Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “districts”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Big Hole Drilling Support for Nuclear Testing, 1985-1992: An Architectural Survey of the Area 1 Subdock, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) planned to demolish two buildings at the Area 1 Subdock at the Nevada National Security Site (NNSS) in Nye County, Nevada, to meet environmental management mission requirements. A review was conducted under Title 54 United States Code (USC) § 306101 (commonly known as Section 106 of the National Historic Preservation Act) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. As a result, a Memorandum of Agreement (MOA) was developed to mitigate the effects of the building demolitions. Stipulation III.B of the MOA requires an architectural survey of the Area 1 Subdock. Prior to this survey, the Subdock had not been systematically recorded. Therefore, an area of approximately 33 hectares (81 acres) was surveyed for historic properties by Desert Research Institute personnel. This effort resulted in the identification, recording, and evaluation of the potential Area 1 Subdock Historic District (SHPO Resource No. D377), including the identification of its contributing components. This district is recommended as eligible for the National Register of Historic Places (NRHP) under Criteria A and C. It contains 14 primary resources which include individual buildings, structures, storage yards, and infrastructure. Of these resources, all except one are recommended as elements that contribute to the district during its period of significance corresponding to nuclear testing from 1985 through 1992. Four of the resources (B18847, B18848, S2772, S2773) are recommended as individually eligible for the NRHP.

54 ENVIRONMENTAL SCIENCES↗

Lawrence Livermore National Security, LLCSite 300: Toxic Emissions Inventory Plan for ABA 2588 California Air Toxics "Hot Spots" Information and Assessment Act of 1987 (Revision 3.0)

The Air Toxics "Hot Spots" Information and Assessment Act (AB 2588 or the “Act”) was enacted in September 1987. Under the Act, stationary sources are required to report the types and quantities of certain toxic substances their facilities routinely release into the air. AB 2588 is designed to provide information to state and local agencies and to the general public on the extent of airborne emissions from stationary sources and the potential public health impacts of those emissions. The San Joaquin Valley Air Pollution Control District (the District) is mandated by the State to implement AB 2588. On March 6, 2015, The State Office of Environmental Health Hazard Assessment (OEHHA) adopted changes to the Air Toxics Hot Spots Program Guidance Manual for the Preparation of Health Risk Assessments. These revisions were designed to incorporate three technical support documents and to provide enhanced protection of children as required under state law (SB 25, Escutia, 1999). Due to these recent changes, and the corresponding potential increases in calculated health risk, the District notified LAWRENCE LIVERMORE NATIONAL SECURITY, LLC that we must be re-evaluated under AB 2588. Pursuant to the Air Toxics "Hot Spots" Information and Assessment Act of 1987, we have prepared a comprehensive, site-specific Toxics Emissions Inventory Plan. The plan specifies in detail how LAWRENCE LIVERMORE NATIONAL SECURITY, LLC will inventory our facility's emissions of all toxic substances on the list of substances subject to the Act. The plan provides a comprehensive and detailed description of the methods that will be used to quantify air releases or potential air releases of listed substances from all points of release. The plan also includes quantification methods which result in accurate and comprehensive characterization of releases and comply with all applicable requirements of the “Hot Spots” regulation.

