Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Engineering management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Summary of 2016 Light Microscopy Module (LMM) Physical Science Experiments on ISS. Update of LMM Science Experiments and Facility Capabilities

This presentation will feature a series of short, entertaining, and informative videos that describe the current status and science support for the Light Microscopy Module (LMM) facility on the International Space Station. These interviews will focus on current experiments and provide an overview of future capabilities. The recently completed experiments include nano-particle haloing, 3-D self-assembly with Janus particles and a model system for nano-particle drug delivery. The videos will share perspectives from the scientists, engineers, and managers working with the NASA Light Microscopy program.

Sicker, Ronald J.↗

Close Range Photogrammetry in Space - Measuring the On-Orbit Clearance between Hardware on the International Space Station

When photogrammetrists read an article entitled "Photogrammetry in Space" they immediately think of terrestrial mapping using satellite imagery. However in the last 19 years the roll of close range photogrammetry in support of the manned space flight program has grown exponentially. Management and engineers have repeatedly entrusted the safety of the vehicles and their crews to the results of photogrammetric analysis. In February 2010, the Node 3 module was attached to the port side Common Berthing Mechanism (CBM) of the International Space Station (ISS). Since this was not the location at which the module was originally designed to be located on the ISS, coolant lines containing liquid ammonia, were installed externally from the US Lab to Node 3 during a spacewalk. During mission preparation I had developed a plan and a set of procedures to have the astronauts acquire stereo imagery of these coolant lines at the conclusion of the spacewalk to enable us to map their as-installed location relative to the rest of the space station. Unfortunately, the actual installation of the coolant lines took longer than expected and in an effort to wrap up the spacewalk on time, the mission director made a real-time call to drop the photography. My efforts to reschedule the photography on a later spacewalk never materialized, so rather than having an as-installed model for the location of coolant lines, the master ISS CAD database continued to display an as-designed model of the coolant lines. Fast forward to the summer of 2015, the ISS program planned to berth a Japanese cargo module to the nadir Common Berthing Mechanism (CBM), immediately adjacent to the Node 3 module. A CAD based clearance analysis revealed a negative four inch clearance between the ammonia lines and a thruster nozzle on the port side of the cargo vehicle. Recognizing that the model of the ammonia line used in the clearance analysis was "as-designed" rather than "as-installed", I was asked to determine the real clearance between the ammonia lines and expected position of the thruster bell using existing on-orbit imagery. Imagery of the area of interest, taken several years earlier from the Space Shuttle during a fly-around of the ISS, was found and used to set a stereo pair. Space Vision System Targets and Handrail bolts measured in the ISS analytical coordinate system (ISSACS) prior to launch, were used to obtain an absolute orientation so all photogrammetric measurement's would be in the ISSACS coordinate system. Coordinates for the design location of the edges of the thruster bell, when the cargo vehicle was fully berthed to the ISS, were displayed in 3-D relative to the as-installed ammonia lines. This immediately revealed a positive clearance, which was later quantified to be a minimum of 10" +/0.5". The analysis was completed over a single weekend by a single analyst. Using updated imagery, acquired from the station's robotic arm, a complete as-installed model of the coolant lines was generated from stereo photography and replaced the design model in the master ISS CAD database.

Liddle, Donn↗

Using Model-Based Systems Engineering to Provide Artifacts for NASA Project Life-cycle and Technical Reviews

This paper is for the AIAA Space Conference. The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.

MBSE↗

Using Model-Based Systems Engineering To Provide Artifacts for NASA Project Life-Cycle and Technical Reviews

The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.

SE Product↗

The Value of Identifying and Recovering Lost GN&C Lessons Learned: Aeronautical, Spacecraft, and Launch Vehicle Examples

Within the broad aerospace community the importance of identifying, documenting and widely sharing lessons learned during system development, flight test, operational or research programs/projects is broadly acknowledged. Documenting and sharing lessons learned helps managers and engineers to minimize project risk and improve performance of their systems. Often significant lessons learned on a project fail to get captured even though they are well known 'tribal knowledge' amongst the project team members. The physical act of actually writing down and documenting these lessons learned for the next generation of NASA GN&C engineers fails to happen on some projects for various reasons. In this paper we will first review the importance of capturing lessons learned and then will discuss reasons why some lessons are not documented. A simple proven approach called 'Pause and Learn' will be highlighted as a proven low-impact method of organizational learning that could foster the timely capture of critical lessons learned. Lastly some examples of 'lost' GN&C lessons learned from the aeronautics, spacecraft and launch vehicle domains are briefly highlighted. In the context of this paper 'lost' refers to lessons that have not achieved broad visibility within the NASA-wide GN&C CoP because they are either undocumented, masked or poorly documented in the NASA Lessons Learned Information System (LLIS).

