Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONTRACTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Manned Mars System Study (MMSS): Mars transportation and facility infrastructure study. Volume 2: Technical report

The Manned Mars System Study (MMSS) was conducted for the Marshall Space Flight Center (MSFC) over the 35 month period between May 15, 1987 and April 30, 1990. During the course of the study, the NASA Office of Exploration (OEXP; Code Z) was created and MSFC was subsequently designated the Transportation Integration Agent (TIA) for support of the OEXP Mission Analysis and Systems Engineering (MASE) team. As a result of this action, modifications to the contract redirected the efforts to be consistent with NASA's overall objectives, including lunar transportation system design. A large number of written submittals were required in order to provide TIA support to MASE. A list summarizing the documents which have been prepared and delivered by Martin Marietta under this contract during the course of this work is presented. In nearly all cases, full sets of view-graphs were also provided to the MSFC COTR, and in several cases magnetic media were provided as well. To incorporate all of these materials (more than 2,000 pages) into the present report would obviously produce an extremely unwieldy and confusing document. Therefore, a summary of key findings are presented in this final report, supplemented by other material produced under this contract but not already available in the widespread literature.

Source record↗

Methods development for total organic carbon accountability

This report describes the efforts completed during the contract period beginning November 1, 1990 and ending April 30, 1991. Samples of product hygiene and potable water from WRT 3A were supplied by NASA/MSFC prior to contract award on July 24, 1990. Humidity condensate samples were supplied on August 3, 1990. During the course of this contract chemical analyses were performed on these samples to qualitatively determine specific components comprising, the measured organic carbon concentration. In addition, these samples and known standard solutions were used to identify and develop methodology useful to future comprehensive characterization of similar samples. Standard analyses including pH, conductivity, and total organic carbon (TOC) were conducted. Colorimetric and enzyme linked assays for total protein, bile acid, B-hydroxybutyric acid, methylene blue active substances (MBAS), urea nitrogen, ammonia, and glucose were also performed. Gas chromatographic procedures for non-volatile fatty acids and EPA priority pollutants were also performed. Liquid chromatography was used to screen for non-volatile, water soluble compounds not amenable to GC techniques. Methods development efforts were initiated to separate and quantitate certain chemical classes not classically analyzed in water and wastewater samples. These included carbohydrates, organic acids, and amino acids. Finally, efforts were initiated to identify useful concentration techniques to enhance detection limits and recovery of non-volatile, water soluble compounds.

Benson, Brian L.↗

Thermally stable electrolytes for rechargeable lithium batteries, phase 2

During the second year of research under NASA SBIR Contract NAS7-967, Covalent Associates and NASA contract monitors at the Jet Propulsion Laboratory agreed to perform an evaluation of the three best electrolytes developed during Phase 2. Due to the extensive period of time required to collect meaningful cycling data, we realized the study would extend well beyond the original formal end of the Phase 2 program (August 31, 1988). The substitution of this effort in lieu of an earlier proposed 20-cell final deliverable is formally documented in Modification No. 1 of Contract NAS7-967 as task 7. This Addendum contains the results of the cycling studies performed at Covalent Associates. In addition, sealed ampoules of each of these three electrolytes were delivered to the Jet Propulsion Laboratory Electrochemical Power Group. Their concurrent evaluation in a different test vehicle has also been recently concluded and their results are also summarized herein.

Dominey, L. A.↗

Providing structural modules with self-integrity monitoring software user's manual

National Aeronautics and Space Administration (NASA) Contract NAS7-961 (A Small Business Innovation and Research (SBIR) contract from NASA) involved research dealing with remote structural damage detection using the concept of substructures. Several approaches were developed. The main two were: (1) the module (substructure) transfer function matrix (MTFM) approach; and (2) modal strain energy distribution method (MSEDM). Either method can be used with a global structure; however, the focus was on substructures. As part of the research contract, computer software was to be developed which would implement the developed methods. This was done and it was used to process all the finite element generated numerical data for the research. The software was written for the IBM AT personal computer. Copies of it were placed on floppy disks. This report serves as a user's manual for the two sets of damage detection software. Sections 2.0 and 3.0 discuss the use of the MTFM and MSEDM software, respectively.

