Redox-flow batteries employing oligomeric organic active materials and size-selective microporous polymer membranes

Intermittent energy sources, including solar and wind, require scalable, low-cost, multi-hour energy storage solutions to be effectively incorporated into the grid. Redox-flow batteries offer a solution, but suffer from rapid capacity fade and low Coulombic efficiency due to the high permeability of redox-active species across the battery's membrane. Here we show that active-species crossover can be arrested by scaling the membrane's pore size to molecular dimensions and in turn increasing the size of the active material to be above the membrane's pore-size exclusion limit. When oligomeric redox-active organic molecules were paired with microporous polymer membranes, the rate of active-material crossover was either completely blocked or slowed more than 9,000-fold compared to traditional separators at minimal cost to ionic conductivity. In the case of the latter, this corresponds to an absolute rate of ROM crossover of less than 3 μmol cm−2 day−1 (for a 1.0 M concentration gradient), which exceeds performance targets recently set forth by the battery industry. This strategy was generalizable to both high and low-potential ROMs in a variety of electrolytes, highlighting the importance of macromolecular design in implementing next-generation redox-flow batteries.

Helms, Brett A.↗

Island Power Systems With High Levels of Inverter-Based Resources: Stability and Reliability Challenges

As many island power systems seek to integrate high levels of renewable energy, they face new challenges on top of the existing difficulties of operating an isolated grid. With their drastically declining cost, variable renewables, such as wind and photovoltaics (PVs), are increasingly being integrated into island grids to reduce the use of imported fuels. These deployments of renewable energy are dominated by PV and wind generators, which bring unique challenges of their own.

IBRs↗

Ageing Studies of Mega Battery Packs for Grid Storage Applications Using Physics Based Modeling

The lower Levelized Cost of Electricity (LCOE) from wind and solar photovoltaics has enabled for greater integration of variable energy resources with energy storage tech-nologies such as larger centralized lithium-ion battery megapacks (with 1MWh total energy and 500V rating) to provide utility-scale services to grid operators. The daily cycling of standalone lithium-ion grid storage will reduce the battery cells' capacity due to several degradation mechanisms. A comprehensive physics-based Python tm framework called Liionpack was developed to estimate these megapacks' remaining life and ageing. The study includes various degradation mechanisms coupled to the electrochemical-thermal model at the pack level. The effect of the inhomogeneities from cell-to-cell thermodynamic and kinetic properties for different working conditions including temperature and charge/discharge protocols on the ageing of a megapack are presented here.

Karra, Vikrant↗

Stochastic economic dispatch of wind power under uncertainty using clustering-based extreme scenarios

Operation of power systems with high penetrations of renewable energy sources requires tools for robust decision making under uncertainty. Stochastic economic dispatch and stochastic unit commitment are effective techniques for planning and operation under uncertainty, whose effectiveness depends on the cardinality and quality of the scenario set. Here, this article proposes a machine learning method using -means clustering for capturing relevant physical information from a large population of analog scenarios. Extreme scenario samples drawn from the clusters are used in a two-stage stochastic economic dispatch computation. The effectiveness of the proposed approach is assessed on a synthetic 200-bus system with a geographic footprint over Illinois, USA for four months from each season of WIND Toolkit data. The combination of -means clustering with importance sampling is shown to reduce the total operational cost by over 43% compared to sampling from populations based on heuristic clustering-based methods. Additionally, the variability in the mean cost is about 56% lower than the variability using Monte Carlo sampling. Moreover, the operational cost with the presented approach is shown to be close to the cost calculated based on a hindsight exact wind profile, signifying a highly accurate quantification of wind uncertainty by the presented -means clustering based sampling method.

17 WIND ENERGY↗

Condition monitoring of wind turbine drivetrains: state-of-the-art technologies, recent trends, and future outlook

As global wind capacity expands, reducing operations and maintenance costs is critical to lowering the levelized cost of energy. This paper explores the state of the art in condition monitoring and prognostic strategies for wind turbine drivetrains, which are among the most failure-prone and maintenance-intensive subsystems. Current diagnostic methodologies are evaluated, covering supervisory control and data acquisition (SCADA) data, high-frequency vibration and acoustic analysis, machine learning and digital twin frameworks. Finally, practical challenges are identified that limit wide-scale industrial adoption, in order to guide future research and industrial efforts.

