Standard Canisters and HLW canisters that may be produced under certain conditions. It also examines the differences in the estimated number of co-disposal waste packages produced for eventual disposal when using different loading strategies in the DOE Standard Canister for Advanced Test Reactor (ATR), Peach Bottom, and High Flux Isotope Reactor (HFIR) SNF. Changing the loading configurations of ATR, Peach Bottom, and HFIR SNF slightly impacted the number of co-disposal waste packages that may be needed for ultimate disposal. The change in loading configuration was more impactful when a different canister was used, as opposed to varying the number of elements that could fit inside the same size canister. In one case, a reduction of co-disposal waste packages could be achieved by allowing mixing of short HLW canisters with long DOE Standard Canisters. The main conclusion from this analysis is that the ratio between HLW canisters and DOE Standard Canisters will drive the total number of co-disposal waste packages. If too many HLW canisters (i.e., more than five times the number of 18-inch DOE standard canisters) or DOE Standard Canisters are produced, some co-disposal waste packages may not have all positions filled. A co-disposal waste package may be filled with all HLW with no DOE Standard Canister, or a co-disposal waste package could be filled with a single DOE Standard Canister. A ratio that does not closely align to optimum could allow for the design of waste packages that hold just HLW canisters or just DOE SNF canisters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Future Visions for Scientific Human Exploration

Today, humans explore deep-space locations such as Mars, asteroids, and beyond, vicariously here on Earth, with noteworthy success. However, to achieve the revolutionary breakthroughs that have punctuated the history of science since the dawn of the Space Age has always required humans as "the discoverers," as Daniel Boorstin contends in this book of the same name. During Apollo 17, human explorers on the lunar surface discovered the "genesis rock," orange glass, and humans in space revamped the optically crippled Hubble Space Telescope to enable some of the greatest astronomical discoveries of all time. Science-driven human exploration is about developing the opportunities for such events, perhaps associated with challenging problems such as whether we can identify life beyond Earth within the universe. At issue, however, is how to safely insert humans and the spaceflight systems required to allow humans to operate as they do best in the hostile environment of deep space. The first issue is minimizing the problems associated with human adaptation to the most challenging aspects of deep space space radiation and microgravity (or non-Earth gravity). One solution path is to develop technologies that allow for minimization of the exposure time of people to deep space, as was accomplished in Apollo. For a mission to the planet Mars, this might entail new technological solutions for in-space propulsion that would make possible time-minimized transfers to and from Mars. The problem of rapid, reliable in-space transportation is challenged by the celestial mechanics of moving in space and the so-called "rocket equation." To travel to Mars from Earth in less than the time fuel-minimizing trajectories allow (i.e., Hohmann transfers) requires an exponential increase in the amount of fuel. Thus, month-long transits would require a mass of fuel as large as the dry mass of the ISS, assuming the existence of continuous acceleration engines. This raises the largest technological stumbling block to moving humans on site as deep-space explorers, delivering the masses required for human spaceflight systems to LEO or other Earth orbital vantage points using the existing or projected fleet of Earth-to-orbit (ETO) launch vehicles. Without a return to Saturn V-class boosters or an alternate path, one cannot imagine emplacing the masses that would be required for any deep-space voyage without a prohibitive number of Shuttle-class launches. One futurist solution might involve mass launch systems that could be used to move the consumables, including fuel, water, food, and building materials, to LEO in pieces rather than launching integrated systems. This approach would necessitate the development of robotic assembly and fuel-storage systems in Earth orbit, but could provide for a natural separation of low-value cargo (e.g., fuel, water).

Garvin, James↗

Nanostructured catalyst supports

The present invention relates to SiC nanostructures, including SiC nanopowder, SiC nanowires, and composites of SiC nanopowder and nanowires, which can be used as catalyst supports in membrane electrode assemblies and in fuel cells. The present invention also relates to composite catalyst supports comprising nanopowder and one or more inorganic nanowires for a membrane electrode assembly.

