Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contingency”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

NASA CEV On-Orbit GN&C Analysis

The Orion spacecraft orbit GN&C system will be required to perform both ISS servicing missions and Lunar sortie and outpost crew transportation. While certain aspects of these two missions are complementary, the two missions are also distinct in many ways. Common between the missions is a Low Earth Orbit (LEO) rendezvous, one with the ISS And the other with the LSAM/EDS stack prior to trans-lunar insertion. The lunar missions will additionally require Orion to perform orbit maintenance in LLO, perform contingency lunar orbit operations including RPOD with the LSAM, perform the TEI maneuver sequence, and execute the trans-Earth cruise. The NASA-led team developed a reference configuration orbit GN&C system capable of executing all of these activities with the same navigation sensor suite and control effectors while fully meeting the requirements being developed for System Requirements Review in advance of prime contractor selection. This paper will present an overview of the analyses performed to support system trade studies, demonstrate the feasibility of the NASA reference configuration, and validate the Orion system requirements. These analyses include linear covariance techniques, 3-DOF Monte Carlo simulations, 6-DOF Monte Carlo simulations, and analytical evaluations of GN&C systems performed by the NASA-led Orion team to characterize the sensitivities of Orion s various missions and assess the unique challenges of each. The first part of this paper will describe the trade studies that were performed in order to characterize the RPOD system performance for both the ISS and the lunar missions including development of an RPOD operations concept, RPOD trajectories, contingency scenarios, docking mechanism and associated contact conditions, post-contact thrust issues, relative navigation sensors, relative navigation sensor target infrastructure. The paper will also discuss concepts for both manually-piloted and automatically executed scenarios, as well as the remotely-piloted contingency scenario in LLO. The second part of the paper will discuss the analyses performed for lunar and cislunar GN&C performance including the accuracy of the post-insertion lunar orbit, the ability of Orion to hit a particular Earth return entry corridor, attitude control solutions for long-duration surface operations, and autonomous navigation in support of TEI without ground tracking.

DSouza, Chris↗

Overview of Umbilical Extravehicular Activity (EVA) Interfaces in Life Support Systems on Spacecraft Vehicles and Applications for the Crew Exploration Vehicle (CEV)

Extravehicular Activities (EVAs) for manned spacecraft vehicles have been performed for contingencies and nominal operations numerous times throughout history. This paper will investigate how previous U.S. manned spacecraft vehicles provided life support to crewmembers performing the EVA. Specifically defined are umbilical interfaces with respect to crewmember cooling, drinking water, air (or oxygen), humidity control, and carbon dioxide removal. As historical data is available, the need for planned versus contingency EVAs in previous vehicles as well as details for a nominal EVA day versus a contingency EVA day will be discussed. The hardware used to provide the cooling, drinking water, air (or oxygen), humidity control, and carbon dioxide removal, and the general functions of that hardware, will also be detailed, as information is available. The Crew Exploration Vehicle (CEV or Orion) EVA interfaces will be generically discussed to provide a glimpse of how similar they are to the EVA interfaces in previous vehicles. Conclusions on strategies that should be used for CEV based on previous spacecraft EVA interfaces will be made in the form of questions and recommendations.

Peterson, Laurie J.↗

Development of a Solid Chlorate Backup Oxygen Delivery System for the International Space Station

The International Space Station (ISS) Program requires that there always be a 45 calendar day contingency supply of breathing oxygen. In the early assembly stages, there is only one flight system, the Russian Solid Fuel Oxygen Generator (SFOG), that can meet that requirement. To better ensure the contingency oxygen supply, the Crew and Thermal Systems Division was directed to develop a flight hardware system that can meet all contingency oxygen requirements for ISS. Such a system, called the Backup Oxygen Candle System (BOCS), has been built and tested. The BOCS consists of 33 chlorate candles, a thermal containment apparatus, support equipment and packaging. The thermal containment apparatus utilizes the O2 produced by the candle as the motive stream in an ejector to passively cool the candle during operation.

