Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “waste package”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Cladding Degradation Model

This report begins with an evaluation of cladding degradation mechanisms deemed important to assessing barrier capability. Unlike similar efforts done in the past, this evaluation accounts for the hypothetical conditions associated with direct dual-purpose canister (DPC) disposal, including conditions resulting from a postulated, in-package, steady-state criticality event. A total of 16 cladding degradation mechanisms are examined assuming direct disposal of DPCs in two different hypothetical repositories: a saturated repository in shale and an unsaturated repository in alluvium.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2025 Status Report - Fiberboard Properties and Degradation Rates for Storage of 9975 Shipping Package in KAC

Fiberboard assemblies in the 9975 package were identified as susceptible to aging and degradation under long-term storage conditions. Thermal, mechanical, and physical properties have been measured on fiberboard samples aging for up to 20 years at accelerated conditions. The aging environments include elevated temperature up to 250 ºF (the maximum allowed service temperature for fiberboard in 9975 packages) and elevated humidity. Accelerated aging results have been analyzed and used to build aging models. Correlations relating several properties (thermal conductivity, energy absorption, weight, dimensions, and density) to their rate of change in potential storage environments have been developed. Combined with an estimate of the actual conditions the fiberboard experiences in K-Area Complex (KAC), these models allow development of service life predictions. KAC completed calculations that supported extending the service life of 9975 packages with 3013 containers in storage from 20 years to 40 years. These calculations addressed the potential for degraded fiberboard properties following 40 years in storage using degradation models. The 40 year storage evaluations assumed the degradation rates from initial values for density, dimensional, and thermal properties were 0.5% per year (i.e., after 40 years, the density, dimensional, and thermal properties of fiberboard were 80% of its initial values). The updated degradation models developed in this report were compared to the assumptions in those calculations, and the current results for fiberboard dimensions, density, axial and radial thermal conductivities, and energy absorption remain consistent with those calculations. Additional data will continue to be collected to permit future refinements to the models and assumptions. Some of the predicted degradation rates presented in this report are purposely high to accelerate aging. These rates relate to environments that do not exist within KAC or are postulated to only occur as upset conditions that are unlikely to persist for an extended period. For a typical package stored in KAC with approximately 10-12 watts internal heat load or less, and ambient temperatures below 90 ºF, the fiberboard assemblies experience storage conditions less severe than any of the aging environments (i.e., under 125 °F) used in this study. Fiberboard in conforming packages with lower internal heat loads should experience little or no degradation and is expected to provide a service life beyond the currently approved 40 year storage period. Packages with higher internal heat loads may not continue to perform their required safety functions beyond 40 years. Ultimately, service life will be determined by the cumulative effect of degradation from all the conditions these packages might encounter. The results and model predictions presented in this report are applicable to 9975 packages with cane or softwood fiberboard overpack assemblies. These degradation models do not address the effects of nonconforming conditions such as the presence of excess moisture and mold or beetle infestations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Update on the Status of a Reduced Flow Test of a 10MW 700°C sCO2 Integrally Geared Compander

. In order to maintain viability as a future power-generating technology, concentrating solar power (CSP) must reduce its levelized cost of electricity (LCOE). One component of solving this problem is reducing the cost of the power block while simultaneously increasing the efficiency of the thermodynamic cycle. One disruptive technology that has the promise to accomplish this is supercritical CO2 based power cycles. These cycles are conceptually similar to steam cycles; however, they have substantially smaller turbomachinery at equivalent power while also delivering more efficiency at turbine inlet temperatures of 500-700 degrees Celsius. This paper will summarize the current status of a US Department of Energy project to develop machinery to support a 10 MW sCO2 power cycle. The team of Southwest Research Institute® (SwRI®) and Hanwha Power Systems America, proposed to develop an integrally-geared (IG) compressor-expander (compander) for use in a nominal 10 MW-scale concentrated solar power (CSP) supercritical carbon dioxide (sCO2) plant application. This integrally-geared compander (IGC) comprises multiple pinion shafts interconnected on a single bull gear to create a compact package, and utilizes a low-cost, low-speed driver. In addition, the integrally geared architecture allows each pinion to operate at different rotational speeds to optimize performance and easily allow for inter-stage cooling and turbine re-heat to further enhance both stage and cycle efficiency. The close integration of all turbomachinery elements into a single integrally-geared (IG) machine creates a design that lends itself to power block modularization, which makes it suitable for waste heat recovery, fossil fuel power plants, and especially CSP applications. As part of the commercialization of this technology, it is necessary to reduce risk by validation testing of key components. In the current work, the focus is developing a test loop to enable safe testing of the main compressor stage across a wide range of operating conditions, and to validate the mechanical integrity of the turbine at full pressure, temperature, and speed. Developing a test loop for sCO2 requires balancing a number of design alternatives that impact cost, lead time, safety, and performance. The current work discusses the design process for the reduced flow test loop for the compander, and supporting documentation supporting the viability of the test loop