30 DIRECT ENERGY CONVERSION↗

Photo-driven growth of a monolayer of platinum spherical-nanocrowns uniformly coated on a membrane toward fuel cell applications

Membrane electrode assemblies (MEAs) serve as the core units of polymer electrolyte membrane fuel cells (PEMFCs) and are regularly fabricated by painting a slurry of commercial Pt/C onto a membrane, leading to thick and disordered electrocatalyst layers (CLs). Herein, we report a photo-driven fabrication of MEAs with ultra-thin and ordered CLs by growing a monolayer of dendritic platinum spherical nanocrowns onto each side of a photocatalyst-modified membrane. This approach allows us to control the thickness and platinum loading of ordered CLs by simply varying the concentration of the platinum precursor under tungsten light irradiation. The resultant MEAs exhibit an excellent fuel cell power density of 1.01 ± 0.05 W cm –2 at a platinum loading of 53 ± 1.5 μg cm cathode –2 . Furthermore, this exceptional activity likely arises from the nanostructured platinum crowns, efficient mass transport, and uniform reaction rate in the ultrathin (59 ± 12 nm thick) and ordered CLs according to electrochemical and theoretical investigations.

25 ENERGY STORAGE↗

Testing of uranium nitride fuel in T-111 cladding at 1200 K cladding temperature

Two groups of six fuel pins each were assembled, encapsulated, and irradiated in the Plum Brook Reactor. The fuel pins employed uranium mononitride (UN) in a tantalum alloy clad. The first group of fuel pins was irradiated for 1500 hours to a maximum burnup of 0.7-atom-percent uranium. The second group of fuel pins was irradiated for about 3000 hours to a maximum burnup of 1.0-atom-percent uranium. The average clad surface temperature during irradiation of both groups of fuel pins was approximately 1200 K. The postirradiation examination revealed the following: no clad failures or fuel swelling occurred; less than 1 percent of the fission gases escaped from the fuel; and the clad of the first group of fuel pins experienced clad embrittlement whereas the second group, which had modified assembly and fabrication procedures to minimize contamination, had a ductile clad after irradiation.

Rohal, R. G.↗

Fabrication of high-performance gas-diffusion-electrode based membrane-electrode assemblies

This paper demonstrates the fabrication and processing steps required to produce high performance fuel cell membrane electrode assemblies (MEAs) based on spray-coated gas-diffusion electrodes (GDEs). It is demonstrated that coating the catalyst layer with a thin layer of ionomer and then hot pressing the GDEs to the membrane is required to achieve comparable catalyst activity and air performance to catalyst-coated-membrane MEAs. We show that there is a critical amount of ionomer required to achieve maximized performance. Using electron microscopy, we show that the combination of the ionomer overlayer and hot-pressing bonds the catalyst layer to the membrane, increasing the interfacial contact area and quality of this interface. We also find that the ionomer overlayer smooths the surface of the GDE and provides increased contact area between the GDE and the membrane. Additionally, we demonstrate that much less ionomer is required for high-performance than has been previously reported. Through model fitting of electrochemical impedance spectroscopy, we show that this improvement in the catalyst layer - membrane interface reduces the effective catalyst layer resistance, which reduces Ohmic losses and increases catalyst utilization.

33 ADVANCED PROPULSION SYSTEMS↗

Implementation of an Orificing Optimization Algorithm in the DASSH Subchannel Analysis Code

The Ducted Assembly Steady-State Heat transfer code (DASSH) performs full-core subchannel thermal hydraulics calculations in liquid metal fast reactors. One of the applications of subchannel codes is to optimize coolant flow orificing. As a design activity, the primary task is to determine the best way to divide assemblies into groups and distribute coolant flow rates among them. This report documents an algorithm implemented in DASSH to automatically optimize coolant orificing. Over the course of multiple iterations, DASSH determines the orifice grouping and flow distribution that minimizes peak coolant, clad, or fuel temperatures across all timesteps for a user-specified number of assembly groups. The total coolant flow rate in the reactor is constrained to achieve the specified core-average outlet temperature. The flow rate to each orifice group may also be constrained by the allowable pressure drop. The distribution of coolant flow among groups is accelerated using a predictor-corrector algorithm based on interpolated results from single-assembly parametric calculations. The assembly orificing grouping is initially predicted based on assembly power but can be refined if results demonstrate that an assembly would fit better in another group. The algorithm is demonstrated with two case studies. The first is a simple model for a reactor core consisting of just fuel assemblies; the pin power distributions are specified to create a situation where the initial assembly grouping prediction is suboptimal. This example is used to describe the initial grouping, demonstrate convergence over multiple iterations, and highlight the impact of regrouping. Then, the algorithm is applied to minimize peak clad and fuel temperatures in an example sodium-cooled fast reactor, the Versatile Test Reactor. The multicycle optimization confirms prior calculations for the reference core design. The example highlights how optimizing for different peak temperatures affects the results and demonstrates the use of the pressure drop constraint to limit the maximum flow rate.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Westinghouse Accident Tolerant Fuel Phase 2B with Higher Enriched and Higher Burnup Add-On Project Final Technical Report Deliverable Volume 1