Graf, John↗

ISS Regenerative Life Support: Challenges and Success in the Quest for Long-Term Habitability in Space

This presentation will discuss the International Space Station s (ISS) Regenerative Environmental Control and Life Support System (ECLSS) operations with discussion of the on-orbit lessons learned, specifically regarding the challenges that have been faced as the system has expanded with a growing ISS crew. Over the 10 year history of the ISS, there have been numerous challenges, failures, and triumphs in the quest to keep the crew alive and comfortable. Successful operation of the ECLSS not only requires maintenance of the hardware, but also management of the station resources in case of hardware failure or missed re-supply. This involves effective communication between the primary International Partners (NASA and Roskosmos) and the secondary partners (JAXA and ESA) in order to keep a reserve of the contingency consumables and allow for re-supply of failed hardware. The ISS ECLSS utilizes consumables storage for contingency usage as well as longer-term regenerative systems, which allow for conservation of the expensive resources brought up by re-supply vehicles. This long-term hardware, and the interactions with software, was a challenge for Systems Engineers when they were designed and require multiple operational workarounds in order to function continuously. On a day-to-day basis, the ECLSS provides big challenges to the on console controllers. Main challenges involve the utilization of the resources that have been brought up by the visiting vehicles prior to undocking, balance of contributions between the International Partners for both systems and resources, and maintaining balance between the many interdependent systems, which includes providing the resources they need when they need it. The current biggest challenge for ECLSS is the Regenerative ECLSS system, which continuously recycles urine and condensate water into drinking water and oxygen. These systems were brought to full functionality on STS-126 (ULF-2) mission. Through system failures and recovery, the ECLSS console has learned how to balance the water within the systems, store and use water for contingencies, and continue to work with the International Partners for short-term failures. Through these challenges and the system failures, the most important lesson learned has been the importance of redundancy and operational workarounds. It is only because of the flexibility of the hardware and the software that flight controllers have the opportunity to continue operating the system as a whole for mission success.

Bazley, Jesse A.↗

Development of a Nutritional Delivery System to Feed Crew in a Pressurized Suit

The contingency scenario for an emergency cabin depressurization event may require crewmembers to subsist in a pressurized suit for up to 144 hours. This scenario requires the capability for safe nutrition delivery through a helmet feed port against a 4 psi pressure differential to enable crewmembers to maintain strength and cognition to perform critical tasks. Two nutritional delivery prototypes were developed and analyzed for compatibility with the helmet feed port interface and for operational effectiveness against the pressure differential. The bag-in-bag (BiB) prototype, designed to equalize the suit pressure with the beverage pouch and enable a crewmember to drink normally, delivered water successfully to three different subjects in suits pressurized to 4 psi. The Boa restrainer pouch, designed to provide mechanical leverage to overcome the pressure differential, did not operate sufficiently. Guidelines were developed and compiled for contingency beverages that provide macro-nutritional requirements, a minimum one-year shelf life, and compatibility with the delivery hardware. Evaluation results and food product parameters have the potential to be used to improve future prototype designs and develop complete nutritional beverages for contingency events. These feeding capabilities would have additional use on extended surface mission EVAs, where the current in-suit drinking device may be insufficient.

Glass, J. W.↗

Community-wide Validation of Geospace Model Ground Magnetic Field Perturbation Predictions to Support Model Transition to Operations

In this paper we continue the community-wide rigorous modern space weather model validation efforts carried out within GEM, CEDAR and SHINE programs. In this particular effort, in coordination among the Community Coordinated Modeling Center (CCMC), NOAA Space Weather Prediction Center (SWPC), modelers, and science community, we focus on studying the models' capability to reproduce observed ground magnetic field fluctuations, which are closely related to geomagnetically induced current phenomenon. One of the primary motivations of the work is to support NOAA SWPC in their selection of the next numerical model that will be transitioned into operations. Six geomagnetic events and 12 geomagnetic observatories were selected for validation.While modeled and observed magnetic field time series are available for all 12 stations, the primary metrics analysis is based on six stations that were selected to represent the high-latitude and mid-latitude locations. Events-based analysis and the corresponding contingency tables were built for each event and each station. The elements in the contingency table were then used to calculate Probability of Detection (POD), Probability of False Detection (POFD) and Heidke Skill Score (HSS) for rigorous quantification of the models' performance. In this paper the summary results of the metrics analyses are reported in terms of POD, POFD and HSS. More detailed analyses can be carried out using the event by event contingency tables provided as an online appendix. An online interface built at CCMC and described in the supporting information is also available for more detailed time series analyses.

