Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operation cost”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Anion-Exchange-Membrane Electrolysis with Alkali-Free Water Feed

Hydrogen is a green and sustainable energy vector that can facilitate the large-scale integration of intermittent renewable energy, renewable fuels for heavy transport, and deep decarbonization of hard-to-abate industries. Anion-exchange-membrane water electrolyzers (AEM-WEs) have several achieved or expected competitive advantages over other electrolysis technologies, including the use of precious metal-free electrocatalysts at both electrodes, fluorine-free hydrocarbon-based ionomeric membranes and bipolar plates based on inexpensive materials. Contrasting the analogous proton-exchange-membrane system (PEM-WE), where pure water is circulated (no support electrolyte), the current generation of AEM-WEs necessitates the circulation of a dilute aqueous alkaline electrolyte for reaching high energy efficiency and durability. For several reasons, including but not limited to lower cost of balance-of-plant, lower operating cost and improved device's lifetime, achieving high cell efficiency and performance using an alkali-free water feed is highly desirable. In this review, we develop and build a foundational understanding of AEM-WEs operating with pure water, as well as discuss the effects of operating with natural water feeds like seawater. After a discussion of the possible advantages of pure-water-fed AEM-WEs, we cover the thermodynamic and kinetic processes involved in AEM-WE, followed by a detailed review of materials and components and their integration in the device. We highlight the influence of electrolyte composition and alkali/electrolyte-free feed on the membrane-electrode assembly, ionomers, electrocatalysts, porous transport layer, bipolar plates and operating configuration. We provide evidence for how the pure water feed engenders several issues related to the degradation of device components and propose mitigation strategies.

Electrodes↗

DSN Wide Area Network Architecture, Capacity and Performance

This paper discusses the architecture of the wide area network that connects key communications facilities within the National Aeronautic and Space Administration (NASA) Deep Space Network (DSN). Several considerations are given to the design of this wide area network to ensure a timely, reliable, and secure data delivery between the mission users and their spacecraft. The network star configuration simplifies data delivery to users and minimizes operational cost. The dual-path connections maximize the system reliability, with geographical diversity in data routing to avoid single point of failure. Data encryption enhances the protection of mission users’ data. The system bandwidth is determined by balancing the needs to minimize the operating bandwidth cost and to have sufficient bandwidth to be able to deliver data to all users within the required. The DSN uses a class base weighted fair queuing (CBWFQ) method in its data delivery. This scheme guarantees a minimum bandwidth to each class of users and allows users to also access any unused bandwidth by other groups. The paper will also show performance of system reliability and bandwidth margin.

Liao, Jason↗

Cost analysis of hydrogen production by high-temperature solid oxide electrolysis

In this study, we estimate construction and operation costs of gigawatt-scale solid oxide electrolysis (SOE) facilities for producing high purity hydrogen gas from water. Manufacturing and assembly costs for two types of SOE cell stacks are estimated using a detailed design for manufacture and assembly (DFMA®) analysis. Modular balance of plant (BOP) process equipment is designed and sized with Aspen®, and cost estimated using equipment vendor quotes. Factory and on-site assembly and installation costs for SOEC stack and BOP equipment integration into modular SOE process units are calculated using a simplified DFMA® method. Total stack costs on a stack input power (SIP) basis reduce to <$100/kW e DC SIP for >500 MW e DC SIP /year production rates with electrode cermet, interconnects, and high-temperature heat treatments dominating the total cost. Integration of stacks with larger BOP equipment operating at higher pressures offers ~36% cost reduction in total facility capital cost due to an economies of physical scale effect since BOP equipment comprises >50% of facility costs. Optimized H 2 prices decrease from ~$\$$4/kgH 2 to ~$\$$2/kgH 2 for 1 GWe DCSIP facilities using $\$$0.025/kWh electricity price. All costs are reported in 2021 US dollars.

