Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contingency planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Spacely's rockets: Personnel launch system/family of heavy lift launch vehicles

During 1990, numerous questions were raised regarding the ability of the current shuttle orbiter to provide reliable, on demand support of the planned space station. Besides being plagued by reliability problems, the shuttle lacks the ability to launch some of the heavy payloads required for future space exploration, and is too expensive to operate as a mere passenger ferry to orbit. Therefore, additional launch systems are required to complement the shuttle in a more robust and capable Space Transportation System. In December 1990, the Report of the Advisory Committee on the Future of the U.S. Space Program, advised NASA of the risks of becoming too dependent on the space shuttle as an all-purpose vehicle. Furthermore, the committee felt that reducing the number of shuttle missions would prolong the life of the existing fleet. In their suggestions, the board members strongly advocated the establishment of a fleet of unmanned, heavy lift launch vehicles (HLLV's) to support the space station and other payload-intensive enterprises. Another committee recommendation was that a space station crew rotation/rescue vehicle be developed as an alternative to the shuttle, or as a contingency if the shuttle is not available. The committee emphasized that this vehicle be designed for use as a personnel carrier, not a cargo carrier. This recommendation was made to avoid building another version of the existing shuttle, which is not ideally suited as a passenger vehicle only. The objective of this project was to design both a Personnel Launch System (PLS) and a family of HLLV's that provide low cost and efficient operation in missions not suited for the shuttle.

Source record↗

Contingency Operations during Failure of Inertial Attitude Acquisition Due to Star Tracker Blinding for Three-Axes-Stabilized Interplanetary Spacecraft

The three interplanetary ESA missions Mars-Express, Rosetta and Venus-Express (launched 2003, 2004 and 2005 resp.) are three-axes stabilized spacecraft (s/c) that estimate their inertial attitude (i.e. the attitude of the s/c w.r.t. the inertial frame) using measurements from a redundant set of star trackers (STR). Each s/c is equipped with four reaction wheels, a reaction control system based on thrusters and a redundant set of ring laser gyroscopes (gyros). The STR h/w layout of the three s/c is identical whereas there is a difference in the star pattern recognition algorithm of Rosetta which uses five neighbouring stars around a central star instead of star triads. The Rosetta algorithm has been implemented to cope with the presence of false stars which are expected to be seen during operations around the comet. The attitude acquisition capability from lost in space is different also in terms of AOCMS: The survival mode of Rosetta which is entered upon STR failure is presented. The AOCMS of Mars- and Venus-Express manages temporary STR outages during sky occultation by the planet not even by using redundancy. Though, a blinding of both STR during cruise lasting for the order of days confronts the ground operators with the limits of the AOCMS design. The operations and analyses that have been planned and partially been performed to compensate for the outage of the STR are demonstrated for Mars-Express. The caution measures taken before Venus orbit insertion of Venus-Express are detailed.

Keil, Joachim↗

Testing of Advanced Capabilities to Enable In-time Safety Management and Assurance for Future Flight Operations