MAGNETIC↗

An Alternative Approach to Human Servicing of Crewed Earth Orbiting Spacecraft

As crewed spacecraft have grown larger and more complex, they have come to rely on spacewalks, or Extravehicular Activities (EVA), for assembly and to assure mission success. Typically, these spacecraft maintain all of the hardware and trained personnel needed to perform an EVA on-board at all times. Maintaining this capability requires up-mass, volume for storage of EVA hardware, crew time for ground and on-orbit training, and on-orbit maintenance of EVA hardware. This paper proposes an alternative methodology, utilizing either launch-on-need hardware and crew or regularly scheduled missions to provide EVA capability for space stations in low Earth orbit after assembly complete. Much the same way that one would call a repairman to fix something at their home these EVAs are dedicated to maintenance and upgrades of the orbiting station. For crew safety contingencies it is assumed the station would be designed such the crew could either solve those issues from inside the spacecraft or use the docked Earth to Orbit vehicles as a return lifeboat, in the same manner as the International Space Station (ISS) which does not rely on EVA for crew safety related contingencies. This approach would reduce ground training requirements for long duration crews, save Intravehicular Activity (IVA) crew time in the form of EVA hardware maintenance and on-orbit training, and lead to more efficient EVAs because they would be performed by specialists with detailed knowledge and training stemming from their direct involvement in the development of the EVA. The on-orbit crew would then be available to focus on the immediate response to any failures such as IVA systems reconfiguration or jumper installation as well as the day-to-day operations of the spacecraft and payloads. This paper will look at how current unplanned EVAs are conducted on ISS, including the time required for preparation, and offer an alternative for future spacecraft. As this methodology relies on the on-time and on-need launch of spacecraft, any space station that utilized this approach would need a robust transportation system, possibly including more than one launch vehicle capable of carrying crew. In addition, the fault tolerance of the future space station would be an important consideration in how much time was available for EVA preparation after the failure. Ideally the fault tolerance of the station would allow for the maintenance tasks to be grouped such that they could be handled by regularly scheduled maintenance visits and not contingency launches. Each future program would have to weigh the risk of on-time launch against the increase in available crew time for the main objective of the spacecraft. This is only one of several ideas that could be used to reduce or eliminate a station's reliance on rapid turnaround EVAs using on-board crew. Others could include having shirt-sleeve access to critical systems or utilizing low pressure temporarily pressurized equipment bays.

Mularski, John R.↗

Cassini Ring Plane Crossings: Hypervelocity Impact Risks to Sun Sensor Assemblies

For both F/G and D-ring crossings: Probability of a penetration damage of the SSH (Sun Sensor Head) window glass is very low; Optical attenuation due to craters on the surface of the window glass caused by direct HVI (Hyper-Velocity Impact) by dust particle is estimated to be less than 1 percent; Optical attenuation due to secondary debris cloud generated by the disintegrated ring dust particles is estimated to be less than 1 percent. To better manage the Sun sensor damage risk during selected proximal orbit crossings, it is highly desirable to follow the contingency procedures mentioned in Section VII of the paper: Details of this contingency procedure are given in the paper entitled "Cassini Operational Sun Sensor Risk Management During Proximal Orbit Saturn Ring Plane Crossings" authored by David M. Bates. Based on results of risk analyses documented in this work and contingency planning work described in the paper mentioned above, we judge that the proximal orbit campaign will be safe from the viewpoint of dust HVI hazard.

