Nuclear Data Scoping Studies for Nonproliferation - paper
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
This paper addresses the framing constraints for building and community energy projects that must be considered when energy master planning (EMP) is conducted. The constraints cover emissions, sustainability, resilience, regulations and directives, and regional and local limitations such as available energy types, local conditions, and project requirements. The paper reflects development results from participants in an International Energy Agency project on energy master planning and in a U.S. Department of Defense project on technology integration to achieve resilient, low-energy use military installations. It identifies a comprehensive list of framing constraints categorized into locational threats, locational resources, energy and water distribution and storage systems, building and facility, indoor environmental, and equipment in buildings and district systems constraints. In addition, it identifies limits for these constraints that exist in seven participating countries. Some framing constraints can profoundly impact technology selection while others impact the installation of technologies (as in hardening) and have little to no impact on technology selection. Furthermore, framing constraints can be assessed in different ways and there are resources available to help EMP stakeholders evaluate them. Finally, a case is made that identifying and applying framing constraints early in EMP can bring efficiencies and better focus to the EMP process. We come to the conclusion that (1) for holistic energy planning, it is essential to identify and assess the framing constraints that bound an optimized EMP solution, (2) framing constraints limits should be evaluated as either hard or soft or promising technologies may fall out of an EMP analysis, (3) to maintain consistent quality in the EMP process, the identification of framing constraints and their limits, and perhaps their evaluation, should be standardized, (4) a standardized approach could establish a baseline that can be used, built upon, and improved, (5) as automated EMP tools are improved or developed, the resources in this paper could possibly contribute to their interworkings relative to technology screening, and (6) continued climate change and resulting aggressive goal setting will likely drive a continued and strong emphasis on EMP.
Abstract not provided.
This slide deck summarizes the Sustainable Opportunities in Food Systems workshop hosted by JISEA and CSU in June 2020.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Alloy 709 is a high temperature austenitic steel with potential for replacing Type 316 stainless steel. Efforts have been underway to lay the groundwork for an ASME code case by first refine the processing conditions to manufacture Alloy 709 plate. This effort continued into this year, as well as work examining the range of allowable solution annealing temperatures, the ability to recover material that was solution annealed at a temperature that was found to produce poor mechanical properties, and to examine the effects of pre-aging the material prior to testing.
High Energy Particle Physics (HEP) faces challenges over the coming decades with a need to attract young people to the field and STEM careers, as well as a need to recognize, promote and sustain those in the field who are making important contributions to the research effort across the many specialties needed to deliver the science. Such skills can also serve as attractors for students who may not want to pursue a PhD in HEP but use them as a springboard to other STEM careers. This paper reviews the challenges and develops strategies to correct the disparities to help transform the particle physics field into a stronger and more diverse ecosystem of talent and expertise, with the expectation of long-lasting scientific and societal benefits.
ATF-2C comprises four tiers with six rodlets each. The experiment test train (TT) is situated in Loop 2A in the center flux trap (CFT) of the ATR, in which typical pressurized water reactor (PWR) conditions shall be approximated. Tier 1 (bottom) of the TT tests Framatome silicon carbide (SiC) cladding, containing molybdenum heater rods. Low-enriched uranium (LEU) Framatome rodlets with chrome-coated M5 cladding have been modeled in their place for the physics safety analysis to allow the substitution of this tier with fuel if needed. Tier 2 tests LEU Framatome rodlets with M5 cladding, which had irradiated in ATR in prior ATF experiments. Tier 3 tests General Atomics SiC composite cladding, also containing molybdenum heater rods. Tier 4/5/6 (top) tests the Japan Atomic Energy Agency (JAEA)/Mitsubishi Heavy Industries (MHI) fueled rodlets. This upper tier tests LEU rodlets with chrome-coated MDA cladding—several with temperature or pressure instrumentation. To flatten the axial power profile, lower portion of Tier 4/5/6 is surrounded by a hafnium (Hf) shroud, and the bottom two UO2 pellets are of natural enrichment. The ATF-2C TT is to be irradiated in the CFT of ATR (Fig. 1) for three or four 60-day cycles.
Explore the source record for details and available documents.
The High Activity Oxide facility (HAO) reprocessed sheared and dissolved 4500 metric tons of light water reactor fuel the fuel of the emerging light water reactor spent fuel between 1976 and 1998. Over the period, approximately 2200 tons of process waste, composed primarily of sheared hulls, was produced and stored in a vast silo in the first place, and in canisters stored in pools in subsequent years. Upon shutdown of the facility, AREVA D and D Division in La Hague launched a thorough investigation and characterization of the silos and pools content, which then served as input data for the definition of a legacy waste retrieval and reconditioning program. Basic design was conducted between 2005 and 2007, and was followed by an optimization phase which lead to the definition of a final scenario and budget, 12% under the initial estimates. The scenario planned for the construction of a retrieval and reconditioning cell to be built on top of the storage silo. The retrieved waste would then be rinsed and sorted, so that hulls could subsequently be sent to La Hague high activity compacting facility, while resins and sludge would be cemented within the retrieval cell. Detailed design was conducted successfully from 2008 until 2011, while a thorough research and development program was conducted in order to qualify each stage of the retrieval and reconditioning process, and assist in the elaboration of the final waste package specification. This R and D program was defined and conducted as a response and mitigation of the major project risks identified during the basic design process. Procurement and site preparatory works were then launched in 2011. By the end of 2012, R and D is nearly completed, the retrieval and reconditioning process have been secured, the final waste package specification is being completed, the first equipment for the retrieval cell is being delivered on site, while preparation works are allowing to free up space above and around the silo, to allow for construction which is scheduled to being during the first semester of 2013. The elaboration of the final waste package is still undergoing and expected to be completed by then end of 2013, following some final elements of R and D required to demonstrate the full compatibility of the package with deep geological repository. The HAO legacy waste retrieval project is so far the largest such project entering operational phase on the site of La Hague. It is on schedule, under budget, and in conformity with the delivery requirements set by the French Safety Authority, as well as other stakeholders. This project paves the way for the successful completion of AREVA La Hague other legacy waste retrieval projects, which are currently being drafted or already in active R and D phase. (authors)
A significant inventory of process waste of varying natures and quantities has been generated during the thirty years of operation of UP2 400 facility on the site of La Hague, France. The retrieval, packaging and final storage of such an inventory has never been achieved before in France and thus requires the design and qualification of new processes, equipment, and waste packages. Following AREVA strategic decisions and French safety authority requirements, the legacy waste program has begun around the year 2000 and is scheduled to be completed around the year 2025. It is under the responsibility of AREVA Site Value Development Project teams. For each category of waste to be recovered, AREVA teams conducted detailed investigations, defined recovery modes, treatment processes, as well as final waste package forms, which they subsequently submitted to French safety and waste management authorities. A Task force initiative was subsequently launched to optimize the program cost and scenario, and lead to an optimization of about 15% of the entire program. The qualification of processes and waste packages required a significant amount of research and development which is now well under way for processes, and scheduled to be completed in 2015. Preparation work has begun on several installations to clear space for the construction of future retrieval facilities, scheduled to begin in the coming three years. La Hague Legacy waste retrieval program represents a significant challenge in the sense that it covers a significant variety and quantity of waste needing recovery and reconditioning, with tight financial objectives and a binding recovery schedule. During the past five years, AREVA SVD successfully conducted design, research, development, and qualification activities which lead to the definition of qualified processes and waste packages for each retrieval program. Preparation work and supplier consultations are now on-going, in order to meet our objectives of beginning retrieval operations in compliance with our commitments to the safety authorities, in 2015 and 2016. (author)