Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Development of Dry Cask Risk Tools

The Nuclear Regulatory Commission (NRC) has repeatedly expressed a desire to increase the use of risk in its decision-making. The Probabilistic Risk Assessment (PRA) Policy Statement published in 1995 formalized the Commission’s commitment to risk-informed regulation through the expanded use of PRA. While a great deal of work has been done to incorporate risk insights into the regulatory framework for at-power nuclear reactors. Far less progress has been made to risk inform the dry-casks and nuclear waste transportation areas of the nuclear fuel cycle. INL was tasked with incorporating the information from the two completed dry cask PRAs as well as any additional available information into a tool that helps the NRC use those insights to identify levels of risk at various stages in the nuclear waste cycle. The first task was to address the License Amendment Request (LAR) Process for Dry Cask storage, the second task is for the incorporate transportation into the tool, and the third and final task will be incorporate any additional regulatory applications for dry cask storage. This report covers the first task of the tool and will eventually incorporate the remaining two tasks may be completed in the future and built off the model described here. Task 1 specifically asked to incorporate the risk insights into the process for determining and prioritizing review of license amendment changes related to storage applications by outlining a resource allocation strategy and defining recommendations of for the depth and breadth of the LAR review. It was requested that the tool be similar in design to the SDP notebooks/worksheets and contain quantitative, qualitative, or semi-quantitative approaches to assessing the risk of the change. The final tool that was selected by INL to be developed was a flowchart and associated rationale document that allows the reviewer to quickly assess potential LAR changes and their associated risks as well as the rationale behind the risk categorization. This risk categorization will lead to specific actionable recommendations to expect from a change of that specific category. This allows for a more consistent review process as well as improving the overall efficiency of the review itself.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

The Dark Energy Spectrographic Instrument (DESI) Corrector Assembly

The specific research of the DESI project is to study in detail the expansion history of the Universe over the past 10 billion years. In order to do this, the project designed, fabricated, tested and commissioned the DESI instrument which has been deployed at the Mayall Telescope at the Kitt Peak National Observatory near Tucson, Arizona. The DESI project was conducted by approximately 30 US and foreign national laboratories. Our CRADA with University College London (UCL) involved both research planning for eventual observing on the DESI telescope; and in the build of the optical corrector, a major part of the instrument. The key major goals of this CRADA were achieved. For survey planning, Drs. Lahav, Abdalla, Peiris, Pontzen and Dr. Farihi were all important contributors to the working groups to which they were assigned. Their modelling efforts, cosmological simulations, target selection and analyses of imaging surveys have been vital in the early planning for targets during commissioning. The major role UCL played in the development of the instrument was performed by Drs. Doel and Brooks. The optical corrector components were developed by scientists and engineers at Lawrence Berkeley National Laboratory and at Fermi National Accelerator Laboratory. UCL was assigned the arduous responsibility for creating the instrumentation necessary to take all the separate components (lenses, cells, rings) and incorporate them, while precisely aligning the optics. Following that, they installed the corrector inside the barrel and shipped everything to the Mayall. It was a great success that the optical barrel arrived safely in good condition. Drs. Doel and Brooks were involved in every step of the fabrication and kept in constant contact with the LBNL DESI Project Manager and Project Director. They were extremely successful in their alignment, which was proved by early observations. First light on the telescope was achieved on October 22, 2020. The first spectrum was taken of a random star at zenith. Shortly thereafter, the telescope slewed to M33 and several spectra were taken there and later in the Persus nebula. It was a major accomplishment for the project.