Dennehy, Cornelius J.↗

OSIRIS-REx Visible And Infrared Spectrometer - OVIRS

Goddard Space Flight Center: Overall Instrument Responsibility; Instrument Scientist and Deputy Instrument Scientist; Management Systems Engineering; Mechanical Hardware; Harness Assemblies; SIDECAR Assembly Code; OVIRS Integration and Environmental Qualification; OVIRS Performance Testing, Calibration and Characterization.

OSIRIS-REx↗

Total and Spectral Solar Irradiance Sensor (TSIS) Project Status

TSIS-1 studies the Sun's energy input to Earth and how solar variability affects climate. TSIS-1 will measure both the total amount of light that falls on Earth, known as the total solar irradiance (TSI), and how that light is distributed among ultraviolet, visible and infrared wavelengths, called solar spectral irradiance (SSI). TSIS-1 will provide the most accurate measurements of sunlight and continue the long-term climate data record. TSIS-1 includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload on the International Space Station (ISS). The TSIS-1 TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. NASA Goddard's TSIS project responsibilities include project management, system engineering, safety and mission assurance, and engineering oversight for TSIS-1. TSIS-1 was installed on the International Space Station in December 2017. At the end of the 90-day commissioning phase, responsibility for TSIS-1 operations transitions to the Earth Science Mission Operations (ESMO) project at Goddard for its 5-year operations. NASA contracts with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS-1, support for ISS integration, science operations of the TSIS-1 instrument, data processing, data evaluation, calibration and delivery to the Goddard Earth Science Data and Information Services Center (GES DISC).

TSIS↗

Guidelines for Verification Strategies to Minimize RISK Based on Mission Environment, -Application and -Lifetime (MEAL)

There is a trend of compromising verification testing to address the cost and schedule constraints, which poses a high-risk posture for programs/projects. Current and emerging aerospace scientific and/or human exploration programs continue to pose new technological challenges. These technological challenges combined with finite budgets and truncated schedules are forcing designers, scientists, engineers, and managers to push technologies to their physical limits. In addition, budget and schedule pressures challenge how those technologies/missions are verified. A clear understanding of the different verification processes is needed to ensure the proper verification of the technology within the mission (i.e., capabilities, advantages, and limitations). The goal of verification is to prove through test, analysis, inspection, and/or demonstration that a product provides its required function while meeting the performance requirements. It is important that verification yield understanding of representative performance under worst-case conditions so that margins to failure can be evaluated for proposed applications. The capabilities, advantages, and limitations of the testing and inspection performed at each level are different, and the risk incurred by omitting a verification step depends on the level of integration as well as Mission, Environment, Application and Lifetime (MEAL). This paper focuses on verification processes. The goal of the verification process is to ensure the given avionics technology could be safely implemented on the given MEAL consistent with the program/project risk posture.

Gonzalez, Oscar↗

Sharing the NASA Experience

Dr. Obadiah Kegege will share his career experience with the University of Missouri _ Kansas City Students. This experience spans from academia, research and development, working on flight and ground systems for space exploration, to current work in engineering project management. Most of his NASA experience concentrates on supporting the Space Communication and Navigation Program (SCaN) program. SCaN implements, manages, and maintains communications and navigation services to existing and planned space missions. Dr. Kegege's talk will touch on topics like "how do we communicate to space," as well giving an overview of NASA's Near-Earth Network (NEN), Space Network (SN), and the Deep Space Network (DSN). Also, Dr. Kegege will answer a few questions from students, i.e applying for NASA internships, applying for jobs at NASA, etc.

