Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planning and operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Simulation of Controller Pilot Data Link Communications over VHF Digital Link Mode 3

The Federal Aviation Administration (FAA) has established an operational plan for the future Air Traffic Management (ATM) system, in which the Controller Pilot Data Link Communications (CPDLC) is envisioned to evolve into digital messaging that will take on an ever increasing role in controller to pilot communications, significantly changing the way the National Airspace System (NAS) is operating. According to FAA, CPDLC represents the first phase of the transition from the current analog voice system to an International Civil Aviation Organization (ICAO) compliant system in which digital communication becomes the alternate and perhaps primary method of routine communication. The CPDLC application is an Air Traffic Service (ATS) application in which pilots and controllers exchange messages via an addressed data link. CPDLC includes a set of clearance, information, and request message elements that correspond to existing phraseology employed by current Air Traffic Control (ATC) procedures. These message elements encompass altitude assignments, crossing constraints, lateral deviations, route changes and clearances, speed assignments, radio frequency assignments, and various requests for information. The pilot is provided with the capability to respond to messages, to request clearances and information, to report information, and to declare/rescind an emergency. A 'free text' capability is also provided to exchange information not conforming to defined formats. This paper presents simulated results of the aeronautical telecommunication application Controller Pilot Data Link Communications over VHF Digital Link Mode 3 (VDL Mode 3). The objective of this simulation study was to determine the impact of CPDLC traffic loads, in terms of timely message delivery and capacity of the VDL Mode 3 subnetwork. The traffic model is based on and is used for generating air/ground messages with different priorities. Communication is modeled for the en route domain of the Cleveland Center air traffic (ZOB ARTCC).

Bretmersky, Steven C.↗

Extending ISS Life Beyond 2030

This paper presents an overview of the International Space Station life extension project, focusing on the analytical approach used to assess its primary structure. Also addressed are life extension approaches for other affected sub-systems, including secondary structure, materials, Environmental Control and Life Support Systems (ECLSS), Electrical Power Systems (EPS), and Logistics and Maintenance (L&M). The United States On-orbit Segment (USOS) of the International Space Station (ISS) was initially designed for a 15-year on-orbit life, but with the realization of its continued importance, efforts were made to extend its operations through 2030. The paper discusses the various analyses conducted, including future operations planning, load simulation, material degradation studies, thermal analyses, and fracture analyses. The results demonstrate the feasibility and achievability of extending the ISS's life, ensuring its on-going role as a hub for scientific research, international cooperation, and educational endeavors. With the life extension process in place, continuous operations beyond 2030 are possible to maintain an uninterrupted human presence in Low Earth Orbit, facilitating the testing of new technologies, and allow for a seamless transition to new commercially owned and operated destinations.

design life↗

Smart Labs: Improving Lab Facilities to Meet Decarbonization Goals

Smart Labs enable safe and efficient world class science to occur in laboratories through high-performance methods. The Smart Labs Toolkit describes a systematic process to help laboratory owners and operators plan, assess, optimize, and manage laboratory facilities. This half-day workshop reviews the four phases of the Smart Labs Toolkit along with an interactive activity to complete a Laboratory Ventilation Risk Assessment. This session will also highlight the Lab Benchmarking Tool, which compares the energy use, emissions, and operational practices of lab buildings with similar facilities. Attendees will also discuss application as well as sharing tools and best practice guides.

assessment↗

InterGraph-CPS: A Graph-Theoretic Approach to Characterize Cross-Domain Cyber-Physical Interdependencies and Uncertainties in Electric Grid Systems for Improved Decision-Making in Operation and Response

Critical infrastructure systems such as the electric grid are increasingly cyber-physical; yet, despite the cyber-physical characteristics of critical infrastructure systems, the physical process system and communication/control network system are traditionally analyzed in siloes. As these systems become more cyber-physical, it is crucial that models and methods are available to assess the cyber physical system (CPS) interdependencies, characteristics, and event propagation for improved planning, operation, and response. Thus, we proposed an integrated structural and temporal CPS interdependency analysis framework, InterGraph-CPS, that provides insight into the CPS function during normal operation as well as disturbances. This integrated structural and temporal interdependency framework is uniquely designed for assessing CPSs by account for the challenges of analyzing cyber and physical data streams together due to data availability, data type, and time scale differences. By leveraging both structural (e.g., graph analysis) and temporal (e.g., data analytics) techniques, different CPS behaviors and configurations can be accounted for.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Juno Mission Simulation

