Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test bed”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

A Cybersecurity Testbed for Smart Buildings

Smart buildings are equipped with a plethora of cyber-physical systems, such as Internet of Things (IoT) devices and building automation systems. These devices, especially in commercial buildings, use legacy communications and hardware that were not designed with cybersecurity in mind. With increasing cyber threats in recent years, smart buildings have become an increasing target for attacks, but not enough published data are available from these incidents to study or replicate the scenarios to defend buildings. As part of the U.S. Department of Energy-funded project focusing on developing the Building Intelligence with Layered Defense Using Security-Constrained Optimization and Security Risk Detection (BUILD-SOS) platform, we developed a cybersecurity test bed for smart buildings. This test bed includes a building simulation tool, virtual devices, emulated operational technology networks, and remote hardware-in-the-loop. Using this test bed, we performed different cyberattacks on the smart building model and collected both physical building data, to understand the impacts on the building, and network data, to aid in separating mechanical faults from cyberattacks during the detection. This test bed is a significant tool in protecting smart buildings from cyberattacks because they can aid in both cybersecurity analysis and the evaluation of cyberattack detection tools by testing the tools in a secure environment without impacting the building operations.

alfalfa↗

A Cybersecurity Testbed for Smart Buildings

Smart buildings are equipped with a plethora of cyber-physical systems, such as Internet of Things (IoT) devices and building automation systems. These devices, especially in commercial buildings, use legacy communications and hardware that were not designed with cybersecurity in mind. With increasing cyber threats in recent years, smart buildings have become an increasing target for attacks, but not enough published data are available from these incidents to study or replicate the scenarios to defend buildings. As part of the U.S. Department of Energy-funded project focusing on developing the Building Intelligence with Layered Defense Using Security-Constrained Optimization and Security Risk Detection (BUILD-SOS) platform, we developed a cybersecurity test bed for smart buildings. This test bed includes a building simulation tool, virtual devices, emulated operational technology networks, and remote hardware-in-the-loop. Using this test bed, we performed different cyberattacks on the smart building model and collected both physical building data, to understand the impacts on the building, and network data, to aid in separating mechanical faults from cyberattacks during the detection. This test bed is a significant tool in protecting smart buildings from cyberattacks because it can aid in both cybersecurity analysis and the evaluation of other cyberattack detection tools by testing the tools in a secure environment without impacting the building operations.

cyber-physical systems↗

Advanced Turbine Technology Applications Project (ATTAP)

ATTAP activities during the past year were highlighted by an extensive materials assessment, execution of a reference powertrain design, test-bed engine design and development, ceramic component design, materials and component characterization, ceramic component process development and fabrication, component rig design and fabrication, test-bed engine fabrication, and hot gasifier rig and engine testing. Materials assessment activities entailed engine environment evaluation of domestically supplied radial gasifier turbine rotors that were available at the conclusion of the Advanced Gas Turbine (AGT) Technology Development Project as well as an extensive survey of both domestic and foreign ceramic suppliers and Government laboratories performing ceramic materials research applicable to advanced heat engines. A reference powertrain design was executed to reflect the selection of the AGT-5 as the ceramic component test-bed engine for the ATTAP. Test-bed engine development activity focused on upgrading the AGT-5 from a 1038 C (1900 F) metal engine to a durable 1371 C (2500 F) structural ceramic component test-bed engine. Ceramic component design activities included the combustor, gasifier turbine static structure, and gasifier turbine rotor. The materials and component characterization efforts have included the testing and evaluation of several candidate ceramic materials and components being developed for use in the ATTAP. Ceramic component process development and fabrication activities were initiated for the gasifier turbine rotor, gasifier turbine vanes, gasifier turbine scroll, extruded regenerator disks, and thermal insulation. Component rig development activities included combustor, hot gasifier, and regenerator rigs. Test-bed engine fabrication activities consisted of the fabrication of an all-new AGT-5 durability test-bed engine and support of all engine test activities through instrumentation/build/repair. Hot gasifier rig and test-bed engine testing activities were performed.