In order to refine an initial Concept of Operations, explore Concepts of Use, and expose/validate requirements for future In-Time Aviation Safety Management Systems (IASMS), testing architectures were created, along with a set of capabilities and underlying information exchange protocols. These systems were conceived and developed based on hazards associated with two envisioned urban area flight domains: (1) highly autonomous small uncrewed aerial systems (sUAS) operating at low altitudes, and (2) highly autonomous air taxis. The initial scope of this development is described in [1]; this report provides an update, focusing on the subsequent developments and test activities. As stated in [1], it is important to note that there are many capabilities already in use by the industry (or soon to be in use) that will play critical roles in future IASMS designs. Those reported here were developed to address a gap in the current state-of-the-art regarding specific hazards/risks, and/or to allow for investigation of the interplay between and across hazard types — particularly regarding how overall safety risk can be reduced or managed effectively. Results of testing and development activities are organized by the operational phase wherein a particular capability would be employed (i.e., preflight, in-flight, and post-flight/off-line). Pre-flight: A set of capabilities were developed to help mitigate safety risk prior to flight (e.g., during flight and mission planning). Results of testing summarize (1) validation activities to raise the Technology Readiness Level (TRL) and (2) evaluation activities where the capabilities were applied to flight/mission planning procedures and used by operators/pilots. For the latter, flight plans were automatically assessed, and operators/pilots were notified of hazardous flight segments so as to enable adjustment of the flight plan and re-evaluation, and/or to better inform go/no-go decisions. Capabilities addressed hazards associated with power consumption, third-party risk, wind, navigation system performance, radiofrequency interference, and proximity to geo-spatial threats (e.g., buildings, trees, and no-fly zones). In-flight: Flight experiments tested capabilities that detect and respond to hazards encountered during flight. In the first series, safety hazards were monitored and assessed onboard, and system-generated mitigation maneuvers were recorded (but not acted upon by the vehicle). In the second series, mitigation maneuver commands directed the aircraft in response to safety hazards (i.e., auto-mitigation). The sUAS used for testing is described in full, as is the test architecture, which included commercial avionics, research avionics, and onboard software designed to detect, assess, and respond to hazards. The onboard system was designed as a run-time assurance framework, consistent with [2] and supportive of both supervisory and automated modes. The primary functions included: real-time risk assessment (RTRA), auto-pilot monitoring, constraint monitoring, and contingency select/triggering. RTRA performs integrated risk assessment considering data from several hazard-related monitors (e.g., battery, motors, navigation, communications, population density, and loss-of-control). Post-flight/off-line: Data monitored and recorded during flights can enable IASMS capabilities that execute after flights have completed (or “off-line”). These include: (1) the ability to identify anomalies and trends that may only be observable when comparing data spanning a number of similar flights; (2) the ability to update and validate pre-flight and in-flight capabilities and any underlying models to improve their performance; (3) the ability to report anomalies/off-nominals that may indicate design changes or maintenance actions are needed; and (4) the ability for humans involved in operations to report safety-relevant observations to help in understanding the flight data and/or the operational context of a flight. Progress on three such capabilities is summarized; the first investigates anomaly detection given a limited set of flight logs and applies an approach previously used for space operations. The second explores what could be identified using a larger set of flight logs, including from web-based forums where flight logs are posted by sUAS autopilot users. The third creates a new means of collecting information on UAS incidents and accidents via the Aviation Safety Reporting System (ASRS).

sUAS↗

Optimal Propellant Maneuver Flight Demonstrations on ISS

In this paper, first ever flight demonstrations of Optimal Propellant Maneuver (OPM), a method of propulsive rotational state transition for spacecraft controlled using thrusters, is presented for the International Space Station (ISS). On August 1, 2012, two ISS reorientations of about 180deg each were performed using OPMs. These maneuvers were in preparation for the same-day launch and rendezvous of a Progress vehicle, also a first for ISS visiting vehicles. The first maneuver used 9.7 kg of propellant, whereas the second used 10.2 kg. Identical maneuvers performed without using OPMs would have used approximately 151.1kg and 150.9kg respectively. The OPM method is to use a pre-planned attitude command trajectory to accomplish a rotational state transition. The trajectory is designed to take advantage of the complete nonlinear system dynamics. The trajectory choice directly influences the cost of the maneuver, in this case, propellant. For example, while an eigenaxis maneuver is kinematically the shortest path between two orientations, following that path requires overcoming the nonlinear system dynamics, thereby increasing the cost of the maneuver. The eigenaxis path is used for ISS maneuvers using thrusters. By considering a longer angular path, the path dependence of the system dynamics can be exploited to reduce the cost. The benefits of OPM for the ISS include not only reduced lifetime propellant use, but also reduced loads, erosion, and contamination from thrusters due to fewer firings. Another advantage of the OPM is that it does not require ISS flight software modifications since it is a set of commands tailored to the specific attitude control architecture. The OPM takes advantage of the existing ISS control system architecture for propulsive rotation called USTO control mode1. USTO was originally developed to provide ISS Orbiter stack attitude control capability for a contingency tile-repair scenario, where the Orbiter is maneuvered using its robotic manipulator relative to the ISS. Since 2005 USTO has been used for nominal ISS operations.