17 WIND ENERGY↗

Decarbonization of the Electric Power Sector and Implications for Low-Cost Hydrogen Production from Water Electrolysis

Increasing development of wind and solar generation in the power sector can create economic opportunities for the deployment of water electrolyzers that produce hydrogen. Temporal variation in the marginal cost of energy in future decarbonized grids can make it favorable for electrolyzers to dispatchably ramp hydrogen production up and down in response to low- and high-cost times. Using this strategy, low-cost hydrogen production is enabled by electrolyzers that are low-capital cost and tolerant to frequent on/off cycling. Ramping down hydrogen production to a designated turndown ratio can avoid performance degradation caused by on/off cycling by not shutting the electrolyzer completely off. This comes with a slight cost penalty which can be minimized if the turndown ratio is low (i.e., the system ramps down hydrogen production to close to zero). These results suggest that electrolyzers integrated into future power systems are likely to benefit from the ability to ramp operation up and down quickly and operate in a standby mode. This analysis forms a basis for comparative tradeoffs between electrolyzer capital cost, operating strategy, and system durability and demonstrates the importance of considering all three factors in technoeconomic analysis.

capital cost↗

The inclusion of uncertainty in circularity transition modeling: A case study on wind turbine blade end-of-life management

The transition to a more circular economy (CE) is complex and hard to predict, including in sustainable energy technologies. Many sources of uncertainty make it challenging to model CE scenarios and their potential benefits. As an example, the high variability in costs and revenues of different recycling options makes future wind turbine blade recycling highly uncertain. To better understand this challenge, the circular economy, life cycle assessment and visualization (CELAVI) framework - a discrete event simulation and life cycle assessment framework - is modified to incorporate uncertainty analysis capabilities. Moreover, a 3-step procedure that covers different aspects of uncertainty in CE studies and includes a Monte-Carlo analysis is proposed. The procedure is tested in a case study on wind turbine blade recycling using CELAVI. Results highlight that grinding and landfilling costs are the most influential parameters for wind power circularity. The model's output coefficients of variation (when input parameter uncertainties are propagated) are between 92% and 384% depending on the indicator. The approach developed in this study may help researchers and decision-makers who study circularity prioritize their data collection effort. Finally, our method contributes to a mounting yet critical body of research: the measurement of uncertainty in circularity transitions.

17 WIND ENERGY↗

Open-Loop Control Co-Design of Semisubmersible Floating Offshore Wind Turbines Using Linear Parameter-Varying Models

Here, this paper discusses a framework to design elements of the plant and control systems for floating offshore wind turbines in an integrated manner using linear parameter-varying models. Multiple linearized models derived from aero-elastic simulation software in different operating regions characterized by the incoming wind speed are combined to construct an approximate low-fidelity model of the system. The combined model is then used to generate open-loop, optimal control trajectories as part of a nested control co-design strategy that explores the system’s power production and stability using the platform pitch tilt as a proxy in the context of crucial plant and control design decisions. The radial distance between the central and outer columns and the diameter of the outer columns of the semisubmersible platform are the plant design variables. The platform stability and power production are studied for different plant design decisions. The effect of plant decisions on subsequent power production and stability response of the floating wind turbine is quantified in terms of the levelized cost of energy. The results show that the inner-loop constraints and the plant design decisions affect the turbine’s power and, subsequently, the cost of the system.