dust particles↗

Optimizing CO2 Washout in the Exploration Extravehicular Mobility Unit

CO2 Washout refers to the suit’s ability to remove exhaled metabolic waste gases from the helmet before the crewmember’s next consecutive inhale. Efficient removal of such waste gases is paramount as it prevents crewmember fatigue as well as hypoxia. A variety of hardware and conditions inside the suit contribute to the efficiency at which CO2 washout occurs including (but not limited to) the shape of the helmet bubble, crewmember head position, breathing type and metabolic rate, the configuration of the oxygen vent inside the helmet, etc. While designing the oxygen vent inside the helmet of the Extravehicular Mobility Unit (xEMU) both nominal and contingency scenarios were considered in order to optimize CO2 washout. During nominal Extravehicular Activity (EVA), the pressure gradient created by the vent loop inlets located in the arms and legs of the Pressure Garment Subsystem (PGS) aids in washout by pulling the metabolic waste out of the helmet. However, in the event that a contingency scenario occurs, where the flow of oxygen to the crewmember, or the removal of metabolic waste is disrupted, the primary oxygen regulator fails open and removal of waste is no longer performed by the vent loop, but rather by the Low Flow Purge Valve (LFPV) located in the helmet. The paper to follow will provide an overview of the analysis, design, and testing performed to optimize washout for both nominal and contingency scenarios for the most current design iteration of the xEMU.

Margot Steely↗

Orion GN&C Sequencing for Off-Nominal Rendezvous, Proximity Operations, and Docking

This paper discusses the Concept of Operations of the nine contingency strategies available for off-nominal Rendezvous, Proximity Operations, and Docking of Orion with the Gateway in a Near-Rectilinear Halo Orbit around the Moon. Explanations are provided for each contingency strategy, how they are initiated, when they can be initiated, and how they are designed to protect the crew. Then an overview is provided of the sequencing of the Guidance, Navigation, and Control flight software used to achieve each contingency strategy, in the form of Phases, Segments, Activities, and Modes. These off-nominal scenarios re-quire the definition of new Segments and Activities.

Jordan S. Abell↗

Cassini's Grand Finale: A Mission Planning Retrospective

On September 15, 2017, Cassini plunged deep into Saturn, down to where the atmosphere was sufficiently dense to destroy the spacecraft, making it part of Saturn forever. In the five months leading up to its destruction, Cassini flew between Saturn and its rings 22 times, collecting data from the never before-explored region of the Kronian system. These orbits, the Grand Finale of Cassini, were the culmination of years of planning by the Cassini flight team. This paper looks back upon the mission planning effort in particular, comparing the baseline operational scenarios and contingency plans to the as flown Grand Finale. The bulk of the Grand Finale mission planning effort was focused on the environmental hazards present in the region between Saturn and its rings: the dust and the atmosphere. Dust hazard and atmospheric transit contingency plans were in place to help ensure spacecraft health and maximize science data return. The dust hazard plan gave the operations team the option to turn the spacecraft to a safe attitude during ring-plane crossings had the dust environment proved more threatening than anticipated. The atmospheric transit plan would have made use of an orbital trim maneuver in order to raise or lower periapsis depending on the density of the atmosphere. The proximal environment did have its surprises, though they were good surprises. The dust was significantly less hazardous than predicted. So much so that elements of the contingency plan were leveraged in order to remove a dust hazard protection from the baseline plan, rather than add one to it. While the atmosphere was substantially denser than predicted, it was not dense enough to warrant a periapsis-raise maneuver and actually meant that better in-situ data was gathered. Ultimately, from a mission planning perspective, the Grand Finale went better than expected.

