Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Integrated Solid-Electrolyte Construction

Proposed construction method for electrolytic cells would integrate porous surface electrodes into a block of solid electrolyte. Porous electrodes would facilitate unrestricted gas flow thereby improving cell performance. Electrode wire mesh is embedded at surface of solid electrolyte. Construction would assure high electrode conductance and low resistance to gas flow.

Richter, R.↗

Development of molded, coated fabric joints: Fabric construction criteria for a spacesuit elbow joint

The design and fabrication of a molded, coated fabric elbow joint capable of operating reliably at 8 psi internal pressure for extended periods of flexure is considered. The overall design of the joint includes: (1) selection of heatsettable fiber of sufficient strengths; (2) choosing an optimum fabric construction; (3) a fatigue resistant; flexible coating; and (4) a molding technique. A polyester yarn of type 56 Dacron and a urethane coating system were selected. The relationships between yarn and weave parameters which lead to an optimum fabric construction for the 8 psi elbow joint are defined.

Olson, L. H.↗

Construction and assembly of large space structures

Three aspects of the construction and assembly of large space structures, namely transportation costs, human productivity in space and the source of materials (lunar vs terrestrial), are considered. Studies on human productivity have been so encouraging that the cost of human labor is now regarded as much less important than transportation costs. It is pointed out that these costs, although high, are extremely demand-sensitive. Even with high demand, however, the construction of several large systems would warrant the use of lunar materials and space manufacturing. The importance of further research is stressed in order to establish the optimum tradeoff between automation and manual assembly.

Mar, J. W.↗

A contribution to the availability of lunar resources for powered construction

The use of lunar resources to construct solar power satellites wherein the resources are transported by a lunar mass driver is discussed. The minimization of cross track errors in the launch of payloads by mass driver is emphasized. The design and construction of the mass driver is outlined. Features of the proposed system addressed include passive magnetic damping, separation and snapout, and downrange correction.

Heppenheimer, T. A.↗

Prototype Environmental Assessment of the impacts of siting and construction of an SPS ground receiving station

A prototype assessment of the environmental impacts of siting and constructing a Satellite Power System (SPS) Ground Receiving Station (GRS) is reported. The objectives of the study were: (1) to develop an assessment of the nonmicrowave related impacts of the reference system SPS GRS on the natural environment; (2) to assess the impacts of GRS construction and operations in the context of actual baseline data for a site in the California desert; and (3) to identify critical GRS characteristics or parameters that are most significant in terms of the natural environment.

Hill, J.↗

The McMillan and Newton polygons of a feedback system and the construction of root loci

The local behaviour of root loci around zeros and poles is investigated. This is done by relating the Newton diagrams which arise in the local analysis to the McMillan structure of the open-loop system, by means of what we shall call the McMillan polygon. This geometric construct serves to clarify the precise relationship between the McMillan structure, the principal structure, and the branching patterns of the root loci. In addition, several rules are obtained which are useful in the construction of the root loci of multivariable control systems.

Byrnes, C. I.↗

Erectable Space-Construction Fixture

Concept for erectable space construction fixture described in report. Fixture combines all equipment required for construction of framework for space platform into single compact work station. Almost all aspects of assembly and farication automated. Design goals for fixture include platform assembly in shortest possible time and minimizing fuel and power requirements of support spacecraft.

Thompson, R. R.↗

Construction of the 18-meter wooden blade at Nibe-Molle B

The construction of an 18 m cantilevered wooden rotor blade for wind turbine-B at Nibe, Denmark is reported. The project is described and conclusions are made based on calculations and tests on the rotor blade. Details are given on choice of material, construction, attachments and fittings, stress problems and loads.