Bhatt, Sagar↗

Large-scale simulation-based parametric analysis of an optimal precooling strategy for demand flexibility in a commercial office building

Achieving success with grid-interactive efficient buildings (GEBs) is closely tied to the utilization of flexible loads. A valuable strategy involves the implementation of precooling techniques before high-demand events, such as peak hours, by adjusting zone air temperature setpoints. This leads to a reduction in thermal loads and peak electricity demand during these times, as the building’s thermal mass stores and subsequently releases thermal energy. However, the effectiveness of the pre-cooling optimization is highly contingent on specific conditions such as building thermal properties, weather conditions, utility rate structure, HVAC equipment sizing, etc. Therefore, investigating the impacts of these condition-specific factors is crucial, especially when considering precooling strategies that utilize thermal mass in commercial buildings. In this paper, we first devised a novel heuristic control approach that incorporates parameterized optimal precooling thermostat schedules to enhance demand flexibility in a commercial office building. Subsequently, we conducted a thorough performance evaluation of this control strategy. Here, the optimal thermostat schedule was parameterized using three optimization variables: the precooling start time, the precooling end time, and the precooling temperature setpoint. Utilizing the DOE medium-sized office building as the virtual testbed, we showed that the parameterized schedule effectively approximates model predictive control and requires drastically reduced computational overhead. In addition, we investigated the impact of different influencing factors on the optimal precooling strategy. These factors include building thermal mass, outdoor air conditions, and energy price profiles. Using high-performance computing, we simulated a total of 225 scenarios, consisting of three levels of thermal mass, five typical outdoor air temperature profiles, and fifteen time-of-use price plans. The results demonstrate that optimal thermostat scheduling could save substantial energy cost in medium-sized office buildings with heavy thermal mass but with some energy penalty. Although the potential for cost savings is lower in buildings with low and medium thermal mass, the energy penalty remains consistent in all three thermal mass scenarios. The study also highlights the need to account for zone diversity and recognize that a one-size-fits-all-zone setpoint schedule may not be suitable for all zones and can lead to unnecessary energy wastage. Furthermore, the results highlight that while outdoor air conditions play a role in cost and energy performance, the cooling load exerts a more immediate and substantial influence on cost savings in precooling strategies. Although cost savings are comparable under certain conditions with the same cooling load, observed deviations in energy penalty indicate potential disparities in the efficiency of the HVAC system during the load-shifting process. In addition, the duration of peak pricing and the ratio between peak and off-peak times exhibit clear correlations with cost savings and energy consumption, aligning with intuitive expectations. These findings offer valuable insights for optimizing precooling strategies in office buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Potential of Data Center Controls in Grid Services

The rapid proliferation of large data centers brings both challenges and opportunities for grid reliability. The data center resources and their potential flexibility have the potential to contribute resources to grid operations. Through capabilities like energy shifting and resource coordination, data centers can help reduce their net demand on the transmission network, as well as provide additional grid services to support reliable operation on the grid. While transient and long-term grid planning and operations are the scenarios that draw most attention, the quasi-steady state timeseries (QSTS) operation of data centers and grid bring interesting scenarios that can help evaluate the data center controls to aid grid services. This work is focused on modeling data centers for QSTS applications – incorporating the AI data center load profiles and building on the PNNL digital twin model for the thermal management loads to enable simulation studies to reveal the impact of data center controls on grid performance. This includes the integration of a QSTS battery and natural gas generator model to incorporate local resource impacts to the system. The simulation study is performed with a modified IEEE 24-Bus transmission system. Scenarios are focused on evaluating the data center load impacts on the transmission system and leveraging both data center and local generation controls to mitigate those impacts and provide additional grid services. The data center controls revealed the ability to contribute to two main kinds of grid services: preventing congestion on a weak grid by coordinating the data center resources with the collocated BESS and onsite generation; and the ability to help the grid operations during stressed times of operation like during a contingency. Leveraging these and other capabilities has the potential to help data centers become grid responsive assets, aiding in both their integration into the power system and grid reliability.

power grid simulation↗

Multi-Sensor Testing for Automated Rendezvous and Docking Sensor Testing at the Flight Robotics Laboratory

