At least 433 records · Page 24

Onboard Automated Scheduling for the Mars 2020 Rover

The Mars 2020 Mission, scheduled to land on Mars February 18, 2021, has developed an onboard scheduling system [1]. The rationale for the onboard scheduler is to enable the Perseverance rover to adjust its activities in response to activities taking longer or shorter than planned, or using more or less resources than expected, as effectively using these resources could significantly improve rover productivity [2]. If deployed, the onboard scheduler would be an unprecedented use of Artificial Intelligence/Autonomy onboard software in a key role for a major mission.

Biehl, J.↗

Scheduling NASA's Deep Space Network: Priorities, Preferences, and Optimization

NASA's Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. Growth in mission demand, both in number of spacecraft and in data return, has led to increased loading levels on the network, and actual demand frequently exceeds network capacity. The DSN scheduling process involves peer-to-peer collaborative negotiation, which consumes significant time and resources in order to reach a baseline version of the schedule, and then to manage and agree to changes. Process delays are exacerbated by the high level of oversubscription experienced by the DSN: it is not unusual for the scheduling process to start with 20-40\% more requested time can be accommodated on the available antennas. The other NASA networks make use of a static mission priority list to address a similar problem: missions are ranked in priority order, then the schedule is populated by priority from highest to lowest. Such a mechanism would not work for DSN due to the heterogeneity of the mission set, and to the time-varying mission requirements with mission phase. This paper describes an alternative approach for the DSN that addresses key problems inherent in the current process --- oversubsubscription and how to "fairly'" reduce it to a manageable level. The main characteristics of the new approach are the use of loading-based limits based on balancing requested time, along with priorities and user preferences as the basis for optimization criteria that can be used by new algorithms.

Johnston, Mark D↗

Scheduling the Mapping of a planet under geometrical constraints

Scheduling the coverage of a planet by scientific instruments on board spacecrafts under observational constraints is central in a significant number of current and future missions for the exploration of the solar system. In this paper, we describe the components and algorithms of a software used to study early-phase mission design or to schedule daily operations of currently in-flight spacecraft. The scheduling problem at hand is usually a large combinatorial problem. A discretization process is described and several ordering algorithms are designed and compared. Experiments show that high-quality schedules can be produced by approaches combining reasoning about rolling, coverage and priorities.

Wells, Christopher↗

User Preference Optimization for Oversubscribed Scheduling of NASA’s Deep Space Network

NASA’s Deep Space Network (DSN) is the primary resource for communications and navigation for interplanetary space missions, for both NASA and partner agencies. Growth in mission demand, both in number of spacecraft and in data return, has led to increased loading levels on the network, and actual demand frequently exceeds network capacity. The DSN scheduling process involves peer-to-peer collaborative negotiation, which consumes significant time and resources in order to reach a baseline version of the schedule, and then to manage and agree to changes. Process delays are exacerbated by the high level of oversubscription experienced by the DSN: it is not unusual for the scheduling process to start with 20-40% more requested time can be accommodated on the available antennas. The other NASA networks make use of a static mission priority list to address a similar problem: missions are ranked in priority order, then the schedule is populated by priority from highest to lowest. Such a mechanism would not work for DSN due to the heterogeneity of the mission set, and to the time-varying mission requirements with mission phase. This paper describes an alternative approach for the DSN that addresses key problems inherent in the current process — oversubsubscription and how to “fairly” reduce it to a manageable level. The main characteristics of the new approach are the use of loading-based limits based on balancing requested time, along with priorities and user preferences as the basis for optimization criteria that can be used by new algorithms.