79 ASTRONOMY AND ASTROPHYSICS↗

The Dark Energy Spectrographic Instrument (DESI) Optical Fiber System

The specific research of the DESI project is to study in detail the expansion history of the Universe over the past 10 billion years. In order to do this, the project designed, fabricated, tested and commissioned the DESI instrument which has been deployed at the Mayall Telescope at the Kitt Peak National Observatory near Tucson, Arizona. The DESI project was conducted by approximately 30 US and foreign national laboratories. The complete instrument includes a prime focus corrector assembly, a focal plane with 5,000 optical fibers whose position can be set by robotic positioners, and ten spectrographs. Each spectrograph can accommodate the light from 500 fibers and include three color channels that are illuminated by a common collimator mirror and other planar transfer optics. In order for this entire system to work, optical fibers are required to connect each positioner to the spectrographs. Our CRADA with Durham University in the UK provided the 10 crucial fiber cables required to connect the DESI focal plane to the 10 spectrographs. The key major goals of this CRADA were achieved. Survey planning was another key component to the Durham contribution. Drs. Frenk, Baugh, Cole, Edge, Lacey, Li, Lucey, Massey, Metcalfe, Norberg and Shanks were all important contributors to the working groups to which they were assigned. Their work to implement emission lines and QSO in lightcone mocks, mocks for non-standard cosmologies/modified gravity, optimization of completeness of BGS in crowded regions and extended source photometry have been vital in the early planning for targets during commissioning. The major role in the project involved Dr. Ray Sharples and his team. They provided a significant portion of the design, fabrication and testing of the optical fiber system. In particular, they were responsible for the design, production of engineering drawings, component procurements, and fabrication of the 10 DESI Science fiber cables. Working in close collaboration with Dr. Claire Poppett, they also designed and fabricated the slit assemblies, the specialized termination of the groups of 500 fibers which plug into the spectrographs.

47 OTHER INSTRUMENTATION↗

Sources of Propane Consumed in California

Project Scope: The objective of this study is to specify the sources of propane consumed in California. It answers the questions, where does the propane used in California come from and how was it produced? The results of this study provide comprehensive, transparent, and verifiable estimates, based on the 2018 market. The information provided in this report is suitable for use to assess the life cycle carbon intensity of propane used as a transportation fuel in California. As the 2009 Low Carbon Fuel Standard (LCFS) aims to reduce California’s greenhouse gas (GHG) emissions and other smog-forming and toxic air pollutants, the appropriate designation of carbon intensity for propane as a transportation fuel is important for evaluating propane’s potential to contribute to GHG goals and understandings in the context of various actions. This study focuses on estimating the shares of total propane consumed in the state of California produced from petroleum refineries, natural gas plants, and bituminous sands sources inside California and elsewhere. Results: An estimated 590 million gallons of propane were consumed in California in 2018, of which, 59.5% originated from refinery production and 40.5% originated from natural gas plants. The majority of this was sourced from refinery production in California, 334 million gallons. Most of the propane imported to California for consumption was sourced from natural gas plants, 113 million gallons, with over half of the imported volume sourced from Canada. The volume sourced from bituminous sand upgrader and fractionator operations was negligible. Details from this analysis are presented in the table below which provides an overview of the propane flows estimated in this study by region and production method. The shares and volumes presented here represent a snapshot for 2018. A significant increase in propane demand, such as could be caused by increased use of propane as a transportation fuel in the state, would affect California’s propane production, imports, and exports. The method and data sources used for the estimates provided in this report also provide the framework which could be used for future updates. Key Method Considerations: The values presented here are based on a two-step approach where the first step was to determine the flows of propane into and out of California from different regions and the second step was to estimate the propane production methods in each region. A volume balance approach is used as the primary method for tracking the volume of propane in and out of California as propane production and import volumes are available by Petroleum Administration of Defense District (PADD) from EIA and neither inter-PADD propane transfers nor state-specific non-prime supplier consumption are available from a public data source. The volume balance performed for this study covered PADD 5 (the West Coast), which includes Arizona, California, Nevada, Oregon, and Washington. The volume balance used all available public datasets to determine propane production, imports, exports, and consumption. Volumes unaccounted for by these datasets were estimated using the resulting volume balance by assuming market equilibrium. Consumption within each state in PADD 5 was estimated based on known import, export, and production volumes and this amount was used to develop the volume balance. EIA only tracks consumption at the state level by prime supplier sales. The volume balance approach provides the basis to correct for additional propane consumed in-states where propane is transferred to California. To determine the California propane sources and trade in 2018. volume of propane consumed in California, the volume balance approach is again used where it was estimated all imported volumes not specifically flagged for re-export were consumed, and the remaining consumption was produced in-state. The California Energy Commission (CEC) provided the total volume of propane imported and exported from California in 2018; this volume data set along with commodity tracking from the Canada Energy Regulator (CER) and the International Trade Commission (ITC) which tracks port of entry and final destination was used to determine where propane originated from and where it was ultimately consumed. For example, the CER tracks propane leaving Canada and entering each state within the U.S. Imported propane from Canada to California – marked for California – is assumed to be consumed in California. When no further data were available, import volumes were assumed to be consumed in California without pass-through (i.e., no propane imported to California was directly sold and exported). In most cases, the production method for each propane source region was applied to the volume of propane transferred to California. In other words, the shares of propane sourced from natural gas and refineries for each production region was assigned to California imports based on their contribution to the total volume flows into California to determine the production method for propane consumed in-state. For volumes imported into California from PADD 4, Washington State, Canada, and the rest of the world (Argentina, Chile, Norway, Peru, South Korea, and Trinidad and Tobago), the volumes sourced from petroleum refineries and natural gas plants reflect the either production ratio for the region or, in cases where the sources specific to the amounts exported to California could be determined, the sources specific to the volumes transferred to California.