The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as AR&D). The crewed missions may also perform rendezvous and docking operations and may require different levels of automation and/or autonomy, and must provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Exploration Program. NASA has the responsibility to determine whether the Crew Exploration Vehicle (CEV) contractor proposed relative navigation sensor suite will meet the requirements. The relatively low technology readiness level of AR&D relative navigation sensors has been carried as one of the CEV Project's top risks. The AR&D Sensor Technology Project seeks to reduce the risk by the testing and analysis of selected relative navigation sensor technologies through hardware-in-the-loop testing and simulation. These activities will provide the CEV Project information to assess the relative navigation sensors maturity as well as demonstrate test methods and capabilities. The first year of this project focused on a series of"pathfinder" testing tasks to develop the test plans, test facility requirements, trajectories, math model architecture, simulation platform, and processes that will be used to evaluate the Contractor-proposed sensors. Four candidate sensors were used in the first phase of the testing. The second phase of testing used four sensors simultaneously: two Marshall Space Flight Center (MSFC) Advanced Video Guidance Sensors (AVGS), a laser-based video sensor that uses retroreflectors attached to the target vehicle, and two commercial laser range finders. The multi-sensor testing was conducted at MSFC's Flight Robotics Laboratory (FRL) using the FRL's 6-DOF gantry system, called the Dynamic Overhead Target System (DOTS). The target vehicle for "docking" in the laboratory was a mockup that was representative of the proposed CEV docking system, with added retroreflectors for the AVGS. The multi-sensor test configuration used 35 open-loop test trajectories covering three major objectives: (1) sensor characterization trajectories designed to test a wide range of performance parameters; (2) CEV-specific trajectories designed to test performance during CEV-like approach and departure profiles; and (3) sensor characterization tests designed for evaluating sensor performance under more extreme conditions as might be induced during a spacecraft failure or during contingency situations. This paper describes the test development, test facility, test preparations, test execution, and test results of the multi-sensor series of trajectories.

Brewster, L.↗

Multi-Sensor Testing for Automated Rendezvous and Docking Sensor Testing at the Flight Robotics Lab

The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as AR&D). The crewed missions may also perform rendezvous and docking operations and may require different levels of automation and/or autonomy, and must provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success ofthe Exploration Program. NASA has the responsibility to determine whether the Crew Exploration Vehicle (CEV) contractor-proposed relative navigation sensor suite will meet the requirements. The relatively low technology readiness level of AR&D relative navigation sensors has been carried as one of the CEV Project's top risks. The AR&D Sensor Technology Project seeks to reduce the risk by the testing and analysis of selected relative navigation sensor technologies through hardware-in-the-Ioop testing and simulation. These activities will provide the CEV Project information to assess the relative navigation sensors maturity as well as demonstrate test methods and capabilities. The first year of this project focused on a series of "pathfinder" testing tasks to develop the test plans, test facility requirements, trajectories, math model architecture, simulation platform, and processes that will be used to evaluate the Contractor-proposed sensors. Four candidate sensors were used in the first phase of the testing. The second phase of testing used four sensors simultaneously: two Marshall Space Flight Center (MSFC) Advanced Video Guidance Sensors (AVGS), a laser-based video sensor that uses retroreflectors attached to the target vehicle, and two commercial laser range finders. The multi-sensor testing was conducted at MSFC's Flight Robotics Laboratory (FRL) using the FRL's 6-DOF gantry system, called the Dynamic Overhead Target System (DOTS). The target vehicle for "docking" in the laboratory was a mockup that was representative of the proposed CEV docking system, with added retroreflectors for the AVGS.' The multi-sensor test configuration used 35 open-loop test trajectories covering three major objectives: (l) sensor characterization trajectories designed to test a wide range of performance parameters; (2) CEV-specific trajectories designed to test performance during CEV-like approach and departure profiles; and (3) sensor characterization tests designed for evaluating sensor performance under more extreme conditions as might be induced during a spacecraft failure or during contingency situations. This paper describes the test development, test facility, test preparations, test execution, and test results of the multisensor series oftrajectories

Brewster, Linda L.↗

Preparation for an Earth Independent Medical Operations Demonstration using the Tempus ALS™ Medical Device