Johnston, Mark D↗

NICS (NASA Instrument Capabilities Study) Instrument Schedule and Cost Study

This paper summarizes work performed on the Flight Projects Directorate Planetary Science Projects Division (PSPD, Code 430) NICS (NASA Instrument Capabilities study) instrument schedule and cost study. Included are a short summary of the original NICS (NASA, 2008), and the design and approach, data collection, analysis, preliminary findings and recommendations from select areas of the current study. The NICS (2008) was chartered by then NASA Chief Engineer Michael Ryschkewitsch and chaired by Goddard Space Flight Center (GSFC) engineer, John Leon. The focus was to identify problem areas in instrument development and, if possible, to offer solutions. In the area of instrument developments, the NICS (2008) identified a lack of resources and authority to successfully manage to instrument cost and schedule requirements; and a lack of critical skills, expertise, and leadership to successfully implement unique (one-of-a-kind) high technology developments (NASA, 2008, pp. 51, 52). Additionally, the NICS (2008) found problems in requirements formulation, reviews and management; unrealistic caps and overly optimistic estimates; and externally directed changes which increased the likelihood of overrunning cost and schedule (NASA, 2008, pp.53, 54). It is noteworthy that NICS findings are consistent with previous studies at the mission level (Robbins, Schmidt & White, 2020). Five years later in 2013, the Instrument Projects Division (IPD) was established to implement and manage instrument projects greater than $20M. The IPD was known as Code 490. Its structure incorporated several of the NICS (2008) recommendations. To see if these incorporated recommendations made a difference, and to identify other potential challenges in instrument developments, two parallel studies were initiated. Originally led by the IPD, now led by the PSPD, and the Instrument and Payload Systems Engineering Branch (IPSE, Code 592), respectively, the instrument schedule and cost study and the instrument technical complexity study began in 2017. Data collection was initiated in 2020 and is on-going. This paper is limited to the IPD/PSPD study. Among other findings, preliminary data indicate IPD/PSPD project management support positively influenced instrument development as related to providing a dedicated level of support staff, including a deputy Instrument Project Manager (dIPM), reducing IPM leadership changes, and providing other project support. Next steps include continued data collection and analysis, and mapping to technical complexity data.

NICS implementation↗

A Combined Day-ahead and Real-time approach for Scheduling Real and Reactive power dispatch of Battery Energy Storage System

A combined day-ahead (look-ahead) and real-time optimization approach is proposed to schedule BESS real and reactive power dispatch. The look ahead scheduling agent maximizes profit and essentially performs the function of energy arbitrage by looking at forecasted prices, network constraints and BESS operating conditions to generate real power dispatch schedule. While this schedule is followed, the real time optimization agent computes an optimum reactive power set-point (for a particular objective function) using optimal power flow framework. The concepts are implemented by co-simulating legacy tools and demonstrated on a large real world distribution system. In addition to the profits from energy arbitrage, optimum reactive power set point computation results in achieving desirable network attributes like flat voltage profiles and minimizing voltage deviations from desired value.

Bhatti, Bilal A.↗

Correlating and Simulating Socio-Demographically Driven Residential End-Use Activity Schedules

Incorporating socio-demographic and behavioral considerations into decision-support tools is crucial for identifying gaps and addressing consumer needs to ensure reliable and affordable energy solutions. In energy simulation models, the correlation between socio-demographics and time-use behavior is not well-captured. Thus, we developed a large-scale simulation workflow to generate schedules for 10 residential activities across 24 population segments defined by age, income, and employment status. Using pre-pandemic 2015-2019 American Time Use Survey (ATUS) data, we used ANOVA to confirm the correlation between demographic factors and time use. We explored three k-modes clustering methods-backward, forward, and a new hybrid approach-to delineate the occupancy patterns based on demographics. Using the probability of cluster membership for each population segment and a time inhomogeneous Markov chain to generate activity transition probabilities for each cluster, we simulated 50,000 schedules per segment and validated them against the ATUS data. The hybrid method produced the most socio-demographically differentiated clusters while demonstrating comparable performance to other approaches, with an overall root mean square error of 0.12 for both weekday and weekend schedules. Thus, the hybrid method, where each cluster is dominated by certain demographic segments and occupancy patterns, offers more modeling versatility in terms of scenario analysis. The new workflow improves the socio demographic differentiation of energy consumption by considering differences in time use. This approach enables future research on demographically segmented time of use (TOU) energy consumption, including impacts of TOU utility bills and rate analysis, long-run marginal emissions, and energy retrofits.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Approximation Algorithm for a Task Allocation, Sequencing and Scheduling Problem Involving a Human-Robot Team