The Westinghouse Electric Company LLC (Westinghouse) accident tolerant fuel (ATF) program funded by Westinghouse and the US Department of Energy (DOE) utilized chromium (Cr) coated zirconium alloy cladding with doped UO 2 (ADOPT(TM)) and uranium silicide (U 3 Si 2 ) high density/high thermal conductivity fuel for its lead test rod (LTR) program with irradiation beginning in 2019. ADOPT is a Cr 2 O 3 +Al 2 O 3 doped UO 2 pellet with increased oxidation resistance and density, and increased resistance to fission gas release. Due to the issues with U 3 Si 2 fuel reaction in pressurized water reactor (PWR) environments, uranium nitride (U 15 N) has been substituted for U 3 Si 2 as a long-term fuel option. Cr coated cladding with ADOPT fuel is the near-term Westinghouse EnCore fuel product. The long-term EnCore ® fuel product is SiGA ® SiC/SiC composite cladding with high density/high thermal conductivity UN fuel. In 2020, the higher burnup and higher enriched and (HBHE) program was integrated into the ATF program. The objective of this expanded program is to extend ATF burnups to at least 75 MWd/kgU to economically facilitate 24-month cycles in PWRs. The ATF program now includes ADOPT fuel with enrichments >5% 235 U. Over the past several years, Westinghouse has tested the Cr coated zirconium (Zr) and silicon carbide (SiC) claddings in Westinghouse Churchill autoclaves and the Massachusetts Institute of Technology (MIT) reactor. Additionally, the Cr coated cladding has been tested in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) and in LTR programs at the Doel 4 and Bryon 2 commercial reactors. High temperature tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried out to determine the time and temperature limits for the Cr coated zirconium claddings. These tests indicate that Cr coated Zr cladding can take temperatures up to about 1500°C for short periods of time without becoming totally oxidized. The main issue is the formation of the Cr-Zr eutectic at 1333°C resulting in the migration of this eutectic inward with the formation of ZrCr 2 which rapidly oxidizes to ZrO 2 on the outside of the tube. The Cr coated Zr cladding also delays the bursting of the tube, reduces the burst area, and reduces hydriding and embrittlement of the Zr which is a major benefit for reducing fuel fragmentation, redistribution, and dispersal (FFRD), the major licensing issue faced by HBHE. The manufacturing parameters for the SiC have been found to have a significant effect on the corrosion rate of the SiC in light water reactor (LWR) conditions and significant improvements have been made in the yield, quality, and oxidation resistance of the SiC cladding by identifying and tightening manufacturing process parameters. Current autoclave results for SiC composite claddings indicate that a corrosion rate of fewer than 2 micrometers per year can be achieved which meets corrosion requirements under normal operating conditions. High temperature steam oxidation tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried and determined that SiC cladding can withstand temperatures up to about 1800°C to 1900°C before excessive corrosion reactions begin, and that the SiC will not balloon and burst. ADOPT fuel pellets were incorporated into the Westinghouse ATF program because of their increased density and oxidation resistance. A topical report supporting the use of ADOPT pellets has been submitted to the NRC and will be approved shortly. ADOPT pellets have been a product in Europe for over 15 years. The additives work to make larger grain sizes which appear to reduce fission gas release during transients as well as increase the density of the pellet. Fuel rod and assembly design in preparation for the lead test rod (LTR) and lead test assembly (LTA) programs is underway as well as licensing efforts with the Nuclear Regulatory Commission (NRC). Finally, accident analyses coupled with economic evaluations for both operating savings as well as fuel savings have been initiated. Modular Accident Analysis Program 5 (MAAP5) calculations indicate that both Cr coated cladding and SiC composite cladding can increase the time to fuel rod loss of geometry for up to two hours longer than current Zr based cladding in a station blackout scenario. This additional time is due to the much higher oxidation resistance of the SiC and Cr coated cladding. These two hours can be used to implement additional response options instituted through the Diverse and Flexible Mitigation Capability (FLEX) program by reactor operators. Both ATF cladding options also reduce hydrogen production which dramatically reduces primary system and containment pressure and the risk of fission product release beyond containment in the unlikely event of an accident. The lower pressure in the system allows more time to feed cooling water to the core, resulting in the avoidance of fuel melting. The coping time is extended indefinitely if the modest water flow provided by FLEX continues. Experimental work on methods to rapidly fabricate SiC composite structures with high density and reduce the fabrication price of SiC fibers while maintaining a high level of performance is needed. Methods for mitigating or stopping the Cr-Zr eutectic are also needed to further improve the oxidation resistance of Cr coated Zr. Minimal (<1%) swelling of U 3 Si 2 and subsequent fission gas release has been demonstrated up to 20 MWd/kgU. Irradiation experiments with U 3 Si 2 fuel in ATR to determine these properties at 40 MWd/kgU were completed but post irradiation examinations were not done since U 3 Si 2 has been replaced by UN. UN has three issues that are being addressed. The first is increasing the oxidation resistance so that there is not excessive reaction up to ~1500°C. While UN increases the pellet density and additives to the UN postponed the temperature at which rapid oxidation occurred by ~100°C to 200°C, this is not enough, and pellet coating options are now being pursued. The second is developing a method to manufacture that does not require the multi-step process of UF 6 to UO 2 to UC to UN. Efforts are underway looking at UF 6 to UN 2 to UN and UF 6 to UF 4 to UN 2 to UN reactions. Finally, an economically acceptable process for potentially enriching the 15 N content of the nitrogen used to make UN to >95% 15N was identified though not experimentally validated. In addition to the work supported by the DOE, research and testing activities are being carried on in a world-wide effort funded by many countries such as Sweden, United Kingdom, Belgium, Netherlands, Spain, Germany, Japan, and France. This work is being facilitated through the Westinghouse led Collaboration for Advanced Research on Accident Tolerant Fuel (CARAT) program. Annual meetings were organized in 2018 and 2019 by Westinghouse as a venue for presentation of this work and to provide for the cross-fertilization of ideas among the many outstanding researchers in the ATF area. No meetings were held in 2020 and 2021 due to the COVID-19 related restrictions on traveling and gatherings. Since SiC, coated cladding, and high-density fuel options are not currently used in the nuclear industry; support from the government and industry members is needed to further the significant effort of setting new standards. The same is true for the Nuclear Regulatory Commission (NRC) which must review and approve the commercial use of these new fuels since all current regulations are oriented toward Zr/UO 2 fuel. Several meetings have been held with the NRC to generate a fast-track approach to licensing ATF using a combination of atomic modeling, in-rod sensors, and in-reactor testing. This approach was memorialized in an “Accelerated Fuel Qualification White Paper” prepared by the Accelerated Fuel Qualification Working Group lead by General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Westinghouse Accident Tolerant Fuel Phase 2B with Higher Enriched and Higher Burnup Add-On Project Final Technical Report Deliverable Volume 2