NASA’s exploration-class missions have severe resource constraints, long return trip durations, significant communication delays and limited resupply opportunities. Validation on the International Space Station (ISS) of medical devices that fit within Earth-Independent Medical Operations (EIMO) systems is a necessary preparation step. Key features of an EIMO medical system include: 1) technologies that support the prevention, diagnosis, and treatment of spaceflight medical events; 2) components that meet mass, volume, power and crew time/training constraints; 3) consideration of the medical skill level of the astronaut caregiver; 4) collection, storage and analysis of medical data within a central data architecture; and 5) incorporation of appropriate guidance and support tools that allow crew autonomy. The Human Research Program’s (HRP) Exploration Medical Capability (ExMC) Element and the Exploration Medical Integrated Product Team (XM-IPT) are planning an ISS technology demonstration to determine the feasibility of including a multifunctional medical device into an EIMO medical system. Demonstration Preparations: The Tempus ALS (Remote Diagnostic Technologies, Ltd., Philips Corp., Farnborough, UK) is a commercial-off-the-shelf medical device, with United States Food and Drug Administration clearance and is Conformité Européene marked in Europe. Several thousand units have been sold and are successfully operating in pre-hospital and in remote settings, such as by European Space Agency (ESA) flight surgeons and some of NASA’s commercial partners during post-flight medical operations. The Tempus ALS provides vital sign measurements such as blood pressure, electrocardiograms, heart rate, end tidal CO2, respiration rate, pulse oximetry and temperature. The device has ultrasound imaging and video laryngoscopy capabilities and has automatic or manual defibrillation modes for treating cardiac arrhythmias. It includes procedural guidance capabilities to assist in the collection of the vital sign measurements and it has various data transmission and report generation features. NASA’s HRP ExMC and XM-IPT are partnering with the ESA to demonstrate the Tempus ALS on ISS, with ESA manifesting the Tempus ALS and its accessories. ESA will compare performance of periodic health status exams and medical contingency drills performed nominally and with the Tempus ALS. NASA’s EIMO demonstration will include the use of Tempus ALS to diagnose a complaint of abdominal pain under increasingly independent circumstances. The caregiver must assess the present illness, collect vital sign measurements, and perform an abdominal ultrasound, under one of three communication situations, including real-time, with a several second delay and with a delay on the order of minutes. Expected Outcomes: Information will be gained about the feasibility, benefits, and challenges of using a multifunctional, all-in-one, medical device for medical diagnosis instead of separate devices with singular functionalities. Information will also be collected about performance differences as communication delays increase and available ground support decreases. Gaining this understanding will allow for further development of exploration medical system capabilities which takes the EIMO construct into consideration.

Beth Lewandowski↗

Computational Algorithms for Unit Commitment with AC Power Flows (Final Report)

Security-constrained unit commitment (SCUC) is a key component in power system operations. When AC power flow constraints are considered in the SCUC model (AC-SCUC), the problem becomes extremely difficult due to its discrete and non-convex nature, as described in “Grid Optimization Competition Challenge 3 Problem Formulation (GOCC)”. There are four main challenges: (i) Discrete decisions regarding unit online/offline status and start-up/shut-down procedures for every single unit. The number of discrete decision variables increases considerably when a system integrates multiple generators; (ii) Configuration-based combined-cycle formulations, and multi-commodity models that include ramping products, spin/non-spin products, and regulation up/down products. The combined-cycle units introduce additional discrete decision variables and auxiliary service products further complicate the model by connecting multi-commodity products’ continuous and discrete variables; (iii) SCUC models with AC power flow constraints are far more complex due to massive bilinear terms in the large-scale nonlinear power balance equations. The nonlinear power balance equations are further complicated by the discrete step control variables of shunts; (iv) N − 1 contingency analysis. The size of the model increases linearly with the number of contingencies considered, greatly increasing the size of the optimization model. Accordingly, there is an emergent need to develop a robust algorithm capable of deriving a high-quality solution in a short time and passing through contingency tests simultaneously. In this project, we explore innovative techniques to address this challenging problem by integrating advanced polyhedral theory, approximation methods, relaxation strategies, decomposition techniques, and parallel computing. Each technique approaches the problem from a different perspective, leveraging its specific strengths to tackle distinct challenges. Each individual method has demonstrated its effectiveness in the PI’s previous research. Their integration is expected to significantly reduce the computational time required to solve the proposed complex problem. Successful completion of this project has the potential to transform the industry by enhancing optimization solvers capable of handling large-scale day-ahead energy market clearing models within strict time constraints, while incorporating AC power flow constraints. This advancement will lead to reduced overall generation costs and, consequently, increased social welfare.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lunar Transient Accelerations White Paper