17 WIND ENERGY↗

Influence of tower shadow on downwind flexible rotors: Field tests and simulations

Abstract As wind turbine rotors become larger, the blades become more flexible, requiring extra stiffness and cost to avoid the risk of tower strike. Wind turbines in a downwind configuration have a reduced risk of tower strike because the rotor thrust acts away from the tower. However, downwind blades pass through the wake of the tower, and the resulting load variation may contribute to blade fatigue. To date, there have been no field tests to quantify this tower shadow effect on unsteady blade moments. The present study reports on the first field testing of a flexible, downwind, coned rotor and compares the experimental data against simulations run in OpenFAST. The tower shadow effect is simulated using the conventional Powles model and a new Eames model (developed herein), which includes the influence of upstream turbulence. Both models reasonably predict the blade root out‐of‐plane bending moment data and the tower shadow dip magnitude when compared to field test data in Region 3. Tower shadow was found to increase the short‐term Damage Equivalent Loads (DELs) by less than 10% compared to other effects (gravity, shear, and turbulence), and the predictions were consistent with experiments. These results indicate that the tower shadow effect can be reasonably modeled with the simpler Powles model and that the tower shadow effect can be small compared to the effect of turbulence. However, long‐term fatigue due to tower shadow should be included in detailed structural analysis and design of the rotor and the tower.

Simpson, Juliet G.↗

Sink or Swim: A Tutorial on the Control of Floating Wind Turbines: Preprint

Within the rapidly growing wind energy sector, floating offshore wind turbines are expected to be the fastest growing portion. This is largely driven by the immense offshore wind resources that are mostly over deep water, where fixed-bottom concepts become cost prohibitive. However, compared to fixed-bottom wind turbines, floating wind turbines are more dynamic and exhibit potential instabilities, which requires advanced control technologies to ensure a safe and efficient operation. Beyond their existing objectives of maximizing power production while minimizing structural loads, floating wind turbine controllers must also avoid large platform oscillations and accommodate wave disturbances. This paper provides an overview of the challenges and opportunities in the control of floating offshore wind energy systems.

control↗

A 200-kW wind turbine generator conceptual design study

A conceptual design study was conducted to define a 200 kW wind turbine power system configuration for remote applications. The goal was to attain an energy cost of 1 to 2 cents per kilowatt-hour at a 14-mph site (mean average wind velocity at an altitude of 30 ft.) The costs of the Clayton, New Mexico, Mod-OA (200-kW) were used to identify the components, subsystems, and other factors that were high in cost and thus candidates for cost reduction. Efforts devoted to developing component and subsystem concepts and ideas resulted in a machine concept that is considerably simpler, lighter in weight, and lower in cost than the present Mod-OA wind turbines. In this report are described the various innovations that contributed to the lower cost and lighter weight design as well as the method used to calculate the cost of energy.

Source record↗

Assessing the Impact of Lubrication on Efficiency and Life Cycle Economics of the US Wind Turbine Fleet: Cooperative Research and Development (Final Report)

As with any mechanical system, lubrication plays a key role in the performance of wind turbines used to generate electricity. The lubricant design offers a way to optimize the competing requirements of efficiency, component reliability, and maintenance strategy. This project will estimate the impact of improved lubrication on the levelized cost of energy of the US wind turbine fleet as a means of identifying opportunities for disruptive innovation or system-level optimization. The models developed will provide a clear understanding of the benefits and potential for advanced lubrication of wind turbines. The project will enable identification of high value targets for wind turbine component suppliers and a roadmap that highlights where the greatest return on technology investment can be achieved. This will promote efficient resource allocation in areas of new technology development.

17 WIND ENERGY↗

Understanding Economic and Deployment Benefits of Wind-PV Hybrid Power Plants

The least-cost approach to decarbonizing the U.S. electricity supply will likely involve a significantly expanded share of variable renewable energy (VRE) generation. Many strategies and approaches have been identified to address integration challenges in a VRE-dominated system, including standalone and coupled battery systems. In this study, we explored the current and future potential of utility-scale hybrid energy systems comprising PV, wind, and lithium-ion battery technologies (PV-wind-battery systems). Analysis results include temporal complementarity of wind and PV resources across the contiguous United States, with an emphasis on metrics that quantify reductions in variability that can be achieved through hybridization. We further use a price-taker model with simulated hourly energy and capacity prices to determine the revenue-maximizing dispatch of a range of PV-wind-battery configurations across Texas, from the present through 2050. We find that coupling PV, wind, and battery technologies allows for more effective utilization of interconnection capacity by increasing capacity factors to 60-80%+ and capacity credits to close to 100%, depending on battery capacity. We also compared the energy and capacity values of PV-wind and PV-wind-battery systems to the corresponding stability coefficient metric, which describes the location-and configuration-specific complementarity of PV and wind resources. Our results show that the stability coefficient effectively predicts the configuration-location combinations in which a smaller battery component can provide comparable economic performance in a PV-wind-battery system (compared to a PV-battery system). These PV-wind-battery hybrids can help integrate more VRE by providing smoother, more predictable generation and greater flexibility. Finally, capacity expansion modeling of PV-wind systems indicates that hybridization can reduce transmission expansion requirements associated with a heavily decarbonized U.S. electricity system.

