Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “utilization plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Alternative Ratemaking in the US: A Prerequisite for Grid Modernization or an Unwarranted Shift of Risk to Customers?

With increasing frequency, investor-owned electric utilities are requesting preferred cost recovery for "grid modernization" in multiple forms, from multi-year rate plans to riders. Utilities' claims that massive grid investment is necessary, and that exceptional investment requires exceptional cost recovery, are typically accepted by policymakers with little challenge. It is difficult for policymakers to resist the siren call of grid modernization's perceived outcomes, from improved reliability and resilience to reduced risks to safety and new customer technology adoption (electric vehicles, distributed energy resources, and more). This paper provides a contrarian viewpoint that is virtually absent as policymakers consider alternative ratemaking practices. It introduces the possibility that excess grid investment in the name of modernization is not only possible, and economically harmful, but has already occurred, encouraged by alternative ratemaking. It provides examples of common grid modernization expenditures the authors have identified as cost-ineffective in the course of their work. It also describes traditional grid planning practices with proven ability to address changing requirements over time, calling into question the need for exceptional grid modernization investment plans. Most important, the paper explains the moral hazard inherent in alternative ratemaking, and the fundamental shift in ratemaking risks and responsibilities from utilities to customers that results. The perspectives this paper presents are critical for policymakers to understand before adopting, extending, or expanding alternative ratemaking practices in their respective jurisdictions.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Review of Marine Renewable Energy in Integrated Resource Plans

As part of a literature review of reference material for grid applications of marine hydrokinetic energy capture technologies, Pacific Northwest National Laboratory (PNNL) surveyed U.S. electric utility integrated resource plans for the mention or treatment of marine renewable energy technologies, principally wave energy, tidal energy, and offshore wind energy. This review offers a window into utility decision-making and data utilization with regard to these generating technologies. The report also offers perspectives on the relationship between traditional and emerging resource planning paradigms and metrics.

16 TIDAL AND WAVE POWER↗

Enhancing Cassini Operations & Science Planning Tools

The Cassini team uses a variety of software utilities as they manage and coordinate their mission to Saturn. Most of these tools have been unchanged for many years, and although stability is a virtue for long-lived space missions, there are some less-fragile tools that could greatly benefit from modern improvements. This report shall describe three such upgrades, including their architectural differences and their overall impact. Emphasis is placed on the motivation and rationale behind architectural choices rather than the final product, so as to illuminate the lessons learned and discoveries made.These three enhancements included developing a strategy for migrating Science Planning utilities to a new execution model, rewriting the team's internal portal for ease of use and maintenance, and developing a web-based agenda application for tracking the sequence of files being transmitted to the Cassini spacecraft. Of this set, the first two have been fully completed, while the agenda application is currently in the early prototype stage.

science planning↗

An analysis of commitment strategies in planning: The details

We compare the utility of different commitment strategies in planning. Under a 'least commitment strategy', plans are represented as partial orders and operators are ordered only when interactions are detected. We investigate claims of the inherent advantages of planning with partial orders, as compared to planning with total orders. By focusing our analysis on the issue of operator ordering commitment, we are able to carry out a rigorous comparative analysis of two planners. We show that partial-order planning can be more efficient than total-order planning, but we also show that this is not necessarily so.

Minton, Steven↗

Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans

This presentation summarizes a recently published beginner's guide for understanding power system model results for long-term resource plans. This guide is designed to improve decision-making in the electricity planning process by strengthening dialogue between system planners and relevant stakeholders. It focuses on interpreting scenario results generated by power system planning models. These results are often used to inform integrated resource plans, which are long-term plans for a utility to meet future electricity requirements. Whether you are a state utility commissioner, commission staff, part of a state energy office, an intervenor in the planning process, or another stakeholder, this guide is designed to help you better weigh in on the modeling methods or interpret the model results to improve decision-making. This guide can enhance your understanding to ask the right questions, which can enable better understanding of results and key assumptions, data, and methods.

ENERGY PLANNING, POLICY, AND ECONOMY↗

SU-E-T-447: Electronic Brachytherapy (EBT) Treatment of Cervical Cancer - First Clinical Experience