Here we present an approximation algorithm for a Task Allocation, Sequencing and Scheduling Problem (TASSP) involving a team of human operators and robots. The robots have to travel to a given set of targets and collaboratively work on the tasks at the targets with the human operators. The problem aims to find a sequence of targets for each robot to visit and schedule the tasks at the targets with the human operators such that each target is visited exactly once by some robot, the scheduling constraints are satisfied and the maximum mission time of any robot is minimum. This problem is a generalization of the single Traveling Salesman Problem and is NP-Hard. Given k robots and m human operators, an algorithm is developed for solving the TASSP with an approximation ratio equal to 5/2- 1/k when m ≥ k and equal to 7/2 -1/k otherwise. Computational results are also presented to corroborate the performance of the proposed algorithm.

42 ENGINEERING↗

Lessons Learned from International Space Station Crew Autonomous Scheduling Test

In 2017, our team investigated and evaluated the novel concept of operations of astronaut self-scheduling (rescheduling their own timeline without creating violations) onboard International Space Station (ISS). Five test sessions were completed for this technology demonstration called Crew Autonomous Scheduling Test (CAST). For the first time in a spaceflight operational environment, an ISS crewmember planned, rescheduled, and executed their activities in real-time on a mobile device while abiding by flight and scheduling constraints. This paper discusses the lessons learned from deployment to execution.

planning and scheduling↗

COVID-19 impacts on residential occupancy schedules and activities in U.S. Homes in 2020 using ATUS

Many aspects of the daily lives of those living in the United States were substantially impacted by the COVID-19 pandemic in the year 2020. A broad diversity of measures was implemented to curb the spread of the virus, many of which included adjustments to where and how people worked, went to school, and otherwise conducted their daily lives compared to pre-pandemic times. This has impacted how residential buildings are used, how much time people spend in their homes, and as a result, how much energy these buildings consume. The main objective of this study is to analyze, at a national scale, the differences in the occupancy schedules and activities conducted in homes in the U.S., as compared to pre-pandemic. 15 years of American Time Use Survey and Current Population Survey data, from 2006 to 2020, was used in this study to analyze the occupancy schedules for both pandemic (2020) and pre-pandemic (2006–2019) times. These impacts were also analyzed with respect to variables including, weekday/weekend, month of the year, age of the occupants, household income, and household size. The impact of the pandemic on occupant schedules were most substantial in the initial months, whereas as the months progressed, these occupancy profiles slowly changed. Across 2020, people spent, on average, 8 % more time (1.9 h) in their home on weekdays, and 3–6 % (1.2 h) on weekend days. The percentage of time spent for different activities and locations within homes were also studied. For 1-member households, their time spent at home decreased whereas for 2-, 3-, and 4- member households, they spent more time at home. Overall, people spent around 45% more time doing office- and work-related activities at home compared to pre-pandemic, which is likely due to increased remote working and schooling. This research helps to improve the understanding of the occupancy presence and absence profiles in U.S. residential buildings due to the pandemic and provides new insights as to modified profiles for researchers, building designers, and policy makers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A data-driven linear formulation of the optimal demand response scheduling problem for an industrial air separation unit

Demand response (DR) has become a key element in balancing the power grid as the contribution of time-varying renewable power generation increases. Chemical plants are appealing candidates for DR programs as they offer large, concentrated and flexible loads. DR participation calls for frequent production rate changes over time scales that overlap with the dominant dynamics of the plant. Production scheduling should therefore consider the process dynamics explicitly. Here we present a data-driven approach for modelling the scheduling-relevant dynamics based on historical closed-loop operating data using autoregressive with extra inputs (ARX) models. We introduce a new, linear scheduling problem formulation based on the ARX representation, and demonstrate its implementation on an industrial air separation unit.

