Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Corridor”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Pedestrian-Involved Traffic Signal Optimization Using Decentralized Graph-based Multi-Agent Reinforcement Learning

Incorporating pedestrian movements in traffic signal timing optimization is essential for ensuring smooth and safe urban transportation systems. To develop an effective signal timing plan, it is crucial to comprehend how various pedestrian accommodation strategies impact both vehicle and pedestrian flow. This study explores the application of the Decentralized Graph-based Multi-Agent Reinforcement Learning (DGMARL) method for signal timing optimization. It considers both pedestrian and vehicle traffic state and assesses the effects of fixed and adaptive pedestrian request response on traffic and signal timing. The evaluation of DGMARL encompasses vehicles Eco_PI which is fuel consumption impact related to vehicle stops and stop delay, and pedestrian waiting time to ensure overall system efficiency. The proposed approach was evaluated using a Digital Twin microscopic traffic simulation model of MLK Smart Corridor in Chattanooga, Tennessee. The evaluation outcomes of vehicles Eco_PI, pedestrian waiting time and serving time are compared with the actuated and DGMARL signal timing with fixed pedestrian recall and minimum recall to determine the most suitable approaches for various traffic conditions. The results indicated that, on average, the strategy of Signal timing optimization with adaptive pedestrian request response improved the Eco_PI by 32.43%, and Signal timing optimization with both automated pedestrian traffic demand and adaptive pedestrian request response improved the Eco_PI by 31.62% compared to the actuated and DGMARL signal timing with fixed pedestrian recall and minimum recall.

K Kumarasamy, Vijayalakshmi↗

Computed Tomography Scanning and Geophysical Measurements of the Integrated Mid-Continent Stacked Carbon Storage Hub Sleepy Hollow Reagan Unit 86A Well

The Computed Tomography (CT) facilities, the Multi-Sensor Core Logger (MSCL), and the Geologic Storage Core Flow laboratory at the National Energy Technology Laboratory (NETL) in Morgantown, West Virginia and Pittsburgh, Pennsylvania were used to characterize a core through Upper Pennsylvanian strata (limestones, mudstones, and sandstones) from the Sleepy Hollow Reagan Unit (SHRU) 86A well in southwest-central Nebraska. The Integrated Mid-Continent Stack Carbon Storage Hub (IMSCS-HUB) core from the vertical well was obtained as part of the Department of Energy’s (DOE) effort to assess the feasibility of stacked storage complexes in Nebraska and Kansas to support a commercial-scale CO2 storage hub. The Sleepy Hollow Field (SHF) is one of three sites within the IMSCS-HUB corridor. Bulk scans of core were obtained from the IMSCS-HUB SHRU 86A well. This report, and the associated scans, include detailed datasets not typically made available to the public. The data sets presented in this report can be accessed from NETL's Energy Data eXchange (EDX) online system.

58 GEOSCIENCES↗

Hydro-EKG: In-Stream Streaming-potential (SP) Electrical Monitoring of the Lifeblood of Watersheds during Disturbance

In order to develop improved methods for characterization and monitoring of hyporheic exchange along stream and river corridors, this project evaluated and compared concentration (C) and discharge (Q) correlations between the dam-managed, intermittent Rio Grande River and the perennial East Fork Poplar Creek in Oak Ridge, Tennessee. Additionally, a multimethod geoelectric survey was implemented between January and March 2022 along a 220-meter long reach of the bedrock-lined East Fork Poplar Creek in Oak Ridge, Tennessee to identify locations of surface-water and groundwater exchange in the bedrock-lined streambed and characterize the subsurface flow paths that convey water between the stream and flood plain.