The Westinghouse Electric Company LLC (Westinghouse) accident tolerant fuel (ATF) program funded by Westinghouse and the US Department of Energy (DOE) utilized chromium (Cr) coated zirconium alloy cladding with doped UO 2 (ADOPT(TM)) and uranium silicide (U 3 Si 2 ) high density/high thermal conductivity fuel for its lead test rod (LTR) program with irradiation beginning in 2019. ADOPT is a Cr 2 O 3 +Al 2 O 3 doped UO 2 pellet with increased oxidation resistance and density, and increased resistance to fission gas release. Due to the issues with U 3 Si 2 fuel reaction in pressurized water reactor (PWR) environments, uranium nitride (U 15 N) has been substituted for U 3 Si 2 as a long-term fuel option. Cr coated cladding with ADOPT fuel is the near-term Westinghouse EnCore ® fuel product. The long-term EnCore fuel product is SiGA ® SiC/SiC composite cladding with high density/high thermal conductivity UN fuel. In 2020, the higher burnup and higher enriched and (HBHE) program was integrated into the ATF program. The objective of this expanded program is to extend ATF burnups to at least 75 MWd/kgU to economically facilitate 24-month cycles in PWRs. The ATF program now includes ADOPT fuel with enrichments >5% 235 U. Over the past several years, Westinghouse has tested the Cr coated zirconium (Zr) and silicon carbide (SiC) claddings in Westinghouse Churchill autoclaves and the Massachusetts Institute of Technology (MIT) reactor. Additionally, the Cr coated cladding has been tested in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) and in LTR programs at the Doel 4 and Bryon 2 commercial reactors. High temperature tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried out to determine the time and temperature limits for the Cr coated zirconium claddings. These tests indicate that Cr coated Zr cladding can take temperatures up to about 1500°C for short periods of time without becoming totally oxidized. The main issue is the formation of the Cr-Zr eutectic at 1333°C resulting in the migration of this eutectic inward with the formation of ZrCr 2 which rapidly oxidizes to ZrO 2 on the outside of the tube. The Cr coated Zr cladding also delays the bursting of the tube, reduces the burst area, and reduces hydriding and embrittlement of the Zr which is a major benefit for reducing fuel fragmentation, redistribution, and dispersal (FFRD), the major licensing issue faced by HBHE. The manufacturing parameters for the SiC have been found to have a significant effect on the corrosion rate of the SiC in light water reactor (LWR) conditions and significant improvements have been made in the yield, quality, and oxidation resistance of the SiC cladding by identifying and tightening manufacturing process parameters. Current autoclave results for SiC composite claddings indicate that a corrosion rate of fewer than 2 micrometers per year can be achieved which meets corrosion requirements under normal operating conditions. High temperature steam oxidation tests at the state-of-the-art Westinghouse facilities in Churchill, PA and at Karlsruhe Institute of Technology (KIT) have been carried and determined that SiC cladding can withstand temperatures up to about 1800°C to 1900°C before excessive corrosion reactions begin, and that the SiC will not balloon and burst. ADOPT fuel pellets were incorporated into the Westinghouse ATF program because of their increased density and oxidation resistance. A topical report supporting the use of ADOPT pellets has been submitted to the NRC and will be approved shortly. ADOPT pellets have been a product in Europe for over 15 years. The additives work to make larger grain sizes which appear to reduce fission gas release during transients as well as increase the density of the pellet. Fuel rod and assembly design in preparation for the lead test rod (LTR) and lead test assembly (LTA) programs is underway as well as licensing efforts with the Nuclear Regulatory Commission (NRC). Finally, accident analyses coupled with economic evaluations for both operating savings as well