Treatment of acoustic fluid-structure interaction by Localized Lagrange Multipliers and comparison to alternative interface coupling methods.

This paper is a sequel on the topic of localized Lagrange multipliers (LLM) for applications of fluid-structure interaction (FSI) between finite-element models of an acoustic fluid and an elastic structure. The prequel paper formulated the spatial-discretization methods, the LLM interface treatment, the time-marching partitioned analysis procedures, and the application to 1D benchmark problems. Here, we expand on formulation aspects required for successful application to more realistic 2D and 3D problems. Additional topics include duality relations at the fluid-structure interface, partitioned vibration analysis, reduced-order modeling, handling of curved interface surfaces, and comparison of LLM with other coupling methods. Emphasis is given to non-matching fluid-structure meshes. We present benchmark examples that illustrate the benefits and drawbacks of competing interface treatments. Realistic application problems involving the seismic response of two existing dams are considered. These include 2D modal analyses of the Koyna gravity dam, transient-response analyses of that dam with and without reduced-order modeling, incorporation of nonlinear cavitation effects, and the 3D transient-response analysis of the Morrow Point arch dam.

13 HYDRO ENERGY↗

Overwintering Distribution and Postspawn Survival of Steelhead in the Upper Columbia River Basin

Abstract Adult summer-run steelhead Oncorhynchus mykiss overwinter in freshwater for several months prior to spawning. In systems supporting mixed populations of fisheries and conservation importance, understanding the distribution and survival of pre- and postspawn fish is necessary for informed management. The upper Columbia River supports hatchery-origin components valued by anglers, natural-origin components of conservation concern, and temporary strays from downstream populations. We used radiotelemetry and PIT telemetry to monitor the behavior, distribution, and survival of adult steelhead during fall, overwintering, spawning, and postspawn periods, with a focus on use of the main stem versus four major tributaries. Adult steelhead (N = 807) were tagged at Priest Rapids Dam in 2015 and 2016. One-fifth of steelhead fell back below Priest Rapids Dam and did not reascend. A slight majority of tagged steelhead that overwintered upstream of Priest Rapids Dam did so in main-stem reservoirs (54%; N = 548). Overwintering in the main-stem Columbia River was more likely for later-arriving steelhead and was concentrated in the upstream-most reservoir. Winter tributary use was highest in the Wenatchee (26%; 2016) and Methow (18%; 2015) rivers, whereas no steelhead overwintered in the Entiat River. Harvest of hatchery-origin steelhead was 18% in 2015 and was near zero in 2016, when the fishery was suspended due to low adult returns. After accounting for reported harvest, annual overwinter survival did not differ between main-stem and tributary habitats, and relatively low adjusted survival of hatchery-origin steelhead in 2015 suggested unreported harvest. In contrast to low iteroparity rates (<3%), the majority of postspawn steelhead (56.5%) exited tributaries as kelts; kelt survival to Bonneville Dam was 65% in 2016 and 23% in 2017. Collectively, the results highlight the importance of understanding patterns of habitat use and mortality in steelhead populations when managers are faced with balancing harvest and conservation goals.

Fuchs, Nathaniel T.↗

Population assignment of migratory Westslope Cutthroat Trout (WCT) in the Clark Fork–Pend Oreille River basin

Abstract Objective The Clark Fork–Pend Oreille River basin of northeastern Washington and the Idaho Panhandle historically supported a robust metapopulation of the Westslope Cutthroat Trout (WCT) Oncorhynchus lewisi, a western native salmonid of high cultural and economic value. The construction of impassible hydroelectric dams and smaller instream barriers has prevented the return of migratory WCT to spawning tributaries, leading to the fragmentation of this metapopulation over the past 100 years. One such impassible barrier is Albeni Falls Dam (AFD) near Newport, Washington, which was completed without fish passage capabilities in 1955. We sought to examine large-scale genetic patterns in the study area and determine the most likely spawning tributary of origin for migratory WCT captured below AFD. Methods We created a genetic baseline representative of populations within the Clark Fork–Pend Oreille River basin from upstream and downstream of the dam using 191 biallelic single-nucleotide polymorphism genetic markers. Our data set included 124 collections, which allowed for an examination of population structure and hatchery influence across the study area and provided a robust tool for population assignment. Population assignment tests were conducted using the program RUBIAS. Result Population assignment tests were successful for all pure WCT of unknown origin despite potential influence from hatchery lineages across the study area. Of 83 migratory WCT captured below AFD, approximately 80% were assigned to tributaries upstream of AFD with a posterior assignment probability of at least 90%. Only one fish was assigned to a tributary downstream of AFD. Conclusion Our results indicate that AFD disrupts the natural metapopulation dynamics of WCT populations in the basin. Passage for WCT at this barrier would reestablish metapopulation connectivity within the basin by allowing migratory individuals to make genetic contributions to populations upstream of the dam.