Purpose: To study the first trial patient in which an electronic brachytherapy (EBT) x-ray source is utilized for treatment of cervical cancer. Methods: During patient treatment, a miniaturized x-ray source was used in combination with a customized titanium tandem and ovoid applicator set. The semi-specialized source was modeled with formalisms outlined by AAMP Task Group 43. Multiple models were used to compensate for variable attenuation conditions as a function of source positions. Varian Brachyvision treatment planning software was utilized on CT data sets for dose calculations prior to treatment delivery. The dose was prescribed to “point A” as defined by American Brachytherapy society. Additional treatments plans were created from those clinically utilized in patient care and were recalculated for an existing Ir-192 source model. Dose volume histograms (DVH) and point dose calculations were compared between the modalities for the clinical condition present in patients treated with EBT. Results: Clinical treatment times, though longer than those typically experienced by Ir-192 users, were manageable. Instantaneous dose rates at personal positions within the treatment vault were lower than those measured during intra operative radiation therapy and breast EBT treatments. Due to lower average photon energy in EBT, dose gradients within the treatment plans were as expected steeper than those observed in Ir-192 based brachytherapy. DVH comparisons between Ir-192 and EBT treatments showed an expected decrease in the integral dose to normal tissues of interest for EBT. In comparing plans created for EBT delivery with those calculated for Ir-192, average dose values for EBT were more than 4%, 11%, and 9% lower at predefined bladder, rectum and “point B” positions, respectively. Conclusion: For the first time, we have demonstrated that the utilizing electronic brachytherapy system for tandem and ovoid based treatment of cancer of the cervix is feasible, and potentially beneficial, in clinical environment.

60 APPLIED LIFE SCIENCES↗

Cost of Saving Electricity Through Efficiency Programs Funded by Customers of Publicly Owned Utilities: 2012–2017

This report finds that energy efficiency programs for customers of publicly owned utilities saved electricity at an average cost of 2.4 cents per kilowatt-hour (kWh) from 2012 to 2017. Utilities use such cost performance metrics to assess effectiveness of efficiency program portfolios, determine what programs to offer customers, and, more broadly, ensure electricity system reliability at the most affordable cost as part of electric utility resource adequacy planning and resource procurement processes. The study analyzed efficiency program data reported by 111 program administrators for 219 publicly owned utilities in 14 states — about 90 percent of the municipal utilities and public utility districts that report the data to the Energy Information Administration (EIA). The data represent 88 percent of all spending and 75 percent of all savings that publicly owned utilities reported to EIA in those years. Berkeley Lab used data from several sources, including data provided directly by American Public Power Association members, publicly available annual reports and regional data collections.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

National Electric Vehicle Infrastructure Formula Program Annual Report: Plan Year 2022-2023

The National Electric Vehicle Infrastructure (NEVI) Formula Program provides nearly $5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of fast EV charging stations along designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with emphasis along the Interstate Highway System. The first-year deployment plans were submitted to and reviewed by the Joint Office and FHWA and certified by FHWA in September 2022. To support the rollout of the NEVI Formula Program, the Joint Office has been providing technical assistance to the states since February 2022 and has developed DriveElectric.gov to serve as the front door for federal efforts to build out a national charging network. This report summarizes the key activities of the Joint Office in relation to the NEVI program and provides an individual and collective overview of the first-year deployment plans. The Joint Office will utilize the summary of these plans to inform program improvement and future technical assistance activities to support the states as they begin to implement their EV charging infrastructure.

33 ADVANCED PROPULSION SYSTEMS↗

Development and Clustering of Rate-Oriented Load Metrics for Customer Price-Plan Analysis

One of the few methods electric utilities can use to motivate and change customer energy consumption is through retail rate structures. Utilities are increasingly moving toward more dynamic rate plans to encourage energy conservation, utilization of onsite renewable generation, peak demand reduction and flattening of demand profiles. This paper creates a set of rate-oriented load metrics that are the determinants of customers' bills under four unique rate plans. These metrics are not only indicative of which rate structure can provide customer bill reductions based on their load profile characteristics, but also convey useful information about load consumption behavior. With these metrics, utilities can analyze their customers and identify classes that are rewarded under each rate plan. This can help inform utilities whether the customers rewarded under each rate plans are meeting their original objectives. To develop these customer classes, we calculate these rate-oriented load metrics for each customer and perform k-means clustering. The analysis is conducted on a set of 300 customer profiles, examining four different rate plans, different numbers of clusters, customer bills and cluster load profile characteristics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Florida Agriculture - Utilizing TRMM to Analyze Sea Breeze Thunderstorm Patterns During El Nino Southern Oscillations and Their Effects Upon Available Fresh Water for South Florida Agricultural Planning and Management

