Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Geospatial Cost Comparison of CO2 Plume Geothermal (CPG) Power and Geologic CO2 Storage

CO 2 Plume Geothermal (CPG) power plants can use gigatonne-levels of CO 2 sequestration to generate electricity, but it is unknown if the resources that support low-cost CPG power align with the resources that support low-cost CO 2 sequestration. Here, we estimate and compare the geospatially-distributed cost of CPG and CO 2 storage across a portion of North America. We find that the locations with lowest-cost CO 2 storage are different than the locations with lowest-cost CPG. There are also locations with low-cost CO 2 storage (<$5/tCO 2 ) that do not support CPG power generation due to insufficient reservoir transmissivity or temperature. Thus, CPG development may require electricity prices that are greater than the levelized cost of electricity (LCOE) to offset the increased cost of sequestration. We introduce the “Additional Cost of Electricity (ACOE)” metric to account for this cost and add it to the LCOE to calculate breakeven electricity prices that are required for CPG development. We find that breakeven prices are lower when new CO 2 injection wells are drilled specifically for CPG (i.e., “greenfield” CPG development) compared to if only existing CO 2 sequestration injection wells are used (i.e., “brownfield” CPG development). This is because comparatively few wells are needed for sequestration-only, and the increased power capacity from having more CPG wells outweighs the increased costs from more drilling. We also find that sequestered CO 2 could be used to approximately triple the United States geothermal electricity power capacity via a single CPG “sweet spot” in South Dakota, but that breakeven electricity price for this development is on the order of $200/MW e h.

15 GEOTHERMAL ENERGY↗

Equivalent Breakeven Installed Cost: A Tradeoff-Informed Measure for Technoeconomic Analysis of Candidate Heliostat Improvements

Technoeconomic analysis (TEA) is commonly used to determine economic viability of power-generating technologies, including concentrating solar power (CSP) and thermal (CST) production plants. Levelized cost of electricity (LCOE) and analogous measures provide an estimate of long-term costs for operating power plants over their designed lifetimes by accounting for revenues and costs in a time-discounted manner. While these measures are effective when assessing a technology’s total lifecycle costs and productivity under various designs, TEA of candidate incremental technology improvements from the lens of LCOE can be limited when required investment and LCOE impacts are small. In this work, we propose a novel metric for TEA of a plant component technology that recasts relative changes in levelized system costs into component-specific capital cost budgets. This measure, which we refer to as the equivalent breakeven installed cost, is the maximum budget for the technology component that leads to improved levelized costs. We illustrate the usefulness of this metric using the example of candidate heliostat improvements for a CSP tower plant. Here, the results suggest that a reduction in mirror washing costs yield a total plant O&M cost of $37/kWe-yr, which is a breakeven proposition if the average reflectance is reduced from 0.90 to 0.85 as a result of the cost savings.

Zolan, Alexander (ORCID:0000000326017604)↗

Strapdown cost trend study and forecast

The potential cost advantages offered by advanced strapdown inertial technology in future commercial short-haul aircraft are summarized. The initial procurement cost and six year cost-of-ownership, which includes spares and direct maintenance cost were calculated for kinematic and inertial navigation systems such that traditional and strapdown mechanization costs could be compared. Cost results for the inertial navigation systems showed that initial costs and the cost of ownership for traditional triple redundant gimbaled inertial navigators are three times the cost of the equivalent skewed redundant strapdown inertial navigator. The net cost advantage for the strapdown kinematic system is directly attributable to the reduction in sensor count for strapdown. The strapdown kinematic system has the added advantage of providing a fail-operational inertial navigation capability for no additional cost due to the use of inertial grade sensors and attitude reference computers.

Eberlein, A. J.↗

Manned Mars mission cost estimate

The potential costs of several options of a manned Mars mission are examined. A cost estimating methodology based primarily on existing Marshall Space Flight Center (MSFC) parametric cost models is summarized. These models include the MSFC Space Station Cost Model and the MSFC Launch Vehicle Cost Model as well as other modes and techniques. The ground rules and assumptions of the cost estimating methodology are discussed and cost estimates presented for six potential mission options which were studied. The estimated manned Mars mission costs are compared to the cost of the somewhat analogous Apollo Program cost after normalizing the Apollo cost to the environment and ground rules of the manned Mars missions. It is concluded that a manned Mars mission, as currently defined, could be accomplished for under $30 billion in 1985 dollars excluding launch vehicle development and mission operations.