54 ENVIRONMENTAL SCIENCES↗

Finding of No Adverse Effect for the Façade Alteration of Building 23-117, Administration Building, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to update the façade of Building 23-117 in the town of Mercury (Nevada State Historic Preservation Office [SHPO] Resource No. B15256), which is on the Nevada National Security Site (NNSS) in Nye County, Nevada. The purpose of the undertaking is to incorporate Building 23-117 into the new Mercury campus in accordance with the master plan for the modernization of Mercury. The NNSA/NFO will implement this undertaking in accordance with the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site, at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA. Building 23-117 was built in 1982 as the architect-engineer Administration Building1 for Holmes & Narver, a government contractor who helped design and engineer the town of Mercury and other areas on the NNSS from its inception until the termination of their contract in 1990. The building continued to be used by subsequent government contractors and is currently still in use by MSTS. The town of Mercury and the immediate surrounding area have been formally determined eligible for listing in the National Register of Historic Places (National Register, NRHP) as the Mercury Historic District (MHD, SHPO Resource No. D230) under Criteria A and C for its importance in supporting nuclear testing and scientific research from 1951 through 1992. Building 23-117 was identified as a contributing element to the MHD in a 2018 architectural survey of the district (Reno et al.) and recorded on a Nevada Architectural Resource Assessment (ARA) form (Reno et al. 2017). It is a historic property for the purposes of compliance with Section 106 of the National Historic Preservation Act (NHPA) and is subject to the stipulations of the Mercury PA. The NNSA/NFO requested that Desert Research Institute (DRI), cultural resource subject matter experts, analyze the effects of the proposed project on historic properties in the Area of Potential Effect (APE) and make a recommended finding for the undertaking in accordance with Section 106 of the NHPA and the Mercury PA. The purpose of this letter report is to submit documentation related to the mitigation of the façade alteration of Building 23-117 (Nevada State Historic Preservation Office [SHPO] Resource No. B15256) in the Mercury Historic District (MHD, SHPO Resource No. D230). This submission is intended to comply with the stipulations in the Programmatic Agreement between the National Nuclear Security Administration Nevada Field Office and the Nevada State Historic Preservation Officer Regarding Modernization and Operational Maintenance of the Nevada National Security Site at Mercury in Nye County, Nevada, hereafter referred to as the Mercury PA.

54 ENVIRONMENTAL SCIENCES↗

Securing Small Modular Reactors in Urban Environments

Current small modular reactor (SMR) deployment use cases consider both rural and urban deployments, depending on the operational in-country needs for clean and reliable sources of energy. Many studies have been conducted analyzing security in rural and remote deployment locations, but this study looks at the physical security implications of an SMR placed in an urban environment and its uses for electricity production, district heating, and process heating. SMRs used for electricity production, district heating, and process heating may be key sources of both energy infrastructure and commercial infrastructure within a city and a State. As a result, long-term shutdowns could have a serious impact on a State’s overall energy or commercial production. Therefore, operators may consider further security applications to protect an SMR plant from physical attacks against both radiological sabotage and sabotage acts that could result in the SMR facility being offline for a significant amount of time. In this study, the team designed and analyzed a physical protection system (PPS) for securing an urban SMR facility against acts of radiological sabotage and sabotage acts that could disrupt the facility’s long-term operation. Additionally, this work analyzed the nuanced security issues related to siting an SMR near an urban environment (versus in a rural environment). The result of these analyses includes recommendations for PPSs for urban SMR facilities used for energy production, district heating, and process heating.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

13 HYDRO ENERGY↗

Hampshire College Center for Science Education. Final Report on Activities Supported by the Department of Energy Grant No. DE-FG02-06ER64256