as fuel savings have been initiated. Modular Accident Analysis Program 5 (MAAP5) calculations indicate that both Cr coated cladding and SiC composite cladding can increase the time to fuel rod loss of geometry for up to two hours longer than current Zr based cladding in a station blackout scenario. This additional time is due to the much higher oxidation resistance of the SiC and Cr coated cladding. These two hours can be used to implement additional response options instituted through the Diverse and Flexible Mitigation Capability (FLEX) program by reactor operators. Both ATF cladding options also reduce hydrogen production which dramatically reduces primary system and containment pressure and the risk of fission product release beyond containment in the unlikely event of an accident. The lower pressure in the system allows more time to feed cooling water to the core, resulting in the avoidance of fuel melting. The coping time is extended indefinitely if the modest water flow provided by FLEX continues. Experimental work on methods to rapidly fabricate SiC composite structures with high density and reduce the fabrication price of SiC fibers while maintaining a high level of performance is needed. Methods for mitigating or stopping the Cr-Zr eutectic are also needed to further improve the oxidation resistance of Cr coated Zr. Minimal (<1%) swelling of U 3 Si 2 and subsequent fission gas release has been demonstrated up to 20 MWd/kgU. Irradiation experiments with U 3 Si 2 fuel in ATR to determine these properties at 40 MWd/kgU were completed but post irradiation examinations were not done since U 3 Si 2 has been replaced by UN. UN has three issues that are being addressed. The first is increasing the oxidation resistance so that there is not excessive reaction up to ~1500°C. While UN increases the pellet density and additives to the UN postponed the temperature at which rapid oxidation occurred by ~100°C to 200°C, this is not enough, and pellet coating options are now being pursued. The second is developing a method to manufacture that does not require the multi-step process of UF 6 to UO 2 to UC to UN. Efforts are underway looking at UF 6 to UN 2 to UN and UF 6 to UF 4 to UN 2 to UN reactions. Finally, an economically acceptable process for potentially enriching the 15 N content of the nitrogen used to make UN to >95% 15 N was identified though not experimentally validated. In addition to the work supported by the DOE, research and testing activities are being carried on in a world-wide effort funded by many countries such as Sweden, United Kingdom, Belgium, Netherlands, Spain, Germany, Japan, and France. This work is being facilitated through the Westinghouse led Collaboration for Advanced Research on Accident Tolerant Fuel (CARAT) program. Annual meetings were organized in 2018 and 2019 by Westinghouse as a venue for presentation of this work and to provide for the cross-fertilization of ideas among the many outstanding researchers in the ATF area. No meetings were held in 2020 and 2021 due to the COVID-19 related restrictions on traveling and gatherings. Since SiC, coated cladding, and high-density fuel options are not currently used in the nuclear industry; support from the government and industry members is needed to further the significant effort of setting new standards. The same is true for the Nuclear Regulatory Commission (NRC) which must review and approve the commercial use of these new fuels since all current regulations are oriented toward Zr/UO 2 fuel. Several meetings have been held with the NRC to generate a fast-track approach to licensing ATF using a combination of atomic modeling, in-rod sensors, and in-reactor testing. This approach was memorialized in an “Accelerated Fuel Qualification White Paper” prepared by the Accelerated Fuel Qualification Working Group lead by General Atomics.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Metallographic Preparation of Space Shuttle Reaction Control System Thruster Electron Beam Welds for Electron Backscatter Diffraction