Wells, Craig D. (ORCID:0000000258513250)↗

The effects of total dissolved gas on chum salmon fry survival, growth, gas bubble disease, and seawater tolerance

Chum salmon Oncorhynchus keta alevin developing in gravel habitats downstream of Bonneville Dam on the Columbia River are exposed to elevated levels of total dissolved gas (TDG) when water is spilled at the dam to move migrating salmon smolts downstream to the Pacific Ocean. Current water quality criteria for the management of dissolved gas in dam tailwaters were developed primarily to protect salmonid smolts and are assumed to be protective of alevin if adequate depth compensation is provided. We studied whether chum salmon alevin exposed to six levels of dissolved gas ranging from 100% to 130% TDG at three development periods between hatch and emergence (hereafter early, middle, and late stage) suffered differential mortality, growth, gas bubble disease, or seawater tolerance. Each life stage was exposed for 50 d (early stage), 29 d (middle stage), or 16 d (late stage) beginning at 13, 34, and 37 d post-hatch, respectively, through 50% emergence. The mortality for all stages from exposure to emergence was estimated to be 8% (95% confidence interval (CI) of 4% to 12%) when dissolved gas levels were between 100% and 117% TDG. Mortality significantly increased as dissolved gas levels rose above 117% TDG,; with the lethal concentration that produced 50% mortality (LC50 ) was estimated to be 128.7% TDG (95% CI of 127.2% to 130.2% TDG) in the early and middle stages. By contrast, there was no evidence that dissolved gas level significantly affected growth in any life stage except that the mean wet weight at emergence of early stage fish exposed to 130% TDG was significantly less than the modeled growth of unexposed fish. The proportion of fish afflicted with gas bubble disease increased with increasing gas concentrations and occurred most commonly in the nares and gastrointestinal tract. Early stage fish exhibited higher ratios of filament to lamellar gill chloride cells than late stage fish, and these ratios increased and decreased for early and late stage fish, respectively, as gas levels increased; however, there were no significant differences in mortality between life stages after 96 h in seawater. The study results suggest that current water quality guidelines for the management of dissolved gas appear to offer a conservative level of protection to chum salmon alevin incubating in gravel habitat downstream of Bonneville Dam.

Geist, David R↗

Evaluating Steelhead Kelt Treatments to Increase Iteroparous Spawners in the Yakima River Basin

Abstract Steelhead Oncorhynchus mykiss are iteroparous, distinguishing them from Pacific salmon Oncorhynchus spp. that are semelparous. In this study we evaluated enhancement techniques that exploit this life history strategy to facilitate species restoration and recovery. In the Columbia River basin, where the natural ecosystem has been substantially altered over several decades due to human influence, all steelhead populations are listed as threatened or endangered under the U.S. Endangered Species Act. One factor believed to be limiting survival of Columbia River kelt (postspawned) steelhead is poor migration success to the ocean past several dams. We evaluated three treatments for kelts captured in the Yakima River basin from 2002 to 2011: (1) transport and release below Bonneville Dam (to provide unimpeded access to the ocean); (2) short-term reconditioning (holding and feeding in an artificial environment to facilitate gonad maturation) with transport; and (3) long-term reconditioning. These treatments were compared with an in-river migration control group to identify differences in the rate at which kelts survived and returned to Prosser Dam for potential repeat spawning (hereafter repeat spawners). The long-term reconditioning treatment exhibited the highest return rate of repeat spawners (range, 11.5–17.6%). The short-term reconditioning treatment with transport downstream from Bonneville Dam had a 3.2% return rate. The transport only treatment exhibited the lowest return rate (0.9%); this was only one-third of the control group's return rate (2.7%). Our results indicate that long-term steelhead kelt reconditioning is more successful than either transportation or in-river migration alternatives at increasing potential repeat spawner abundance and providing recovery benefits in river systems that have experienced substantial losses in natural productivity due to loss of habitat and habitat connectivity. Received June 23, 2015; accepted February 27, 2016 Published online July 15, 2016