Source record↗

SPoRT - An End-to-End R2O Activity

Established in 2002 to demonstrate the weather and forecasting application of real-time EOS measurements, the Short-term Prediction Research and Transition (SPoRT) program has grown to be an end-to-end research to operations activity focused on the use of advanced NASA modeling and data assimilation approaches, nowcasting techniques, and unique high-resolution multispectral observational data applications from EOS satellites to improve short-term weather forecasts on a regional and local scale. SPoRT currently partners with several universities and other government agencies for access to real-time data and products, and works collaboratively with them and operational end users at 13 WFOs to develop and test the new products and capabilities in a "test-bed" mode. The test-bed simulates key aspects of the operational environment without putting constraints on the forecaster workload. Products and capabilities which show utility in the test-bed environment are then transitioned experimentally into the operational environment for further evaluation and assessment. SPoRT focuses on a suite of data and products from MODIS, AMSR-E, and AIRS on the NASA Terra and Aqua satellites, and total lightning measurements from ground-based networks. Some of the observations are assimilated into or used with various versions of the WRF model to provide supplemental forecast guidance to operational end users. SPoRT is enhancing partnerships with NOAA / NESDIS for new product development and data access to exploit the remote sensing capabilities of instruments on the NPOESS satellites to address short term weather forecasting problems. The VIIRS and CrIS instruments on the NPP and follow-on NPOESS satellites provide similar observing capabilities to the MODIS and AIRS instruments on Terra and Aqua. SPoRT will be transitioning existing and new capabilities into the AWIIPS II environment to continue the continuity of its activities.

Jedlovec, Gary J.↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Evaluation of a Data Validation System

Online data validation is a performance-enhancing component of modern control and health management systems. It is essential that performance of the data validation system be verified prior to its use in a control and health management system. A new Data Qualification and Validation (DQV) Test-bed application was developed to provide a systematic test environment for this performance verification. The DQV Test-bed was used to evaluate a model-based data validation package known as the Data Quality Validation Studio (DQVS). DQVS was employed as the primary data validation component of a rocket engine health management (EHM) system developed under NASA's NGLT (Next Generation Launch Technology) program. In this paper, the DQVS and DQV Test-bed software applications are described, and the DQV Test-bed verification procedure for this EHM system application is presented. Test-bed results are summarized and implications for EHM system performance improvements are discussed.

Wong, Edmond↗

Advanced Turbine Technology Applications Project (ATTAP)

Advanced Turbine Technology Application Project (ATTAP) activities during the past year were highlighted by test-bed engine design and development activities; ceramic component design; materials and component characterization; ceramic component process development and fabrication; component rig testing; and test-bed engine fabrication and testing. Although substantial technical challenges remain, all areas exhibited progress. Test-bed engine design and development activity included engine mechanical design, power turbine flow-path design and mechanical layout, and engine system integration aimed at upgrading the AGT-5 from a 1038 C metal engine to a durable 1371 C structural ceramic component test-bed engine. ATTAP-defined ceramic and associated ceramic/metal component design activities include: the ceramic combustor body, the ceramic gasifier turbine static structure, the ceramic gasifier turbine rotor, the ceramic/metal power turbine static structure, and the ceramic power turbine rotors. The materials and component characterization efforts included the testing and evaluation of several candidate ceramic materials and components being developed for use in the ATTAP. Ceramic component process development and fabrication activities are being conducted for the gasifier turbine rotor, gasifier turbine vanes, gasifier turbine scroll, extruded regenerator disks, and thermal insulation. Component rig testing activities include the development of the necessary test procedures and conduction of rig testing of the ceramic components and assemblies. Four-hundred hours of hot gasifier rig test time were accumulated with turbine inlet temperatures exceeding 1204 C at 100 percent design gasifier speed. A total of 348.6 test hours were achieved on a single ceramic rotor without failure and a second ceramic rotor was retired in engine-ready condition at 364.9 test hours. Test-bed engine fabrication, testing, and development supported improvements in ceramic component technology that will permit the achievement of program performance and durability goals. The designated durability engine accumulated 359.3 hour of test time, 226.9 of which were on the General Motors gas turbine durability schedule.