Kegege, Obadiah O.↗

The Comet Astrobiology Exploration Sample Return (CAESAR) Mission

The Comet Astrobiology Exploration Sample Return (CAESAR) mission will acquire and return to Earth for laboratory analysis a minimum of 80 grams of surface material from the nucleus of comet 67P/Chur-yumov-Gerasimenko (67P). CAESAR will characterize the surface region sampled, preserve the collected sample in a pristine state, and return evolved volatiles by capturing them in a separate gas reservoir. NASA Goddard Space Flight Center provides project management, systems engineering, safety and mission assurance, contamination control, mission operations, and many other important functions. Northrop Grumman Space Systems will build the spacecraft, based on Dawn mission heritage, which like CAESAR, uses solar electric propulsion. CAESAR was selected by for Phase A study in the New Frontiers 4 Competition and will be proposed to New Frontiers 5.Collection of a sample from the surface of comet 67P is facilitated by a set of cameras that together provide images to support sample site selection, perform optical navigation, and document the sample before, during, and after col-lection. The sample is collected at the end of an arm during a 5-second touch-and-go (TAG) maneuver with the Sample Acquisition System (SAS)designed by Honeybee Robotics for the surface properties of comet 67P observed by the Rosetta mission. After sample collection, and while the sample is still cold (< -80°C), the TAG Arm inserts the sample container into the Sample Containment System (SCS) mounted inside the Sample Return Capsule (SRC). The SCS is sealed, preventing the sample from escaping into space. The sample is slowly warmed inside the SCS to enable sublimation of volatiles, which are collected in the Gas Containment System (GCS), a passively cooled gas reservoir. Separating the volatiles from the solid sample protects the solid sample from alteration. Once all sublimated H2O is transferred to the GCS, the GCS is sealed to capture the volatile sit contains, and the SCS is vented to space to maintain the solid sample under vacuum. The SCS vent is closed before Earth entry to prevent atmospheric contamination. Detailed laboratory analyses of the sample from 67P will trace the history of volatile reservoirs, delineate the chemical pathways that led from simple interstellar species to complex molecules, constrain the evolution of the comet, and evaluate the role of comets in delivering water and prebiotic organics to the early Earth. CAESAR will achieve these goals by carrying out coordinated sample analyses that will link macroscopic properties of the comet with microscale mineralogy, chemistry, and isotopic studies of volatiles and solids. Most of the sample (≥75%) will be set aside for analyses by generations of scientists using continually advancing tools and methods, yielding an enduring scientific treasure that only sample return can provide. This presentation will review development conducted during NF4 Phase A and discuss the NF5 mission concept.

A G Hayes↗

Kibo Robot Programming Challenge Final Activity Report

On October 8th, 2020 the Kibo Robot Programming Challenge (RPC) Finals Event took place. Student teams from Australia, Indonesia, Japan, Singapore, Taiwan, Thailand, and UAE were the finalists of the competition and became the first students to ever upload APKs to an Astrobee robot (Bumble) on the ISS. This was the culmination of a joint effort between JAXA’s Int-Ball developing team in Tsukuba, Japan and NASA’s Astrobee Facility team at NASA Ames Research Center\ in California, USA. The collaboration between JAXA and NASA started in late 2017. Throughout this time mutual visits by the engineering and management teams were organized. In July 2019 the Kibo RPC concept was formally defined and the competition started. Hundreds of students across the Asia Pacific region participated and during the final event they did so in real time with the participation of NASA’s astronaut, Chris Cassidy. Chris interacted with the students, JAXA personnel and with the robot during the activity. This report aims to summarize the lessons learned from the several crew and non-crew tended activities, the evaluations performed on ground, the coordination of resources both in the ground and at the International Space Station (ISS) as well as operations. It identifies the issues the teams faced and the solutions put in place to mitigate them.

Astrobee↗

The Epic Chronicle of Designing Cassini's Titan Flyby Altitudes

The selection and optimization of Titan flyby altitudes for NASA's Cassini mission at Saturn has traveled a long, fascinating, and often torturous sixteen-year path - starting in 2001, when pre-arrival trajectory design decisions had to be made, through April of 2017 when Cassini's last, and arguably most critical, low flyby takes place. The chronicle of designing and updating the Titan flyby altitudes have twists and turns enough to satisfy a full-length novel or feature film, including: critical design decision-making before arrival with multiple atmospheric models, high uncertainties, and limited data; early flybys that seemed to show trends that weren't there; use and misuse of statistical analysis; unexpected surprises with limited reaction time; navigation of a scientific, engineering, and management community with a wide array of inherent biases; and consideration of a variety of project risk postures in a high-scrutiny, high-impact, high-reward environment.

