Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “resume”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Solving Cassini's data glitch problem during coherency mode transition for Titan radar observations

We describe the problem of regular small telemetry losses incurred during coherency mode transitions in Cassini’s telecommunication. The project did not originally plan any corrective steps for avoiding these data losses, because of 1) the disparity between the small durations of the transitions (1-2 min) and large playback capability losses (15 min) needed for bracketing the transition time spans and 2) the unpredictable content of data downlinking during the transitions. However, as the intense science data return from the tour began, it became apparent that the impact of these small losses can sometimes be significant. We provide two examples of the impact on Radar-dedicated Titan flybys. In general, the impacts are larger for high-rate data and for data acquired during a targeted flyby of Titan and other icy satellites. Although the content of data during a transition for every downlink pass is unpredictable, we are certain that some important data will be lost on downlink passes dedicated to transmit the flyby data and it does not matter what part of the data will be hit by the transitions. We collected more than 200 days of data from Cassini tour operations between June 2004 and February 2005 to analyze the distributions of the start time and duration of the transitions. We found that the occurrence of a transition can be predicted within a 5-min window, with 95 percent confidence. Given that, it is possible to eliminate the data losses by pausing playback at the beginning of a transition for 5 minutes and resuming playback after transition completion. We briefly describe three operational fixes as to how to implement the playback pause, with the pros and cons for each method. Finally, we report the results of the method chosen by the project and implemented on the spacecraft for several Titan and icy satellites flybys between September and October, 2005.

Weld, K. R.↗

Segmented Ion Engine Plume Characteristics

Preliminary evaluation of the segmented ion thruster (SIT) ion beam characteristics was performed by measuring the two dimensional ion current density distribution at four axial locations downstream from the thruster. Current density profiles were measured with the concurrent operation of multiple ion sources. Preliminary assessments regarding symmetry of the plume, characterization of plume development as a function of axial position, and the interactions of multiple simultaneously operating ion sources were conducted. A numerical integration scheme was applied to the acquired data to determine the total beam current. A qualitative analysis of the downstream development of the ion beam was conducted. Most of the data acquired so far has been on somewhat of a trial basis and extensive testing is scheduled to resume in August 1994.

ion↗

Validation of Fault-Tolerant Plans for Europa Clipper

The Europa Clipper mission will explore that icy moon in a series of brief flybys through the Jovian radiation belts. A single event upset in the spacecraft flight computer during these critical scientific periods could jeopardize the success of the mission. Rather than safing and awaiting operator intervention, the Clipper mission envisions limited onboard autonomy that can restore spacecraft state sufficiently to resume the encounter observation plan as rapidly as possible. The contingency plan is contained in an Activity Restart Timeline (ART) that is transmitted in parallel with the nominal plan, which must be co-validated jointly against all spacecraft state and resource constraints amid unpredictable fault timing. A prototype validation tool was built that leverages declarative spacecraft models and automated search techniques to find such potential inconsistencies in the unified contingent mission plan. Early validation results within motivating scenarios are presented.

Ferguson, Eric↗

In-Flight Operation of the Dawn Ion Propulsion System Through Completion of the Final Orbit Around Dwarf Planet Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional DV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to all science orbits at Ceres including the final orbit for Dawn’s primary mission, called the low altitude mapping orbit (LAMO), a circular orbit at a mean altitude above Ceres of approximately 385 km. Dawn met or exceeded all pre-launch science requirements and Dawn's prime mission concluded on June 30, 2016. Dawn subsequently received NASA approval for two extended missions at Ceres, called XM1 and XM2. During XM1 IPS was used for orbit maintenance and to transit the spacecraft to several new, higher-altitude science orbits, ending in an elliptical orbit at a maximum altitude of approximately 38,000 km. In XM2, IPS operations included transiting the Dawn spacecraft to its final, highly elliptical orbit at Ceres ranging from 35 km perigee to 4,800 km apogee. Science data acquisition will continue in XM2 until the hydrazine is exhausted, which is expected to occur between August and October 2018. Dawn has successfully completed all science goals for both the primary and XM1 extended missions. To date the IPS has been operated for approximately 51,250 hours, consumed approximately 416 kg of xenon, and provided a delta-V of almost 11.5 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2018. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations for XM1, and XM2 through June 2018.