03 NATURAL GAS↗

Molten Salt Reactor Signatures and Modeling Study

Molten salt reactor (MSR) technologies, either liquid fueled and cooled or only liquid cooled, pose specific, unique challenges for safeguards of the special nuclear material during the operation, fueling, and maintenance of the reactor. MSRs are one type of Generation IV technologies being invested in and considered for U.S. domestic fabrication primarily for electricity and process heat production. These designs have generated growing commercial interest for several reasons, including high (≈40%) thermal efficiency, ease of fueling, improved use of uranium fuel, potential utilization of thorium fuel, and proposed inherent safety features. U.S. companies have several planned designs that differ in fuel, cooling, and neutron energy spectrum. Driven by commercial interest and the intent of licensing MSRs, the U.S. Nuclear Regulatory Commission (NRC) has developed a vision and strategy to accommodate non-light water reactors (LWR), which include MSRs (U.S. Nuclear Regulatory Commission 2019). In addition, the Department of Energy (DOE) through the Office of Nuclear Energy (NE) Office of Advanced Reactor Technologies (ART), …sponsors research, development and deployment (RD&D) activities through its Next Generation Nuclear Plant (NGNP), Advanced Reactor Concepts (ARC), and Advanced Small Modular Reactor (aSMR) programs to promote safety, technical, economical, and environmental advancements of innovative Generation IV nuclear energy technologies. Reactor types considering the use of salts, liquid metals, or gases for coolant fall under both ARC and aSMR. Therefore, Research Design & Development is being pursued by DOE-NE through national laboratories, universities, and international and industrial collaborations. Additionally, the U.S. is a member of the Gen IV International Forum (GIF). The GIF is a cooperative, multinational organization to guide and carry out research and development needed for the GEN IV reactor systems (Forum 2018). GIF evaluated numerous reactor concepts and down-selected to the six most feasible advanced reactor technologies: gas-cooled fast reactor (GFR), lead-cooled fast reactor (LFR), MSR, supercritical watercooled reactor (SCWR), sodium-cooled fast reactor (SFR), and very high temperature reactor (VHTR). In support of the growing interest domestically and internationally, the Materials Protection, Accounting, and Control Technologies (MPACT) campaign, under the DOE-NE Fuel Cycle Technologies (FCT) program, engages in R&D activities by developing advanced instrumentation and analysis for safeguards and security of modern, advanced nuclear fuel cycle (non-LWR) facilities. Because of the historic experience in the operation of the Aircraft Reactor Experiment (ARE) and the Molten Salt Reactor Experiment (MSRE) (Robertson, MSRE Design and Operations Report Part I 1965), Oak Ridge National Laboratory (ORNL) is heavily engaged in the various R&D activities through the DOE complex related to MSRs including national technical leadership of the DOE-NE MSR campaign. This report discusses and presents the outcomes of the FY19 MPACT MSR Safeguards task. The challenges presented by MSRs for nuclear material accountancy and control (NMAC) and associated safeguards will be investigated. The objective of this research is to explore and compile the safeguards requirements and identify measurement signatures through an initial high-level MSR design and develop complementary advanced simulation and modeling capabilities. A high-level ORNL-developed MSR design called the Molten Salt Demonstration Reactor (MSDR) (Bettis, Alexander and Watts 1972) was used as the target reactor design for this research. The MSDR model incorporates technology from the MSRE and the Molten Salt Breeder Reactor (Robertson, Conceptual Design of a Single-Fluid Molten-Salt Breeder Reactor 1971). But the MSDR is a 750 MWth graphite moderated liquid fueled (low-enriched uranium) MSR compared to the MSRE’s of 7.5 MWth. The focus of this report is to discuss the evaluation of novel signatures, correlations, and indicators to understand the applicability of current safeguards instrumentation to MSRs using the modeling results from the MSDR.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Human Factors Considerations for Automating Microreactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of microreactors ( <10 MW th ). It is envisioned that microreactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. However, before this new class of nuclear reactor can be fully developed and implemented by designers, an effort must be made to explore the technical issues and provide reasonable assurance to the public regarding health and safety impacts centered on various technical issues. Prior works have examined many of these issues. One issue not yet fully explored is the possible change in role of the operations and support personnel. Due to the passive safety features of microreactors and their low level of nuclear material, the microreactor facilities may automate more functions and rely on inherent safety features more than its predecessor nuclear power plants. In some instances, human operators may not be located onsite and may instead be operating or monitoring the facility from a remote location. Some designs also call for operators to supervise and control multiple microreactors from the control room. This report explores the issues around reduced staffing of microreactors, highlights the historical safety functions associated with human operators, assesses current licensing requirements for appropriateness to varying levels of personnel support, and describes a recommended regulatory approach for reviewing the impact of reduced staff to the operation of microreactors. The report evaluates these issues through an extensive literature survey and Subject Matter Expert interviews. The literature covers research topics related to Human Factors Engineering as well as regulatory guidance given by the Nuclear Regulatory Commission.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Benefit-Cost Analysis for Utility-Facing Grid Modernization Investments: Trends, Challenges, and Considerations