Trammell, Jeffrey L. J.↗

Identification of recG genetic interactions in Escherichia coli by transposon sequencing

ABSTRACT Maintaining the integrity of the genome is of utmost importance for cell division and propagation. In Escherichia coli , the RecG protein has been implicated in processing branched recombination intermediates during DNA repair processes, but the primary cellular role(s) of RecG and the repair pathways in which it acts have been difficult to define. To gain additional insight into RecG function, we employed transposon sequencing to identify recG genetic interactions and reveal complementary or redundant functions. The strongest hits from the screen were the dam , uvrD , rnhA , radA , and rep genes. The conditional importance of these five genes in cells lacking recG was confirmed using a plasmid-based assay, revealing synthetic lethal interactions for most double deletion strains. Several of the synthetic lethal gene combinations (with uvrD, rep, and radA , but not rnhA or dam ) were suppressed by deletion of recF or recO , indicating that their genetic relationships involved roles in post-replication gap repair. Additionally, loss of the RecG/SSB interaction phenocopied a recG deletion when combined with dam , uvrD , radA , or rnhA deletions but not with rep . The results reinforce the idea of RecG as a general genome guardian. RecG has at least two functions. It plays an important role in the resolution of joint molecules behind the fork, formed during post-replication gap repair. RecG is also required to suppress genome over-replication caused by unscheduled replication initiation at R-loops, at double-strand breaks caused by dam inactivation, and during replication termination. IMPORTANCE DNA damage and subsequent DNA repair processes are mutagenic in nature and an important driver of evolution in prokaryotes, including antibiotic resistance development. Genetic screening approaches, such as transposon sequencing (Tn-seq), have provided important new insights into gene function and genetic relationships. Here, we employed Tn-seq to gain insight into the function of the recG gene, which renders Escherichia coli cells moderately sensitive to a variety of DNA-damaging agents when they are absent. The reported recG genetic interactions can be used in combination with future screens to aid in a more complete reconstruction of DNA repair pathways in bacteria.

59 BASIC BIOLOGICAL SCIENCES↗

A model of the effects of flow fluctuations on fall Chinook salmon spawning habitat availability in the Columbia River

Previously we reported that about 30% to 60% of the area predicted to be used by fall Chinook salmon (Oncorhynchus tshawytscha) for spawning in the Hanford Reach of the Columbia River did not contain redds. One explanation for the overprediction of habitat was that our model did not incorporate streamflow fluctuation. Daily fluctuation in flow caused by load-following operations (power generation to meet short-term electrical demand) at Priest Rapids Dam, situated at the upper end of the Hanford Reach, changes the hydraulic characteristics to which fish respond in selecting redd sites. The purpose of the study described here was to examine the effect of flow changes on spawning habitat modeling and, in particular, to look at the connection between spawning and the variability and persistence of habitat variables caused by rapid changes in flow resulting from load-following operations at Priest Rapids Dam. We found that spawning habitat use by fall Chinook salmon was consistent with previous fall Chinook salmon studies in the Reach. Dynamic variables that were based on hourly time series were used to account for the variability in habitat as a result of flow fluctuations. The analysis showed that the proportion of velocities that fell within the range of 1.0 to 2.5 m/s differed significantly between locations that were predicted to be spawning by the logistic regression model where spawning actually occurred and locations that were predicted to be spawning where spawning did not occur. However, the resulting sequential logistic regression model that incorporated the dynamic variables did not provide significant improvement in the percentage of errors for areas predicted to be spawning; the model’s overprediction errors still ranged from 63% to 78%. We suggest that while flow fluctuation may affect spawning habitat and individual fish behavior, the high correlation between time-averaged velocities and the proportion of hourly velocities that fell within the most favorable range negated any improvements in model predictions.