Rayman, Marc D.↗

NASA’s Human Landing System: Enabling the Next Generation of Lunar Science

The Human Landing System (HLS) is the mode of transportation that will take astronauts to the lunar surface as part of NASA's Artemis exploration program. HLS also serves as a research platform both on the surface and in lunar orbit, enabling critical scientific investigations on and of the Moon. With support at NASA centers around the country, the HLS program, based at Marshall Space Flight Center in Huntsville, Alabama, is working closely with its commercial partners throughout the development process to design and build innovative and technically advanced lunar landers – new vehicles designed for the modern era of space travel – leveraging decades of human spaceflight experience and the speed of the commercial sector. In 2019, NASA asked U.S. industry for proposals to design and develop a human lander for the first human mission to the lunar surface under Artemis. Initial contracts were awarded to Blue Origin Federation, Dynetics, and SpaceX to advance their designs. Following the execution of the ten-month Base Period, NASA announced in April 2021 that the agency selected SpaceX to move forward with its human landing system [1] and land the first two astronauts on the lunar surface during the Artemis III mission. Following two protest periods, NASA awarded the contract, known as Option A, to SpaceX in July 2021 and resumed work in November 2021 (Fig. 1). In parallel, the HLS program has been preparing for the acquisition that will procure regular crewed transportation to the lunar surface following Artemis III. NASA released a request for information (RFI) in July 2021 asking U.S. industry for feedback to help inform the future solicitation, known as Lunar Exploration Transportation Services (LETS) [2]. Also in July 2021, NASA released the NextSTEP-2 Appendix N broad agency announcement soliciting new work from U.S. industry to mature their HLS designs and perform risk reduction activities in advance of the LETS procurement [3]. NASA selected Blue Origin Federation, Dynetics, Lockheed Martin, Northrop Grumman, and SpaceX to participate [4]. This work will also help better inform the LETS procurement and prepare industry to propose. NASA hopes to release a draft request for proposals (RFP) in Spring 2022.

R C Weber↗

ARIEL: Autonomous Excavation Site Selection for Europa Lander Mission Concept

This paper presents ARIEL (Autonomous Ranking and Interrogation of Excavation Location), an autonomy system for selecting an excavation site on-board for NASA’s Europa Lander Mission Concept. Historically, excavation site selection has been performed by a lengthy ground-in-the-loop (GITL) process involving manual inspections, assessments, and decision making in past missions. However, as Europa Lander would have approximately 20 days of lifetime after the landing, many surface activities, including excavation site selection, must be autonomously performed on-board. This paper describes the overall system of ARIEL as well as its two major algorithmic components: vision-based candidate selection and smart interrogation, which estimates the physical properties of the icy surface through physical contact with the robotic arm’s endeffector. Preliminary results are presented using images from Earth analogue sites. The Europa Lander mission returned to the formulation phases in early 2019 while ARIEL was at an early stage of development. Described in this paper is a snapshot of ARIEL as of the project suspension. This paper also describes the remaining challenges to be solved, should the mission resume in the future.

Ono, Hiro↗

What Makes Hybrid Concurrent Engineering Teams Work and Not Work: A Theoretical Analysis

Aerospace concurrent engineering teams (CETs) have been around since 1995 and have evolved into various shapes and forms. Historically, CETs have been designed to function with all team members physically collocated. In order to continue operating during the coronavirus pandemic, these teams have had to become fully distributed in 2020. Previously, distributed CETs were predicted to be considerably less efficient than traditional CETs. However, at JPL studies are being successfully run at peak rate in a distributed mode. As nominal working conditions resume after the pandemic, a major question is whether these teams must go back to being fully collocated or if they can become successful hybrid teams, with half or more of the engineers working remotely. In order to address this question, it is important to understand the key characteristics that make a CET more likely to be successful in a remote mode. This paper revisits a framework for characterizing concurrent engineering teams, providing a means to describe and compare the behavior of concurrent engineering teams in various settings [1], and uses the framework to make recommendations for future hybrid teams.

Chattopadhyay, Debarati↗

Long-Duration Wear Testing of the ASTRAEUS Thruster, Phase I: 50 kg Xe Throughput

The thruster component of the Ascendant Sub-kW Transcelestial Electric Propulsion System successfully completed a propellant throughput demonstration of 50 kg Xe. The thruster was operated for a total of 3,287 h, of which 97.9% was spent at 300 V – 1000 W, and generated 790 kN-s of total impulse. Thrust, telemetry, and temperature measurements periodically recorded at four operating conditions spanning 200 – 500 V and 200 – 1000 W revealed constant performance across the full test duration. High-fidelity plasma simulations of the erosion of the thruster’s downstream faces suggest a theoretical lifetime capability of >30 kh, corresponding to propellant throughput of >450 kg Xe and a total impulse of >7 MNs, at the 300 V – 1000 W operating condition. The test was voluntarily paused after 50 kg Xe throughput to take these erosion measurements before the test was resumed at a different operating condition.