54 ENVIRONMENTAL SCIENCES↗

Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART): Data Format and Preparation Guidance (V.5.0)

The Joint Office of Energy and Transportation maintains the Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART), which provides a centralized hub for submitting electric vehicle (EV) charging infrastructure data directed by the Federal Highway Administration (23 CFR 680.112(a)-(c)). EV-ChART provides a streamlined data submission process and an integrated set of analytic tools, connects to other data sources, and empowers data sharing and access across stakeholders, including the public. Any data shared publicly will be aggregated and anonymized to stay in accordance with 23 CFR 680. This EV-ChART Data Format and Preparation Guidance provides a comprehensive overview of the data reporting requirements as authorized under 23 CFR 680.112(a)-(c)). The guidance is intended to be used alongside the EV-ChART Data Input Template, which defines the tabular data structure that these data submissions must follow. Per 23 CFR 680.112(a)-(c), the annual and quarterly data submissions are required of all National Electric Vehicle Infrastructure (NEVI) Formula Program projects, as well as projects for the construction of publicly accessible EV chargers that are funded with funds made available under Title 23, United States Code, including any EV charging infrastructure project funded with federal funds that is treated as a project on a federal-aid highway. One-time data submissions are required of both the NEVI Formula Program projects and grants awarded under 23 U.S.C. 151(f) for projects that are for EV charging stations located along and designed to serve the users of designated Alternative Fuel Corridors (AFCs). Other information and data required in 23 CFR 680, such as 23 CFR 680.112(d), 23 CFR 680.116(c), and 23 CFR 680.106(a), are not discussed in this guidance.

33 ADVANCED PROPULSION SYSTEMS↗

Energy-Efficient Adaptive Cruise Control Using Eco-Driving Algorithm

SwRI Eco-Driving Algorithm – Objectives and Method – Required Information Streams and Velocity Profile Realization ▪ Impact on Energy Consumption – Study 1 – NEXTCAR II • Individual (ego/eco) vehicle on Blanco Road, San Antonio, TX – Study 2 – DOE EEMS • Entire Urban Corridor – N High Street, Columbus, OH

Bhagdikar, Piyush↗

Empirical Indicators of Transmission Value in the Southeast United States

Concurrent differences in energy price between different parts of the electric grid are a key indicator of the value of additional transmission. In areas without a wholesale electricity market, such as the Southeast, an alternative indicator to price is the Federal Energy Regulatory Commission’s (FERC) system lambda data. This economic metric represents the minimized marginal production costs of thermal generators, including fuel and other variable operation and maintenance expenses. Balancing Authorities report a single system lambda for their entire balancing area. Most Southeastern lambdas exhibit sufficient price variation to support a transmission valuation analysis, although incomplete accounting of congestion costs or scarcity rents during peak load hours may underestimate the true value of transmission capacity. With transmission value defined as the annual average hourly absolute price difference between two regions and FERC’s system lambda data used as a price proxy, we find the following results in the Southeast region during 2012-2023 (reported in $\$2024$/MWh): Intra‐regional findings: Annual averages historically span $\$2$–$\$28$/MWh and average $\$12$/MWh in SERTP and span $\$4$–$\$19$/MWh and average $\$9$/MWh in FRCC, disregarding transmission value driven by anomalous data. The ranges of transmission value reported here are large, spanning an order of magnitude in some cases. Much of this variation is driven by year-to-year changes, with 2022 having a particularly high intra-regional transmission value due to elevated natural gas prices. Inter‐regional corridors: Annual average transmission values across three broader regions range from $\$6$ to $\$28$/MWh with a long-term average of $\$11$/MWh. Much of the transmission value is concentrated in a small portion of hours. Across all regions, severe weather—particularly polar vortex events in January 2018, February 2021, and December 2022—drives the largest price spreads. Seasonal patterns also emerge, with summer afternoons and fall mornings contributing consistently to transmission value, as for example between MISO and SOCO in 2023.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Defining a Platform Approach and Market Participation: Data Driven Business Models for Solid State Transformer-Based Synthetic Inertia and Voltage Stability Controls (CRADA Final Report, Project 1, Mod 1)

The primary objective of this project is to determine the incremental value created with the medium voltage solid-state transformer (MV SST) technology to different stakeholders in view of the updated DER grid regulations. This includes studying the benefits of the MV SST technology in a range of use cases for EV and DER penetration including (1) “corridor charging” for EVs and (2) solar plus storage (FERC 2222). The potential customers of this technology include utilities for EV charging, DER installers who must meet utility interconnection requirements, balancing authorities, and DER aggregators. The traditional transformers on the grid could be a limiting factor for the EV-grid integration as the distribution transformers were not designed to handle the dynamic and fluctuating EV charging loads. Thus, the issues such as voltage fluctuations, increased losses and reduced efficiency [1] can negatively impact the grid operation. To address these challenges, transformers with flexibility and adaptability become imperative to meet the evolving energy demands. In this regard, the concept of Medium Voltage Solid-State Transformers.