54 ENVIRONMENTAL SCIENCES↗

Evaluating greenhouse gas emissions from hydropower complexes on large rivers in Eastern Washington

Water bodies, such as freshwater lakes, are known to be net emitters of carbon dioxide (CO2), and methane (CH4). In recent years, significant greenhouse gas (GHG) emissions from tropical, boreal, and mid-latitude reservoirs have been reported. At a time when hydropower is increasing worldwide, better understanding of seasonal and regional variation in GHG emissions is needed in order to develop a predictive understanding of such fluxes within man-made impoundments. We examined power-producing dam complexes within xeric temperate locations in the northwestern United States. Sampling environments on the Snake (Lower Monumental Dam Complex) and Columbia Rivers (Priest Rapids Dam Complex) included tributary, mainstem, embayment, forebay, and tailrace areas during winter and summer 2012. At each sampling location, GHG measurement pathways included surface gas flux, degassing as water passed through dams during power generation, ebullition within littoral embayments, and direct sampling of hyporheic pore-water.

Arntzen, Evan V.↗

SLH Timing Belt Powertrain (Final Technical Report)

The main goal of this proposal was to develop and test a novel powertrain solution for the SLH hydroEngine, a low-cost, efficient low-head hydropower technology. Nearly two-thirds of U.S. renewable electricity is produced by hydropower (EIA 2010). According to the U.S. Department of Energy; this amount could be increased by 50% with small hydropower plants, often using already-existing dams (Hall 2004). There are more than 80,000 existing dams, and of these, less than 4% generate power (Blankinship 2009). In addition, there are over 800 irrigation districts in the U.S., many with multiple, non-power, low-head drops. These existing, non-power dams and irrigation drops could be retrofitted to produce distributed, baseload, renewable energy with appropriate technology. The problem is that most existing dams are low-head, or less than 30 feet in height (Ragon 2009). Only about 2% of the available low-head hydropower resource in the U.S. has been developed, leaving more than 70 GW of annual mean potential low-head capacity untapped (Hall 2004). Natel Energy, Inc. is developing a low-head hydropower turbine that operates efficiently at heads less than 6 meters and is cost-effective for deployment across multiple low-head structures. Because of the unique racetrack-like path taken by the prime-movers in the SLH, a flexible powertrain is required. Historically, the only viable technological solution was roller chain. Despite the having the ability to easily attach blades, roller chain is characterized by significant drawbacks, including high cost, wear, and vibration from chordal action. Advanced carbon- fiber-reinforced timing belts have been recently developed which, coupled with a novel belt attachment system developed by Natel Energy, result in a large reduction in moving parts, reduced mass and cost, and elimination of chordal action for increased fatigue life. The work done in this project affirmatively addressed each of the following 3 major uncertainties concerning a timing-belt based hydroEngine powertrain: 1. Can a belt handle the high torques and power loads demanded by the SLH? (Yes.) 2. Can the SLH blades be mounted to belt with a connection that can withstand the loads encountered in operation? (Yes.) 3. Can the belt, with blade attachments, live through the required cyclic loading? (Yes.) The research adds to the general understanding of sustainable small hydropower systems by using innovative system testing to develop and demonstrate performance of a novel powertrain solution, enabling a new type of hydroelectric turbine to be commercially developed. The technical effectiveness of the methods investigated has been shown to be positive through an extensive design and testing process accommodating many constraints and goals, with a major emphasis on high cycle fatigue life. Economic feasibility of the innovations has been demonstrated through many iterations of design for manufacturability and cost reduction. The project is of benefit to the public because it has helped to develop a solution to a major problem -- despite the large available potential for new low-head hydropower, high capital costs and high levelized cost of electricity (LCOE) continue to be major barriers to project development. The hydroEngine represents a significant innovation, leveraging novel fluid mechanics and mechanical configuration to allow lower-cost turbine manufacture and development of low head hydropower resources.

13 HYDRO ENERGY↗

Assessment of Fluctuating Reservoir Elevations Using Hydraulic Models and Impacts to Larval Pacific Lamprey Rearing Habitat in the Bonneville Pool

This report presents the results of a modeling assessment of likely lamprey larval habitat that may be impacted by dewatering of the major tributary delta regions in the Bonneville Pool of the Columbia River. This assessment was conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers Portland District (CENWP). The goal of the study was to provide baseline data about how the regions of interest would potentially be impacted at three river flows (10, 50, and 90 percent exceedance flow) for four different forebay elevations at Bonneville Dam. Impacts of unsteady flows at The Dalles Dam and changing forebay elevation at Bonneville Dam for a 2-week period were also assessed. The area of dewatered regions was calculated by importing modeled data outputs into a GIS and then calculating the change in inundated area near tributary deltas for the four Bonneville forebay surface elevations. From the modeled output we determined that the overall change in area is less sensitive to elevations changes during higher river discharges. Changing the forebay elevation at Bonneville and the resulting impact to total dewatered regions was greater at the lowest modeled river flow (97 kcfs) and showed the greatest variation at the White Salmon/Hood River delta regions followed by the Wind, Klickitat and the Little White Salmon rivers. To understand how inundation might change on a daily and hourly basis. Unsteady flow models were run for a 2-week period in 2002 and compared to 2014. The water surface elevation in the upstream pool closely follows that of the Bonneville Dam forebay with rapid changes of 1 to 2-ft possible. The data shows that 2.5-ft variation in water surface elevation occurred during this period in 2002 and a 3.7-ft change occurred in 2014. The duration of these changes were highly variable and generally did not stay constant for more than a 5-hr period.