08 HYDROGEN↗

Operations, maintenance, and cost considerations for PV+Storage in the United States

Battery storage systems are increasingly being installed at photovoltaic (PV) sites to address supply-demand balancing needs. Although there is some understanding of costs associated with PV operations and maintenance (O&M), costs associated with emerging technologies such as PV plus storage lack details about the specific systems and/or activities that contribute to the cost values. This study aims to address this gap by exploring the specific factors and drivers contributing to utility-scale PV plus storage systems (UPVS) O&M activities costs, including how technology selection, data collection, and related and ongoing challenges. Specifically, we used semi-structured interviews and questionnaires to collect information and insights from utility-scale owners and operators. Data was collected from 14 semi-structured interviews and questionnaires representing 51.1 MW with 64.1 MWh of installed battery storage capacity within the United States (U.S.). Differences in degradation rate, expected life cycle, and capital costs are observed across different storage technologies. Most O&M activities at UPVS related to correcting under-performance. Fires and venting issues are leading safety concerns, and owner operators have installed additional systems to mitigate these issues. There are ongoing O&M challenges due the lack of storage-specific performance metrics as well as poor vendor reliability and parts availability. Insights from this work will improve our understanding of O&M consideration at PV plus storage sites.

14 SOLAR ENERGY↗

Simulation of on-orbit maintenance cycle for LST

A maintenance simulation model of the Large Space Telescope has been developed to assess the operational cost sensitivity to system configuration options. The model lends itself to equipment-level selections for various subsystem alternatives. Maintenance decisions include considerations for LST spacecraft on-orbit service or retrieval. Tradeoffs are identified in terms of on-orbit maintenance for specific design concepts, with Space Shuttle revisit costs balanced against retrieval and ground-facility operations. Simulation output is in the form of computer plots of cost, availability, time to first maintenance, and a cost-effective Shuttle revisit frequency.

Donnelly, J. A.↗

Performance Evaluation of Electrochem's PEM Fuel Cell Power Plant for NASA's 2nd Generation Reusable Launch Vehicle

NASA's Next Generation Launch Technology (NGLT) program is being developed to meet national needs for civil and commercial space access with goals of reducing the launch costs, increasing the reliability, and reducing the maintenance and operating costs. To this end, NASA is considering an all- electric capability for NGLT vehicles requiring advanced electrical power generation technology at a nominal 20 kW level with peak power capabilities six times the nominal power. The proton exchange membrane (PEM) fuel cell has been identified as a viable candidate to supply this electrical power; however, several technology aspects need to be assessed. Electrochem, Inc., under contract to NASA, has developed a breadboard power generator to address these technical issues with the goal of maximizing the system reliability while minimizing the cost and system complexity. This breadboard generator operates with dry hydrogen and oxygen gas using eductors to recirculate the gases eliminating gas humidification and blowers from the system. Except for a coolant pump, the system design incorporates passive components allowing the fuel cell to readily follow a duty cycle profile and that may operate at high 6:1 peak power levels for 30 second durations. Performance data of the fuel cell stack along with system performance is presented to highlight the benefits of the fuel cell stack design and system design for NGLT vehicles.

Kimble, Michael C.↗

Demonstration of Scaled-Production of Rare Earth Oxides and Critical Materials from U. S. Coal-Based Sources (Final Report)