wilkes, jason↗

Modeling Tungsten Boride Neutronics in ORIGEN for Z-Facility

ORIGEN is one of the main transmutation software packages used in nuclear engineering Modeling Tungsten Boride Neutronics in ORIGEN for Z-Facilityproblems. For the case of this study, tungsten borides are studied using a coupled framework between MCNP and the ORIGEN package of scale. The input used four compositions of tungsten boride: WB with natural boron- 10 abundance, WB with 80wt% B-10 per isotope of boron, WB4 with natural boron-10 abundance, and WB4 with 80wt% B-10 per isotope of boron. Isotopic inventories were produced for WB which show the time dependent change up to 2 years after a 6-Month irradiation. This will allow for further studies of the materials to assess things material composition changes, dose contribution, and waste management requirements.

36 MATERIALS SCIENCE↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

AN UPDATE ON THE STATUS OF A REDUCED FLOW TEST OF A 10MW 700⁰C SCO2 INTEGRALLY GEARED COMPANDER

In order to maintain viability as a future power-generating technology, concentrating solar power (CSP) must reduce its levelized cost of electricity (LCOE). One component of solving this problem is reducing the cost of the power block while simultaneously increasing the efficiency of the thermodynamic cycle. One disruptive technology that has the promise to accomplish this is supercritical CO2 based power cycles. These cycles are conceptually similar to steam cycles; however, they have substantially smaller turbomachinery at equivalent power while also delivering more efficiency at turbine inlet temperatures of 500-700℃. This paper will summarize the current status of a US Department of Energy project to develop machinery to support a 10 MW sCO2 power cycle. The team of Southwest Research Institute® (SwRI®) and Hanwha Power Systems America, proposed to develop an integrally-geared (IG) compressor-expander (compander) for use in a nominal 10 MW-scale CSP supercritical carbon dioxide (sCO2) plant application. This integrally-geared compander (IGC) comprises multiple pinion shafts interconnected on a single bull gear to create a compact package, and utilizes a low-cost, low-speed driver. In addition, the integrally-geared architecture allows each pinion to operate at different rotational speeds to optimize performance and easily allow for inter-stage cooling and turbine re-heat to further enhance both stage and cycle efficiency. The close integration of all turbomachinery elements into a single integrally-geared (IG) machine creates a design that lends itself to power block modularization, which makes it suitable for waste heat recovery, fossil fuel power plants, and especially CSP applications.

14 SOLAR ENERGY↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Discovering methylated DNA motifs in bacterial nanopore sequencing data with MIJAMP