complementarity↗

Design space exploration and decision‐making for a segmented ultralight morphing 50‐MW wind turbine

Abstract Wind turbine design encompasses many different aspects including aerodynamic, structural, electrical, and control system design. To achieve optimal plant performance, a system design approach is utilized in which the performance of the whole wind turbine is evaluated and quantified during operational scenarios with subsystem interactions. In this paper, the design for a Segmented Ultralight Morphing Rotor (SUMR) 50‐MW wind turbine is presented utilizing levelized cost of energy (LCOE) for design choices, with additional quantification of simulated performance shortcomings at the 50‐MW scale. The multi‐disciplinary design process results in a final ultra‐scale turbine configuration that outperforms other existing offshore wind farms regarding the LCOE.

Kianbakht, Sepideh↗

Electro-Thermo-Mechanical (ETM) Study on Submarine Dynamic Power Cables (SDPC) for Offshore Wind Transmission

Understanding the failure mechanisms of submarine dynamic power cables (SDPC) is critical for innovative design to meet the 2035 cost reduction target of U.S. DOE Floating Offshore Wind Shot. This is important because the current design suffers a significant failure rate in the field. This project conducted a systematic electro-thermo-mechanical (ETM) experimental study on the power cores extracted from a 15kV power cable with three cores of copper conductor, ethylene propylene rubber (EPR) insulation, and continuously corrugated welded aluminum armor (CCWA). An ETM testing system was developed by integrating a high voltage (HV) amplifier, two ceramic heaters, and a rod-plate transverse compression setup into a mechanical testing machine. Increasing temperature from room temperature (RT, 22 degree C) to 90 degree C resulted in the 67% decrease in the failure mechanical load as defined by the dielectric breakdown. Under creep mechanical loading, the dielectric breakdown time was decreased by 70% for a given mechanical load when the specimen temperature increased from RT to 90oC. The failure strain in both monotonic and creep mechanical loading modes was related to the maximum mechanical load applied. Although the dielectric breakdown occurred in the ETM test, the post-test measurement revealed an impressive recovery of electric resistance. The failure analysis on cross section of tested specimens indicated a sizable gap across insulation layer near the area between copper conductor and loading rod, which apparently resulted from online dielectric failure and offline elastic recovery of components including conductor and insulation layer.

17 WIND ENERGY↗

Wind Turbine Structural Dynamics

A workshop on wind turbine structural dynamics was held to review and document current United States work on the dynamic behavior of large wind turbines, primarily of the horizontal-axis type, and to identify and discuss other wind turbine configurations that may have lower cost and weight. Information was exchanged on the following topics: (1) Methods for calculating dynamic loads; (2) Aeroelasticity stability (3) Wind loads, both steady and transient; (4) Critical design conditions; (5) Drive train dynamics; and (6) Behavior of operating wind turbines.

Miller, D. R.↗

Distributed Wind Aeroelastic Modeling (dWAM)

Aeroelastic modeling is the primary method for the structural and performance assessment of any wind turbine. These tools provide an understanding of the impact of design parameters on turbine loading and power response before operating in the field. Despite these advantages, the use of aeroelastic modeling in the distributed wind energy industry is limited. This project aims to improve the aeroelastic modeling tools for distributed wind turbines to enable the design and certification of optimized turbine technology with a competitive cost of energy.

aeroelastic modeling tools↗