Source record↗

Advanced Turbine Technology Applications Project (ATTAP)

ATTAP activities during the past year included test-bed engine design and development, ceramic component design, materials and component characterization, ceramic component process development and fabrication, ceramic component rig testing, and test-bed engine fabrication and testing. Significant technical challenges remain, but all areas exhibited progress. Test-bed engine design and development included engine mechanical design, combustion system design, alternate aerodynamic designs of gasifier scrolls, and engine system integration aimed at upgrading the AGT-5 from a 1038 C (1900 F) metal engine to a durable 1372 C (2500 F) structural ceramic component test-bed engine. ATTAP-defined ceramic and associated ceramic/metal component design activities completed include the ceramic gasifier turbine static structure, the ceramic gasifier turbine rotor, ceramic combustors, the ceramic regenerator disk, the ceramic power turbine rotors, and the ceramic/metal power turbine static structure. The material and component characterization efforts included the testing and evaluation of seven candidate materials and three development components. Ceramic component process development and fabrication proceeded for the gasifier turbine rotor, gasifier turbine scroll, gasifier turbine vanes and vane platform, extruded regenerator disks, and thermal insulation. Component rig activities included the development of both rigs and the necessary test procedures, and conduct of rig testing of the ceramic components and assemblies. Test-bed engine fabrication, testing, and development supported improvements in ceramic component technology that permit the achievement of both program performance and durability goals. Total test time in 1991 amounted to 847 hours, of which 128 hours were engine testing, and 719 were hot rig testing.

Source record↗

Development of a Hardware-in-The-Loop Testbed for a Decentralized, Data-Driven Electric Vehicle Charging Control Algorithm

This study presents the design of an electric vehicle (EV)-grid integration (EVGI) hardware test-bed to implement smart EV charging algorithms. Here, the proposed test-bed also allows to create different grid events via flexible integration of other power hardware (e.g., controllable loads and battery energy storage systems) and test their impacts on EV charging. The design uses a real-time digital simulator to realize a complex distribution grid model with primary and secondary networks. A grid simulator physically realizes the selected nodes of the simulated grid to power an actual EV, forming a hardware-in-the-loop (HIL) test setup. The EV-grid integration is demonstrated based on the custom hardware and software implementation of the J1772 charging protocol using dSPACE MicroLabBox, operating as a custom EV Supply Equipment (EVSE). The HIL test-bed features a novel testing platform for accurate implementation and analysis of scalable charging algorithms. To this end, a data-driven, decentralized, model-free charging controller based on the Additive Increase and Multiplicative Decrease (AIMD) algorithm is presented and validated on an EV using the HIL test-bed. We tested the proposed algorithm under various case studies, and presented a comparison study with an existing droop-based, decentralized charging solution. The results showed that the EV successfully performed charging commands generated by the EVSE and regulated its charging power to effectively reduce the system loading caused by high EV penetration.

33 ADVANCED PROPULSION SYSTEMS↗

ATTAP/AGT101 - Year 2 progress in ceramic technology development

The progress made by the Advanced Turbine Technology Applications Project (ATTAP) is summarized, with emphasis on the following areas: ceramic materials assessment and characterization, ceramic impact damage assessment, ceramic combustor evaluation, turbine inlet particle separator development, impact-tolerant turbine designs, and net-shape ceramic component fabrications. In the evolutionary ceramics development in the Automotive Gas Turbine (AGT101) and ATTAP programs initial designs were conceived to reduce stresses by using well-established criteria: bodies of revolution were preferred over nonaxisymmetric geometries, sharp corners were avoided, the contact area between components was kept as large as possible, and small parts were preferred over large when feasible. Projects discussed include: initial ceramic component fabrication by ceramic suppliers in 1990, engine test to 1371 C in 1991, 100-hr test bed engine durability test in 1991, and 300-hr test bed engine durability in 1992.

Kidwell, J. R.↗

Adsorbent testing and mathematical modeling of a solid amine regenerative CO2 and H2O removal system

The paper examines the design and the construction details of the test bed built for testing a solid-amine-based Regenerable CO2 Removal System (RCRS) built at the NASA/Johnson Space Center for the extended Orbiter missions. The results of tests are presented, including those for the adsorption breakthrough and the adsorption and desorption of CO2 and H2O vapor. A model for predicting the performance of regenerative CO2 and H2O vapor adsorption of the solid amine system under various operating conditions was developed in parallel with the testing of the test stand, using the coefficient of mass transfer calculated from test results. The results of simulations are shown to predict the adsorption performance of the Extended Duration Orbiter test bed fairly well. For the application to the RCRS at various operating conditions the model has to be modified.