Hampshire College's Center for Science Education (Center) focuses on teacher professional development, curriculum development, and student enrichment programs. The Center also maintains research programs on teacher change, student learning and instructional effectiveness. The Center's work promotes learning that persists over time and transfers to new situations in and out of school. The projects develop the implications of the increasing agreement among teachers and researchers that effective learning involves active concept mastery and consistent practice with inquiry and critical thinking. The Center's objective is to help strengthen the pipeline of U.S. students pursuing postsecondary study in STEM fields. The Center achieves this by fostering an educational environment in which science is taught as an active, directly experienced endeavor across the K-16 continuum. Too often, young people are dissuaded from pursuing science because they do not see its relevance, instead experiencing it as dry, rote, technical. In contrast, when science is taught as a hands-on, inquiry-driven process, students are encouraged to ask questions grounded in their own curiosity and seek experimental solutions accordingly. In this way, they quickly discover both the profound relevance of science to their daily lives and its accessibility to them. Essentially, they learn to think and act like real scientists. The Center’s approach is multi-faceted: it includes direct inquiry-based science instruction to secondary and postsecondary students, educating the next generation of teachers, and providing new educational opportunities for teachers already working in the schools. Funding from the Department of Energy focused on the last population, enabling in-service teachers to explore and experience the pedagogy of inquiry-based science for themselves, and to take it back to their classrooms and students. The Center has demonstrated that the inquiry-based approach to science learning is compatible with existing state curriculum frameworks and produces students who understand and are positively inclined toward science. Funds from this Department of Energy grant supported three projects that involved K-16 science outreach: 1. Teaching Issues and Experiments in Ecology (TIEE). TIEE a peer-reviewed online journal and curriculum resource for postsecondary science teachers. 2. The Collaboration for Excellence in Science Education (CESE). CESE is a partnership with the Amherst, Massachusetts school system to foster the professional development of science teachers, and to perform research on student learning in the sciences and on teacher change. The project draws on Hampshire's long experience with inquiry-oriented and interdisciplinary education, as well as on its unique strengths in cognitive science. The project is run as design research, working with teachers to improve their practices and studying student and/or teacher outcomes. 3. Day in the Lab. Grant funds partially supported the expansion of the ongoing science outreach activities of the School of Natural Science. These activities are focused on local districts with large minority enrollments, including the Amherst, Holyoke and Springfield Public School Districts, and the Pioneer Valley Performing Arts Charter School (PVPA). Each of the three projects supported by the grant met or exceeded its goals. In part, the successes we met were due to continuity and communication among the staff of the programs. At the beginning of the CESE project, a science outreach coordinator was recruited. He worked throughout the grant period along with a senior researcher and the project's curriculum director. Additionally, the director and an undergraduate student conducted research on teacher change. The science outreach coordinator acted as a liaison among Hampshire College, the school districts, and a number of local businesses and agencies, providing organizational support, discussion facilitation, classroom support for teachers, and materials purchase. His presence in the schools kept teachers engaged and supported. He also brought the PVPA Charter School into the project. He worked closely with the educational outreach coordinator at Hampshire who oversaw the Day in the Lab program. Together, they have ensured the continuity of support to the schools through the use and placement of student interns. Finally, the director and coordinators worked with the Hitchock Center for the Environment to bring the two science professional development efforts in Amherst together. The joint development of workshops for elementary teachers was extremely successful. A major reason for the successes of the CESE program was the strength of the teacher outreach team and the sheer number of hours spent building relationships, talking about teaching and learning, planning projects, developing curriculum, and working with experts throughout the Pioneer Valley.