The project objective was to demonstrate scaled production of high purity rare earth oxides (REO), nominally exceeding 90% grade, from coal refuse sources using innovative technologies that reduce cost and improve environmental outcomes relative to traditional rare earth processing technologies. The project utilized a critical material pilot plant constructed and tested as part of a previous U.S. Department of Energy project. Target performance criteria was a 50% reduction in production cost based on previous optimum values, 150% increase in recovery and greater than 2% concentrates of rare earth oxides, cobalt and manganese. Concentrate production goals were to produce a rare earth mix oxide product at a rate of 200 grams per day having a minimum purity of 50% as well as products of cobalt and manganese having a minimum purity of 2%. A previous pilot plant investigation identified acid cost as the major contributor to an operating cost that made the recovery of rare earth and other critical metals from bituminous coal sources economically challenging. As such, acid cost reduction was a major target using bio-oxidation reactors to produce sulfuric acid from naturally occurring coal pyrite. Based on laboratory data, a bio-oxidation circuit was designed for the pilot plant to produce 7.5 l/min of acid using two 11-m3 (3000 gallon) reactors equipped with 40 hp aerators for air dispersion. The pilot-scale tests revealed that acid concentration equivalent to as high as 1.0 M sulfuric acid could be continuously produced. However, the bio-acid contained exceptionally high iron concentrations, which complicated downstream processing of the pregnant leach solution (PLS). A TEA of the bio-oxidation circuit showed that production cost was approximately $0.13 per kg acid equivalent if produced using a four-day retention time in the reactors. This value represents a 48% reduction from that of purchased bulk sulfuric acid. Calcination (or roasting) studies were conducted on coarse refuse from West Kentucky No. 13 and Fire Clay coal seam sources. The test results revealed the potential to increase recovery by nearly 100% using temperatures between 500°C to 700°C with light REE recovery value being the most improved. Acid baking of the calcined products using sulfuric acid at 250°C increased heavy rare earth recovery from around 40% to 80% while decreasing the acid requirements by over 50%. The existing pilot plant was upgraded for the pilot scale demonstration of REE and CM recovery. The primary feedstocks were West Kentucky No.13 and heap leach pregnant leach solution (PLS) while a secondary feedstock was a lignite waste material from a construction sand operation. The pilot scale operation started with PLS generation through leaching followed by iron and aluminum removal, nominally at 3.3 and 4.5 pH, respectively. Leaching lixiviants used for the test were industrial grade sulfuric acid or bio-acid generated at the pilot scale facility. For most of the tests, the solid feed rate was 200 lb/hr whereas lixiviant was added at 2 gpm to provide an optimal residence time of 45 minutes. Following the contaminant removal step, several different process schematics were tested with the goal of maximizing REE recovery and purity. In the first test, direct processing of aluminum precipitation raffinate for REE recovery using oxalic acid at pH 1.5 was investigated. Overall REE recovery was approximately 45%. Unfortunately, elevated calcium content in the PLS significantly impacted the RE-Oxide product grade. Similarly, high calcium content decreased both the product purity and grades of CM products. As such, a new flowsheet was tested with the same initial process schematic but different precipitation stages for REEs and CMs at pH 6.0 and 9.0, respectively. It was noted that the overlapping precipitation behavior of Co, Ni and Zn with REEs limited the applicability of this process schematic. While this change increased the RE-Oxide grade from 36% in the first test to 87%, the loss of critical metals to the REE cake and bypass of the REEs to the CM cake significantly impacted the recovery of both REEs and CMs. Therefore, the modified process flowsheet combined oxalic acid precipitation stage raffinate and redissolved CM cake filtrate to maximize both the recovery and purity of the products. Consequently, a RE-Oxide product with 85% purity and CM cakes with over 19% Co, 38% Ni, 14% Zn and 9% Mn content were generated with significantly higher recoveries. While the modified process flowsheet improved recoveries and grades, elemental losses observed in separate precipitation and redissolution losses inspired the adaptation of a single precipitation stage at pH 9.0 for both REEs and CMs. This change was anticipated to maximize the REE recovery while minimizing the costs associated with separated redissolution and processing stages. As expected, REE recovery in this new circuit arrangement was over 56% with a product grade of over 87% RE-Oxide content. Similarly, Co, Ni, Mn, and Zn recoveries of 54%, 40%, 67%, and 66%, respectively, were achieved. Unfortunately, the elevated calcium content present in the solution due to its precipitation at pH 9.0 caused a decrease in the CM cake quality. Therefore, the final process flowsheet involved the addition of calcium oxalate precipitation following the oxalic acid precipitation stage, which effectively eliminated calcium contamination of the CM products. Finally, the pilot scale experiments conducted using bio-acid achieved comparable REE leaching recoveries to the conventional sulfuric acid leaching. Elevated iron concentration in the solution caused the co-precipitation of REEs with the iron and aluminum cake, resulting in the REE losses. Furthermore, elevated iron content bypassing the iron and aluminum precipitation stages contaminated the metal sulfide and manganese cake, respectively. A techno-economic analysis was performed based on a commercial facility capable of treating 500 tph of coal-based material. The production cost for West Kentucky No. 13 coarse refuse material ranged from approximately $500-$700/kg of total rare earth oxide whereas the lignite source had significantly lower production cost of $100-$300/kg. The significant difference in cost was due to the easier leaching characteristics of the lignite material and the higher feed concentrations. All process scenarios resulted in a negative net present value (NPV). For the lignite feedstock, laboratory REE leach recovery values were about 30% higher than the pilot plant data. Using the lab leach results, a positive net present value was achieved and the production cost decreased from $100-$300 $/kg to less than $150/kg of total REO.