A Space Shuttle Reaction Control System (RCS) thruster failed during a firing test at the NASA White Sands Test Facility (WSTF), Las Cruces, New Mexico. The firing test was being conducted to investigate a previous electrical malfunction. A number of cracks were found associated with the fuel closure plate/injector assembly (Fig 1). The firing test failure generated a flight constraint to the launch of STS-133. A team comprised of several NASA centers and other research institutes was assembled to investigate and determine the root cause of the failure. The JSC Materials Evaluation Laboratory was asked to compare and characterize the outboard circumferential electron beam (EB) weld between the fuel closure plate (Titanium 6Al-4V) and the injector (Niobium C-103 alloy) of four different RCS thrusters, including the failed RCS thruster. Several metallographic challenges in grinding/polishing, and particularly in etching were encountered because of the differences in hardness, ductility, and chemical resistance between the two alloys and the bimetallic weld. Segments from each thruster were sectioned from the outboard weld. The segments were hot-compression mounted using a conductive, carbon-filled epoxy. A grinding/polishing procedure for titanium alloys was used [1]. This procedure worked well on the titanium; but a thin, disturbed layer was visible on the niobium surface by means of polarized light. Once polished, each sample was micrographed using bright field, differential interference contrast optical microscopy, and scanning electron microscopy (SEM) using a backscatter electron (BSE) detector. No typical weld anomalies were observed in any of the cross sections. However, areas of large atomic contrast were clearly visible in the weld nugget, particularly along fusion line interfaces between the titanium and the niobium. This prompted the need to better understand the chemistry and microstructure of the weld (Fig 2). Energy Dispersive X-Ray Spectroscopy (EDS) was used to confirm the chemical composition of the variations in contrast in these areas. Niobium alloys generally require exposure to more aggressive chemical reagents than titanium alloys for etching because of niobium s chemical resistance; therefore, the titanium portion of the sample was etched first. A five second immersion in Kroll s reagent revealed a general microstructure on the titanium portion of the sample; however, the titanium heat affected zone closest to the weld, was over-etched due to higher concentrations of refined grains and an increase in eta-phase. The Kroll s etchant also revealed some microstructure in the weld nugget itself; the niobium portion of the sample remained unetched.