Jeng, F. F.↗

Demonstration of a High-Efficiency Free-Space Optical Communications Link

In this paper we discuss recent progress on the implementation of a hardware free-space optical communications test-bed. The test-bed implements an end-to-end communications system comprising a data encoder, modulator, laser-transmitter, telescope, detector, receiver and error-correction-code decoder. Implementation of each of the component systems is discussed, with an emphasis on 'real-world' system performance degradation and limitations. We have demonstrated real-time data rates of 44 Mbps and photon efficiencies of approximately 1.8 bits/photon over a 100m free-space optical link.

pulse-position-modulation↗

Near-term Persistent Platform Orbital Testbed: Three Candidate Architecture Options

On-orbit Servicing, Assembly, and Manufacturing (OSAM) will revolutionize the space industry by transforming the concept of operations of space systems and enabling new, radically different system implementations. These new implementations will benefit from a novel persistent asset design paradigm which focuses on evolvable designs that are tailored to the operational environment, not the launch environment. In addition, the ability to launch sub-systems independently enable future persistent assets to economically expand in capability and size, achieving cost effective and productive operations lasting for decades like terrestrial observatories. With few exceptions (International Space Station, Hubble Space Telescope, Mission Extension Vehicle customers), current space systems are not visited once they are operational. Leveraging emerging low cost commercial launch provides the ability to repeatedly and routinely revisit space systems. Thus, revolutionary new approaches for space system design are possible, creating completely new opportunities for small businesses and accelerating the growth of already established space industries. To usher in the revolutionary new operational paradigm, two things are needed. First, to build confidence in the technology and new paradigm, there must be a leading example, a bellwether persistent asset, that demonstrates the reliability and maturity of the new persistent asset paradigm (where repeated visits are common). Second, in order to rapidly advance and validate OSAM capabilities, an efficient means is required to conduct tests in the space environment. A persistent platform testbed satisfies both these needs. The space environment exhibits a plethora of characteristics that are difficult and costly to accurately simulate for a full system in a terrestrial laboratory, such as near zero gravity, a wide range of ionizing radiation types, atomic oxygen, and micro-meteoroids and space debris traveling at high velocity. In addition, since persistent assets range in mass from a few grams to several metric tons, it is difficult to accurately simulate interactions between these systems and visiting vehicles (that also exhibit a wide range of varying masses and capabilities). These interactions include the transmission of forces and/or exchanging mass (in the form of instruments, fuel, robotic assets, etc.). Thus, a rapid, versatile and cost efficient in-space testing capability that includes a persistent test platform and a surrounding in-space test zone is needed to mature technologies through experimentation. The testbed can provide common services, such as: power, thermal control, vibration isolation, data transmission between experiments and terrestrial experimenters, station-keeping, pointing, and robotic agents that can be leveraged by customer experiments. The onboard robotic agents can be used to provide payload handling services, such as: assembly, change out or upgrade, relocation, connecting/disconnecting utilities, inspection, repair or servicing, etc. Since the persistent platform cost will be amortized over many hosted payloads, its services can eventually be offered at a price much lower than if one were to design a unique and dedicated spacecraft and mission for those few experiments. The key to achieving an effective testbed is providing efficient cost effective access and infrastructure to a variety of commercial, academic and government customers coupled with extensibility, in the capability of an individual persistent platform test bed or replication of the test bed in a different operational regime. Three potential options for implementing a test bed were developed and evaluated in this study.

Persistent Platform↗

Near-term Persistent Platform Orbital Testbed: Three Candidate Architecture Options