42 ENGINEERING↗

Total Dissolved Gas Prediction and Optimization in RIVERWARE

Management and operation of dams within the Columbia River Basin (CRB) provides the region with irrigation, hydropower production, flood control, navigation, and fish passage. These various system-wide demands can require unique dam operations that may result in both voluntary and involuntary spill, thereby increasing tailrace levels of total dissolved gas (TDG) which can be fatal to fish. Appropriately managing TDG levels within the context of the systematic demands requires a predictive framework robust enough to capture the operationally related effects on TDG levels. Development of the TDG predictive methodology herein attempts to capture the different modes of hydro operation, thereby making it a viable tool to be used in conjunction with a real-time scheduling model such as RiverWare. The end result of the effort will allow hydro operators to minimize system-wide TDG while meeting hydropower operational targets and constraints. The physical parameters such as spill and hydropower flow proportions, accompanied by the characteristics of the dam such as plant head levels and tailrace depths, are used to develop the empirically-based prediction model. In the broader study, two different models are developed a simplified and comprehensive model. The latter model incorporates more specific bubble physics parameters for the prediction of tailrace TDG levels. The former model is presented herein and utilizes an empirically based approach to predict downstream TDG levels based on local saturation depth, spillway and powerhouse flow proportions, and entrainment effects. Representative data collected from each of the hydro projects is used to calibrate and validate model performance and the accuracy of predicted TDG uptake. ORNL, in conjunction with IIHR - Hydroscience & Engineering, The University of Iowa, carried out model adjustments to adequately capture TDG levels with respect to each plant while maintaining a generalized model configuration. Validation results indicate excellent model performance with coefficient of determination values exceeding 92% for all sites. This approach enables model extension to an increasingly wider array of hydropower plants, i.e., with the proper data input, TDG uptake can be calculated independent of actual physical component design. The TDG model is used as a module in the systematic optimization framework of RiverWare, a river and reservoir modeling tool used by federal agencies, public utility districts, and other dam owners and operators to forecast, schedule, and manage hydropower assets. The integration and testing of the TDG module within RiverWare, led by University of Colorado's Center for Advanced Decision Support for Water and Environmental Systems (CADSWES), will allow users to generate optimum system schedules based on the minimization of TDG. Optimization analysis and added value will be quantified as system wide reductions in TDG achieved while meeting existing hydropower constraints. Future work includes the development of a method to predict downstream reservoir forebay TDG levels as a function of upstream reservoir tailrace TDG values based on river hydrodynamics, hydro operations, and reservoir characteristics. Once implemented, a holistic model that predicts both TDG uptake and transport will give hydropower operators valuable insight into how system-wide environmental effects can be mitigated while simultaneously balancing stakeholder interests.

13 HYDRO ENERGY↗

French Modular Impoundment: Final Cost and Performance Evaluation

This report comprises the Final Cost and Performance Report for the Department of Energy Award # EE0007244, the French Modular Impoundment (aka the “French Dam”.) The French Dam is a system of applying precast modular construction to water control structures. The “French Dam” is a term used to cover the construction means/methods used to construct or rehabilitate dams, diversion structures, powerhouses, and other hydraulic structures which impound water and are covered under FDE’s existing IP (Patents # US8414223B2; US9103084B2.)