01 COAL, LIGNITE, AND PEAT↗

Advanced HVAC Humidity Control for Hot-Humid Climates

During this project we develop and validate a cost-effective, integrated control solution to improve humidity control and comfort for energy-efficient homes in hot-humid climates. This study focuses on developing a strategy that is effective, field tested, and practical for builders to install with minimal disruption to standard practices. A successful solution would simplify the transition to high-performance humidity control and be the basis for design and installation guidance. By relying on the central system as a starting point, the strategy employed minimizes system complexity and cost for builders, while improving comfort and operating cost for homeowners. The solution strategy was to coordinate the cooling, dehumidification, and ventilation functions of central, ducted HVAC systems to better control indoor humidity, improve occupant thermal comfort, and capture energy savings. The primary strategic goals were to: (1) optimize dehumidification by the central air-conditioning system, particularly during part-load conditions, using conventional equipment with modified control settings and lower system airflows; (2) maximize ventilation during heating/cooling on-cycles, to “bank” and condition outdoor ventilation air, and minimize ventilation during off-cycles; (3) quantify the effectiveness and energy impact of the dehumidification and ventilation strategies, while identifying a metric that would be useful to evaluate latent effectiveness. For the test houses in our study, located in Richmond Hill, Georgia; Houston, Texas; and Monroe, Louisiana we observed: (1) the indoor humidity did not exceed 60% RH during the monitored cooling season for 99% of the time in Richmond Hill, 96% of the time in Houston, and 90% of the time in Monroe; (2) the dehumidification strategy improved the steady-state latent capacity of the HVAC system at design conditions by 16% to 49% at the Houston test house and by 28% to 71% at the Monroe test house, depending on which mode the system was operating in; and (3) the good results at the test houses were primarily due to the amount of time the air-conditioning system operated in ramping or dehumidification modes, or both, particularly during the early cooling season. This study demonstrates that air conditioners or heat pumps with a single-stage compressor can provide good humidity control without the need for a two-stage or variable-stage compressor system. The airflow and control settings for ramping and dehumidification modes are critical to control indoor humidity in hot-humid climates, particularly during part-load and shoulder season conditions. The dehumidification strategy used in this study did not jeopardize the mechanical reliability of the cooling equipment. The strategies used in this study are applicable across various equipment brands, models, and efficiency levels, and also applicable to a broad range of homes in hot-humid climates. Results will vary by specific equipment, location, and house configuration and construction.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Isotherm Modeling and Techno-Economic Analysis of Contactor Technologies for New Tetraamine-Appended MOF for NGCC Applications

Recently, a family of tetraamine-functionalized metal-organic frameworks (MOF) has been reported as promising sorbent materials for capturing CO2 from flue gas conditions relevant to natural gas combined cycle (NGCC) applications. The main advantages of these materials are their two-step cooperative CO2 adsorption, which gives rise to unusual two step-shaped CO2 adsorption profiles and their high thermal stability. This work presents the modelling of the two-transition isotherm of the tetraamine-appended MOF, N,N'-bis(3-aminopropyl)-1,4-diaminobutane (3-4-3)-appended Mg2(dobpdc), and the techno-economic analysis (TEA) of carbon capture processes utilizing this sorbent. Due to the unusual isotherm shapes of the experimental CO2 adsorption data for tetraamine-appended Mg2(dobpdc) and the strong nonlinearity of CO2 loading with respect to temperature and pressure, we tested two different models which use logistic functions for representing the different isotherm behaviors in the different pressure ranges. The first model uses the quadratic isotherm model in the low-pressure region, the Langmuir isotherm model in the middle pressure range, and the dual site Langmuir isotherm model in the high-pressure range. To model the transition between regions we used the arctangent functions independent of temperature and the thermal effect was accounted by using the Clausius-Clapeyron relation]. The second model is an extension of the weighted dual-site Langmuir isotherm model presented by Hughes et al.. In this extended model, the dual-site Langmuir isotherm is employed in the three transition regions, using temperature-dependent logistic functions to activate or deactivate the isotherm model in the low, middle, and high-pressure ranges. Both models fit the experimental data quite well with root mean squared errors (RMSE’s) of 0.41 and 0.17 for model 1 and model 2, respectively. Since model 2 resulted in a lower RMSE, it was leveraged for the development of the gas/solid contactor models used by the TEA. Specifically, two different contactor models, an axial-flow fixed bed and moving bed contactor, were developed as part of this work. These models are dynamic, pressure-driven, and consist of mass, energy, and momentum conservation equations. A kinetic model was also developed by performing parameter estimation using experimental fixed bed breakthrough data. These models are then used to simulate CO2 capture processes from the flue gas generated from a ~600 gross MW NGCC power plant. A cost model was developed which considers the capital cost of the reactors and the significant operating costs such as steam and electricity. Using NETL’s Framework for the Optimization and Quantification of Uncertainty of Uncertainty and Surrogates tool (FOQUS), which has the capability of linking models built using numerous modelling platforms with derivative-free optimization solvers, a techno-economic optimization of the carbon capture processes was performed which minimizes the cost of capture.