Nielsen, P. C.↗

Construction of low-cost, Mod-OA wood composite wind turbine blades

Two sixty-foot, low-cost, wood composite blades for service on 200 kW Mod-OA wind turbines were constructed. The blades were constructed of epoxy resin-bonded Douglas fir veneers for the leading edge sections, and paper honeycombcored, birch plywood faced panels for the afterbody sections. The blades were joined to the wind turbine hub by epoxy resin-bonded steel load take-off studs embedded into the root end of the blades. The blades were installed on the 200 kW Mod-OA wind turbine facility at Kahuku, Hawaii, The blades completed nearly 8,000 hours of operation over an 18 month period at an average power of 150 kW prior to replacement with another set of wood composite blades. The blades were replaced because of a corrosion failure of the steel shank on one stud. Inspections showed that the wood composite structure remained in excellent condition.

Lark, R. F.↗

Design and construction of 2 transonic airfoil models for tests in the NASA Langley C.3-M TCT

As part of a NASA/DFVLR cooperation program two transonic airfoils were tested in the NASA Langley 0.3-m TCT. Model design and construction was carried out by DFVLR. The models designed and constructed performed extremely well under cryogenic conditions. Essentially no permanent changes in surface quality and geometric dimensions occurred during the tests. The aerodynamic results from the TCT tests which demonstrate the large sensitivity of the airfoil CAST 10-Z/DOAZ to Reynolds number changes compared well with results from other facilities at ambient temperatures.

Schaechterle, G.↗

Construction of a model of the Venus surface and its use in processing radar observations

An algorithm is described for constructing the model of the Venus surface as an expansion in spherical functions. The relief expansion coefficients were obtained up to the coefficient S sub 99. The surface picture representation is given according to this expansion. The surface model constructed was used for processing radar observations. The use of the surface model allows improved agreement between the design and measured values of radar ranges.

Borodin, V. A.↗

Operational modules for space station construction

Identification of an effective space construction concept is a current objective of NASA studies. One concept, described in this memorandum, consists of repetitive use of operational modules, which minimizes on-orbit stay time for the shuttle. A space station constructed of operational modules may benefit from fabrication and system checkout in ground-based facilities, and since the modules are the primary structure of the space station, a minimum of additional structure, and trips and on-orbit stay time of the shuttle are required.

Jackson, L. R.↗

Automatic Construction of Verification Generators from Hoare Logics

A method for mechanically constructing verification condition generators from a useful class of Hoare logics is defined. Any verification condition generator constructed is shown to be sound and deduction complete with respect to the associated Hoare logic. The method was implemented.

Moriconi, M.↗

Space Station truss structures and construction considerations

Although a specific configuration has not been selected for the Space Station, a gravity gradient stabilized station as a basis upon which to compare various structural and construction concepts is considered. The Space Station primary truss support structure is described in detail. Three approaches (see sketch A) which are believed to be representative of the major techniques for constructing large structures in space are also described in detail so that salient differences can be highlighted.

Mikulas, M. M., Jr.↗

The Space Station as a Construction Base for Large Space Structures

The feasibility of using the Space Station as a construction site for large space structures is examined. An overview is presented of the results of a program entitled Definition of Technology Development Missions (TDM's) for Early Space Stations - Large Space Structures. The definition of LSS technology development missions must be responsive to the needs of future space missions which require large space structures. Long range plans for space were assembled by reviewing Space System Technology Models (SSTM) and other published sources. Those missions which will use large space structures were reviewed to determine the objectives which must be demonstrated by technology development missions. The three TDM's defined during this study are: (1) a construction storage/hangar facility; (2) a passive microwave radiometer; and (3) a precision optical system.

Gates, R. M.↗

Assembly Concept for Construction of Erectible Space Structure (ACCESS) Neutral Buoyancy Testing Results

ACCESS, which is an acronym for Assembly Concept for Construction of Erectable Space Structure, is a planned Shuttle flight experiment to assess the potential of a manual on orbit construction concept and generate assembly data for correlation of ground test data. The individual parts (struts and nodal joints used to interconnect the struts) of the beam truss shown attached to the Shuttle in the figure are unpackaged and assembled by two astronauts working from fixed foot restraints (work stations). The planned flight experiment is described and results of the baseline neutral buoyancy simulation of the flight test are presented.

Heard, W. L., Jr.↗