Sturm II, Erick J.↗

Down-Selection of Four Common Habitat Variants

The Common Habitat is a large habitat developed as an alternative architecture study, not part of the current NASA baseline, that uses the SLS core stage liquid oxygen tank as its primary structure. It has a gravity-independent internal architecture, such that identical units can be used on the lunar surface, Mars surface, and in microgravity. In developing the habitat, two key architectural questions emerged. Should the internal layout use a vertical or horizontal orientation of the tank? Should the crew size be four or eight? This led to the design of four variants: a four-crew horizontal, four-crew vertical, eight-crew horizontal, and eight-crew vertical. The four-crew variants use a shortened version of the tank while the eight-crew variants use the entire tank. The primary consideration applied for down-selection is the crew experience living and working in the habitat, inclusive of crew productivity, well-being, and survivability. Based on this consideration, a series of seven assessments were performed to compare the variants. This analysis was performed as an unfunded, volunteer activity leveraging civil servants across multiple field centers, most with expertise working in various Artemis teams. Additionally, the evaluation was limited to the use of CAD models, images, and spreadsheet data, with no resources available for mockups or Virtual Reality. A logistics analysis developed a standard logistics module and then estimated how much stowage could be carried onboard each Common Habitat and how many logistics modules are required by each variant for a given mission duration. It also considered the amounts of water to be stored in each variant. A functional analysis identified and compared the living and working functions across the habitats, ranking them relative to each other. A crew time assessment first estimated the total crew time, building a weekly crew timeline for both four and eight-person crews. It then allocated time to activities linked to living and working functions, comparing how much time was available for each function in each variant. A science productivity assessment developed a relative metric using crew time, science stowage, and assumed rates of experiment consumables use to analytically compare the four variants. It also comparatively ranked the habitats with respect to a number of subjective parameters and a workstation acceptability rating. A maintenance capacity assessment identified and compared eleven generic maintenance capabilities across the variants and also ranked them for their predicted ability to complete twelve fabrication, maintenance, and repair scenarios. A contingency responsiveness analysis examined twelve serious in-flight contingencies. For each scenario, the number of crew needed to respond were predicted and acceptability of various aspects of contingency response were evaluated, comparing the variants against each other. Finally, in a habitability assessment, 120 habitability characteristics reflecting 13 major categories were evaluated for each habitat. These results were compared to identify the most acceptable habitat in each category. Ultimately, the data favored the horizontal orientation over the vertical and an eight-person crew over four. Implications of selecting this variant are discussed, including specific architectural challenges that result from the use of the full tank.

Habitability↗

Down-Selection of Four Common Habitat Variants

The Common Habitat is a large habitat that uses the Space Launch System core stage liquid oxygen tank as its primary structure. It has a gravity-independent internal architecture, such that identical units can be used on the lunar surface, Mars surface, and in microgravity. In developing the habitat, two key architectural questions emerged. Should the internal layout use a vertical or horizontal orientation of the tank? Should the crew size be four or eight? This led to the design of four variants: a four-crew horizontal, four-crew vertical, eight-crew horizontal, and eight-crew vertical. The primary consideration applied for down-selection was the crew experience living and working in the habitat, inclusive of crew productivity, well-being, and survivability. Based on this consideration, a series of seven assessments was performed to compare the four variants. A stowage assessment developed a standard logistics module and then considered the amounts of water to be stored in each variant. It then estimated how much stowage could be carried onboard each Common Habitat and how many logistics modules are required by each variant for a given mission duration. A functional analysis identified and compared the living and working functions across the four habitat, ranking them relative to each other. A crew time assessment first estimated the total crew time, building a weekly crew timeline for both four and eight-person crews. It then allocated time to activities linked to living and working functions, comparing how much time was available for each function in each variant. A science productivity assessment developed a relative metric using crew time, science stowage, and assumed rates of experiment consumables use to analytically compare the four variants. It also comparatively ranked the habitats with respect to a number of subjective parameters and a workstation acceptability rating. A maintenance capacity assessment identified and compared eleven generic maintenance capabilities across the four variants and also ranked the variants for their predicted ability to complete twelve fabrication, maintenance, and repair scenarios. A contingency responsiveness analysis examined twelve serious in-flight contingencies. For each scenario, the number of crew needed to respond was predicted and acceptability of various aspects of contingency response was evaluated, comparing the four variants against each other. Finally, in a habitability assessment, 120 habitability characteristics reflecting 13 major categories were evaluated for each habitat. These results were compared to identify the most acceptable habitat in each category. Ultimately, the data was shown to favor the horizontal orientation over the vertical and an eight-person crew over four. Implications of selecting this variant are discussed, including specific architectural challenges that result from the use of the full SLS liquid oxygen tank.