Recently, the United States announced a plan to return astronauts to the moon by 2024 [8]. Lunar landing (and subsequent Mars landing) architecture was not considered when the current NASA standards and vehicle design requirements for crew injury risk were developed. Therefore a gap exists in protecting the crew in planetary landing scenarios. One of the interesting aspects of this design reference mission (DRM)is the consideration of having the crew stand during dynamic phases of flight. Although this approach was contemplated for the Apollo Lunar Module, current NASA standards do not address design solutions that allow the crew to stand. Currently, NASA uses several tools and associated limits to mitigate crew injury because of dynamic loads. Some of these tools are the Brinkley Dynamic Response Criterion (BDRC) model and Hybrid III Anthropomorphic Test Devices (ATDs) [10]; and these have several limitations for assessing spaceflight loading environments, as well as specific underlying assumptions that may not be applicable in planetary landing vehicles. The BDRC is a simple lumped mass parameter model developed by the U.S. military, and has been used primarily to evaluate injury risk associated with aircraft ejection systems. The model evaluates seat accelerations in each axis to determine injury risk. Because the model treats the human-seat-restraint system as a single system, it is contingent on a restraint system and seat with similar characteristics of the original test data underlying the model. In particular, the model requires a rigid seat with a minimum natural frequency of 15Hz, minimal seat pan padding, side supports, and multipoint harness. The BDRC model uses undamped natural frequency and damping coefficients based on these requirements and any deviations may render the model injury predictions void. In lunar landing, one expects that a minimal or even no seat with minimal restraints will be employed. In this case, the original model parameters are likely to not be applicable. For capsule-based spacecraft returning crew to Earth, the Hybrid III ATD in various sizes also is used to supplement the BDRC. This analytical tool was added to address limitations in the BDRC related to spacecraft landings while wearing a pressure garment and helmet. Although the Hybrid III ATD has additional measurement capability; head, neck,and lumbar spine responses were the only metrics included because of the limitations imposed by the model.Lunar landing acceleration limits must assume the crew is standing during landing, an orientation for which we have limited data.Although the Apollo missions did employ a standing orientation for the crew, much of the data is lost. Therefore data from othersources havebeen examined to inform lunar landing acceleration limits.

Jeffrey T Somers↗

A Unified Metric for Fast Frequency Response in Low-Inertia Power Systems

Future power systems with more inverter-based resources (IBRs), will be vulnerable to frequency decline contingencies. Fast frequency response (FFR) provided by IBRs is a good candidate to arrest frequency excursions. Diverse types of FFR have been proposed, and some have been deployed in our power systems. Without a unified quantification of FFR, it is hard for the grid operators to compare and fully leverage the FFR capabilities of IBRs. This work introduces a potential unified metric that quantifies two key characteristics of FFR and describes its application to three prevailing FFR types. We then use metric-to-frequency mapping to validate the accuracy of the metric in predicting the impact of a given FFR on the trajectory of a frequency event. The results show that the proposed metric is simple yet accurately captures the ability of diverse forms of FFR to improve system frequency dynamics.