This project utilizes Tropical Rainfall Measuring Mission (TRMM) and Landsat satellite data to assess the impact of sea breeze precipitation upon areas of agricultural land use in southern Florida. Water is a critical resource to agriculture, and the availability of water for agricultural use in Florida continues to remain a key issue. Recent projections of statewide water use by 2020 estimate that 9.3 billion gallons of water per day will be demanded, and agriculture represents 47% of this demand (Bronson 2003). Farmers have fewer options for water supplies than public users and are often limited to using available supplies from surface and ground water sources which depend in part upon variable weather patterns. Sea breeze thunderstorms are responsible for much of the rainfall delivered to Florida during the wet season (May-October) and have been recognized as an important overall contributor of rainfall in southern Florida (Almeida 2003). TRMM satellite data was used to analyze how sea breeze-induced thunderstorms during El Nino and La Nina affected interannual patterns of precipitation in southern Florida from 1998-2009. TRMM's Precipitation Radar and Microwave Imager provide data to quantify water vapor in the atmosphere, precipitation rates and intensity, and the distribution of precipitation. Rainfall accumulation data derived from TRMM and other microwave sensors were used to analyze the temporal and spatial variations of rainfall during each phase of the El Nino Southern Oscillation (ENSO). Through the use of TRMM and Landsat, slight variations were observed, but it was determined that neither sea breeze nor total rainfall patterns in South Florida were strongly affected by ENSO during the study period. However, more research is needed to characterize the influence of ENSO on summer weather patterns in South Florida. This research will provide the basis for continued observations and study with the Global Precipitation Measurement Mission.

Billiot, Amanda↗

Prototype Design, Analysis, and Results for a Liquid Radiological Waste Control Room

Human factors researchers at Idaho National Laboratory are collaborating with a utility partner to address human factors in the modernization of their radiological waste control room. The collaborating utility, Palo Verde, plans to remove all control boards associated with the liquid radiological waste system, which include controls, indicators, and alarm systems, and replace them with modernized digital instrumentation and controls and displays. To be sure the new system either supports current operational performance or enhances it, researchers have carried out three planning and analysis activities: expert operator review, function allocation analysis, and human factor principles and design applications. Researchers utilized access to expert operators to gain information about the system. Operators were asked to detail a procedure exemplifying typical interactions with the liquid radiological waste system and provide it to Idaho National Laboratory with a list of functionalities to incorporate (Section 4.1). Later, operators were asked to provide additional feedback to inform a prototype with adequate realism to support sound analysis of the system design (Section 4.2). Other operators not associated with the utility partner were also involved in experiment design and prototype evaluation (Section 4.2). Due to the extent of the upgrade, care was given to measure the change in the operator’s role (Section 7). As part of the modernization, some plant systems are expected to be equipped with automation or sensors that send information directly to the control where previously operators were required to enter controlled areas to find the information. Such updates made slight changes to operator role requirements, but the impact was negligible. The way the system is operated will remain largely the same, but operator convenience and safety is expected to increase. Additionally, to map operator tasks during the selected procedure, an Operational Sequence Diagram was created (Section 7.1). The diagram helped to account for every interaction and piece of equipment needed to create the prototype design. Alternatively, the diagram can be created following the final design to identify any function reallocations due to redesign. Human factors principles were also applied to the design. An ergonomic assessment was performed on the workspace resulting in various recommendations for placing and designing the new workstation (Section 6). A 3 D mockup of the control room was created to depict the options available with in-depth descriptions of each. Furthermore the prototype design incorporates well known human factors principles. However, to be sure the principles are sound in the control room context, the researches have designed an experiment to measure the impact design decision has on operator performance. The experiment is described in detail in Section 5. Lastly, a tool emerged as this effort began called the NUREG 0711 Crosswalk (Section 8). The tool has multiple uses, but it was primarily intended to communicate how the researcher’s action directly mapped to specific results suggested in the Nuclear Regulatory Commission review guideline. The tool also maps how current results impact future decisions in the modernization process.

47 OTHER INSTRUMENTATION↗

Proactive Regulatory Approaches to Electrification and Load Growth: Workshop Report

On July 10 and 11, 2024, Pacific Northwest National Laboratory and RMI led a workshop in Aurora, Colorado, to explore novel and proactive approaches to electrification and load growth while minimizing risks and costs to customers. Over the next decade, a unique opportunity exists to invest strategically in the electricity system to enable electrification across the transportation, industrial, and building sectors and respond to data and technology-based load growth. However, current utility and regulatory planning practices are insufficient to identify and enable the right investments, and work must be done to reduce the risk and decisional uncertainty faced by utility regulatory commissions and utilities. Ensuring timely electrification investments may require new approaches to address risk, uncertainty, prudence, and cost recovery. Understanding the decision-making process and information needs of utilities and regulators is critical. New policies (or application of policies), financial tools, systems analysis, regulatory mechanisms, and enhanced process transparency may be required. The workshop's goal was to identify proactive regulatory approaches for electrification and load growth that minimize costs and risks to customers. Our intention was that the conversations and the resulting solutions and takeaways would be specific and tactical rather than general and theoretical and that together we would create actionable next steps for key actors in the system, including utilities, regulators, thought leaders, researchers, and the U.S. Department of Energy (DOE). This report is intended to provide workshop attendees with a record and summary of the discussion and proposals raised at the workshop and to provide interested entities who did not attend, such as other regulators, policymakers, utilities, and U.S. DOE offices, with an understanding of what was discussed and with ideas to explore in their organizations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An analysis of possible advanced space strategies featuring the role of space resource utilization

Unresolved issues in space planning in the U.S. are examined, focusing on space resource utilization. The role of the Space Station, determining the most profitable space exploration strategies, and space resource use are discussed. Performance modeling suggests that lunar oxygen is useful on the moon and economical in LEO if lunar hydrogen is available. It is found that the use of volatile materials from Phobos and Deimos might be undertaken if lunar hydrogen is unavailable. It is suggested that resource synergisms between operations in the Mars system and in earth-moon space have important commercial possibilities.