13 HYDRO ENERGY↗

Bureau of Reclamation Hydropower Lease of Power Privilege: Case Studies and Considerations

This report analyzes the U.S. Bureau of Reclamation's (Reclamation) lease of power privilege (LOPP) regulatory process for a nonfederal entity to use a Reclamation jurisdictional dam or conduit for power generation. Recent federal initiatives encouraging hydropower development at federally-owned facilities coupled with Reclamation's hydroelectric potential has led to an increased interest in powering Reclamation dams and conduits through the LOPP process. During the last five years, 23 of the 36 total LOPP projects (76 MW) have been initiated and are at some phase of the development process. Resource assessments analyzed in this report identify over 360 MW of hydroelectric potential at Reclamation-owned dams and conduits. This report provides considerations from Reclamation staff involved in the LOPP regulatory process and developers that have received an LOPP and are currently generating hydropower at a Reclamation dam or conduit. The authors also analyze LOPP regulatory processing timelines before and after the implementation of federal initiatives to streamline the LOPP process and provide case studies of hydropower projects that have obtained an LOPP.

13 HYDRO ENERGY↗

Species-specific Susceptibility to Scale Loss: Using Simulated Shear to Understand Among Species Differences in Turbine Passage Injury

Hydropower is the largest source of utility-scale, renewable electricity (e.g., 44% of all renewable energy) in the USA to date (U.S. Energy Information Administration (USEIA), 2017); however, dam installation and operation have impacted natural upstream and downstream fish passage and altered connectivity of riverine fish communities throughout the USA (Čada, 1998; Čada et al., 2006; Pracheil et al., 2016a). Fish ladders and exclusion devices (among others) allow fish to safely circumvent and avoid passage through the turbines altogether (Čada, 2001), but are rarely 100% effective. At many dams, passage through turbines is unavoidable, and stressors like collision with structures or blade strike, barotrauma or cavitation, turbulence, and exposure to shear forces may cause injury or mortality to entrained fish (Čada, 2001; Neitzel et al., 2004; Pracheil et al., 2016a). Passage injury and mortality may be a consequence of exposure to the entire suite of stressors, while the exact role of each is difficult to ascertain and link to individuals (Colotelo et al., 2017). Contributing complicating factors to understanding mortality include turbine type, variation in fish size (i.e., life stages), and the marked morphological diversity of freshwater fishes (Pracheil et al., 2016a; Colotelo et al., 2017). Laboratory studies aimed to understand the effects of turbine passage have quantified each stressor separately to determine appropriate dose-response relationships based on fish size, species, etc. Establishing dose-response relationships by stressor for priority species that interact with hydropower dams is one of the primary objectives of the Biologicallybased Design and Evaluation (BioDE) project being conducted at Oak Ridge National Laboratory (ORNL) and Pacific Northwest National Laboratory (PNNL). At its core, BioDE is focused on empirically driven research that quantifies fish responses to stressors at exposure levels similar to those experienced during turbine passage so that Biological Performance Assessment (BioPA) models can be developed. The BioPA model informs hydropower turbine design modifications based on predicted injury and mortality in response to various stressor exposures, e.g., blade strike, shear, and barotrauma. Stress exposure is defined by computational fluid dynamics models of the turbine environment. Fish response relationships are determined through laboratory studies like the one reported in this document. The BioPA model will aid turbine manufactures, plant operators, and dam owners with design of lower impact turbines and modify operating procedures to maximize survival of entrained fishes.

13 HYDRO ENERGY↗

The Integrated Basin-Scale Opportunity Assessment Initiative: Pilot Assessment for the Deschutes River Basin