Goebel, Dan↗

A Terrestrial Gamma-ray Flash from the 2022 Hunga Tonga–Hunga Ha’apai Volcanic Eruption

The Hunga Tonga–Hunga Ha’apai submarine volcano recently resumed activity. Violent eruptions on 2022 January 14th and 15th launched a tall ash plume that produced extremely high lightning rates. Here we report a terrestrial gamma-ray flash (TGF) that was produced by the volcanic lightning and observed from space by the Fermi Gamma-ray Burst Monitor (GBM). Observations by radio lightning networks and especially by the Geostationary Lightning Mapper (GLM) show that the only lightning close enough to produce a TGF detectable by Fermi GBM was from the volcano’s plume. With the observing duration of Fermi, observing a single TGF is consistent with the hypothesis that the volcanic lightning of this eruption produced TGFs at the average rate of thunderstorm lightning. The observation of a strong TGF from space also indicates that the electric field was oriented so as to accelerate electrons upward.

Terrestrial gamma-ray flashes↗

NASA MSFC Lunar Surface Simulator (LSS): A Facility for Lunar Relevant Environment Testing

NASA will resume crewed visits to the lunar sur-face beginning in the mid-2020s. Environmental testing is essential to developing and validating the hardware that will enable a sustained presence on the lunar surface. Lunar dust is one of the most pressing challenges that threatens the longevity of mechanical systems as well as the health of astronauts living and working on the Moon. Facilities that allow large pieces of hard-ware to be exposed to both lunar dust and the temperature and vacuum of the lunar environment are invaluable to the agency as well as to the broader community of international, academic, and industry partners with which the agency collaborates. Marshall Space Flight Center has out-fitted one of its largest test chambers with regolith simulant beds to create the Lunar Surface Simulator (LSS).

Relevant environment testing↗

Assessing the Relationships Between Sensorimotor Biomarkers and Post-Landing Functional Task Performance

Spaceflight drives adaptive changes in healthy individuals appropriate for sensorimotor function in a microgravity environment. These changes are maladaptive for return to earth's gravity. The inter-individual variability of sensorimotor decrements is striking, although poorly understood. The goal of this study is to identify a set of behavioral, neuroimaging and genetic measures that can be used to predict early post-flight performance on a set of sensorimotor tasks. Astronauts are recruited who previously participated in sensorimotor field tests and/or posturography soon after long-duration spaceflight. Behavioral tests include assessments of sensory dependency and adaptability. Visual dependency involves treadmill walking while viewing a moving virtual visual scene. Vestibular thresholds are measured while seated during lateral translations. Proprioception dependency is measured during one-legged stance on a horizontal air-bearing surface. Ground assessment of adaptability is performed (1) during treadmill walking with a virtual linear hallway and a moving walking surface, and (2) during multiple trials of navigating an obstacle course while wearing reversing prisms. The neuroimaging tests will characterize individual differences in regional brain volumes (using Structural MRI) and white matter microstructure (using Diffusion Tensor Imaging) to serve as potential predictors of adaptive capacity. The genetic tests will utilize saliva samples to examine variations in four genes chosen because of their ability to differentiate sensorimotor adaptation ability in a normative population, including Catechol-O-methyltransferase (COMT), Dopamine Receptor D2 (DRD2), Brain-derived neurotrophic factor (BDNF) and the α2-adrenergic receptor. Twenty-one ISS crewmembers have been tested to date, including 6 from this past year after testing resumed post-COVID. This cohort includes 9 first-time fliers, 4F, and mission durations lasting 182 ± 32 days, mean ± std. We are utilizing a combination of three post-flight functional task outcomes: tandem walk, recovery from fall and dynamic posturography. There is considerable variability among the post-flight performance outcomes for the 21 participants to date. Based on a partial sample using an ordinal scale survey, 80% indicated their ability to perform functional tasks were more impacted postflight relative to inflight with 50% indicating they needed to restrict movements for a longer period postflight relative to inflight. While there is a strong association within tests obtained at different R+0 timepoints, by R+24 hr performance on one post-flight test does not necessarily correlate with performance on other post-flight tests. There are apparent relationships between individual measures and specific post-flight outcome measures; however, additional data is needed to draw conclusions. Preliminary statistical analysis indicates combining biomarkers will increase predictive power and this will be explored with future analyses. Our preliminary findings underscore the importance of a comprehensive post-flight test battery including different types of tasks with varying sensory feedback. We expect that understanding the relationships between these sensorimotor biomarkers and post-flight functional task performance will improve both our understanding of the individual variability and our strategy to optimize sensorimotor countermeasures.