The Juno spacecraft is planned to launch in August of 2012 and would arrive at Jupiter four years later. The spacecraft would spend more than one year orbiting the planet and investigating the existence of an ice-rock core; determining the amount of global water and ammonia present in the atmosphere, studying convection and deep- wind profiles in the atmosphere; investigating the origin of the Jovian magnetic field, and exploring the polar magnetosphere. Juno mission management is responsible for mission and navigation design, mission operation planning, and ground-data-system development. In order to ensure successful mission management from initial checkout to final de-orbit, it is critical to share a common vision of the entire mission operation phases with the rest of the project teams. Two major challenges are 1) how to develop a shared vision that can be appreciated by all of the project teams of diverse disciplines and expertise, and 2) how to continuously evolve a shared vision as the project lifecycle progresses from formulation phase to operation phase. The Juno mission simulation team addresses these challenges by developing agile and progressive mission models, operation simulations, and real-time visualization products. This paper presents mission simulation visualization network (MSVN) technology that has enabled a comprehensive mission simulation suite (MSVN-Juno) for the Juno project.

space vehicles↗

Notification of Operational Scope Change for the FTWC Venting Project at Los Alamos National Laboratory (LANL)

This letter is intended to provide you an update on the scope of work for the venting of the Flanged Tritium Waste Containers (FTWCs) at Los Alamos National Laboratory (LANL) Technical Area (TA-) 54. This project was described in the Application for Pre-Construction Approval 1 ("the Application") that was approved by EPA Region 6 on May 22, 2019. As operational planning for this project has been finalized, the scope of work described in the Application has slightly changed. The project has now determined that each FTWC may be vented multiple times, and these venting activities may take place at more than one location. The original application only discussed a single venting operation for each FTWC at a single location, TA-54. However, the radionuclide inventory and expected air releases remain bounded by the values described in the Application.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Research and Test Reactor Fuels

PRO-RR is the research reactor focused program element of the broader Proliferation Resistance Optimization program (PRO-X) under the National Nuclear Safety Administration (NNSA) in the U.S. Department of Energy (DOE). PRO-X provides a framework for integrating proliferation resistance in nuclear system designs to minimize weapons usable nuclear materials (WUNM) production and diversion pathways while optimizing systems performance for peaceful use missions. PRO-RR applies the PRO-X mission objectives to research reactor system design. This document serves as one of the foundational documents for the PRO-RR-Fuel System Design technical team by documenting current research reactor fuels usage. The PRO-RR-Fuel System Design technical team consists of subject matter experts from Argonne National Laboratory (Argonne) and Savannah River National Laboratory (SRNL). In order to determine the preferred fuel of use in upcoming research and test reactors to optimize proliferation resistance, performance, and safety, it is useful to assess the fuels that have been used in the past, or are currently in use. This report reviews the historical and current fuels used in research and test reactors to inform future fuel selection. Chapter 2 discusses the low-enriched uranium (LEU) fuels currently in use in terms of thermal power level and utilization of the reactor. Chapter 3 summarizes the fabrication processes for common fuel types. Chapter 4 discusses in detail the fuel types in use in research and test reactors. A review of the cladding types in use is presented in Chapter 5, and a historical review of research and test reactor fuel fabricators is presented in Chapter 6. The data collection strategy used the International Atomic Energy Agency (IAEA) research reactor database [1] as a starting point. Information on the fuel used was gathered on research reactors (other than critical assemblies) that were listed as operational, planned, or in temporary shutdown in the IAEA database. Data on the fuel type, geometry, enrichment, uranium loading, cladding type, and fabricator were collected for each of the reactors available in the public domain. Sources of data included conference papers, journal articles, and facility and fabricator websites. Data on research reactors operating on LEU fuels are presented in Appendix A, while Appendix B presents data collected on all reactors at the time of publication of this report. Appendix C presents data collected on reactors that were part of the M3 research and test reactor conversion program.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

We Can't Count on Repairing All Failures Going to Mars

Reliability analysis often assumes that a complex system can be kept operating indefinitely with scheduled maintenance and emergency repair using a stock of spare parts, as long as the spare parts are not depleted. This assumption seems justified for well-tested, widely used, long operational systems with a multigenerational history of failure, redesign, and reliability growth. It seems doubtful that newer, relatively untried, high technology space systems can always be repaired. We cannot assume space systems will have a low rate of random failures that can all be repaired with a few identical spares. New untried systems usually have a high initial failure rate, called infant mortality, due to errors in requirements, design, parts, materials, and operations planning. These problems can cause groups of related failures called Common Cause Failures (CCFs). The practical definition of a CCF is any failure mode that cannot be cured using identical redundant systems or spare parts. Systems with CCFs may fail repeatedly for the same reason. Can a life support system be kept operating on the way to Mars using only redundant systems and spare parts? The failure history of International Space Station (ISS) life support systems suggests that CCFs are likely to occur and will probably require design changes rather than being reparable with spare parts.