Hamaker, Joseph↗

Cost characteristics of tilt-rotor, conventional air and high speed rail short-haul intercity passenger service

The cost analysis done to support an assessment of the potential for a small tilt-rotor aircraft to operate in short-haul intercity passenger service is described in detail. Anticipated costs of tilt-rotor air service were compared to the costs of two alternatives: conventional air and high speed rail (HSR). Costs were developed for corridor service, varying key market characteristics including distance, passenger volumes, and minimum frequency standards. The resulting cost vs output information can then be used to compare modal costs for essentially identical service quality and passenger volume or for different service levels and volumes for each mode, as appropriate. Extensive sensitivity analyses are performed. The cost-output features of these technologies are compared. Tilt-rotor is very attractive compared to HSR in terms of costs over the entire range of volume. It also has costs not dramatically different from conventional air, but tilt-rotor costs are generally higher. Thus some of its other advantages, such as the VTOL capability, must offset the cost disadvantage for it to be a preferred or competitive mode in any given market. These issues are addressed in the companion report which considers strategies for tilt-rotor development in commercial air service.

Schoendorfer, David L.↗

Reliability and cost: A sensitivity analysis

In the design phase of a system, how a design engineer or manager choose between a subsystem with .990 reliability and a more costly subsystem with .995 reliability is examined, along with the justification of the increased cost. High reliability is not necessarily an end in itself but may be desirable in order to reduce the expected cost due to subsystem failure. However, this may not be the wisest use of funds since the expected cost due to subsystem failure is not the only cost involved. The subsystem itself may be very costly. The cost of the subsystem nor the expected cost due to subsystem failure should not be considered separately but the total of the two costs should be maximized, i.e., the total of the cost of the subsystem plus the expected cost due to subsystem failure.

Suich, Ronald C.↗

Space system production cost benefits from contemporary philosophies in management and manufacturing

The cost of manufacturing space system hardware has always been expensive. The Engineering Cost Group of the Program Planning office at Marshall is attempting to account for cost savings that result from new technologies in manufacturing and management. The objective is to identify and define contemporary philosophies in manufacturing and management. The seven broad categories that make up the areas where technological advances can assist in reducing space system costs are illustrated. Included within these broad categories is a list of the processes or techniques that specifically provide the cost savings within todays design, test, production and operations environments. The processes and techniques listed achieve savings in the following manner: increased productivity; reduced down time; reduced scrap; reduced rework; reduced man hours; and reduced material costs. In addition, it should be noted that cost savings from production and processing improvements effect 20 to 40 pct. of production costs whereas savings from management improvements effects 60 to 80 of production cost. This is important because most efforts in reducing costs are spent trying to reduce cost in the production.

Rosmait, Russell L.↗

Industry survey of space system cost benefits from New Ways Of Doing Business

The cost of designing, building and operating space system hardware has always been expensive. Small quantities of specialty parts escalate engineering design, production and operations cost. Funding cutbacks and shrinking revenues dictate aggressive cost saving programs. NASA's highest priority is providing economical transportation to and from space. Over the past three decades NASA has seen technological advances that provide grater efficiencies in designing, building, and operating of space system hardware. As future programs such as NLS, LUTE and SEI begin, these greater efficiencies and cost savings should be reflected in the cost models. There are several New Ways Of Doing Business (NWODB) which, when fully implemented will reduce space system costs. These philosophies and/or culture changes are integrated in five areas: (1) More Extensive Pre-Phase C/D & E, (2) Multi Year Funding Stability, (3) Improved Quality, Management and Procurement Processes, (4) Advanced Design Methods, and (5) Advanced Production Methods. Following is an overview of NWODB and the Cost Quantification Analysis results using an industry survey, one of the four quantification techniques used in the study. The NWODB Cost Quantification Analysis is a study performed at Marshall Space Flight Center by the Engineering Cost Group, Applied Research Incorporated and Pittsburg State University. This study took place over a period of four months in mid 1992. The purpose of the study was to identify potential NWODB which could lead to improved cost effectiveness within NASA and to quantify potential cost benefits that might accrue if these NWODB were implemented.

Rosmait, Russell L.↗

Cost Estimation and Control for Flight Systems

Good program management practices, cost analysis, cost estimation, and cost control for aerospace flight systems are interrelated and depend upon each other. The best cost control process cannot overcome poor design or poor systems trades that lead to the wrong approach. The project needs robust Technical, Schedule, Cost, Risk, and Cost Risk practices before it can incorporate adequate Cost Control. Cost analysis both precedes and follows cost estimation -- the two are closely coupled with each other and with Risk analysis. Parametric cost estimating relationships and computerized models are most often used. NASA has learned some valuable lessons in controlling cost problems, and recommends use of a summary Project Manager's checklist as shown here.