In recent years, many electric utilities have submitted grid modernization plans for review by state public utility commissions. A central objective of these plans is to demonstrate that grid modernization investments will provide net benefits to customers, be reasonable and be in the public interest. The plans typically include some form of benefit-cost analysis, but the assumptions, methodologies and frameworks vary considerably between utilities. This report: -Describes utility-facing technologies and projects for modernizing distribution systems, including interdependencies of grid components -Highlights benefit-cost considerations related to grid modernization -Summarizes recent trends in benefit-cost analysis for grid modernization based on a review of 21 plans by U.S. electric utilities -Discusses challenges state public utility commissions face in reviewing utility plans and provides options for addressing challenges

24 POWER TRANSMISSION AND DISTRIBUTION↗

Preliminary Plan for Evaluation of Reactor Pressure Vessel Surveillance Materials from Palisades Nuclear Generating Station

The Palisades Nuclear Generating Station (PNGS), located in Michigan, is owned and operated by Entergy. It is a Combustion Engineering 2-loop pressurized water reactor (PWR) producing 805 MWe (2,565 MWth). The PNGS was built between 1967 and 1970, with approval to operate at full power in 1973; the plant’s original license was due to expire on March 24, 2011. An application for 20-year extension was filed in 2005 with the Nuclear Regulatory Commission and was granted on January 18, 2007. Although the plant was scheduled for decommissioning by 2031, Entergy currently plans to close the PNGS in 2022. The PNGS included in its reactor pressure vessel (RPV) surveillance program a capsule, designated A-60, containing specimens of one of the vessel plates and a weld metal with nickel content of about 1.36 wt% and copper content of about 0.20 wt%. This capsule was irradiated to a fluence of 1.8 x 10 20 n/cm 2 . The capsule was removed from its surveillance position in 1995 and has been resident in the spent fuel pool since that time. The material is also of special interest because of its very high nickel content and because of the potential for development of NiMnSi (nickel-manganese-silicon) precipitates, dubbed “late blooming phases.” The surveillance program also includes a capsule, designated T-150, dedicated specifically for thermal aging, which would provide results for at least 33 effective full power years, which is beyond the current thermal-aging database for such materials. Given that license extensions to 60 years of operation have been approved by the US Nuclear Regulatory Commission for most of the currently operating light water reactors in the United States, and that the first extension to 80 years was recently approved, there exists the probability that some RPVs will reach and possibly exceed a fast neutron fluence (> 1 MeV) of 1 x 10 20 n/cm 2 . This is a fluence regime with no US surveillance data and very little test reactor data, except for the Light Water Reactor Sustainability Program–sponsored University of California Santa Barbara Advanced Test Reactor (ATR) ATR-2 project. Thus, the materials in the A-60 capsule represent a valuable resource for directly exploring the effects of commercial surveillance irradiation on a typical plate and a high-nickel weld with similar materials irradiated in the ATR-2 test reactor project. This report provides background information for the surveillance program, previous results of surveillance materials testing, the preliminary plan for capsule retrieval and disassembly, and the plan for testing and microstructural examination of the mechanical test specimens of these unique materials to assess the features induced by very high irradiation fluence or very long thermal aging time