Mars↗

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign would be a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR would, for the first time ever, present a need to communicate with multiple surface assets that are co-located on Mars in a coordinated effort to accomplish the unified objective of fetching, transporting, and returning samples from Mars. Currently, Mars surface assets relay data to and from Earth using a number of orbiters in what’s known as the Mars Relay Network (MRN). This network is characterized by a small number of surface assets distributed across the Martian globe and a larger number of orbiters to provide relay services. As of June 2020, there are two surface assets for which five orbiters are providing relay. During the MSR Campaign, there would be two rovers and a lander that all would require relay communication from a small number of Mars orbiters to meet the aggressive MSR timeline. The inversion of the current MRN paradigm, a system of many surface assets requiring relay and few orbiters to provide relay, necessitates the unique challenge of optimally allocating relay passes to maximize the operational capability of all assets. The allocation must consider a large number of trade variables including Mars asset operational requirements and Earth ground system constraints, including staffing schedules, operations planning across time zones, and more. To address these telecommunication challenges, the Mars Asset Relay Mission Link Allocation Design Environment (MARMLADE) tool was developed. It is a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets and quantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbiter geometry and telecommunication capabilities provided by JPL’s Telecom Orbit Analysis and Simulation Tool (TOAST) software to compute which asset should get each pass based on a series of heuristics and predictions of all assets’ states. Within MARMLADE, the user can provide inputs including the option for time-based pass splitting, fixed FWD data rate capabilities, DFE communication capabilities, and link parameters allowing for the assessment of complex operations and hardware trades using surface mission operational efficiency as a primary figure of merit. As the MSR mission concepts continue to mature, MARMLADE is being used to assess ability of all MSR elements to meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.This paper will describe the motivation and design of the MARMLADE tool and how it is being used to perform campaign and mission level trades, generate requirements, and support development of the MSR surface mission scenarios.

Lee, Charles↗

NASA Crew and Cargo Launch Vehicle Development Approach Builds on Lessons from Past and Present Missions

The United States (US) Vision for Space Exploration, announced in January 2004, outlines the National Aeronautics and Space Administration's (NASA) strategic goals and objectives, including retiring the Space Shuttle and replacing it with new space transportation systems for missions to the Moon, Mars, and beyond. The Crew Exploration Vehicle (CEV) that the new human-rated Crew Launch Vehicle (CLV) lofts into space early next decade will initially ferry astronauts to the International Space Station (ISS) Toward the end of the next decade, a heavy-lift Cargo Launch Vehicle (CaLV) will deliver the Earth Departure Stage (EDS) carrying the Lunar Surface Access Module (LSAM) to low-Earth orbit (LEO), where it will rendezvous with the CEV launched on the CLV and return astronauts to the Moon for the first time in over 30 years. This paper outlines how NASA is building these new space transportation systems on a foundation of legacy technical and management knowledge, using extensive experience gained from past and ongoing launch vehicle programs to maximize its design and development approach, with the objective of reducing total life cycle costs through operational efficiencies such as hardware commonality. For example, the CLV in-line configuration is composed of a 5-segment Reusable Solid Rocket Booster (RSRB), which is an upgrade of the current Space Shuttle 4- segment RSRB, and a new upper stage powered by the liquid oxygen/liquid hydrogen (LOX/LH2) J-2X engine, which is an evolution of the J-2 engine that powered the Apollo Program s Saturn V second and third stages in the 1960s and 1970s. The CaLV configuration consists of a propulsion system composed of two 5-segment RSRBs and a 33- foot core stage that will provide the LOX/LED needed for five commercially available RS-68 main engines. The J-2X also will power the EDS. The Exploration Launch Projects, managed by the Exploration Launch Office located at NASA's Marshall Space Flight Center, is leading the design, development, testing, and operations planning for these new space transportation systems. Utilizing a foundation of heritage hardware and management lessons learned mitigates both technical and programmatic risk. Project engineers and managers work closely with the Space Shuttle Program to transition hardware, infrastructure, and workforce assets to the new launch systems, leveraging a wealth of knowledge from Shuffle operations. In addition, NASA and its industry partners have tapped into valuable Apollo databases and are applying corporate wisdom conveyed firsthand by Apollo-era veterans of America s original Moon missions. Learning from its successes and failures, NASA employs rigorous systems engineering and systems management processes and principles in a disciplined, integrated fashion to further improve the probability of mission success.