Hammond, Walter E.↗

Development of a Multivariable Parametric Cost Analysis for Space-Based Telescopes

Over the past 400 years, the telescope has proven to be a valuable tool in helping humankind understand the Universe around us. The images and data produced by telescopes have revolutionized planetary, solar, stellar, and galactic astronomy and have inspired a wide range of people, from the child who dreams about the images seen on NASA websites to the most highly trained scientist. Like all scientific endeavors, astronomical research must operate within the constraints imposed by budget limitations. Hence the importance of understanding cost: to find the balance between the dreams of scientists and the restrictions of the available budget. By logically analyzing the data we have collected for over thirty different telescopes from more than 200 different sources, statistical methods, such as plotting regressions and residuals, can be used to determine what drives the cost of telescopes to build and use a cost model for space-based telescopes. Previous cost models have focused their attention on ground-based telescopes due to limited data for space telescopes and the larger number and longer history of ground-based astronomy. Due to the increased availability of cost data from recent space-telescope construction, we have been able to produce and begin testing a comprehensive cost model for space telescopes, with guidance from the cost models for ground-based telescopes. By separating the variables that effect cost such as diameter, mass, wavelength, density, data rate, and number of instruments, we advance the goal to better understand the cost drivers of space telescopes.. The use of sophisticated mathematical techniques to improve the accuracy of cost models has the potential to help society make informed decisions about proposed scientific projects. An improved knowledge of cost will allow scientists to get the maximum value returned for the money given and create a harmony between the visions of scientists and the reality of a budget.

Dollinger, Courtnay↗

Equivalent Breakeven Installed Cost: A Tradeoff-Informed Measure for Technoeconomic Analysis of Candidate Heliostat Improvements: Preprint

Technoeconomic analysis (TEA) is commonly used to determine economic viability of power-generating technologies, including concentrating solar power (CSP) and thermal (CST) production plants. Levelized cost of electricity (LCOE) and analogous measures provide an estimate of long-term costs for operating power plants over their designed lifetimes by accounting for revenues and costs in a time-discounted manner. While these measures are effective when assessing a technology's total lifecycle costs and productivity under various designs, TEA of candidate incremental technology improvements from the lens of LCOE can be limited when required investment and LCOE impacts are small. In this work, we propose a novel metric for TEA of a plant component technology that recasts relative changes in levelized system costs into component-specific capital cost budgets. This measure, which we refer to as the equivalent breakeven installed cost, is the maximum budget for the technology component that leads to improved levelized costs. We illustrate the usefulness of this metric using the example of candidate heliostat improvements for a CSP tower plant. Here, the results suggest that a reduction in mirror washing costs yield a total plant O&M cost of $37/kWe-yr, which is a breakeven proposition if the average reflectance is reduced from 0.90 to 0.85 as a result of the cost savings.

concentrating solar power↗

Assessing the levelized cost of energy in South Korea

This study evaluates the levelized cost of energy (LCOE) for various energy technologies in the Republic of Korea (Korea) from 2023 to 2050, highlighting cost trajectories and potential crossovers among competing technologies. The analysis projects that, based on our set of assumptions, utility-scale photovoltaic systems achieve lower LCOEs than nuclear by 2030, while fixed offshore wind is expected to become cost-competitive with coal-fired generation around the same time. Floating offshore wind is projected to reach cost parity with coal in the late 2030s. Co-firing with natural gas and green hydrogen is identified as the highest-cost generation option due to high natural gas and green fuel costs and declining capacity utilization. This study further examines the potential for hybrid systems that integrate renewable energy with energy storage to serve as flexible, cost-effective, zero-emission alternatives to green hydrogen-based generation. Spatial LCOE assessments indicate that near-shore offshore wind sites may achieve lower costs despite modest capacity factors, contingent on site-specific factors such as grid integration and social acceptance. The findings indicate that renewable energy technologies are expected to experience continued cost declines, with solar photovoltaic becoming the most competitive energy source in Korea by 2030–2035. Incorporating social costs accelerates this shift from conventional alternatives.