On-orbit Servicing, Assembly, and Manufacturing (OSAM) will revolutionize the space industry by transforming the concept of operations of space systems and enabling new, radically different system implementations. These new implementations will benefit from a novel persistent asset design paradigm which focuses on evolvable designs that are tailored to the operational environment, not the launch environment. In addition, the ability to launch sub-systems independently enable future persistent assets to economically expand in capability and size, achieving cost effective and productive operations lasting for decades like terrestrial observatories. With few exceptions (International Space Station, Hubble Space Telescope, Mission Extension Vehicle customers), current space systems are not visited once they are operational. Leveraging emerging low cost commercial launch provides the ability to repeatedly and routinely revisit space systems. Thus, revolutionary new approaches for space system design are possible, creating completely new opportunities for small businesses and accelerating the growth of already established space industries. To usher in the revolutionary new operational paradigm, two things are needed. First, to build confidence in the technology and new paradigm, there must be a leading example, a bellwether persistent asset, that demonstrates the reliability and maturity of the new persistent asset paradigm (where repeated visits are common). Second, in order to rapidly advance and validate OSAM capabilities, an efficient means is required to conduct tests in the space environment. A persistent platform testbed satisfies both these needs. The space environment exhibits a plethora of characteristics that are difficult and costly to accurately simulate for a full system in a terrestrial laboratory, such as near zero gravity, a wide range of ionizing radiation types, atomic oxygen, and micro-meteoroids and space debris traveling at high velocity. In addition, since persistent assets range in mass from a few grams to several metric tons, it is difficult to accurately simulate interactions between these systems and visiting vehicles (that also exhibit a wide range of varying masses and capabilities). These interactions include the transmission of forces and/or exchanging mass (in the form of instruments, fuel, robotic assets, etc.). Thus, a rapid, versatile and cost efficient in-space testing capability that includes a persistent test platform and a surrounding in-space test zone is needed to mature technologies through experimentation. The testbed can provide common services, such as: power, thermal control, vibration isolation, data transmission between experiments and terrestrial experimenters, station-keeping, pointing, and robotic agents that can be leveraged by customer experiments. The onboard robotic agents can be used to provide payload handling services, such as: assembly, change out or upgrade, relocation, connecting/disconnecting utilities, inspection, repair or servicing, etc. Since the persistent platform cost will be amortized over many hosted payloads, its services can eventually be offered at a price much lower than if one were to design a unique and dedicated spacecraft and mission for those few experiments. The key to achieving an effective testbed is providing efficient cost effective access and infrastructure to a variety of commercial, academic and government customers coupled with extensibility, in the capability of an individual persistent platform test bed or replication of the test bed in a different operational regime. Three potential options for implementing a test bed were developed and evaluated in this study.

Persistent Platform↗

NRIC Asset Suite Engineering and Operations Data Integration Plan

The National Reactor Innovation Center (NRIC), established by the U.S. Department of Energy (DOE) in August 2019, accelerates the demonstration and deployment of advanced nuclear energy through its mission to inspire stakeholders and the public, empower innovators, and deliver successful outcomes through efficient coordination of partners and resources. NRIC is a national program led by Idaho National Laboratory (INL), enabling collaborators to harness the world-class capabilities of the U.S. National Laboratory System. Committed to demonstrating advanced reactors by the end of 2025, NRIC is designed to bridge the gap between research, development, and the marketplace to help convert some of the Nation’s most promising advanced nuclear reactors into commercial applications by 2030. To meet these needs, NRIC is developing two reactor demonstration test beds at Idaho National Laboratory (INL), the Laboratory for Operation and Testing in the United States (LOTUS) and the Demonstration and Operation of Microreactor Experiments (DOME) test bed. Each test bed involves the modification of existing facilities at INL’s Materials and Fuels Complex (MFC). Retrofitting these facilities to accommodate novel reactors, as well as subsequent but similar NRIC projects, is a non-trivial engineering task and is expected to generate a significant amount of new and revised documentation. Leveraging digital engineering practices, this documentation will be managed in a purpose-built data management tool to facilitate origination, review, and approval while coordinating with the design contractor. The subsequent upload and review of documentation to INL’s existing document control system comprises a long and unnecessarily manual task. An opportunity exists to automate this upload process and save job-hours while continuing to adhere to INL/MFC document management procedures.

99 GENERAL AND MISCELLANEOUS↗

Main Power Distribution Unit for the Jupiter Icy Moons Orbiter (JIMO)

Around the year 2011, the Jupiter Icy Moons Orbiter (JIMO) will be launched and on its way to orbit three of Jupiter s planet-sized moons. The mission goals for the JIMO project revolve heavily around gathering scientific data concerning ingredients we, as humans, consider essential: water, energy and necessary chemical elements. The JIM0 is an ambitious mission which will implore propulsion from an ION thruster powered by a nuclear fission reactor. Glenn Research Center is responsible for the development of the dynamic power conversion, power management and distribution, heat rejection and ION thrusters. The first test phase for the JIM0 program concerns the High Power AC Power Management and Distribution (PMAD) Test Bed. The goal of this testing is to support electrical performance verification of the power systems. The test bed will incorporate a 2kW Brayton Rotating Unit (BRU) to simulate the nuclear reactor as well as two ION thrusters. The first module of the PMAD Test Bed to be designed is the Main Power Distribution Unit (MPDU) which relays the power input to the various propulsion systems and scientific instruments. The MPDU involves circuitry design as well as mechanical design to determine the placement of the components. The MPDU consists of fourteen relays of four different variations used to convert the input power into the appropriate power output. The three phase system uses 400 Vo1ts(sub L-L) rms at 1000 Hertz. The power is relayed through the circuit and distributed to the scientific instruments, the ION thrusters and other controlled systems. The mechanical design requires the components to be positioned for easy electrical wiring as well as allowing adequate room for the main buss bars, individual circuit boards connected to each component and power supplies. To accomplish creating a suitable design, AutoCAD was used as a drafting tool. By showing a visual layout of the components, it is easy to see where there is extra room or where the components may interfere with one another. By working with the electrical engineer who is designing the circuit, the specific design requirements for the MPDU were determined and used as guidelines. Space is limited due to the size of the mounting plate therefore each component must be strategically placed. Since the MPDU is being designed to fit into a simulated model of the spacecraft systems on the JIMO, components must be positioned where they are easily accessible to be wired to the other onboard systems. Mechanical and electrical requirements provided equally important limits which are combined to produce the best possible design of the MPDU.