Caballero, Daison↗

Opportunities for structural improvements for an advanced supersonic transport vehicle

The superplastically formed diffusion-bonded (SPF/DB) program has developed successfully and far enough to recommend that a major structural program to validate the weight and cost of SPF/DB sandwich titanium structure should be initiated. The NASA Langley study of wing and fuselage SPF/DB sandwich panels shows that this process is potentially structurally efficient. The Douglas SPF/DB expanded sandwich process that utilizes a welded core sheet that expands to face sheets proves to be very efficient. The theoretical weight optimization design charts for the wing and fuselage concepts were validated by small-scale tests. Mnay design applications were fabricated. Projecting the results of an SPF/DB sandwich airframe structure to a MDC AST design shows significant weight and cost savings. A 6 percent lower direct operating cost was calculated. A growth AST utilizing composites, metal matrices, and SPF/DB sandwich shows future promise for a post-1990 technology readiness. Titanium SPF/DB sandwich, compared to presently available aluminum structure, is superior for application to a Mach 2.2 supersonic transport.

Fischler, J. E.↗

Study of basic physical processes in liquid and solid rocket propulsion

A process model was developed to assess the suitability of new/modified technologies and subsystems for application to commercial launch vehicles. Suitability is measured in terms of cost, safety, and environmental impact. Cost is related to recurring production and operational cost per flight, amortization of non-recurring development costs, 'effective' cost of difference in payload capability, and the cost of unreliability. The process is also applicable for assessing technologies and subsystems for application to other launch vehicles. The process will enable a comprehensive systems engineering approach to assess the potential of technologies and subsystems for launch vehicle applications and to provide documentation of the results for application to technology planning for the future.

Monroe, Joseph W.↗

Increasing Density and Reducing Costs of Data Acquisition

There are a number of reasons why it is important to increase the density of data acquisition functions. Sensor fusion seeks to integrate large numbers of sensors into a decision network. Addition of health monitoring functions may incur additional sensor requirements. But at the same time, it is important to reduce the per-channel costs of data acquisition systems. Often the most significant cost is the management of data acquisition networks, which incurs substantial costs associated with transducer installation, configuration, calibration, and maintenance. Alternatives that lower the cost of the transducer system and reduce the data acquisition system channel count will directly impact initial system costs. Other techniques that affect maintenance and operating costs will contribute to reducing life cycle costs. This paper describes work undertaken to explore alternative architectures for lowering the cost per transducer function using a MEMS-based accelerometer as the model.

Schmalzel, J. L.↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems in preparation for the retirement of the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo Saturn (1961 to 1975) and Space Shuttle (1972 to 2010) programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as the vast amount of legacy knowledge gained from almost a half-century of hard-won experience in the space enterprise. Beginning early next decade, the Ares I will launch the new Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both the Ares I and Ares V systems are being designed to support longer future trips to Mars. The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also touches on risk-based management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it gives a summary of several notable accomplishments over the past year, since the Exploration Launch Projects effort officially kicked off in October 2005, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

Risk-Aware Planetary Rover Operation: Autonomous Terrain Classification and Path Planning

Identifying and avoiding terrain hazards (e.g., soft soil and pointy embedded rocks) are crucial for the safety of planetary rovers. This paper presents a newly developed groundbased Mars rover operation tool that mitigates risks from terrain by automatically identifying hazards on the terrain, evaluating their risks, and suggesting operators safe paths options that avoids potential risks while achieving specified goals. The tool will bring benefits to rover operations by reducing operation cost, by reducing cognitive load of rover operators, by preventing human errors, and most importantly, by significantly reducing the risk of the loss of rovers.

Ono, Masahiro↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility Operations

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic . Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Urban Air Mobility↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic. Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55 operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Advanced Air Mobility↗