Green hydrogen↗

Cost-Effectiveness Analysis of Single Fraction of Stereotactic Body Radiation Therapy Compared With Single Fraction of External Beam Radiation Therapy for Palliation of Vertebral Bone Metastases

Purpose: Stereotactic body radiation therapy (SBRT) has been proposed for the palliation of painful vertebral bone metastases because higher radiation doses may result in superior and more durable pain control. A phase III clinical trial (Radiation Therapy Oncology Group 0631) comparing single fraction SBRT with single fraction external beam radiation therapy (EBRT) in palliative treatment of painful vertebral bone metastases is now ongoing. We performed a cost-effectiveness analysis to compare these strategies. Methods and Materials: A Markov model, using a 1-month cycle over a lifetime horizon, was developed to compare the cost-effectiveness of SBRT (16 or 18 Gy in 1 fraction) with that of 8 Gy in 1 fraction of EBRT. Transition probabilities, quality of life utilities, and costs associated with SBRT and EBRT were captured in the model. Costs were based on Medicare reimbursement in 2014. Strategies were compared using the incremental cost-effectiveness ratio (ICER), and effectiveness was measured in quality-adjusted life years (QALYs). To account for uncertainty, 1-way, 2-way and probabilistic sensitivity analyses were performed. Strategies were evaluated with a willingness-to-pay (WTP) threshold of $100,000 per QALY gained. Results: Base case pain relief after the treatment was assumed as 20% higher in SBRT. Base case treatment costs for SBRT and EBRT were $9000 and $1087, respectively. In the base case analysis, SBRT resulted in an ICER of $124,552 per QALY gained. In 1-way sensitivity analyses, results were most sensitive to variation of the utility of unrelieved pain; the utility of relieved pain after initial treatment and median survival were also sensitive to variation. If median survival is ≥11 months, SBRT cost <$100,000 per QALY gained. Conclusion: SBRT for palliation of vertebral bone metastases is not cost-effective compared with EBRT at a $100,000 per QALY gained WTP threshold. However, if median survival is ≥11 months, SBRT costs ≤$100,000 per QALY gained, suggesting that selective SBRT use in patients with longer expected survival may be the most cost-effective approach.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Advanced Fuel Cycle Cost Basis

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Advanced Fuel Cycle Cost Basis

This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

2025 Geothermal Drilling Cost Curves Update: Preprint

Drilling activities account for 30% to 57% of the cost to develop and install a geothermal plant. Therefore, an accurate representation of the cost to drill a well is paramount in techno-economic analysis to determine the feasibility of a geothermal power project. In 2022, the National Renewable Energy Laboratory (NREL) endeavored to revise the U.S. Department of Energy (DOE) GeoVision baseline drilling cost curves due to extensive improvement in drilling rates at the Utah Frontier Observatory Research in Geothermal Energy (FORGE) demonstration site. That effort did not culminate in the recommendation of new curves because the actual project costs did not match the reported performance improvements and were at or above the GeoVision baseline. The need for another iteration of this analysis has arisen from industry record drilling performance reported by recent commercial field-scale and demonstration projects, including Fervo Energy’s Cape Station, the Utah FORGE 16B(78)-32 demonstration and the Geysers Power Company’s GDC-36 demonstration. Therefore, in this work, we have estimated the resulting industry average rate of penetration (ROP) and bit life and applied these parameters as inputs to the Well Cost Simplified model used in the GeoVision analysis. The resulting revised cost curves show a significant decline from the GeoVision baseline. For vertical wells, the magnitude of cost decline ranges between 12% and 24% while for deviated wells, cost reductions between 18% and 26% are estimated. The revised cost curves are in good agreement with actual cost data and therefore, quantify the economic impact of the utilization of (and advances in) polycrystalline diamond compact (PDC) bit technology and the application of physics-based methodologies that optimize mechanical specific energy.

15 GEOTHERMAL ENERGY↗

Updating Nuclear Energy Cost Estimates for Net Zero World Initiative

Energy modeling of decarbonized scenarios in integrated energy systems requires nuclear energy parameters that are critical for forecasting, modeling and cost structure analysis. Using updated real-world data has always been a challenge to estimate current nuclear reactors costs and deployment scenarios. Given this, an updated set of parameters for overnight capital costs and operation and maintenance costs are estimated for the Net Zero World initiative using recent reports that provided a vast set of open sources data inputs. This paper follows the methodology developed in the Net Zero World report and applies the new ranges estimated in the Gateway for Accelerated Innovation in Nuclear report that address many of the current challenges in obtaining accurate cost data for advanced nuclear concepts. The final goal is to provide new estimates of the overnight capital costs and operational costs for different countries. The present paper improves the earlier capital cost estimations, building on recent literature that aims to obtain accurate data for modeling and simulation to enhance energy system evaluations and support decision-making in areas like de-carbonization and capacity expansion. Finally, the paper compares the new cost estimates with the old cost results.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