99 GENERAL AND MISCELLANEOUS↗

HarDWR - Raw Water Rights Records

For a detailed description of the database of which this record is only one part, please see the HarDWR meta-record. In order to hold a water right in the western United States, an entity, (e.g., an individual, corporation, municipality, sovereign government, or non-profit) must register a physical document with the state's water regulatory agency. State water agencies each maintain their own database containing all registered water right documents within the state, along with relevant metadata such as the point of diversion and place of use of the water. All western U.S. states have digitized their individual water rights databases, along with the geospatial data describing the spatial units where water rights are managed. Each state maintains and provides their own water rights data in accordance with individual state regulations and standards. We collected water rights databases from 11 western United States states either by downloading them from publicly accessible web portals, or by contacting state water management representatives; detailed descriptions of where and when the data was collected is provided in the README.txt, as well as Lisk et al.(in review). This collection of data are those raw water rights. Each state formats their data differently, meaning that file types, field availability, and names vary from state to state. Note, the data provided here reflects the state of the water rights databases at the time we collected the data; updates have likely occurred in many states. Some pieces of information are common among all states. These are: priority date, volume or flow of water allowed by the right, stated water use of the right, and some means of identifying the geography and source of the water pertaining to the right - typically the coordinates of the Point of Diversion (PoD) of a waterbody or well. Arizona regulates water in a different way than the other 10 states. Outside of some relatively small critical agricultural areas called Active Management Areas (AMAs), Arizona does not maintain any water rights. However, the state does require registration of surface and groundwater pumping devices, which includes disclosing the mechanical specifics of the devices. We used these records as a proxy for water rights. Each state, and their respective water right authorities, have made their water right records available for non-commercial reference uses. In addition, the states make no guarantees as to the completeness, accuracy, or timeliness of their respective databases, let alone the modifications which we, the authors of this paper, have made to the collected records. None of the states should be held liable for using this data outside of its intended use. In addition, the following states have requested specifically worded disclaimers to be included with their data. Colorado: "The data made available here has been modified for use from its original source, which is the State of Colorado. THE STATE OF COLORADO MAKES NO REPRESENTATIONS OR WARRANTY AS TO THE COMPLETENESS, ACCURACY, TIMELINESS, OR CONTENT OF ANY DATA MADE AVAILABLE THROUGH THIS SITE. THE STATE OF COLORADO EXPRESSLY DISCLAIMS ALL WARRANTIES, WHETHER EXPRESS OR IMPLIED, INCLUDING ANY IMPLIED WARRANTIES OF MERCHANTABILITY, OR FITNESS FOR A PARTICULAR PURPOSE. The data is subject to change as modifications and updates are complete. It is understood that the information contained in the Web feed is being used at one's own risk." Montana: "The Montana State Library provides this product/service for informational purposes only. The Library did not produce it for, nor is it suitable for legal, engineering, or surveying purposes. Consumers of this information should review or consult the primary data and information sources to ascertain the viability of the information for their purposes. The Library provides these data in good faith but does not represent or warrant its accuracy, adequacy, or completeness. In no event shall the Library be liable for any incorrect results or analysis; any direct, indirect, special, or consequential damages to any party; or any lost profits arising out of or in connection with the use or the inability to use the data or the services provided. The Library makes these data and services available as a convenience to the public, and for no other purpose. The Library reserves the right to change or revise published data and/or services at any time." Oregon: "This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or surveying purposes. Users of this information should review or consult the primary data and information sources to ascertain the usability of the information." The available data is provided as a series of compressed files, which each containing the full data collected from each state. Some of the files have been renamed, to more easily know which state the data belongs to. The file renaming was also required as some files from different states had the same name. In other cases, the data for a state has been placed in a folder indicating which state it belongs to - as the state organized its data by selected subregions. Below is a brief description of the format of the collected data from each state. ArizonaRights_StatementOfClaimants: A folder containing a database of interconnected CSV files. The soc_erd.pdf file contains a visual flowchart of how the various files are connected, beginning with SOC_MAIN.csv in the center of the page. ArizonaRights_SurfaceWaterRightsData: A folder containing a database of a single Shapefile and 10 associated CSVs. SurfaceWater.pdf contains a visual flowchart of how the various files are connected, beginning with ADWR_SW_APPL_REGRY.csv. ArizonaRights_Well55Registry: A folder containing a database of a single Shapefile and 59 associated CSVs. Wells55.pdf contains a visual flowchart of how the various files are connected, beginning with WellRegistry.shp. CaliforniaRights_eWRIMS_directDatabase: A folder containing a collection of four "series" Microsoft Excel files, as either XLS or XLSX. The four "series": byCounty, byEntity (what type of legal entity holds the right), byUse (stated water use), and byWatershed, are various methods by which the California water rights are organized within the state's database. However, it was observed that by only collecting a single series, not all water rights were being provided. So, essentially, the majority of records within each "series" are copies of each other, with each "series" containing some unique records. ColoradoRights_NetAmounts: A folder containing 78 CSV files, with one file per Colorado Water District. IdahoRights_PointOfDiversion: A Shapefile containing the Points of Diversion for the entire state of Idaho. IdahoRights_PlaceOfUse: A Shapefile containing the Place of Use polygons for the entire state of Idaho. MontanaRights_WaterRights: A Geodatabase file containing the Points of Diversion and Places of Use for the entire state of Montana. The name of the Points of Diversion Feature Layer within the Geodatabase is "WRDIV", and the name of the Places of Use Feature Layer is "WRPOU". NevadaRights_POD_Sites: A Shapefile containing the Points of Diversion for the entire state of Nevada. NewMexicoRights_Points_of_Diversion: A Shapefile containing the Points of Diversion for the entire state of New Mexico. OregonRights_state_shp: A folder containing 36 Shapefiles and are split between "pod" (Point of Diversion) and "pou" (Place of Use) for each water management basin within Oregon. In other words, each basin has one "pod" file and one "pou" file. The "pod" files are point shapes, and the "pou" files are polygons. UtahRights_Points_of_Diversion: A Shapefile containing the Points of Diversion for the entire state of Utah. WashingtonRights_WaterDiversions_ECY_NHD: A Geodatabase file containing both the Points of Diversion for the entire state of Washington. The name of the Feature Layer within the Geodatabase is "WaterDiversions_ECY_NHD". WyomingRights: A folder containing four subdirectories, one for each Wyoming Water Division. Each Division directory includes a varying number of subdirectories for each Wyoming Water District. Each District folder contains two copies of the Point of Diversion records for that area, with one copying being in CSV and one copy in Microsoft Excel XLS format.