Abstract Bacterial DNA methylation is involved in diverse cellular functions, including modulation of gene expression, DNA repair, and restriction–modification systems for defense against viruses and other foreign DNA. Restriction systems hinder efforts to engineer organisms to produce fuels and chemicals from waste and renewable feedstocks by degrading DNA during transformation. Methylome analysis allows identification of motifs within a bacterial chromosome that may be targeted by native restriction enzymes. Further expression of the corresponding methyltransferases in Escherichia coli allows plasmid DNA to be protected from restriction in the target organism, thereby drastically enhancing transformation efficiency. Nanopore sequencing can detect methylated bases, but software is needed to transform modified base coordinates into methylated motifs. Here, we develop MIJAMP (MIJAMP Is Just A MethylBED Parser), a software package that was developed to discover methylated motifs from the output of ONT’s Modkit or other data in the methylBED format. MIJAMP employs a human-driven refinement strategy that empirically validates all motifs against genome-wide methylation data, thus eliminating incorrect motifs. MIJAMP also reports methylation data on specific, user-defined motifs. Using MIJAMP, we determined the methylated motifs both in a control strain (wild-type E. coli) and in Synecococcus sp. strain PCC7002, laying the foundation for improved transformation in this organism. MIJAMP is available at https://code.ornl.gov/alexander-public/mijamp/. One Sentence Summary: Here we describe software written to discover DNA methylation motifs from nanopore sequencing data.

59 BASIC BIOLOGICAL SCIENCES↗

NCS design and evaluation of new high-density storage containers

Changes in mission at Y-12 National Security Complex evolving over the past five years have resulted in increased levels of storage utilization. This has prompted a need to reevaluate storage capacity and efficiency. As a result, Y-12 Nuclear Criticality Safety (NCS) and Packaging Engineering developed and designed a new modified neutron absorbing container. The high-density storage container is known as the 12-Place Rackable Can Storage Box (12-Place RCSB) and will allow safe and efficient storage of fissile material at the Highly Enriched Uranium Materials Facility (HEUMF).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation Apps Bring Us Closer to Mars

My work with mathematical modeling and computer simulations began in earnest in 1987 when I signed on with the National Aeronautics and Space Administration, better known as NASA. At the time I was developing computer simulations to support the design of carbon dioxide (CO2) removal systems for the International Space Station (ISS) life support system. CO2 is a human metabolic waste, produced at a rate of a kilogram per day per crewmember. CO2 must be removed from the crew cabin, as it will quickly become detrimental to crew health. The systems used to remove CO2 are typically based on sorption processes, which include complex interactions of heat transfer, mass transfer, and gas flow through porous media. At this time, there were no commercial options for solving a set of coupled mathematical models such as partial differential equations (PDEs); you either force-fit the physics into a thermal analysis package or wrote your own code, complete with discretization, meshing, and solution algorithms. Unfortunately, coding CO2 removal processes from scratch did not allow an appropriate focus on the challenging yet crucial task of understanding and capturing the underlying physics via appropriate mathematical models. Configuration control was often simply ignored due to tight schedules, resulting in a code that would be quicker for a second party to rewrite than modify. In the early 2000s, I decided to move CO2 removal simulations to a platform with built-in meshing, solvers, and postprocessing capabilities, and that could solve user-defined multiphysics PDEs. The program chosen to meet these needs was COMSOL Multiphysics®. Along with freeing the engineer to focus on the underlying physics, a degree of configuration control was automatically achieved via a consistent user interface, thus allowing COMSOL users to share computer models. My team has developed simulations that are already providing a valuable debugging capability for the ISS CO2 removal system, and will provide guidance in upgrades to that system.

Knox, Jim↗

Thermostable Shelf Life Study

The objective of this project is to determine the shelf life end-point of various food items by means of actual measurement or mathematical projection. The primary goal of the Advanced Food Technology Project in these long duration exploratory missions is to provide the crew with a palatable, nutritious and safe food system while minimizing volume, mass, and waste. The Mars missions could be as long as 2.5 years with the potential of the food being positioned prior to the crew arrival. Therefore, it is anticipated that foods that are used during the Mars missions will require a 5 year shelf life. Shelf life criteria are safety, nutrition, and acceptability. Any of these criteria can be the limiting factor in determining the food's shelf life. Due to the heat sterilization process used for the thermostabilized food items, safety will be preserved as long as the integrity of the package is maintained. Nutrition and acceptability will change over time. Since the food can be the sole source of nutrition to the crew, a significant loss in nutrition may determine when the shelf life endpoint has occurred. Shelf life can be defined when the food item is no longer acceptable. Acceptability can be defined in terms of appearance, flavor, texture, or aroma. Results from shelf life studies of the thermostabilized food items suggest that the shelf life of the foods range from 0 months to 8 years, depending on formulation.