effective inertia↗

VERNE: Revealing the Mysteries and Histories of Venus

Introduction: The three Venus missions that were recently selected for upcoming flight (VERITAS, DAVINCI+, and EnVision) will be incredibly valuable to our understanding of Venus’ history, geology, and atmosphere. However, even once completed, key gaps in our knowledge of Venus, and more generally the formation and active processes on rocky, Earth-like planets, will still persist. Remaining questions include 1) how global intrinsic magnetic fields might be maintained on rocky worlds, and how they could then go extinct, and 2) what role atmospheric sulfur chemistry plays in climates of Earth-like planets, which is an increasingly timely subject as Earth’s own atmospheric sulfur content is climbing due to human activity. These questions require in-situ observations from Venus’ cloud deck, at the altitudes at which the UV absorber exists. The Venus Environment Research and Novel Exploration (VERNE) mission will address these questions with an aerial platform that will drift around the equatorial region of the planet for 9 days. VERNE will collect data to determine the identity of the mysterious UV absorber, while also taking magnetic field measurements over the tesserae, the regions on Venus that are most likely to retain remanent crustal magnetization, in order to understand the potential role of a past intrinsically-generated global magnetic field on Venus. Mission Objectives: The two major science objectives that drive the VERNE mission are: 1) Determine the identity of the Venusian unknown ultraviolet absorber(s). First observed approximately a century ago [1], the composition of Venus’ ultraviolet (UV) absorber is one of the oldest mysteries in Venus atmospheric chemistry [2,3]. While several candidate UV absorbers (mostly sulfur species) have been proposed, no consensus has been reached on its composition and its specific interactions with the atmosphere. Determining the identity of the UV absorber will aid climate models by showing how and where incident solar energy is absorbed by the atmosphere and make progress towards understanding the chemical and energetic processes taking place above Venus’ upper cloud deck [4]. 2) Determine if Venus retains evidence of a past, internally-generated magnetic field. While Venus does not currently have an intrinsically-generated magnetic field, evidence for the existence of a past field on Venus and a timeline of its decay will fill in a more holistic picture of the evolution of Venus’ geological record and atmosphere. As the oldest geologic units on the surface, Venus’ tesserae may still have remanent crustal magnetization signatures within the rocky composition [5]. In any case, the signatures detected will provide insight into Venus’ past geological and core dynamo activity. Mission Summary: VERNE includes a 3-part flight system made up of 1) an entry system with a HEEET (Heatshield for Extreme Entry Environment Technology) aeroshell, 2) an orbiter for data relay, and 3) an in-situ balloon and gondola. After entry into Venus’ atmosphere, the balloon will be deployed within the upper cloud deck, at an altitude of 62 km, over a tesserae region. The in-situ data collection will last for the duration of 2 full circumnavigations of the planet, which will take ~9 days. Instrumentation Suite: The four instruments that comprise VERNE’s instrument payload will enable the identification of the unknown UV absorber and the detection of remanent crustal magnetization if it exists in the tesserae. The proposed instrument suite cycle during mission operations is shown in Fig. 1. The four instruments are described below: 1) Adams (ion neutral mass spectrometer) has a range of 18-257 AMU and will detect and distinguish the mixing ratios of O₂, H₂O, H₂SO₄, S, S₂, S₃, S₄, S₅, S₆, S₇, S₈, SO, SO₂, OSSO, SO₃, Cl₂, FeCl₃ and other trace sulfur and organic species. The spatial (longitudinal) and temporal (day/night) variations will be observed throughout 2 circumnavigations with a sample cadence of 12 minutes. 2) Shelley (nephelometer) will determine the size distribution of the aerosols (0.4 to 36 um) in the atmosphere. With a size resolution of <0.7 um, it can determine which mode of H2SO4 is present and characterize the large (>30 um) organic particles previously detected by the Venera and Galileo missions [6,7]. 3) Herbert (UV imager) will measure UV radiance at 283 nm (the wavelength of SO2 absorption) and 365 nm (the unknown part of the absorber). UV images will be taken concurrently with the INMS and nephelometer to correlate UV absorption with abundances of the UV absorber species. 4) Vonnegut (magnetometer) has a range of >600 nT and a precision and accuracy of 1 nT. If magnetized by a past field, the crust may have retained a magnetization of up to 3 A/m2 [5]. With a noise floor of 10 nT, the magnetometer will be able to detect RCM from an altitude of 62 km, even if the thickness of the magnetized crust is just 1 km (Fig. 2). Mission Concept Design: VERNE will be launched with a mass of 3300 kg in an intermediate-high performance class vehicle with a 4-m fairing. The 475-day mission includes 466 days for the cruise, coasting, and orbit initialization phases before entry, descent, and balloon deployment. During the 9-day science phase, the aerial platform will make 2 circumnavigations of the planet at an altitude of 62 km. The INMS and the nephelometer will acquire data for 2 hours during the daytime and nighttime during each circumnavigation, while the UV imager will be on for the duration of the daytime, and the magnetometer will be operational throughout the entirety of the science phase. Data will be stored and processed with the JPL-designed Sphinx command and data handling system. Data will be sent from the balloon to the orbiter using an S-band relay link, stored on the orbiter, and then forwarded to Earth where it will be received by the DSN. Conclusion: VERNE will fill key gaps in our understanding of the history and ongoing processes related to the geology and atmosphere of Venus and rocky worlds in general. Even with adequate flight system contingencies and expected costs below the $900M New Frontiers cost cap, VERNE is not without its risks and challenges. Further trade spaces to explore include 1) using solely battery power vs. including solar panels to increase the mission duration and 2) investigating the use of lightweight materials and 3D-printed structures to reduce the gondola mass, among others. Acknowledgments: We would like to thank the JPL Planetary Science Summer School, especially our mentors Troy Hudson, Karl Mitchell, and Leslie Lowes, as well as our Team-X study lead Al Nash and the members of Team-X. We’d additionally like to thank our review panel for asking insightful questions and providing valuable feedback. References: [1] Ross, F. E. (1928) Astrophysical J., 68, 57-92. [2] Rossow, W. B. et al. (1980) J. Geophysical Research, 85, 8107-8128. [3] Pinto, J. P. et al. (2021) Nature Communications, 12, 175. [4] Titov, D. V. et al. (2007) Cosmic Research, 21, 401. [5] O’Rourke, J. et al. (2019) Geophysical Research Lett., 46, 5768–5777. [6] Limaye, S. S. et al. (2018) Astrobiology, 18(9), 1181-1198. [7] Grinspoon, D. H. et al. (2013) Planetary and Space Sci., 41(7), 515-542. [8] Parker, R. L. (2003) J. Geophysical Research, 108, 5006. *The cost information contained in this document is of a budgetary and planning nature and is intended for informational purposes only. It does not constitute a commitment on the part of JPL and/or Caltech.