Habitability↗

Optimizing Consumable Gas Tank Usage while Maintaining Emergency Reserves Between Two Pressure Control Systems on Gateway

Two of NASA’s Lunar Space Station (Gateway) modules, the Habitation and Logistics Outpost (HALO) and International Habitat (IHAB) contain a pressure control system (PCS) that is used to supply Nitrogen (N2) and Oxygen (O2) to maintain a habitable environment within Gateway, with only one of the PCS active at any given time. To protect the crew during a contingency that is affecting pressure control and therefore gas consumables, Gateway is required to have sufficient amount of reserve consumable gas across the entire habitable Gateway stack of modules until the gas can be replenished by crew changing out a gas tank. This will occur in a non-contingency setting either on the current mission or on the next mission. To access the stack reserve Gateway features a Nitrogen Oxygen Transfer System (NOTS) between HALO and IHAB that allows each module’s PCS to access the gas tanks in the other module. The PCS designs are different between the two modules and lack interchangeable tanks so which module has active PCS must be accounted for in logistics planning. This paper describes the logistics resupply planning analysis used to determine the most efficient use of the tanks within each PCS, and a method for switching which module is active for PCS while maintaining the stack reserve that preserves enough gas to cover contingency cases.

Rachel Anne Sturtz↗

Assessments of Physiology and Cognition in Hybrid-Reality Environments (APACHE)

NASA is planning to return to the Moon in the mid-2020s as a stepping stone to Mars missions in the 2030s. Spacewalks, or extravehicular activities (EVAs), performed on the Moon and Mars will differ in a variety of ways from those that have been performed in decades past. NASA has identified multiple risks to human health and performance associated with a crewed mission to Mars, especially those associated with exploration EVAs which are expected to be a primary mission activity. Crew may be expected to conduct up to 24 hours of EVA per person per week, where the likelihood of injury and/or mental mistakes are increased compared to ground-based training or current microgravity EVAs and the consequences of which can be catastrophic. Current test environments for exploration EVA research and technology development are large, costly facilities that are limited in their availability or capabilities. Spacesuit testing in a reduced gravity environment such as NASA’s Neutral Buoyancy Laboratory, while a good representation of the crew’s physical workload during exploration EVAs, typically has small datasets and is difficult to integrate physiological sensors or other types of crew performance measures. Meanwhile, scientific field-based testing such as NASA’s Desert Research and Technology Studies offers an operationally relevant environment for exploration EVAs, particularly for cognitive workload, but is also limited by small datasets, lack of a pressurized spacesuit, and obtrusive measures. The limitations of current analogs for exploration EVAs identify a need for a new test environment that can approximate both the physical and cognitive demands associated with exploration EVAs to enable rapid, controlled, and repeatable evaluations of human health and performance risks of exploration missions. In response, the Human Physiology, Performance, Protection, and Operations Laboratory (H-3PO) at NASA Johnson Space Center has developed a hybrid reality exploration EVA analog named the Assessments of Physiology And Cognition in Hybrid-reality Environments (APACHE) to address these limitations using a combination of virtual, physical, and hybrid reality techniques. The APACHE facility resides at NASA Johnson Space Center and serves as a large “sandbox” for EVA research and simulation. At its center is a roughly 15x20ft space surrounded by a 14” tall sandbox partially filled with lunar regolith simulant to emulate the physical feeling of walking on a planetary surface and to allow for simulated geology operations. Nearby, a curved passive treadmill (Skillmill Connect, Technogym, Fairfield, NJ) and an omnidirectional treadmill (Infinadeck, Infinadeck, Rocklin, CA) are included to enable exploration of these large virtual environments while also imposing the physical demands, representative timelines, and cognitive burdens required to navigate and traverse these distances during exploration EVA. A 6DOF motion platform is used to simulate rover operations and supports various human performance evaluations and associated risks. Lastly, APACHE can support two extravehicular (EV) crewmembers working in tandem. A computer workstation is located nearby and also supports an intravehicular (IV) crewmember as part of a full mission simulation. The IV crewmember has direct video and audio communication with the EV crew in VR to provide operational and procedural support. The software used in APACHE was created by the JSC Engineering Directorate, in partnership with Buendea, powered by a custom Unreal Engine 5 (UE5.3, Epic Games) project. APACHE currently utilizes the HTC Vive Pro Eye in a wireless configuration for VR simulations. There are two virtual environments that subjects can explore within APACHE, a Lunar and Martian surface. The virtual Lunar surface was created from LIDAR data of the Lunar South Pole to create roughly 16 sq km of explorable terrain. The virtual Martian surface contains roughly 400 sq km of explorable terrain derived from Mars Reconnaissance Orbiter LIDAR data of the Jezero Crater. The immersion and related cognitive burdens of conducting a planetary EVA is simulated through a series of EVA-relevant tasks performed in the VR environment, using these high-fidelity visual representations. Additionally, APACHE includes biosensor driven informatics, such as real-time heart rate monitoring and/or derived values from model simulations, for active monitoring by the EV crew and added cognitive demand. A “Wizard of Oz” control panel enables test operators to activate contingency events such as simulated spacesuit malfunctions, loss of communications, and/or limited visibility. Embedded performance measures such as accuracy, completeness, and execution time have been developed for various exploration tasks to objectively quantify crew performance during an EVA and compare impacts to performance when different environmental stressors, both physical and cognitive, are added to or removed from the simulation. Additionally, validated cognitive and operational performance measures such as the Digit Symbol Substitution Task have been recreated and embedded in VR for direct and relatively unobtrusive measurement of motor perception. The APACHE environment currently supports multiple research studies at NASA. Examples include the CHAPEA project, a series of simulated year-long missions on Mars by a 4-person crew; and the CO2 Contingency Walk Back Study, an investigation of elevated CO2 exposure on crew performance during a contingency EVA scenario. APACHE also provides a test environment to support the development of the Crew State and Risk Model, which is a collection of individualized, mathematical models of crew physical and cognitive state; and the Personalized EVA Informatics and Decision Support system, an operational tool for flight controllers, and eventually a self-reliant Martian crew, to make biomedically-informed decisions in real-time to optimize the EVA planning and execution with respect to crew health and performance. Some technical challenges associated with developing the APACHE environment, as well as current limitations, include VR limitless natural walking with a hybrid spacesuit simulator, optimizing performance for wireless PC VR streaming while maintaining a high degree of visual fidelity, and the integration of various physiological (metabolic masks) and psychometric (eye tracking) sensors with the VR headset.