Perchonok, M. H.↗

Thermostabilized Shelf Life Study

The objective of this project is to determine the shelf life end-point of various food items by means of actual measurement or mathematical projection. The primary goal of the Advanced Food Technology Project in these long duration exploratory missions is to provide the crew with a palatable, nutritious and safe food system while minimizing volume, mass, and waste. The Mars missions could be as long as 2.5 years with the potential of the food being positioned prior to the crew arrival. Therefore, it is anticipated that foods that are used during the Mars missions will require a 5 year shelf life. Shelf life criteria are safety, nutrition, and acceptability. Any of these criteria can be the limiting factor in determining the food's shelf life. Due to the heat sterilization process used for the thermostabilized food items, safety will be preserved as long as the integrity of the package is maintained. Nutrition and acceptability will change over time. Since the food can be the sole source of nutrition to the crew, a significant loss in nutrition may determine when the shelf life endpoint has occurred. Shelf life can be defined when the food item is no longer acceptable. Acceptability can be defined in terms of appearance, flavor, texture, or aroma. Results from shelf life studies of the thermostabilized food items suggest that the shelf life of the foods range from 0 months to 8 years, depending on formulation.

Perchonok, Michele H.↗

Thermoelectric Integrated Membrane Evaporation Subsystem operational improvements

A three-man preprototype Thermoelectric Integrated Membrane Evaporation Subsystem (TIMES) has been developed to provide high quality water recovery from waste fluids on extended duration space flights. In the most recent effort, a number of improvements have been made to simplify subsystem operation and increase performance. These modifications include changes to the hollow fiber membrane evaporator, the condensing section of the thermoelectric heat pump, and the electronic controller logic and display. This paper describes the results of the test program that was conducted to evaluate the implemented improvements. In addition, an advanced design concept is discussed that will provide lower electrical power consumption, greater water production capacity, lower weight, and a smaller package than the present subsystem configuration.

Dehner, G. F.↗

Mapping the Concentration Distribution of Contaminant Plumes to the Computational Grid of the Plateau to River Model (Ver. 8.3)

This environmental calculation file (ECF) outlines the process conducted for defining the initial condition groundwater plumes for select contaminants of interest (COIs) to the Plateau River model version 8.3 (P2Rv8.3) domain (CP-57037, Model Package Report: Plateau to River Groundwater Model Version 8.3). Various data sources were combined into a single set of files defining plume conditions at time 1/1/2018. The resulting files are intended for use as inputs for transport modeling to support forecasts of the Central Plateau contaminant plume fate and transport.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Complete Documentation of Applicable Regulations and Regulatory Authority for Transportation

This report fulfills the M4 milestone M4MR-20PN0303023, “Complete Documentation of Applicable Regulations and Regulatory Authority for Transportation. Microreactors are very small nuclear reactors with a power output of 20MWe or less and are designed to be factory-built, modular in nature, and highly portable. The objective of this report is to identify and document applicable regulations, the appropriate regulatory authority, and the associated framework for microreactor transport. Sections 2 and 3 of this report summarize U.S. Department of Transportation (DOT) and NRC regulations related to the transportation of Class 7 (radioactive) materials. These sections concentrate on the transport of fissile material packages and Type B packages, which would be most applicable to the transport of a microreactor before and after irradiation. Section 4 summarizes DOE hazardous and radioactive material transportation regulations. Section 5 summarizes U.S. Coast Guard regulations related to the transport of radioactive material. Section 6 discusses state requirements for the permitting of oversize and/or overweight truck shipments. Section 7 presents detailed schedules of requirements for transporting fissile material packages and Type B packages based on NRC and DOT regulations. The schedules are presented in a two-column format, the right column is the regulatory requirement and the left column is the citation of the regulation in which the requirement is found.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