Lisk, Matthew↗

Mineral exploration with ERTS imagery

Ten potential target areas for metallic mineral exploration were selected on the basis of a photo-lineament interpretation of the ERTS image 1172-17141 in central Colorado. An evaluation of bias indicated that prior geologic knowledge of the region had little, if any, effect on target selection. In addition, a contoured plot of the frequency of photo-lineament intersections was made to determine what relationships exist between the photo-lineaments and mineral districts. Comparison of this plot with a plot of the mineral districts indicates that areas with a high frequency of intersections commonly coincide with known mineral districts. The results of this experiment suggest that photo-lineaments are fractures or fracture-controlled features, and their distribution may be a guide to metallic mineral deposits in Colorado, and probably other areas as well.

Nicolais, S. M.↗

Evaluation of the Williams-type spring wheat model in North Dakota and Minnesota

The Williams type model, developed similarly to previous models of C.V.D. Williams, uses monthly temperature and precipitation data as well as soil and topological variables to predict the yield of the spring wheat crop. The models are statistically developed using the regression technique. Eight model characteristics are examined in the evaluation of the model. Evaluation is at the crop reporting district level, the state level and for the entire region. A ten year bootstrap test was the basis of the statistical evaluation. The accuracy and current indication of modeled yield reliability could show improvement. There is great variability in the bias measured over the districts, but there is a slight overall positive bias. The model estimates for the east central crop reporting district in Minnesota are not accurate. The estimate of yield for 1974 were inaccurate for all of the models.

Leduc, S.↗

Correlations and contrasts in structural history and style between an Archaean greenstone belt and adjacent gneiss belt, NE Minnesota

An analysis of the deformation along the boundary between the Vermilion Granitic Complex (VGC) and the Vermilion district indicates that the two terranes have seen a similar deformation history since the earliest stages of folding in the area. Despite this common history, variations in structural style occur between the two terranes, such as the relative development of D sub 1 fabrics and D sub 2 shear zones, and these can be attributed to differences in the crustal levels of the two terranes during the deformation. Similarly, the local development of F sub 3 folds in the VGC, but not in the Vermilion district, is interpreted to be a result of later-D sub 2 pluton emplacement which was not significant at the level of exposure of ther Vermilion district.

Bauer, R. L.↗

Transpression as the main deformational event in an Archaean greenstone belt, northeastern Minnesota

Deformed and metamorphosed sedimentary and volcanic rocks of the Vermilion district constitute an Archean greenstone belt trending east-west between higher grade rocks of the Vermilion Granitic Complex to the north and the Giants Range batholith to the south. Metamorphic grade is low throughout, being lowest in the center of the belt (chlorite zone of the greenschist facies). All the measured strain, a cleavage or schistosity, and a mineral lineation in this belt are attributed to the main phase of deformation D sub 2 that followed an earlier nappe-forming event D sub 1, which left little evidence of penetrative fabric. Previous work assumed that the D sub 2 deformation resulted from north-south compression across the district. It is now believed that a significant component of this deformation resulted from dextral shear across the whole region. Thus the Vermilion fault, a late-state largely strike-slip structure that bounds the Vermilion district to the north, may simply be the latest, most brittle expression of a shear regime that was much more widespread in space and time. Features that are indicative of shear include ductile shear zones with sigmoidal foliation patterns, highly schistose zones with the development of shear bands, feldspar clasts or pyrite cubes with asymmetric pressure shadows, and the fact that the asymmetry of the F sub 2 folds is predominantly Z for at least 15 km south of the Vermilion fault.