Cordell, Bruce↗

Regulatory Mechanisms to Enable Investments in Electric Utility Resilience

In 2019, Sandia National Laboratories contracted Synapse Energy Economics (Synapse) to research the integration of community and electric utility resilience investment planning as part of the Designing Resilient Communities: A Consequence-Based Approach for Grid Investment (DRC) project. Synapse produced a series of reports to explore the challenges and opportunities in several key areas, including benefit-cost analysis, performance metrics, microgrids, and regulatory mechanisms to promote investments in electric system resilience. This report focuses on regulatory mechanisms to improve resilience. Regulatory mechanisms that improve resilience are approaches that electric utility regulators can use to align utility, customer, and third-party investments with regulatory, ratepayer, community, and other important stakeholder interests and priorities for resilience. Cost-of-service regulation may fail to provide utilities with adequate guidance or incentives regarding community priorities for infrastructure hardening and disaster recovery. The application of other types of regulatory mechanisms to resilience investments can help. This report: characterizes regulatory objective as they apply to resilience; identifies several regulatory mechanisms that are used or can be adapted to improve the resilience of the electric system--including performance-based regulation, integrated planning, tariffs and programs to leverage private investment, alternative lines of business for utilities, enhanced cost recovery, and securitization; provides a case study of each regulatory mechanism; summarizes findings across the case studies; and suggests how these regulatory mechanisms might be improved and applied to resilience moving forward. In this report, we assess the effectiveness of a range of utility regulatory mechanisms at evaluating and prioritizing utility investments in grid resilience. First, we characterize regulatory objectives which underly all regulatory mechanisms. We then describe seven types of regulatory mechanisms that can be used to improve resilience--including performance-based regulation, integrated planning, tariffs and programs to leverage private investment, alternative lines of business for utilities, enhanced cost recovery, and securitization--and provide a case study for each one. We summarize our findings on the extent to which these regulatory mechanisms have supported resilience to date. We conclude with suggestions on how these regulatory mechanisms might be improved and applied to resilience moving forward.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transport aircraft loading and balancing system: Using a CLIPS expert system for military aircraft load planning

The requirement for improving aircraft utilization and responsiveness in airlift operations has been recognized for quite some time by the Canadian Forces. To date, the utilization of scarce airlift resources has been planned mainly through the employment of manpower-intensive manual methods in combination with the expertise of highly qualified personnel. In this paper, we address the problem of facilitating the load planning process for military aircraft cargo planes through the development of a computer-based system. We introduce TALBAS (Transport Aircraft Loading and BAlancing System), a knowledge-based system designed to assist personnel involved in preparing valid load plans for the C130 Hercules aircraft. The main features of this system which are accessible through a convivial graphical user interface, consists of the automatic generation of valid cargo arrangements given a list of items to be transported, the user-definition of load plans and the automatic validation of such load plans.

Richardson, J.↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Maximizing Light Utilization Efficiency and Hydrogen Production in Microalgal Cultures

The project addressed the following technical barrier from the Biological Hydrogen Production section of the Fuel Cell Technologies Program Multi-Year Research, Development and Demonstration Plan: Low Sunlight Utilization Efficiency in Photobiological Hydrogen Production is due to a Large Photosystem Chlorophyll Antenna Size in Photosynthetic Microorganisms (Barrier AN: Light Utilization Efficiency).

08 HYDROGEN↗

3D treatment planning system—Pinnacle system

The treatment planning system is key for the success of external beam radiotherapy, directly impacting the quality of treatment plans and accuracy of dose calculation in the plans. In this article, we provided an overview of the Pinnacle treatment planning system for external beam planning, including 3-dimensional (3D) conformal plans, step-shoot intensity modulated radiotherapy (IMRT) plans, and volumetric modulated arc therapy (VMAT) plans. We discussed dose calculation algorithm and other utilities, including image fusion, plan documentation, and adaptive planning. Based on our many years of clinical experience with the system, the aim of this article is to provide readers with a summary of this particular planning system.

62 RADIOLOGY AND NUCLEAR MEDICINE↗