Bittner, Molly↗

Altimetry for the Future: Building on 25 Years of Progress

In 2018 we celebrated 25 years of development of radar altimetry, and the progress achieved by this methodology in the fields of global and coastal oceanography, hydrology, geodesy and cryospheric sciences. Many symbolic major events have celebrated these developments, e.g., in Venice, Italy, the 15th (2006) and 20th (2012) years of progress and more recently, in 2018, in Ponta Delgada, Portugal, 25 Years of Progress in Radar Altimetry. On this latter occasion it was decided to collect contributions of scientists, engineers and managers involved in the worldwide altimetry community to depict the state of altimetry and propose recommendations for the altimetry of the future. This paper summarizes contributions and recommendations that were collected and provides guidance for future mission design, research activities, and sustainable operational radar altimetry data exploitation. Recommendations provided are fundamental for optimizing further scientific and operational advances of oceanographic observations by altimetry, including requirements for spatial and temporal resolution of altimetric measurements, their accuracy and continuity. There are also new challenges and new openings mentioned in the paper that are particularly crucial for observations at higher latitudes, for coastal oceanography, for cryospheric studies and for hydrology. The paper starts with a general introduction followed by a section on Earth System Science including Ocean Dynamics, Sea Level, the Coastal Ocean, Hydrology, the Cryosphere and Polar Oceans and the ‘‘Green” Ocean, extending the frontier from biogeochemistry to marine ecology. Applications are described in a subsequent section, which covers Operational Oceanography, Weather, Hurricane Wave and Wind Forecasting, Climate projection. Instruments’ development and satellite missions’ evolutions are described in a fourth section. A fifth section covers the key observations that altimeters provide and their potential complements, from other Earth observation measurements to in situ data. Section 6 identifies the data and methods and provides some accuracy and resolution requirements for the wet tropospheric correction, the orbit and other geodetic requirements, the Mean Sea Surface, Geoid and Mean Dynamic Topography, Calibration and Validation, data accuracy, data access and handling (including the DUACS system). Section 7 brings a transversal view on scales, integration, artificial intelligence, and capacity building (education and training). Section 8 reviews the programmatic issues followed by a conclusion.

Saleh Abdalla↗

Human System Risk Communication: Directed Acyclic Graphs

- The Human System Risk Board (HSRB) is responsible for the management of a portfolio of 30 human system risks that NASA tracks and configuration manages to mitigate for future crewed exploration missions. - The HSRB has been exploring the concept of causal diagrams (in the form of Directed Acyclic Graphs or DAGs) as an approach to creating knowledge graphs for each risk to enable shared mental models of causal flow from spaceflight hazards to mission outcomes among HSRB Stakeholders. - These diagrams are intended to improve insight and communication of risk across the myriad subject matter experts and management interested in human system risk reduction. This includes program managers, systems engineers, and operators in addition to the Human Health and Performance Directorate. - The DAG project was intended to create the foundation for composition of the 30 baselined DAGs into a single risk network and software is being developed in parallel to enable this forward work.

directed acrylic graph↗

Final Report of the COSPAR Meeting Series on Knowledge Gaps in Planetary Protection for Crewed Missions to Mars

The international scientific community has, through a Committee on Space Research (COSPAR) meeting series, participated in a seven-year review of knowledge gaps in planetary protection for crewed missions to Mars. This meeting series first identified a prioritized list of knowledge gaps that, if addressed, would permit development of an implementable planetary protection policy for the initial crewed Mars mission. Next, a consideration of the available venues (ground, LEO, deep space, planetary surfaces) yielded a roadmap of potential future investigations needed to close the knowledge gaps. Finally, the meeting series evaluated topic-specific measurements that are essential to establishing the figures of merit needed for hardware engineering design requirements. The three main topic threads considered within the meeting series were: microbial and human health monitoring; natural transport of terrestrial biological contamination on Mars, and; technologies and operations for contamination control (of spacecraft systems). Participants at the meeting series included engineers, scientists, managers and various subject matter experts from space agencies, academic and research institutions, commercial companies, and other government departments. This paper provides a detailed summary review of the findings of the meeting series, including descriptions of the basis for each of the figures of merit (where they were identified), and considerations of how planetary protection implementation and policy for crewed missions may progress from the current state of the art.