Source record↗

Solar extreme ultraviolet sensor and advanced langmuir probe

For more than two decades, the staff of the Space Physics Research Laboratory (SPRL) has collaborated with the Goddard Space Flight Center (GSFC) in the design and implementation of Langmuir probes (LP). This program of probe development under the direction of Larry Brace of GSFC has evolved methodically with innovations to: improve measurement precision, increase the speed of measurement, and reduce the weight, size, power consumption and data rate of the instrument. Under contract NAG5-419 these improvements were implemented and are what characterize the Advanced Langmuir Probe (ALP). Using data from the Langmuir Probe on the Pioneer Venus Orbiter, Brace and Walter Hoegy of GSFC demonstrated a novel method of monitoring the solar extreme ultraviolet (EUV) flux. This led to the idea of developing a sensor similar to a Langmuir probe specifically designed to measure solar EUV (SEUV) that uses a similar electronics package. Under this contract, a combined instrument package of the ALP and SEUV sensor was to be designed, constructed, and laboratory tested. Finally the instrument was to be flight tested as part of sounding rocket experiment to acquire the necessary data to validate this method for possible use in future earth and planetary aeronomy missions. The primary purpose of this contract was to develop the electronics hardware and software for this instrument, since the actual sensors were suppied by GSFC. Due to budget constraints, only a flight model was constructed. These electronics were tested and calibrated in the laboratory, and then the instrument was integrated into the rocket payload at Wallops Flight Facility where it underwent environmental testing. After instrument recalibration at SPRL, the payload was reintegrated and launched from the Poker Flat Research Range near Fairbanks Alaska. The payload was successfully recovered and after refurbishment underwent further testing and developing to improve its performance for future use.

Voronka, N. R.↗

Method and apparatus for preloading a joint by remotely operable means

The invention is a method and apparatus for joining structures, an active structure and a passive structure, and imposing a tensile pre-load on the joint by a remotely operable mechanism comprising a heat contractible joining element. The method and apparatus include mounting on the structure, a probe shaft of material which is transformable from an expanded length to a contracted length when heated to a specific temperature range. The shaft is provided with a probe head which is receivable in a receptacle opening formed in the passive structure, when the active structure is moved into engagement therewith by an appropriate manipulator mechanism. A latching system mounted on the structure adjacent to the receptacle opening captures the probe head, when the probe head is inserted a predetermined amount. A heating coil on the shaft is energizable by remote control for heating the shaft to a temperature range which transforms the shaft to its contracted length, whereby a latching shoulder thereof engages latching elements of the latching system and imposes a tensile preload on the structural joint. Provision is also made for manually adjusting the probe head on the shaft to allow for manual detachment of the structures or manual preloading of the structural joint.

Kahn, Jon B.↗

Simulation models for autonomous rendezvous and capture

Autonomous rendezvous and capture (AR&C) is a critical space technology with significant application to a variety of missions. Martin Marietta Astronautics Group (MMAG) has been developing AR&C technical capability in support of several recent NASA contracts. The use of AR&C for the Mars Rover/Sample Return (MRSR) mission was studied through a contract with JSC. Incorporation of AR&C in the Space Transportation Vehicle (STV) lunar mission was studied through a contract with MSFC. The MMAG has also been developing AR&C simulation capability under independent research and development studies. Simulation development was driven by two goals: comprehensive software simulation of the autonomous rendezvous and capture mission from launch to final capture; and integration of the overall software and hardware simulation to support an AR&C flight demonstration. This presentation will highlight the AR&C software simulation tools and analyze results from their application to the STV lunar mission. Plans for an integrated software and hardware simulation will also be summarized.

Smith, Nick G.↗

High speed semiconductor lasers and integrated receivers for microwave and millimeter wave signal transmission

This project was proposed to be a three-year contract, but was cut off after one year (1987) of support. Sufficient progress was made to allow continuation for a year on minimal internal funds before proper support levels were received from a combination of ONR, RADC, and IBM contracts at about the start of 1989. A major DARPA grant, expected to start August 1, 1990, will sharply expand this effort to include several faculty members. During the course of this project, two students did thesis research, one Ph.D. on lasers and one M.S. on high speed photodetectors. These theses were finished in September 1988, nine months after the contract was cut off. This report covers excerpts from those theses as well as information obtained on other programs since that time.