Human Performance↗

Decision support systems and methods for complex networks

Methods and systems for automated decision support in analyzing operation data from a complex network. Embodiments of the present invention utilize these algorithms and techniques not only to characterize the past and present condition of a complex network, but also to predict future conditions to help operators anticipate deteriorating and/or problem situations. In particular, embodiments of the present invention characterize network conditions from operation data using a state estimator. Contingency scenarios can then be generated based on those network conditions. For at least a portion of all of the contingency scenarios, risk indices are determined that describe the potential impact of each of those scenarios. Contingency scenarios with risk indices are presented visually as graphical representations in the context of a visual representation of the complex network. Analysis of the historical risk indices based on the graphical representations can then provide trends that allow for prediction of future network conditions.

97 MATHEMATICS AND COMPUTING↗

Systems and methods for improved stability of power systems

The embodiments described herein provide for a system including a processor. The processor is configured to select at least one grid system contingency from a plurality of grid system contingencies. The processor is further configured to derive one or more eigen-sensitivity values based on the at least on grid system contingency. The processor is also configured to derive one or more control actions at least partially based on the eigen-sensitivity values. The processor is additionally configured to apply the one or more control actions for generation re-dispatch of a grid system.

Baone, Chaitanya Ashok↗

Transactive Energy Rationing in an Islanded Electric Power System

A battery energy storage system (BESS) has been installed on Nantucket Island to provide service continuity during the N-1 contingency of partial electricity supply interruption from the mainland. During the N-2 contingency of complete interruption from the mainland, most of the loads will have to be disconnected so that a combustion gas turbine (CTG) can supply critical facilities. This work proposes an alternative transactive rationing mechanism that would provide some service to all of the loads, and still fully serve the critical loads, through market-based control during the N-2 contingency. A BESS operating strategy is proposed that would enhance the transactive rationing mechanism. The necessary enabling changes to communication systems, controls and utility tariffs are discussed, along with some ancillary benefits.