Hudleston, P. J.↗

Small passive student experiments on G324 261 individual quests for student knowledge

The Charleston County School District CAN DO Project payload on STS-57 had a primary goal of photographing the Earth with the GeoCam camera system. In addition, the payload carried 261 passive student experiments representing the efforts of several thousand students throughout the district and in four other states. These experiments represented the individual concepts of teams ranging in age from pre-school to high school. Consequently, a tremendous variety of samples from collard green seeds to microscopic 'water bears' were flown. Each prospective team was provided a simple kit equipped with five vials. Each student team submitted five coded samples, one for space flight and four control samples. The control samples were exposed to radiation, cold and centrifugation respectively while one negative control sample was passively stored. The students received the samples back still coded so that they were unaware of which samples were flown. They then investigated their samples according to their individual research protocols. The results were presented in poster and platform form at a student research symposium. Space Trees grown from tree seeds flown in the payload have been planted at all district schools, and at many guest schools. These seeds represented another way in which to involve additional classes and students. Both the passive experiments and the space trees were housed in what otherwise would have been wasted space within the payload. They extended the GAS programs worthwhile ballast concept to another level. The opportunity to fly an experiment in space is too previous not to be extended to the greatest number of students possible.

Nicholson, James H.↗

STS-114: Discovery Impromptu Briefing

Dr. Griffin, NASA Administrator, is accompanied by members of The U.S. House of Representatives in this STS-114 Discovery Impromptu briefing. The U.S. House of Representatives present include: Sherwood Boehlert, House Science Committee Chairman, Senator Hutchinson, Sheila Jackson, 18th Congressional District Texas, Al Green, 9th Congressional District, Representative Jim Davis, Florida, and Gene Green, 29th District, Texas. Griffin talks about the problem that occurred with the external fuel tank sensor of the Space Shuttle Discovery and the effort NASA is pursuing to track the problem, and identify the root cause. He answers questions from the news media about the next steps for the Space Shuttle Discovery, time frame for the launch, and activities for the astronauts for the next few days.

Source record↗

Langley Research Center Utility Risk from Future Climate Change

The successful operation of NASA Langley Research Center (LaRC) depends on services provided by several public utility companies. These include Newport News Waterworks, Dominion Virginia Power, Virginia Natural Gas and Hampton Roads Sanitation District. LaRC's plan to respond to future climate change should take into account how these companies plan to avoid interruption of services while minimizing cost to the customers. This report summarizes our findings from publicly available documents on how each company plans to respond. This will form the basis for future planning for the Center. Our preliminary findings show that flooding and severe storms could interrupt service from the Waterworks and Sanitation District but the potential is low due to plans in place to address climate change on their system. Virginia Natural Gas supplies energy to produce steam but most current steam comes from the Hampton trash burning plant, thus interruption risk is low. Dominion Virginia Power does not address climate change impacts on their system in their public reports. The potential interruption risk is considered to be medium. The Hampton Roads Sanitation District is projecting a major upgrade of their system to mitigate clean water inflow and infiltration. This will reduce infiltration and avoid overloading the pump stations and treatment plants.

De Young, Russell J.↗

Zero Energy Schools: The Challenges

School buildings have a lot of potential to achieve zero energy (ZE) in new construction as well as in retrofits. There are many examples of schools operating at ZE, and many technical resources available to guide school districts and their design and construction teams through the process. When school districts embark on the path to ZE, however, they often confront challenges related to processes and a perception that ZE buildings require 'new,' unconventional, and expensive technologies, materials, or equipment. Here are some of the challenges school districts and their design and construction teams commonly encounter, and the solutions they use to overcome them.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Niagara Falls Storage Site - Interim Waste Containment Structure - 16199