Papa, Melissa R.↗

Overview and evolution of the LeRC PMAD DC Testbed

Since the beginning of the Space Station Freedom Program (SSFP), the Lewis Research Center (LeRC) has been developed electrical power system test beds to support the overall design effort. Through this time, the SSFP has changed the design baseline numerous times, however, the test bed effort has endeavored to track these changes. Beginning in August 1989 with the baseline and an all DC system, a test bed was developed to support the design baseline. The LeRC power measurement and distribution (PMAD) DC test bed and the changes in the restructure are described. The changes includeed the size reduction of primary power channel and various power processing elements. A substantial reduction was also made in the amount of flight software with the subsequent migration of these functions to ground control centers. The impact of these changes on the design of the power hardware, the controller algorithms, the control software, and a description of their current status is presented. An overview of the testing using the test bed is described, which includes investigation of stability and source impedance, primary and secondary fault protection, and performance of a rotary utility transfer device. Finally, information is presented on the evolution of the test bed to support the verification and operational phases of the SSFP in light of these restructure scrubs.

Soeder, James F.↗

DEVELOPMENT AND DEMONSTRATION TESTBED FOR THE REMOTE OPERATIONS AND MONITORING OF MICROREACTORS

The nuclear industry is rapidly developing many advanced-reactor concepts for near-term deployment in both traditional and non-traditional nuclear-powered applications. One such category of advanced reactor is the microreactor, a class of reactor with less than 20MWth power output, intended for applications where the economics or logistics of traditional power sources are difficult. This includes applications such as remote communities, mining sites, defense installations, or humanitarian and disaster-relief missions. One key enabling feature for the successful deployment of microreactors is a remote operations capability. Remote operations provide monitoring and control capabilities which can significantly reduce staffing costs by eliminating the need for licensed operators at each reactor facility and improve the economic viability for microreactor deployment. A remote concept of operations is not currently an established capability in the nuclear industry. In addition, no demonstration microreactor is expected to complete construction or go critical until at least 2026. This leaves two major capability gaps: the successful demonstration of a remote concept of operations for microreactors and a test bed suitable for said demonstration. Both gaps must be addressed in order to advance the remote concepts of nuclear operation and, more broadly, microreactors themselves from paper to reality. This paper aims to fill these gaps and describes a test bed that would support development and deployment of a remote concept of nuclear operations, initial experimental results from that test bed, and the application of the test bed and experimental results for a digital-twin-based remote concept of operations underdevelopment at Idaho National Laboratory (INL). The platform chosen as a remote concept of nuclear operations test bed is the Single Primary Heat Extraction and Removal Emulator, known as SPHERE, located at INL. SPHERE is a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The small-scale and non-nuclear nature of SHPERE limit safety concerns associated with remote operations while still providing the physical response representative of a microreactor. A network connection was added to SPHERE that enables remote-monitoring capability. This allows for real-time data streaming to networked workstations, data historians, and human-machine interfaces (HMIs). These are all critical components in a remote concept of operations, thus providing a robust development and demonstration platform. An initial experiment was performed using the SPHERE remote operations testbed. This included running a comprehensively instrumented SPHERE through a series of steady-state and transient operating scenarios in both normal and abnormal operating conditions, all while streaming live test data to a remote HMI and data warehouse. This initial experiment served three purposes: (1) characterizing the response of SPHERE, (2) demonstrating the remote connection to SPHERE, and (3) providing a baseline data set for development of a digital-twin-based remote concept of operations that is under development at INL.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