J Andy Spry↗

Exploring the Moon: Training Astronauts for Artemis Missions

For the first time in over 50 years, NASA scientists are training astronauts assigned to lunar missions. The successful Artemis 1 test flight in 2022 set the stage for future human missions to the Moon. The Artemis II mission will send astronauts to fly by the Moon, providing the first opportunity since Apollo for humans to directly observe and document the lunar surface from a few thousand kilometers, including the lunar far side. Artemis III will be the first human mission to land and explore the Moon’s surface near the lunar South Pole. To prepare for Artemis exploration, geology training for the Artemis II crew and detailed training plans for Artemis III and beyond are in full swing. NASA scientists have been working for several years with the Flight Operations Directorate (FOD) at the Johnson Space Center on a progressive geology training program that starts with incoming astronaut classes, offers opportunities to maintain the geology proficiency between flight assignments, and trains the broader engineering-operations-management community in geology and field operations. In the spring of 2023, our team developed an introductory week-long class called Lunar Fundamentals and delivered this content to the Artemis II crew, as well as key NASA Flight Control Team members. The Lunar Fundamentals curriculum combines basic geographic and geologic information about the Moon; includes detailed content on major geologic processes, the lunar environment, lunar volatiles, and sample science; provides historical context of our growing knowledge about the Moon; and introduces new lunar data sets and tools for exploring the lunar surface. With the Lunar Fundamentals foundation, we continue development of the advanced planetary science classroom content for the Artemis III crew, together with field training science objectives and plans. Partnering with our FOD colleagues, we are building an integrated training plan for lunar science, exploration field methods, and operational skills to ensure that the Artemis astronauts exploring the Moon will have the necessary foundation in geology and lunar science to achieve mission success.

Astronauts training↗

Implementation of a Goal-Based Systems Engineering Process Using the Systems Modeling Language (SysML)

Building upon the purpose, theoretical approach, and use of a Goal-Function Tree (GFT) being presented by Dr. Stephen B. Johnson, described in a related Infotech 2013 ISHM abstract titled "Goal-Function Tree Modeling for Systems Engineering and Fault Management", this paper will describe the core framework used to implement the GFTbased systems engineering process using the Systems Modeling Language (SysML). These two papers are ideally accepted and presented together in the same Infotech session. Statement of problem: SysML, as a tool, is currently not capable of implementing the theoretical approach described within the "Goal-Function Tree Modeling for Systems Engineering and Fault Management" paper cited above. More generally, SysML's current capabilities to model functional decompositions in the rigorous manner required in the GFT approach are limited. The GFT is a new Model-Based Systems Engineering (MBSE) approach to the development of goals and requirements, functions, and its linkage to design. As a growing standard for systems engineering, it is important to develop methods to implement GFT in SysML. Proposed Method of Solution: Many of the central concepts of the SysML language are needed to implement a GFT for large complex systems. In the implementation of those central concepts, the following will be described in detail: changes to the nominal SysML process, model view definitions and examples, diagram definitions and examples, and detailed SysML construct and stereotype definitions.

Patterson, Jonathan D.↗

Implementation of a Goal-Based Systems Engineering Process Using the Systems Modeling Language (SysML)

Building upon the purpose, theoretical approach, and use of a Goal-Function Tree (GFT) being presented by Dr. Stephen B. Johnson, described in a related Infotech 2013 ISHM abstract titled "Goal-Function Tree Modeling for Systems Engineering and Fault Management", this paper will describe the core framework used to implement the GFTbased systems engineering process using the Systems Modeling Language (SysML). These two papers are ideally accepted and presented together in the same Infotech session. Statement of problem: SysML, as a tool, is currently not capable of implementing the theoretical approach described within the "Goal-Function Tree Modeling for Systems Engineering and Fault Management" paper cited above. More generally, SysML's current capabilities to model functional decompositions in the rigorous manner required in the GFT approach are limited. The GFT is a new Model-Based Systems Engineering (MBSE) approach to the development of goals and requirements, functions, and its linkage to design. As a growing standard for systems engineering, it is important to develop methods to implement GFT in SysML. Proposed Method of Solution: Many of the central concepts of the SysML language are needed to implement a GFT for large complex systems. In the implementation of those central concepts, the following will be described in detail: changes to the nominal SysML process, model view definitions and examples, diagram definitions and examples, and detailed SysML construct and stereotype definitions.

Breckenridge, Jonathan T.↗