Eastman, L. F.↗

The NASA Lewis Research Center SBIR program: An assessment

An assessment was made of the NASA Lewis Small Business Innovation Research (SBIR) Program for the years 1983 to 1989. The assessment was based on the study of 99 Phase 1 contracts and 39 Phase 2 contracts. The overall impact of SBIR was found to be very positive, contributing strongly to many NASA programs. In addition, many successful efforts were commercialized benefiting the small business, federal agencies, and the aerospace industry. The program was evaluated in terms of contract quality, innovativeness, comparison to the state-of-the-art, achievement of goals, difficulty, and impact. Program difficulties were also identified, which could suggest possible program improvements. Much of the information gained in this assessment provided a basis for a SBIR data base which will be updated every year. This data base is computerized and will provide an excellent source of information about past SBIR efforts and company capabilities.

Grimes, Hubert H.↗

The role of metrics and measurements in a software intensive total quality management environment

Paramax Space Systems began its mission as a member of the Rockwell Space Operations Company (RSOC) team which was the successful bidder on a massive operations consolidation contract for the Mission Operations Directorate (MOD) at JSC. The contract awarded to the team was the Space Transportation System Operations Contract (STSOC). Our initial challenge was to accept responsibility for a very large, highly complex and fragmented collection of software from eleven different contractors and transform it into a coherent, operational baseline. Concurrently, we had to integrate a diverse group of people from eleven different companies into a single, cohesive team. Paramax executives recognized the absolute necessity to develop a business culture based on the concept of employee involvement to execute and improve the complex process of our new environment. Our executives clearly understood that management needed to set the example and lead the way to quality improvement. The total quality management policy and the metrics used in this endeavor are presented.

Daniels, Charles B.↗

Observations of optical counterparts of Gamma-Ray bursts

This is a final report for a contract begun in Dec. 1987 and ended in Mar. 1989 to use the existing Lincoln Laboratory Experimental Test Site in Socorro, NM to search for optical counterparts to gamma-ray bursts. The objective was to develop an autonomous staring system to search for stationary, transient optical flashes. The search was to use an existing 31-inch telescope equipped with a sensitive video detector. The approach for the search was to develop real-time processing software to monitor the video signal from the detector and to record any transient, point-like flashes that occurred in the field of view. The system would have been able to detect fainter flashes (B is approximately 15(sup m) in 1/30 s, delta(m(sub v)) = 0.25(sup m)) than other systems but lacked a large field of view (only 1.2 deg diameter) necessary to give a high probability of detecting a random flash on the sky. As such, the plan was to monitor known gamma-ray burst error boxes and wait for a repetition of an earlier event. The high payoff of good sensitivity with high angular resolution (1 pixel = 10sec) and good time resolution (30 s) to allow post-burst searches warranted funding if the cost was not prohibitive. The contract began in the middle of the three-year cycle for High Energy Astrophysics Gamma-Ray Astronomy Research and Analysis Program. This final report briefly describes the portion of the plan completed under the original contract.

Knight, Frederick K.↗

Development of a naming convention and data ma nagement system

This contract covered work in data management, acquisition, and analysis for the Earth Science and Applications Division (ESAD) of the Space Science Laboratory of MSFC. Under this contract, a naming convention and data management system were developed for ESAD data sets, data visualization, and standard data format issues were investigated, and specific data analysis and management needs were addressed for several ESAD projects and data sets. In the following sections, details of the research performed over the duration of this contract are summarized.

Mcnider, Richard T.↗

NASA procurement report, FY 1993

Summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during fiscal year 1993. The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during fiscal year 1993. However, these larger procurements accounted for only 29 percent of the total actions. Procurement action, as used in this report, means contractural actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement, or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.

Source record↗

Summary data on all NASA procurement actions

This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1992 (FY-92). The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during FY-92. However, these larger procurements accounted for only 28 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.

Source record↗

Analysis and effects of the advanced solid rocket motor on the Space Shuttle elements

This interim final report summarizes the activities and major accomplishments under NASA/MSFC Contract NAS8-39235 for the initial two year contractual effort beginning October 1, 1991, and ending September 30, 1993. It is not intended as an exhaustive treatment or review of any particular technical issue which was addressed during this two-year period, but does provide an overview of the many induced environment studies and test support activities undertaken by REMTECH and its subcontractors during this two-year period. The initial scope of work has been pursued vigorously through this two-year period by separating the effort into five functional areas. The five functional areas are ascent plume radiation, ascent plume convection, ascent aerodynamic heating, launch stand environments, and reentry heating. A work breakdown structure (WBS) for each functional area was devised to permit nearly autonomous activities within each functional responsibility while maintaining commonality in reporting procedures and cost accounting. The contract was modified 11 times to provide incremental funding and to expand the scope of work. Additional work breakdown structure was incorporated to meet the expanded scope. A contract chronology is provided in Section 2. The initial scope of work, expanded scope, and corresponding WBS designation are described in Section 3. A summary review of major accomplishments is also provided in Section 4 to show the breadth of activities and extent of reporting. Reports, meetings, test activities, and other accomplishments within each functional area are also summarized by WBS heading in the appendices.