Dumbacher, Daniel L.↗

Predictive Modeling and Operational Monitoring of Starlink Leo Satellite Network Performance in Maritime Environments

This thesis investigates short-term performance prediction for maritime LEO operational planning and application performance cannot anticipate available bandwidth or communication delay, which complicates variation alter signal conditions over short time scales. As a result, maritime users often fluctuations in link quality. In addition, Frequent satellite handoffs and Doppler-induced rapid satellite movement and changing atmospheric conditions cause substantial unavailable. Despite their availability, reliable operation at sea remains difficult because broadband connectivity in maritime regions where terrestrial infrastructure in

97 MATHEMATICS AND COMPUTING↗

User modeling techniques for enhanced usability of OPSMODEL operations simulation software

The PC based OPSMODEL operations software for modeling and simulation of space station crew activities supports engineering and cost analyses and operations planning. Using top-down modeling, the level of detail required in the data base can be limited to being commensurate with the results required of any particular analysis. To perform a simulation, a resource environment consisting of locations, crew definition, equipment, and consumables is first defined. Activities to be simulated are then defined as operations and scheduled as desired. These operations are defined within a 1000 level priority structure. The simulation on OPSMODEL, then, consists of the following: user defined, user scheduled operations executing within an environment of user defined resource and priority constraints. Techniques for prioritizing operations to realistically model a representative daily scenario of on-orbit space station crew activities are discussed. The large number of priority levels allows priorities to be assigned commensurate with the detail necessary for a given simulation. Several techniques for realistic modeling of day-to-day work carryover are also addressed.

Davis, William T.↗

Environmental effects on an optical-UV-IR synthesis array

The Moon offers a stable platform with excellent seeing conditions for the Lunar Optical-UV-IR Synthesis Array (LOUISA). Some troublesome aspects of the lunar environment will need to be overcome to realize the full potential of the Moon as an observatory site. Mitigation of negative effects of vacuum, thermal radiation, dust, and micrometeorite impact is feasible with careful engineering and operational planning. Shields against impact, dust, and solar radiation need to be developed. Means of restoring degraded surfaces are probably essential for optical and thermal control surfaces deployed in long-lifetime lunar facilities. Precursor missions should be planned to validate and enhance the understanding of the lunar environment (e.g., dust behavior without and with human presence and to determine environmental effects on surfaces and components. Precursor missions should generate data useful in establishing keepout zones around observatory facilities while rocket launches and landings, mining, and vehicular traffic could be detrimental to observatory operation.

Johnson, Stewart W.↗

Environmental effects on lunar astronomical observatories

The Moon offers a stable platform with excellent seeing conditions for astronomical observations. Some troublesome aspects of the lunar environment will need to be overcome to realize the full potential of the Moon as an observatory site. Mitigation of negative effects of vacuum, thermal radiation, dust, and micrometeorite impact is feasible with careful engineering and operational planning. Shields against impact, dust, and solar radiation need to be developed. Means of restoring degraded surfaces are probably essential for optical and thermal control surfaces deployed in long-lifetime lunar facilities. Precursor missions should be planned to validate and enhance the understanding of the lunar environment (e.g., dust behavior without and with human presence) and to determine environmental effects on surfaces and components. Precursor missions should generate data useful in establishing keepout zones around observatory facilities where rocket launches and landings, mining, and vehicular traffic could be detrimental to observatory operation.

Johnson, Stewart W.↗

Microgravity Research Results and Experiences from the NASA Mir Space Station Program

The Microgravity Research Program Office (MRPO) participated aggressively in Phase I of the International Space Station Program using the Russian Mir Space Station. The Mir Station offered an otherwise unavailable opportunity to explore the advantages and challenges to long duration microgravity space research. Payloads with both NASA and commercial backing were included as well as cooperative research with the Canadian Space Agency (CSA). From this experience, much was learned about dealing with long duration on orbit science utilization and developing new working relationships with our Russian partner to promote efficient planning, operations, and integration to solve complexities associated with a multiple partner program. Microgravity participation in the NASA Mir Program began with the first joint NASA Mir flight to the Mir Space Station. The earliest participation setup acceleration measurement capabilities that were used throughout the Program. Research, conducted by all Microgravity science disciplines, continued on each subsequent increment for the entire three-year duration of the Program. The Phase I Program included the Microgravity participation of over 30 Fluids, Combustion, Materials, and Biotechnology Sciences and numerous commercially sponsored research payloads. In addition to the research gained from Microgravity investigations, long duration operation of facility hardware was tested. Microgravity facilities operated on Mir included the Space Acceleration Measurement System (SAMS), the Microgravity Glovebox (MGBX), the Biotechnology System (BTS) and the Canadian Space Agency sponsored Microgravity Isolation Mount (MIM). The Russian OPTIZONE Furnace was also incorporated into our material science research. All of these efforts yielded significant and useful scientific research data. This paper focuses on the microgravity research conducted onboard the Mir space station. It includes the Program preparation and planning necessary to support this type of cross increment research experience; the payloads which were flown; and summaries of significant microgravity science findings. Most importantly this paper highlights the various disciplines of microgravity research conducted during the International Space Station, Phase 1 Program onboard the Mir Station. A capsulation of significant research and the applicability of our findings are provided. In addition, a brief discussion of how future microgravity science gathering capabilities, hardware development and payload operations techniques have enhanced our ability to conduct long duration microgravity research.