14 SOLAR ENERGY↗

Nine Canyon Long-Duration Energy Storage: A Feasibility Study

The Nine Canyon Long Duration Energy Storage (LDES) Feasibility Study explores the technical and economic viability of deploying advanced energy storage technologies at Energy Northwest's (EN) Nine Canyon (9C) Wind Project site in Benton County, Washington. Supported by the Washington State Department of Commerce and the U.S. Department of Energy’s Office of Electricity under its LDES Voucher Program, the study represents a collaborative effort between EN, Pacific Northwest National Laboratory (PNNL), and ARES North America. At the core of this effort is the development of a generalized techno-economic modeling framework and evaluation tool designed to assess the value proposition of LDES projects across a variety of contexts. The modeling tool is technology-agnostic and accommodates user-defined parameters such as rated power, energy duration, round-trip efficiency, capital and operational costs, and dispatch constraints. It also integrates economic inputs, including market prices, energy revenue structures, and financing parameters to evaluate performance through key metrics. The tool provides utilities with a transparent, adaptable platform to support decision-making, investment prioritization, and portfolio planning for various storage technologies. To guide scenario design and interpretation, the study first surveyed the LDES technology landscape, including lithium-ion batteries, flow batteries, non-hydro gravity storage, and thermo-mechanical systems, comparing cost trajectories, technical performance, safety and hazards, materials sourcing and recyclability, and spatial/siting considerations. This literature-grounded review highlights technology trade-offs and reinforces the need to align technology choice with site characteristics, use cases, and project objectives. A companion chapter examines ownership structures (EN ownership, third-party ownership, shared models) and offtake options (energy marketing, capacity/energy PPAs, time-of-use PPAs, block-delivery PPAs, and tolling), where PPAs (power purchase agreements) represent contractual arrangements for buying and selling electricity. The chapter also highlights implications for risk allocation, capital access, operational control, and revenue certainty. The study also evaluates supervisory control and data acquisition (SCADA) and transmission interconnection pathways, options include upgrading the existing SCADA or deploying a dedicated LDES controller, with attention to protection schemes, data telemetry, cybersecurity, and regulatory coordination with BPA. In addition, an ARES-specific geotechnical and hydrology assessment presented in the appendix screens multiple corridors for slope stability, bearing capacity, cut-and-fill magnitude, and stormwater behavior.

25 ENERGY STORAGE↗

Control Oriented Models for Co-Design: Technical Overview of MT HVDC, MVDC, and Solid State Transformer Building Blocks

The electric power system is shifting toward a power electronics–enabled grid, where converter based “building blocks” (e.g., high voltage direct current (HVDC) links, multi terminal HVDC (MT HVDC) networks, medium voltage DC (MVDC) links, and solid state transformers (SSTs)) provide fast, precise control of power flows, voltage, and frequency. This report develops and applies publicly shareable electromagnetic transient (EMT) and phasor models to examine how such building blocks can be composed and coordinated to support offshore wind integration, inter area transfers, feeder support, and resilience. Section 2 documents a modular multilevel converter (MMC)–based MT HVDC modeling framework and two use cases: a compact WSCC/IEEE 9 bus test system and a 240 bus “mini WECC” case with five offshore wind plants (OWFs). Phasor to EMT transfer, initialization, and sanity checks are summarized, and neutral demonstrations of normal and contingency operation are reported. Section 3 frames the problem of wind plant inertial frequency response (IFR): shaping energy release and recovery to improve nadir while avoiding aerodynamic stall; representative simulations illustrate the issues without disclosing proprietary control. Section 4 develops MVDC concepts through an IEEE 16 bus loop and an Olympic Peninsula case study that compares AC vs. MVDC corridors and shows how feeder headroom can be pooled via DC couplers. Section 5 surveys SST architectures and identifies a gap: scalable, communication free coordination of multiple SSTs for islanded feeder networks. Across the report, novel methods and configurations under separate publication and IP review are not disclosed; only topic oriented, replicable setups and non proprietary results are shown. These models and use cases are intended as foundations for future publications and co design studies on architecture, control, and coordination of PE enabled grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Uncertainty in Synthetic Tropical Cyclone Hazard and Risk Estimates: Insights from RAFT, CHAZ, MIT, STORM, and CLIMADA