Martinez, James↗

BWR Spent Nuclear Fuel Acquisition and Testing to Support DOE-NE High Burnup Spent Fuel Data Project

The Office of Spent Fuel and Waste Disposition (SFWD) within the US Department of Energy (DOE) Office of Nuclear Energy (NE) established the Spent Fuel and Waste Science and Technology (SFWST) campaign to conduct research and development (R&D) activities related to the storage, transportation, and disposal of spent nuclear fuel (SNF) and high-level radioactive waste. The SFWST program was created within SFWD to address issues of extended or long-term SNF storage and transportation. Some near-term objectives of SFWST are to use a science-based, engineering-driven approach to: Support the enhancement of the technical bases to support the continued safe and secure dry storage of SNF for extended periods; Support the enhancement of the technical bases for retrieving SNF after extended dry storage; Support the enhancement of the technical bases for transporting high burnup (HBU) fuel and transporting low burnup fuel and HBU fuel after dry storage DOE-NE, in partnership with the Electric Power Research Institute, developed the High Burnup Spent Fuel Data Project to perform a large-scale demonstration and laboratory-scale testing of HBU pressurized water reactor (PWR) fuels (exceeding 45 gigawatt-days per metric ton of uranium [GWd/MTU]). Under this project, 25 sister rods—which are rods that have the same design, power histories, and other characteristics—were removed from assemblies at the North Anna Nuclear Power Station and sent to Oak Ridge National Laboratory (ORNL) in January 2016. ORNL performed detailed nondestructive examination (NDE) on all 25 rods. The NDE consisted of visual examinations, gamma and neutron scanning, profilometry and rod length measurements, and eddy current examinations. After completing the NDE, 10 of the sister rods were delivered to Pacific Northwest National Laboratory (PNNL) in a NAC International, Inc. legal-weight truck cask in September 2018 for destructive examination (DE). To date, SFWD work has focused on the PWR fuel that is part of the Sister Rod Test program. No boiling water reactor (BWR) fuel has been tested in the program, and the data needs that were identified for the PWR fuel have not been collected for BWR fuel. The goal to obtain six to nine BWR rods and test them at ORNL will support closing this important data gap. BWR fuel comprises approximately 56% of the total fuel assemblies currently in storage at nuclear power plants in the United States. BWR nuclear fuel and cladding designs and manufacturing are significantly different from PWRs. Differences include the following: BWR fuel pellets are larger than PWR pellets; Variations of Zircaloy-2 (including liners) are used instead of the Zircaloy-4 cladding materials used in PWRs; Clad manufacturing and stress-relief processes are different between PWRs and BWRs; The fuel rod dimensions are different because larger rod diameters and thicker cladding are used in BWRs; BWR fuel typically has lower internal rod pressures and sees vastly different operating conditions than PWR fuel (i.e., two-phase flow); BWR assemblies are “canned,” meaning each assembly is surrounded by a metal fuel channel; BWR cladding is often composed of an inner pure Zr liner that has widely different mechanical properties than the Zircaloy-2 alloy and exhibits a stronger affinity for hydrogen; The BWR SNF generally has more total hydrogen in the cladding/liner than typical PWR fuel; The construction of the PWR and BWR assemblies is vastly different; BWR rods are solidly attached to the assembly nozzles and experience a much different vibration and shock load than PWR rods, which are “floating” within a grid system attached to guide tubes, and the rods sit loosely on the bottom end plates. These numerous differences will affect the way the BWR SNF responds under dry storage preparation processes (e.g., vacuum drying) and during transportation. The results collected in the PWR experimental program must be compared with a subset of similar data collected on BWR SNF to establish a technical basis for whether the larger PWR database is sufficient to bound the BWR SNF end-of-life conditions as is currently assumed for several fuel/clad properties. Changes that occur in both fuel types at HBU could exacerbate any mechanical property differences. As the fuel burnup increases, several changes occur that might affect the performance of the fuel, cladding, and assembly hardware in storage and transportation. These changes include increased cladding corrosion layer thickness, increased cladding hydrogen content, increased cladding creep strains, increased fission gas release, and the formation of the HBU structure at the surface of the fuel pellets. The Nuclear Regulatory Commission (NRC) limits the current maximum rod-averaged burnup to 62 GWd/MTU due to these changes and the lack of data at higher burnups.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Gamma-ray imaging of inertial confinement fusion implosions reveals remaining ablator carbon distribution

The joint LANL/LLNL nuclear imaging team has acquired the first gamma-ray images of inertial confinement fusion implosions at the National Ignition Facility. The gamma-ray image provides crucial information to help characterize the inertially confined fuel and ablator assembly at stagnation, information that would be difficult to acquire from neutron or x-ray observations. Gamma imaging visualizes both gamma radiation emitted directly in deuterium–tritium (DT) fusion reactions as well as gamma rays produced when DT fusion neutrons scatter inelastically on carbon nuclei in the remaining ablator of the fuel capsule. The resulting image provides valuable information on the position and density of the remaining ablator and potential contamination of the hot spot—a powerful diagnostic window into the capsule assembly during burn.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Mini-99 Experiment Design and Target Assembly