S J Wood↗

NASA MSFC Lunar Surface Simulator (LSS): A Facility for Lunar Relevant Environment Testing

NASA will resume crewed visits to the lunar surface beginning in the mid-2020s. Environmental testing is essential to developing and validating the hardware that will enable a sustained presence on the lunar surface. Lunar dust is one of the most pressing challenges that threatens the longevity of mechanical systems as well as the health of astronauts living and working on the Moon. Facilities that allow large pieces of hardware to be exposed to both lunar dust and the temperature and vacuum of the lunar environment are invaluable to the agency as well as to the broader community of international, academic, and industry partners with which the agency collaborates. Marshall Space Flight Center has outfitted one of its largest thermal vacuum chambers with regolith simulant beds to create the Lunar Surface Simulator (LSS).

Relevant environment testing↗

Operational Evaluation of NASA SPoRT Lightning Safety Applications for Impact Based Decision Support Services

The NWS Office in Huntsville is tasked with monitoring and predicting the threat for lightning within its County Warning Area. These impact-based decision support services (IDSS) are provided routinely for aviation operations, irregularly for large-scale, outdoor events, and can have varying safety requirements, such as proximity to location and duration. Lightning monitoring and prediction can require the rapid synthesis of a plethora of data, so products that make this process more efficient and effective are sought by the operational community. The Huntsville NWS Office benefits from close collaboration with the NASA SPoRT Center, which is developing several products to address these operational challenges in concentrated R2O/O2R efforts. One example of this is the StopLight product, which uses Geostationary Lightning Mapper (GLM) flash extent density (FED) to provide an easy-to-interpret visual aid of lightning occurring within the last 30 minutes. The StopLight product shows both the age and location of the last lightning flash within each GLM pixel, which can be particularly useful for IDSS with determining when to resume activities or operations that have been shut down due to lightning. This presentation highlights results of collaboration between NASA SPoRT and NWS Huntsville, including testing of the Stoplight product, and additional experimental products in development. A brief summary of the lightning products are provided while the main focus will discuss product evaluation and forecaster perspective during real-time weather watch activities to support aviation operations and events where IDSS was necessary.

Kristopher White↗

The NASA Astrobiology Program’s Professional Advancement Workshop Series: Next Steps

Introduction: In the modern-day competitive job search, it is not enough for a candidate to have an excellent academic resume. Candidates must also present themselves well in various styles of interviews, have managerial skills, and be capable of engaging in complex interpersonal relationships and team building. The NASA Astrobiology Program’s Professional Advancement Workshop Series (PAWS) addresses the need for professional skills development that is not traditionally taught in graduate programs. PAWS is designed to supplement academic teachings by providing a space where early career scientists can learn new skills to help them explore, interview for, and be hired in the jobs and careers they want. This is especially true for jobs that are outside of the traditional academic “pipeline” (the path of student to postdoc to tenure-track professor). PAWS embraces the braided river model of career development [1], which emphasizes flexibility as a scientist’s needs change throughout their life. PAWS also presents an opportunity for other early career scientists to meet and network with each other outside of conferences and other formal events. This is especially important as the world emerges from the ongoing COVID-19 pandemic. Finally, PAWS creates an informative space full of resources available to everyone, which lowers institutional barriers regarding knowledge of opportunities and potentially provides mentorship to those in need. Both items are identified as supportive of a more diverse and inclusive future workforce [2–4]. PAWS began in August 2021 and was originally intended to last until the Astrobiology Science Conference in May 2022. The NASA Astrobiology Program initially sponsored PAWS, allowing the PAWS Leadership to bring in expert speakers from outside of NASA. These external speakers exposed the event attendees to new techniques and perspectives. PAWS has been able to continue beyond May 2022 because of many people volunteering their time for panels and a good balance between panels and expert-led workshops. Here, we share how PAWS works, what the results have been so far, and the future plans for PAWS.