H Alpert↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of the Oxygen Concentrator Prototypes: Pressure Swing Adsorption Prototype and Electrochemical Prototype

An oxygen concentrator is needed to provide enriched oxygen in support of medical contingency operations for future exploration human spaceflight programs. It would provide continuous oxygen to an ill or injured crew member in a closed cabin environment. Oxygen concentration technology is being pursued to concentrate oxygen from the ambient environment so oxygen as a consumable resource can be reduced. Because oxygen is a critical resource in manned spaceflight, using an oxygen concentrator to pull oxygen out of the ambient environment instead of using compressed oxygen can provide better optimization of resources. The overall goal of this project is to develop an oxygen concentrator module that minimizes the hardware mass, volume, and power footprint while still performing at the required clinical capabilities. Should a medical event occur that requires patient oxygenation, the release of 100 percent oxygen into a small closed cabin environment can rapidly raise oxygen levels to the vehicles fire limit. The use of an oxygen concentrator to enrich oxygen from the ambient air and concentrate it to the point where it can be used for medical purposes means no oxygen is needed from the ultra-high purity (99.5+% O2) oxygen reserve tanks. By not adding oxygen from compressed tanks to the cabin environment, oxygen levels can be kept below the vehicle fire limit thereby extending the duration of care provided to an oxygenated patient without environmental control system intervention to keep the cabin oxygen levels below the fire limits. The oxygen concentrator will be a Food and Drug Administration (FDA) clearable device. A demonstration unit for the International Space Station (ISS) is planned to verify the technology and provide oxygen capability. For the ISS, the demonstration unit should not exceed 10 kg (approximately 22 lb), which is the soft stowage mass limit for launch on resupply vehicles for the ISS. The unit's size should allow for transport within the spacecraft to an ill crewmember. The user interface needs to be designed for ease of use by the local care provider and with consideration to the limited amount of training available to the astronaut corps for medical equipment and procedures.

Gilkey, Kelly M.↗

Lunar Surface Concept of Operations for the Global Exploration Roadmap Lunar Surface Exploration Scenario

The International Space Exploration Coordination Group (ISECG) is a voluntary, non-binding coordination forum of 26 space agencies. Building on the 2018 Global Exploration Roadmap (GER) and on growing global interest in space exploration, ISECG’s GER Supplement (Aug 2020) captures the latest developments in lunar exploration planning in an updated Lunar Surface Exploration Scenario. The updated Lunar Surface Exploration Scenario describes a phased approach to implementing infrastructure and exploration on the lunar surface to meet the goals and objectives defined by the ISECG. The updated scenario starts with Boots on the Moon, where space agencies focus on sending humans to the Moon beginning in 2024 and robotic exploration missions to support the 2024 goal and later phases. Next is Phase 2, Lunar Exploration—Expanding and Building, with an emphasis on completion of the proposed lunar surface objectives by exploring the lunar surface diversely and ultimately settling at the most beneficial site. Initial focus is on lunar surface exploration objectives pertaining to human landing and ascent, logistic cargo landers, and long-range traverses. The later focus is on lunar surface exploration objectives pertaining to long duration habitation, crew health and performance, and in-situ resource utilisation (ISRU). The third phase, Sustained Lunar Opportunities, envisages laying the foundation for a sustained and vibrant lunar presence in the coming decades through partnerships with international governments, academia and industry. During this phase, governments would shift their investment focus to further expand the frontier, including Mars exploration missions. This paper will describe the concept of operations by phase that supported the development of the updated scenario, along with refinements to those concepts of operations since the release of the updated scenario. By phase, the paper will describe the scenario, give an overview of the applicable architecture elements, identify functional requirements/needs of those elements, and include a discussion of nominal operations and contingency scenarios.

Markus Landgraf↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