Qualification of nuclear fuels requires an understanding of a myriad of fuel performance variables, which requires time-consuming irradiations in test reactors. Accelerating burnup accumulation to reduce the irradiation time has historically been accomplished by increasing the 235 U enrichment in integral fuel tests, which inherently couples the fuel’s temperature and fission heat generation. Separate effects irradiation testing of nuclear fuel, using the MiniFuel target in the Oak Ridge National Laboratory’s (ORNL’s) High Flux Isotope Reactor (HFIR), offers an approach for decoupling fuel temperature and fission rate by reducing the quantity of the fuel and relying primarily on gamma heating in the surrounding components to drive fuel temperatures. However, if the fission rate is high enough, the fuel temperature will still vary over time as the fission heating changes, primarily due to poor heat conduction between the fuel and the surrounding components. This work details the design, analysis, and fabrication of a MiniFuel target which utilizes sodium bonding to improve the heat rejection from the fuel specimen, enabling the testing of higher 235 U enrichments (~8wt.%) to further accelerate burnup accumulation without prohibitively large temperature variations throughout the course of the irradiation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assembly and Initial Testing of the Gamma-Ray Emission Tomography Assessment Prototype for Irradiated Fuel

The following report documents the final development, assembly, and initial testing of the gamma-ray emission tomography assessment system (GRETA-1) for post-irradiation examination of irradiated fuel. It includes descriptions of the system components, including the high-purity germanium gamma-ray detector, the surrounding shield and collimator, the sample scanning hardware, and the control and collection software package. A series of MCNP6 simulations were performed that modeled a fuel rod scan to test image reconstruction algorithms with a complex and understood source distribution. A bench-top scan of isotopic check sources was also performed and analyzed using standard image reconstruction algorithms. The system is currently awaiting deployment at Idaho National Laboratory’s Hot Fuel Examination Facility.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Radial Deconsolidation and Leach-Burn-Leach of AGR-3/4 Compact 1-4 and 10-4

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program third and fourth irradiation experiments (AGR-3/4), originally planned as separate tests, were combined in one test train for irradiation in the Advanced Test Reactor at Idaho National Laboratory (INL). The irradiation test began on December 14, 2011 and ended on April 12, 2014 (Collin 2016). The originally planned AGR-3 and AGR-4 irradiation experiments were both focused on obtaining data on fission product transport to support the improvement of modeling. The AGR-3 experimental plan was focused on gaseous and metallic fission product release from the kernels and diffusion in the coatings during irradiation and postirradiation safety testing. The AGR-4 experimental plan was focused on diffusivities and sorptivities in the compact matrix and reactor graphite (Petti et al. 2005). These two goals were combined in the AGR-3/4 irradiation, which consisted of twelve independently monitored capsules that each contained four AGR-3/4 compacts in a single stack surrounded by an inner ring of matrix or graphite and an outer ring of graphite. There were two capsule types: a standard capsule and a “fuel body”, in which the outer graphite ring included a floor and cap that fully enclosed the fuel (Stempien et al. 2018a). The fuel body design supported post-irradiation safety testing of the intact fuel and ring assembly to provide data on fission product transport and release from matrix and graphite at accident temperatures (Demkowicz 2017).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Radial Deconsolidation and Leach-Burn-Leach of AGR-3/4 Compacts 1-3, 4-3, 10-1, and 10-2

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program’s third and fourth irradiation experiments (AGR-3/4), originally planned as separate tests, were combined into one test train for irradiation in the Advanced Test Reactor at Idaho National Laboratory (INL). The irradiation test began on December 14, 2011 and ended on April 12, 2014 (Collin 2016). The originally planned AGR-3 and AGR-4 irradiation experiments were both focused on obtaining data on fission product transport to support modeling improvement. The AGR-3 experimental plan was focused on gaseous and metallic fission product release from the kernels and diffusion in the coatings during irradiation and post-irradiation safety testing. The AGR-4 experimental plan was focused on diffusivities and sorptivities in the compact matrix and reactor graphite (Petti et al. 2005). These two goals were combined in the AGR-3/4 irradiation, which consisted of twelve independently monitored capsules that each contained four AGR-3/4 compacts in a single stack surrounded by an inner ring of matrix or graphite and an outer ring of graphite. There were two capsule types: a standard capsule and a fuel body in which the outer graphite ring included a floor and cap that fully enclosed the fuel (Stempien et al. 2018a). The fuel body design supported post-irradiation safety testing of the intact fuel and ring assembly to provide data on fission product transport and release from matrix and graphite at accident temperatures (Demkowicz 2017)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