Worshop↗

Long-Duration Wear Testing of the ASTRAEUS Hall Thruster, Phases II & III: 72 kg Xe Throughput & 1.2 MN-s Total Impulse

The thruster component of the Ascendant Sub-kW Transcelestial Electric Propulsion System successfully completed a propellant throughput demonstration of 72 kg Xe in a long-duration wear test planned to eventually exceed 100 kg. The thruster has been operated for a total of 5450 h over three operating conditions: 3287 h at 300 V – 1000 W, 1745 h at 500 V – 1000 W, and 417 h at 400 V – 600 W. A total of 1.2 MN-s of impulse has been demonstrated to date. Thrust, telemetry, and temperature measurements periodically recorded at four operating conditions spanning 200 – 500 V and 200 – 1000 W revealed constant performance across the full test duration. The erosion of the downstream faces of the thruster was observed to be higher than anticipated after the first 5032 h of thruster operation. This issue was traced to the application of sub-nominal magnetic field strengths throughout the LDWT, caused by an electrical-related ground-support equipment issue, which resulted in a downstream shift of the discharge plasma and enhanced erosion of the thruster’s pole covers. Nevertheless, the thruster performance and operational behaviour remained unaffected. High-fidelity plasma simulations of the erosion of the thruster’s downstream faces, supported by prior short-duration wear testing, suggest a theoretical lifetime capability of >30 kh, corresponding to propellant throughput of >450 kg Xe and a total impulse of >7 MNs, at the 300 V – 1000 W operating condition. The test was voluntarily paused after 68 kg Xe and 72 kg Xe throughput, respectively, to take these erosion measurements at the 500 V and 400 V operating conditions before the test was resumed at a different operating condition.

Goebel, Dan↗

2021-2022 Long-Term Groundwater Monitoring Report Industrial Area Kennedy Space Center, Florida

This report presents the groundwater sampling results from the National Aeronautics and Space Administration (NASA) Industrial Area (IA) 2021-2022 Long-Term Monitoring (LTM) activities and results of the 2023 DPT activities at three of the sites. The NASA IA LTM Program includes the following 14 sites: - Ransom Road Landfill (RRLF) – Solid Waste Management Unit (SWMU) 003 - Orsino Storage Yard (ORSY) – SWMU 004 - Building M7-0505 Treatment Tank Area (M505) – SWMU 039 - Hypergol Maintenance Facility Hazardous Waste South Staging Area (HMF South) – SWMU 070 - Operations and Checkout Building (O&C) – SWMU 076 - Vertical Processing Facility (VPF) – SWMU 077 - Environmental Health Facility (EHF) – SWMU 079 - Kennedy Athletic, Recreation, and Social Park 1 (KARS Park 1) – SWMU 084 - Engineering Development Laboratory (EDL) – SWMU 085 - Launch Equipment Test Facility (LETF) – SWMU 091 - Mobil Service Station (MOBIL) – SWMU 093 - General Services Administration Seized Property (GSSP) – SWMU 095 - Space Station Processing Facility (SSPF) – SWMU 098 - Fuel Storage Area #1 Underground Storage Tank (UST) [Building 1044] (FSA1) – Potential Release Location (PRL) 157 Groundwater levels were gauged at each site during the 2021 and 2022 LTM field activities. Sampling events for the IA LTM Program are conducted seasonally during the dry and wet seasons, which occur in May and November, respectively. The sites in the NASA IA LTM Program are sampled on annual, biennial, or 5-year sampling frequencies based on historical trends. Due to contract transitions and monitoring well installations, 2021 dry season activities were conducted during September 2021, while dry season activities for 2022 resumed in May 2022.

groundwater↗

NASA Exploration Toilet Hardware Status and Crew Feedback from ISS Artemis-2 Demonstration

The Universal Waste Management System (UWMS), ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Technical progress continues to be made with each on-orbit operation and will ultimately culminate with nominal US crew use of the hardware on ISS. During 2023, the Artemis-2 Demonstration was started, and this paper discusses issues encountered, on-orbit troubleshooting, subsequent ground failure investigation and proposed repairs as well as near-term plans to resume the Artemis-2 demo. Also discussed is an update to the commercial-off-the-shelf (COTS) Conductivity Monitor which is planned to be flown for the resumption of the demo along with additional UWMS hardware and Toilet Integration Hardware (TIH). An updated design of the commode seat and fecal bag for Artemis-2 UWMS will be demonstrated on ISS and a summary of the hardware is included in the paper. Use of the hardware during the first days of the aborted demonstration by crewmembers and feedback received is summarized as well as hardware updates resulting from that feedback. The paper will also provide an overview of the demo results to date that inform the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