42 ENGINEERING↗

Multistage Stochastic optimization for mid-term integrated generation and maintenance scheduling of cascaded hydroelectric system with renewable energy uncertainty

The uncertainties resulting from the escalating penetration of renewable energy resources pose severe challenges to the efficient operation of modern power systems. Hydroelectricity is characterized by its flexibility, controllability, and reliability, and thus becomes one of the most ideal energy resources to hedge against such uncertainties. This paper studies the mid-term integrated generation and maintenance scheduling of a cascaded hydroelectric system (CHS) consisting of multiple cascaded reservoirs and hydroelectric units. To precisely describe the mid-term water regulation policies, the hydraulic coupling relationship and water-energy nexus of CHS are incorporated into the proposed optimization model. The uncertainties of natural water inflow and the power outputs of wind/solar energy generation are taken into consideration and captured via a stochastic process modeled by a scenario tree. A multistage stochastic optimization (MSO) approach is developed to coordinate the complementary operations of multiple energy resources, by optimizing the mid-term water resource management, generation scheduling, and maintenance scheduling of CHS. The proposed MSO model is formulated as a large-scale mixed-integer linear program that presents significant computational intractability. To address this issue, a tailored Benders decomposition algorithm is developed. Two real-world case studies are conducted to demonstrate the capability and characteristics of the proposed model and algorithm. The computational results show that the proposed MSO model can exploit the flexibility of hydroelectricity to efficiently respond to variable wind and solar power, and reserve water resources for the generation in peak months to reduce the consumption of fossil fuel. Furthermore, the proposed solution approach also exhibits promising computational efficiency when handling large-scale models.

13 HYDRO ENERGY↗

Resilience-based Recovery Scheduling of Transportation Network in Mixed Traffic Environment: A Deep-Ensemble-Assisted Active Learning Approach

Devising effective post-hazard recovery strategies is critical in enhancing the resilience of transportation networks (TNs). However, existing work does not consider the multiclass users’ travel behavior in network functionality quantification and the metaheuristic solution procedures often suffer from extensive computational burden due to the exploration need in large solution space and the expensive functionality quantification. Here, this study develops a bilevel decision-making framework for the resilience-based recovery scheduling of the TN in a mixed traffic environment with connected and autonomous vehicles (CAVs) and human-driven vehicles (HDVs). The lower level quantifies the TN's functionality over time considering different travel behavior of CAV and HDV users arisen from their different levels of information perception. The upper level presents a novel deep-ensemble-assisted active learning approach to balance optimization performance and computational cost. This framework can help decision makers better quantify the TN's functionality to support effective recovery scheduling of TN with different mixed traffic scenarios ranging from HDV-only to future CAV-dominant traffic. The optimization approach bears the potential to be extended to solving general large-scale network recovery scheduling problems effectively and efficiently. The proposed methodology is demonstrated using a real-world traffic network in Southern California under earthquake considering deterministic and stochastic repair durations.

42 ENGINEERING↗

Heuristic solutions to the single depot electric vehicle scheduling problem with next day operability constraints

This study focuses on the single depot electric vehicle scheduling problem (SDEVSP) within the broader context of the vehicle scheduling problem (VSP). By developing an effective scheduling model using mixed-integer linear programming, we generate bus blocks that accommodate electric vehicles (EVs), ensuring successful completion of each block while considering recharging requirements between blocks and during off-hours. Next day operability constraints are also incorporated, allowing for seamless repetition of blocks on subsequent days. The SDEVSP is known to be computationally complex, deriving optimal solutions unattainable for large-scale problems within reasonable timeframes. To address this, we propose a two-step solution approach: first solving the single depot VSP, and then addressing the block chaining problem (BCP) using the blocks generated in the first step. The BCP focuses on optimizing block combinations to facilitate recharging between consecutive blocks, considering operational constraints. Further, a case study conducted reveals that nearly 100% electrification for Chicago, IL and Austin, TX transit buses is viable yet requires 1.6 EVs at 150-mile range per diesel vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