Schagheck, R. A.↗

Lifetime study of the ColdADC for the Deep Underground Neutrino Experiment

ColdADC is a custom ASIC digitizer implemented in 65 nm CMOS technology using specialized techniques for long-term reliability in cryogenic environments. ColdADC was developed for use in the DUNE Far Detector complex, which will consist of four liquid argon time projection chambers. Each contains 17 kilotons liquid argon as the target material in order to measure neutrino oscillations. Approximately 40,000 ColdADC ASICs will be installed for DUNE in the first two large detectors and will be operated at cryogenic temperatures during the experiment without replacement. The lifetime of the ColdADC is a critical parameter affecting the data quality and physics sensitivity of the experiment. A measurement of the lifetime of the ColdADC was carried out, and the results shown in this paper assure orders of magnitude longer lifetime of the ColdADC than the planned operation time of the detectors.

Front-end electronics for detector readout↗

PlanWorks: A Debugging Environment for Constraint Based Planning Systems

Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

Daley, Patrick↗

DOE Award No.: DE-FE0023919 Phase 3 Scientific/Technical Report

This is the Phase 3 Report for the ‘Deepwater Methane Hydrate Characterization and Scientific Assessment or Genesis of Methane Hydrates in the Gulf of Mexico (GOM2)’ research project (DOE Award No. DE-FE0023919). The report summarizes activities from January 16, 2018 to September 30, 2019. The project is led by the University of Texas at Austin (UT). The objective is to gain insight into the nature, formation, occurrence and physical properties of methane hydrate-bearing sediments for the purpose of methane hydrate resource appraisal through the planning and execution of drilling, coring, logging, testing and analytical activities that assess the geologic occurrence, regional context, and characteristics of marine methane hydrate deposits in the Gulf of Mexico outer continental shelf (OCS). We determined that it would not be possible to pursue the project with the International Ocean Discovery Program (IODP) and then developed a revised science and operations plan to maximize the science using a commercial vessel within the budget that is available. We improved the scientific capability of the UT pressure core center by adding the ability to X-ray pressure cores, and the ability to cut and store multiple core samples for experimental analysis. We transferred pressure cores to peer institutions, including the National Energy Technology Lab (NETL) the United States Geological Survey (USGS Woods Hole). We made advances in understanding the composition and source of gasses locked in the methane hydrate from Green Canyon 955 (GC-955). We developed approaches to determine the in-situ salinity of hydrate-bearing samples, revealing that the in situ salinity of the GC 955 reservoir is just above that of seawater. We determined that the GC-955 hydrate reservoir is composed of sandy silt with a high concentration of hydrate interbedded with clayey silt with no hydrate present. We determined that some or all of the intervals bounding the hydrate reservoir are composed of material similar to the reservoir (sandy silt with hydrate and clayey silt with no hydrate), but with a lower net to gross. We determined that the reservoir effective permeability at a hydrate saturation of ~80-90 % is ~0.1 mD (or 1.0×10-16 m2) to ~0.5 mD (or 5.0×10-16 m2) and the intrinsic permeability is ~12 mD (or 1.2×10-14 m2). The GC-955 reservoir in-situ porosity of sandy silt is 0.38 to 0.40 and is largely independent of effective stress, and that the porosity of clayey silt is 0.33 at an in situ effective stress of 3.8 MPa to ~0.37 at zero effective stress. We developed a systematic, repeatable approach to studying hydrate reservoir properties by reconstituting individual lithofacies from dissociated pressure cores. We determined index properties of GC-955 reservoir, including liquid limit and plasticity, porosity, capillary behavior, and particle size distribution. We developed a more robust pressure coring technology. We finalized and published the UT-GOM2-1 Expedition Volume and we finalized a dedicated volume on the UT-GOM2-1 expedition that will be published in the American Association of Petroleum Geologists Bulletin (AAPG) in spring 2020.

03 NATURAL GAS↗