The Niagara Falls Storage Site (NFSS) is a 77.3-hectare (ha) (191-acre) property that is owned by the United States Government and located in the township of Lewiston, Niagara County, New York. The NFSS is part of the former Lake Ontario Ordnance Works (LOOW) that was used by the War Department beginning in 1942 for the production of trinitrotoluene (TNT). During the 1940's and 1950's, the Manhattan Engineer District and the Atomic Energy Commission brought various radioactive wastes and uranium processing byproducts (residues) resulting from our nation's atomic energy program to the LOOW for storage. Site operations caused soil, sediment, and groundwater contamination that lead to several remedial actions, which culminated in the construction of the Interim Waste Containment Structure (IWCS) on the NFSS. The U.S. Army Corps of Engineers (USACE)-Buffalo District is the lead Federal agency for Formerly Utilized Sites Remedial Action Program (FUSRAP) remediation of the NFSS. As the lead agency, USACE is conducting a remedial investigation/feasibility study (RI/FS) pursuant to the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). CERCLA activities at the NFSS have transitioned from the site RI activities to the FS evaluation of potential remediation alternatives. USACE recognizes the need to implement a focused CERCLA FS process and, therefore, has established three separate operable units (OUs) for NFSS: the IWCS OU, the Balance of Plant (BOP) OU [i.e., all on-site areas outside the boundary of the IWCS], and the Groundwater OU. This paper will discuss the following: - Provide background information on the NFSS including the nature of the materials within the IWCS. - Explain the steps of the CERCLA and associated processes the Formerly Utilized Sites Remedial Action Program (FUSRAP) employs. - Describe the OUs for the NFSS property and the subunit designations used in the FS evaluations for the IWCS OU. - Provide the current project status within the CERCLA framework and path forward for all OUs and Vicinity Properties (VPs). Identify the Applicable or Relevant and Appropriate Requirements (ARARs) preferred by USACE and the regulatory agencies and explain the differences between the two positions. - Provide the comparative evaluation of the remedial alternatives assessed in the FS. - Identify the justifications for the USACE - Buffalo District selecting the preferred remedial alternative within the Proposed Plan. The remedial action objectives for the IWCS OU are designed to provide short- and long-term protection of human health and the environment. CERCLA requires that any action taken be protective of human health and the environment as well as be compliant with identified ARARs. USACE evaluated 'No Action' and four potential remedial alternatives for the IWCS OU that ranged from leaving all of the wastes in-place and installing a final cover to partial and full removal of the contents. The four alternatives met the remedial action objectives defined identified for the IWCS OU. In accordance with the statutory requirements of CERCLA Section 121, remedial alternatives must comply with two threshold criteria, overall protection of human health and the environment and compliance with ARARs, in order to be carried forward for further evaluation. If a remedial alternative meets the threshold criteria, it is evaluated against the following five balancing criteria: - Long-term effectiveness and permanence; - Reduction in toxicity, mobility, or volume through treatment; - Short-term effectiveness; - Implementability; and, - Cost. The Feasibility Study evaluation led to the preferred remedial alternative selection and this will be the focus of this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INTEGRATION OF CONDUIT HYDROPOWER AND BATTERIES INTO IRRIGATION INFRASTRUCTURE

Irrigation districts, ditch companies, and other agricultural water providers across the West operate and maintain canals, ditches, and reservoirs that store and deliver water for agricultural production, municipal needs, and other purposes. Co-locating energy generation and storage with this infrastructure provides opportunities to improve resilience and reduce energy costs. This memo discusses two case studies of co-located infrastructure and their contexts. The first case study discusses the development of an integrated microgrid, hydropower, solar, and battery storage project in North Unit Irrigation District (NUID) in Oregon. The second case study discusses the development of a battery storage project in Tulelake Irrigation District (TID) in northern California. Together, these two projects demonstrate the potential for co-located energy and water infrastructure.

13 - HYDRO ENERGY↗

Site demonstration and performance evaluation of MPC for a large chiller plant with TES for renewable energy integration and grid decarbonization

Thermal energy storage (TES) for a cooling plant is a crucial resource for load flexibility. Traditionally, simple, heuristic control approaches, such as the storage priority control which charges TES during the nighttime and discharges during the daytime, have been widely used in practice, and shown reasonable performance in the past benefiting both the grid and the end-users such as buildings and district energy systems. However, the increasing penetration of renewables changes the situation, exposing the grid to a growing duck curve, which encourages the consumption of more energy in the daytime, and volatile renewable generation which requires dynamic planning. The growing pressure of diminishing greenhouse gas emissions also increases the complexity of cooling TES plant operations as different control strategies may apply to optimize operations for energy cost or carbon emissions. This paper presents a model predictive control (MPC), site demonstration and evaluation results of optimal operation of a chiller plant, TES and behind-meter photovoltaics for a campus-level district cooling system. The MPC was formulated as a mixed-integer linear program for better numerical and control properties. Compared with baseline rule-based controls, the MPC results show reductions of the excess PV power by around 25%, of the greenhouse gas emission by 10%, and of peak electricity demand by 10%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