A Q-Learning-Based Approach for Distributed Beam Scheduling in mmWave Networks

We consider the problem of distributed downlink beam scheduling and power allocation for millimeter-Wave (mmWave) cellular networks where multiple base stations (BSs) belonging to different service operators share the same unlicensed spectrum with no centralized control or explicit coordination among them. Our goal is to design efficient distributed beam scheduling and power allocation schemes such that the network-level payoff, defined as the weighted sum of the total throughput and a power penalization term, can be maximized. To this end, we propose a distributed scheduling approach to power allocation and adaptation for efficient interference management over the shared spectrum by modeling each BS as an independent Q-learning agent. As a baseline, we compare the proposed approach to the state-of-the-art non-cooperative game-based approach which was previously developed for the same problem. We conduct extensive experiments under various scenarios to verify the effect of multiple factors on the performance of both approaches. Experiment results show that the proposed approach adapts well to different interference conditions by learning from experience and thus can achieve higher payoff than the game-based approach. The proposed approach can also be integrated into our previously developed Lyapunov stochastic optimization framework for the purpose of network utility maximization with optimality guarantee. As a result, the weights in the payoff function can be automatically and optimally determined by the virtual queue values from the sub-problems derived from the Lyapunov optimization framework.

99 GENERAL AND MISCELLANEOUS↗

A Vision–based Robust $\mathcal{H}$ ∞ Gain Scheduling Longitudinal and Lateral Following Controller for Autonomous Vehicles on Urban Curved Roads

Implementing advanced driver assistance systems (ADAS) in congested and intricate urban traffic scenarios poses significant challenges. To address the frequent stop–and–go motions exhibited by autonomous vehicles (AVs) navigating urban roads with changes in curvature, we propose a vision–based robust $\mathcal{H}$ ∞ adaptive cruise control system (ACC) for longitudinal control, plus a lane keeping assist system (LKAS) for lateral control. For the vision-based ACC, a weighted probability objective function for the vehicle following behavior is formulated. We incorporate $\mathcal{H}$ ∞ performance and gain scheduling techniques to mitigate the impact of uncertainty in visual sensor measurements. Furthermore, the optimal time headway is scheduled based on the velocity to ensure traffic flow efficiency and safety during the vehicle following process. For the LKAS, we introduce a road curvature estimation method that integrates lane and vehicle dynamics information to obtain the lateral and heading offsets. Next, the design criterion of the observer–based robust gain scheduling lateral motion controller is established by linear matrix inequality (LMI). Here, a series of experiments conducted within a camera–in–loop platform validate the proposed method.

33 ADVANCED PROPULSION SYSTEMS↗

Collaborative Scheduling Using JMS in a Mixed Java and .NET Environment

A viewgraph presentation to demonstrate collaborative scheduling using Java Message Service (JMS) in a mixed Java and .Net environment is given. The topics include: 1) NASA Deep Space Network scheduling; 2) Collaborative scheduling concept; 3) Distributed computing environment; 4) Platform concerns in a distributed environment; 5) Messaging and data synchronization; and 6) The prototype.

.NET↗

Deep Space Network Scheduling Using Evolutionary Computational Methods

The paper presents the specific approach taken to formulate the problem in terms of gene encoding, fitness function, and genetic operations. The genome is encoded such that a subset of the scheduling constraints is automatically satisfied. Several fitness functions are formulated to emphasize different aspects of the scheduling problem. The optimal solutions of the different fitness functions demonstrate the trade-off of the scheduling problem and provide insight into a conflict resolution process.

Deep Space Network (DSN)↗