We synthesize five complementary tropical cyclone (TC) hazard frameworks—RAFT (physics-based machine learning), CHAZ and MIT (statistical–dynamical), STORM (fully statistical), and CLIMADA (observation-driven resampling)—to characterize uncertainty in wind-related TC metrics relevant to energy applications. All datasets and the IBTrACS observational record are harmonized to a common 6-hourly, 2.5° grid. We compare basin-wide and coastal properties using consistent definitions for TC frequency, mean and maximum intensity, 24-hour intensification, and 6-hour translation speed, and quantify agreement with Pearson r, RMSE, and Kling–Gupta efficiency (KGE) alongside resampling-based confidence intervals. CLIMADA is included for basin context but excluded from coastal skill scoring because it resamples historical IBTrACS; if supplied with projected future tracks from an external hazard model, CLIMADA can be used to simulate future TC scenarios. Results show robust, cross-model signals: (i) a corridor of activity from the tropical Atlantic through the Caribbean into the Bahamas and western subtropical Atlantic; (ii) a meridional dipole in 24-hour intensification (low-latitude strengthening, subtropical weakening); and (iii) a transition from slower tropical motion to faster midlatitude translation. Coastal winds (mean and maximum) consistently cluster from the eastern Gulf into the Bahamas–western Atlantic transition. The largest structural spread occurs in the amplitude and footprint of lifetime maximum intensity and, secondarily, in translation speed; intensification exhibits similar central behavior across frameworks with variability in extremes. Translation speed shows the most uniform coastal agreement. These findings provide a decision envelope for wind-focused risk screening and clarify where uncertainty should be carried forward; wind-only results represent a lower bound on total hazard, motivating integration of surge and rainfall modules and a companion, asset-level damage analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2022

This report describes the monitoring of areas revegetated by various contractors on the Hanford Site. Revegetation sites include those revegetated by the River Corridor Closure Contractor and CH2M Hill Plateau Remediation Company that were transitioned to Mission Support Alliance (MSA) in 2017. These sites, along with sites revegetated by MSA between 2017 and 2020, were transitioned to Hanford Mission Integration Solutions (HMIS) in 2021. HMIS performs revegetation monitoring activities for these transitioned sites and for sites revegetated by HMIS and other contractors in subsequent years to determine revegetation site success. This report contains data collected in 2022 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 53 sites selected to be representative sites for areas planted between the years of fiscal year (FY) 2007 and FY 2022.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2021

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to Mission Support Alliance (MSA) in 2017. These sites, along with sites revegetated by MSA between 2017 and 2020, were transitioned to Hanford Mission Integration Solutions (HMIS) in 2021. Site monitoring is a continuance of efforts performed by the RCCC from fiscal year (FY) 2007 through FY 2020. This report contains data collected in 2021 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing Site mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 52 sites selected to be representative sites for areas planted between the years of FY 2007 and FY 2021.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2020

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to and monitored by Mission Support Alliance (MSA) in 2020, along with sites revegetated by MSA. Site monitoring is a continuance of efforts performed by the RCCC from fiscal year (FY) 2007 through FY 2020. This report contains data collected in 2020 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing Site mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 41 sites selected to be representative sites for areas planted between the years of FY 2007 and FY 2020.

54 ENVIRONMENTAL SCIENCES↗

One Earth Energy Seismic Interpretation

The objectives of the Illinois Storage Corridor (ISC) project are to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site (ISC Project Narrative, 2020). As part of this project, and as part of the subsurface geologic characterization, 2D seismic data was acquired at both sites. This report summarizes the findings from the 2D and 3D seismic interpretation at the One Earth Energy site near Gibson City, Illinois. The seismic data confirms the stratigraphic continuity of the Mt. Simon Arkose Zone storage interval and the Eau Claire confining unit across the project area. The seismic data also indicates that there are faults that transect the Mt. Simon Arkose Zone Sandstone storage reservoir within the modeled CO 2 plume (for more detailed information, see Faults and Fractures section of One Earth Energy Class VI Permit applications). However, the seismic data also shows that there are no faults within the modeled CO 2 plume that transect the confining unit Eau Claire Formation. The faults that transect the Mt. Simon Arkose Zone Sandstone storage reservoir all tip out in the Lower Mt. Simon Formation and do not reach the overlying Eau Claire confining unit. A small 3D survey acquired around the One Earth Energy #1 characterization well confirms these findings.