In 2010, the U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office provided funding to Pacific Northwest National Laboratory, Oak Ridge National Laboratory (ORNL), and Argonne National Laboratory to develop an approach for assessing a river basin as an integrated system within the context of existing uses and environmental conditions to identify opportunities for sustainable hydropower development and environmental improvements. Called the Integrated Basin-Scale Opportunity Assessment Initiative (BSOA Initiative), the project is one of seven action items of the March 24, 2010 Memorandum of Understanding (MOU) for Sustainable Hydropower. Early efforts of the BSOA Initiative focused on forming a National Steering Committee, identifying potential basins for opportunity assessments, methodologies for stakeholder engagement, existing and needed analytical tools, barriers to the opportunity assessment process, and significant data gaps. One of the key outcomes was identifying a need for better collaborative decision-making tools that can be used by stakeholders. In response to this need, the Basin-Scale Project Team chose a scenario-based modeling approach for assessing hydropower, environmental, and other water-use opportunities. The approach involved the development of a daily hydrologic model for the Upper Deschutes River and Lower Crooked River subbasins to simulate alternative water management scenarios. Two example scenarios were constructed to demonstrate the use of the hydrologic model to explore three management goals in the Deschutes Basin: 1) increasing hydropower assets by adding new generation at existing dams or diversions and in existing irrigation canals or conduits, 2) increasing instream flows to benefit fish and aquatic ecosystems, and 3) maintaining existing water uses (primarily irrigation). Actions to achieve these goals were simulated by incrementally increasing minimum flow requirements during the storage season and reducing water demands during the irrigation season, while simulating hydropower generation at non-powered dams and in irrigation canals. As part of the effort to demonstrate scenario-based modeling, the project team also developed a web-based data-visualization interface for synthesizing modeling results. The interface allows users to view model results in raw form (daily flow) or in the form of value-based metrics that are based on specific information needs expressed by stakeholders (e.g., how often flow exceeds a conservation flow target at a certain location). In addition to the modeling efforts, 29 potential hydropower sites (14 non-powered dams, 15 canal/conduit sites) were evaluated for their technical and economic feasibility using ORNL’s Hydropower Energy and Economic Assessment tool. Results of the feasibility assessment indicated that eight of the sites (four non-powered dams, four canals/conduits) may be feasible and could add approximately 19 megawatts (MW) of hydroelectric capacity in the basin and generate over 78 gigawatt-hours (GWh) of energy per year. The approach presented here is intended to encourage consideration of methods that emphasize exploration of a range of potential management actions that may achieve a better balance among multiple, and often conflicting, management goals. It is important to consider the approach as an iterative and collaborative process focused on moving debates beyond agreement about an exact target that is acceptable to all parties to a discussion of how stakeholders can better understand how achieving their goals interacts with the achievement of goals by other stakeholder groups. By exploring the results of the model in this way, stakeholders are more likely to narrow the bounds of interest so that more in-depth analysis can be completed.

13 HYDRO ENERGY↗

The Relationship of Hydrology in the Green River to Colorado Pikeminnow Populations

The Federally listed Colorado Pikeminnow (CP) (Ptychocheilus Lucius) has been declining in the Green River Basin over the last 20 years. Muth et al. (2000) recommended flows and temperatures to benefit endangered fish species downstream of Flaming Gorge Dam on the Green River. The recommendations identified a range of flows during the base flow period (flows that occur after the annual snowmelt runoff period, usually from early summer to the following spring) that were intended to benefit CP. The recommendations indicated that the mean flow for the summer–winter period should be established each year on the basis of anticipated hydrologic conditions, but adjustments could be made if hydrologic conditions change. Flow should gradually decline from peak flow to base flow, with the base flow reached by early to middle summer (depending on hydrologic conditions) and maintained through February. The rate of decline should depend on rates of decline in Yampa River flows and the recommended rates of decline for dam releases. No specific recommendations were made for base flow variation in Reach 1, but variation around the annual mean base flow should be restricted to achieve recommended levels of variation in Reach 2 (middle Green River) (Table 5.5 in Muth et al. 2000). Implementation of the flow and temperature recommendations served as the proposed action for an EIS on Flaming Gorge Dam operations. A Biological Assessment of the impacts on endangered species of implementing the recommendations was prepared and a Biological Opinion that called for development of a study plan to examine the effects of implementation. Projects to address this evaluation were identified in the Green River Study Plan and have been conducted since then. The purpose of the Study Plan was to identify and recommend to the Recovery Program those monitoring or research projects necessary for implementation and evaluation of the flow and temperature recommendations. Those projects included studies to evaluate the anticipated effects of implementing the recommendations (including potential adverse effects identified in the 2006 Biological Opinion) and studies to examine recognized uncertainties of the recommendations. A new recovery program summer base flow study plan was approved in September of 2020 to evaluate stable and elevated summer base flows below Flaming Gorge Dam intended to benefit CP spawning and rearing success. Anecdotal observations suggest CP production may have been higher in years prior to flow restrictions for endangered fish. Based on long-term CP monitoring data in the Green River, Bestgen and Hill (2016) concluded that CP would benefit from higher summer baseflows (1,700-3,000 ft 3 /sec) with flows above or below associated with lower abundance of age-0 CP. Therefore, flexibility in the ROD is currently being utilized to establish higher stable summer base flows in an attempt create more advantageous conditions for spawning and rearing CP. These fish recovery flows are restrictive to WAPA in the summer months, therefore it is necessary to conduct an analysis of historic river data relationships to CP abundance to better understand if the recommended fish flows (elevated and stable base flows) are necessary for fish recovery.