Source record↗

Eccentric exercise testing and training

Some researchers and practitioners have touted the benefits of including eccentric exercise in strength training programs. However, others have challenged its use because they believe that eccentric actions are dangerous and lead to injuries. Much of the controversy may be based on a lack of understanding of the physiology of eccentric actions. This review will present data concerning eccentric exercise in strength training, the physiological characteristics of eccentric exercise, and the possible stimulus for strength development. Also a discussion of strength needs for extended exposure to microgravity will be presented. Not only is the use of eccentric exercise controversial, but the name itself is fraught with problems. The correct pronunciation is with a hard 'c' so that the word sounds like ekscentric. The confusion in pronunciation may have been prevented if the spelling that Asmussen used in 1953, excentric, had been adopted. Another problem concerns the expressions used to describe eccentric exercise. Commonly used expressions are negatives, eccentric contractions, lengthening contractions, resisted muscle lengthenings, muscle lengthening actions, and eccentric actions. Some of these terms are cumbersome (i.e., resisted muscle lengthenings), one is slang (negatives), and another is an oxymoron (lengthening contractions). Only eccentric action is appropriate and adoption of this term has been recommended by Cavanagh. Despite the controversy that surrounds eccentric exercise, it is important to note that these types of actions play an integral role in normal daily activities. Eccentric actions are used during most forms of movement, for example, in walking when the foot touches the ground and the center of mass is decelerated and in lowering objects, such as placing a bag of groceries in the car.

Clarkson, Priscilla M.↗

Cardiac output and cardiac contractility by impedance cardiography during exercise of runners

Most of the solid state electronic engineering of the system now generally known as the Minnesota Impedance Cardiograph was performed with the support of a five-year contract, NAS9-4500, with the NASA Lyndon B. Johnson Space Center, Houston, Texas. This contract ran from 1965 to 1970. In addition to the engineering design and development of the hardware, the contract called for testing on both animals and human subjects. This project also provided funds to construct twenty impedance cardiographs and place them in selected research and clinical facilities for further evaluation. This, then, led to the First Symposium on Impedance Cardiography, held at the NASA Lyndon B. Johnson Space Center, Houston, Texas, 2-4 June 1969. Twenty-four excellent papers were presented.

Kubicek, W. G.↗

The value of electrical stimulation as an exercise training modality

Voluntary exercise is the traditional way of improving performance of the human body in both the healthy and unhealthy states. Physiological responses to voluntary exercise are well documented. It benefits the functions of bone, joints, connective tissue, and muscle. In recent years, research has shown that neuromuscular electrical stimulation (NMES) simulates voluntary exercise in many ways. Generically, NMES can perform three major functions: suppression of pain, improve healing of soft tissues, and produce muscle contractions. Low frequency NMES may gate or disrupt the sensory input to the central nervous system which results in masking or control of pain. At the same time NMES may contribute to the activation of endorphins, serotonin, vasoactive intestinal polypeptides, and ACTH which control pain and may even cause improved athletic performances. Soft tissue conditions such as wounds and inflammations have responded very favorably to NMES. NMES of various amplitudes can induce muscle contractions ranging from weak to intense levels. NMES seems to have made its greatest gains in rehabilitation where directed muscle contractions may improve joint ranges of motion correct joint contractures that result from shortening muscles; control abnormal movements through facilitating recruitment or excitation into the alpha motoneuron in orthopedically, neurologically, or healthy subjects with intense sensory, kinesthetic, and proprioceptive information; provide a conservative approach to management of spasticity in neurological patients; by stimulation of the antagonist muscle to a spastic muscle stimulation of the agonist muscle, and sensory habituation; serve as an orthotic substitute to conventional bracing used with stroke patients in lieu of dorsiflexor muscles in preventing step page gait and for shoulder muscles to maintain glenohumeral alignment to prevent subluxation; and of course NMES is used in maintaining or improving the performance or torque producing capability of muscle. NMES in exercise training is our major concern.

Currier, Dean P.↗