20 FOSSIL-FUELED POWER PLANTS↗

Prairie State Generating Company 2D Seismic Interpretation

The objectives of the Illinois Storage Corridor (ISC) project are to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site (ISC Project Narrative, 2020). As part of this project, and as part of the subsurface geologic characterization, two-dimensional (2D) seismic data was acquired at both sites. This report summarizes the findings from two phases of 2D acquisition and seismic interpretation at the Prairie State Generating Company site near Marissa, Illinois. The seismic data indicates the presence of three faults that completely transect the storage and confining units. The initial 2021 2D seismic acquisition revealed the presence of a feature two miles east of the Lively Grove #1 characterization well. The feature is a polyphase fault with a component of strike-slip motion, forming a small positive flower structure. The second phase of 2D seismic acquisition in 2022 constrained the maximum extent of the fault, indicating it has a relatively limited length. Other 2022 seismic lines revealed the presence of two other faults that transect the storage and confining units in the southwest and northeast portions of the 2D seismic acquisition area. The 2021 and 2022 2D seismic surveys have identified three specific locations within the project area that may have an elevated risk of out of zone CO 2 migration due to faulting. Further technical work will be needed to quantify this risk and determine how and if this risk will impact the placement of CO 2 injection wells across the project area.

01 COAL, LIGNITE, AND PEAT↗

One Earth Energy FEED Process Design Basis

This report establishes the process design basis for the front-end engineering design (FEED) of a carbon capture and injection facility at One Earth Energy's (OEE) ethanol production plant in Gibson City, Illinois, developed as part of the Illinois Storage Corridor CarbonSAFE Phase III project. The facility is designed to compress and dehydrate up to approximately 458,000 metric tonnes of CO 2 per year, sourced directly from OEE's ethanol fermenters, for permanent injection into a saline aquifer approximately four miles from the plant. At normal operating conditions, the system will process 1,290 metric tonnes of CO 2 per day, assuming 355 operating days per year and an ethanol production rate of 160 million gallons per year. The proposed process trains a multistage centrifugal blower with a five-stage reciprocating compressor, delivering CO 2 to the injection wellhead at up to 1,500 psig. Triethylene glycol (TEG) dehydration, applied after the fourth compression stage, reduces water content to a target of 10 lb/MMscf, well within the 30 lb/MMscf injection limit. Beyond dehydration, no additional treatment is required; trace impurities including oxygen and nitrogen will remain in the injected stream. Key design considerations include the absence of spare cooling tower capacity at the site, necessitating new cooling infrastructure, and the need for a new electrical substation to support large motor loads. The facility is designed for continuous, largely unattended operation, monitored around the clock by existing OEE operations staff. This document serves as the foundational reference for all subsequent detailed engineering activities associated with the OEE CO 2 injection facility.

01 COAL, LIGNITE, AND PEAT↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗

White Rock Canyon Riparian Monitoring

Land and natural resources within the Los Alamos National Laboratory (LANL) complex are owned and managed by the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA). The Laboratory’s eastern boundary is in White Rock Canyon (WRC) along the Rio Grande within Technical Areas (TAs) 70 and 33, with approximately 4 miles of property along the river (Figure 1). In 1999, the riparian corridor from the mesa tops down to the river was designated as the White Rock Canyon Reserve by former New Mexico Governor Bill Richardson and is recreationally open to the public (DOE 1999). This area provides viable foraging and stopover habitat for many species of wildlife, including the Yellow-billed Cuckoo and the Southwestern Willow Flycatcher, both of which are federally listed under the Endangered Species Act (ESA).

54 ENVIRONMENTAL SCIENCES↗