54 ENVIRONMENTAL SCIENCES↗

Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.

13 HYDRO ENERGY↗

Secure & Restore Critical Fisheries Habitat, Flathead Subbasin, FY2008 Annual Report.

The construction of Hungry Horse Dam inundated 125 km of adfluvial trout habitat in the South Fork of the Flathead River and its tributaries, impacting natural fish reproduction and rearing. Rapid residential and commercial growth in the Flathead Watershed now threaten the best remaining habitats and restrict our opportunities to offset natural resource losses. Hydropower development and other land disturbances caused severe declines in the range and abundance of our focal resident fish species, bull trout and westslope cutthroat trout. Bull trout were listed as threatened in 1998 under the Endangered Species Act and westslope cutthroat were petitioned for listing under ESA. Westslope cutthroat are a species of special concern in Montana and a species of special consideration by the Confederated Salish and Kootenai Tribes. The Secure & Protect Fisheries Habitat project follows the logical progression towards habitat restoration outlined in the Hungry Horse Dam Fisheries Mitigation Implementation Plan approved by the NWPPC in 1993. This project is also consistent with the 2000 Fish and Wildlife Program and the Flathead River Subbasin Plan that identifies the protection of habitats for these populations as one of the most critical needs in the subbasin and directs actions to offset habitat losses. The Flathead basin is one of the fastest growing human population centers in Montana. Riparian habitats are being rapidly developed and subdivided, causing habitat degradation and altering ecosystem functions. Remaining critical habitats in the Flathead Watershed need to be purchased or protected with conservation easements if westslope cutthroat and bull trout are to persist and expand within the subbasin. In addition, habitats degraded by past land uses need to be restored to maximize the value of remaining habitats and offset losses caused by the construction of Hungry Horse Dam. Securing and restoring remaining riparian habitat will benefit fish by shading and moderating water temperatures, stabilizing banks and protecting the integrity of channel dimension, improving woody debris recruitment for in-channel habitat features, producing terrestrial insects and leaf litter for recruitment to the stream, and helping to accommodate and attenuate flood flows. The purpose of this project is to work with willing landowners to protect the best remaining habitats in the Flathead subbasin as identified in the Flathead River Subbasin Plan. The target areas for land protection activities follow the priorities established in the Flathead subbasin plan and include: (1) Class 1 waters as identified in the Flathead River Subbasin Plan; (2) Class 2 watersheds as identified in the Flathead River Subbasin Plan; and (3) 'Offsite mitigation' defined as those Class 1 and Class 2 watersheds that lack connectivity to the mainstem Flathead River or Flathead Lake. This program focuses on conserving the highest quality or most important riparian or fisheries habitat areas consistent with program criteria. The success of our efforts is subject to a property's actual availability and individual landowner negotiations. The program is guided using biological and project-based criteria that reflect not only the priority needs established in the Flathead subbasin plan, but also such factors as cost, credits, threats, and partners. The implementation of this project requires both an expense and a capital budget to allow work to be completed. This report addresses accomplishments under both budgets during FY08 as the two budgets are interrelated. The expense budget provided pre-acquisition funding to conduct activities such as surveys, appraisals, staff support, etc. The capital budget was used to purchase the interest in each parcel including closing costs. Both the pre-acquisition contract funds and the capital funds used to purchase fee title or conservation easements were spent in accordance with the terms negotiated within the FY08 through FY09 MOA between the Tribes, State, and BPA. In FY08, the focus of this project was to pursue all possible properties targeted by the Tribes and Montana Fish, Wildlife and Parks. Although we were not be able to acquire an interest in all properties targeted this fiscal year due to limited time, BPA staff constraints, and negotiation constraints, we expended approximately $4.2M providing BPA with 4.2 km of credit. The Siderius and Gardner parcels were protected with conservation easements. The Siderius conservation easement is held by the Flathead Land Trust and the Gardner conservation easement is held by the Tribes. Fee title was acquired for three parcels with the Tribes holding title to the Cole and Firestone parcels and MFWP holding title to the parcels acquired from Plum Creek Timber Company. All stream kilometers credited to BPA offset construction and inundation impacts (not operations related impacts) associated with Hungry Horse Dam as defined in the 1991 Hungry Horse Loss Assessment.