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

HVAC Duct Pressure Optimization System

The US Department of Energy, the California Energy Commission, and other public and private entities including the venture capital community are seeking technical solutions that include “smart, grid-interactive, efficient buildings - to best serve the needs of building occupants and the grid while reducing energy consumption overall.” In this paper, a systems engineering approach is used to examine elements of a prior proof-of-concept project along with new ideas seeking to justify additional research funding to further advance the technology. With additional research and development funding, the technology described here has the potential to achieve success toward development of a commercially viable product. These types of projects provide financial and environmental benefit to American taxpayers and investors. Cost effectiveness and return on investment are key criteria for energy efficiency projects. By evaluating the end-to-end processes including manufacturing, installation, commissioning and comparing various options, we arrived at a proposed implementation concept of a HVAC Duct Pressure Optimization System that saves energy in commercial buildings and improves the return on investment by a factor of 6X compared to previous research projects.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Ranger

On January 11, 1951, the Atomic Energy Commission announced that the President of the United States had authorized the Commission to use part of Las Vegas Bombing and Gunnery Range for “experiments necessary to the atomic weapons development program.” Sixteen days later, on January 21st, the first test, codenamed Able, exploded at 0545 hours Pacific Standard Time 1,060 feet over the dry lake bed of Frenchman Flat with a yield of one kiloton. In quick succession, four more devices were dropped over Frenchman Flat with yields ranging from one to twenty-two kilotons.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Thermal Hydraulic Experimental Test Article (FY21 Final Report)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA has been installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2 and Figure 3. Since the FY20 THETA status report, further water shakedown testing was performed, some final welding modifications were performed, all system components were sanitized, dry assembled, and commissioned. The THETA submersible electromagnetic flowmeter was welded closed to hermetically seal internal components from sodium followed by a helium leak check for the final time. Following installation of THETA into vessel #4, all data acquisition and control systems were brought online and commissioned at room temperature in the argon gas space of the empty vessel. The vessel zone 1 heaters were reinstalled and the flange was then insulated. The vessel 4 heaters were brought to a temperature of 100 °C and the THETA pump was jogged at 600 RPM to ensure it was functioning correctly. The secondary, AC Conduction based electromagnetic pump from CMI Novacast (product number CA-15) was ordered and will be delivered in late calendar year 2021. The custom designed permanent magnet based secondary flowmeter was designed, a drawing package and manufacturing specification created and quote requested from a machine shop. The intermediate heat exchanger design was completed and a drawing package is currently in progress. During the middle of calendar year 2021 the Building 308 sodium scrubber system was shut down in order to replaced some corroded piping and facilitate improvements on the system, thus requiring the sodium in METL to remain frozen. This has imposed a delay in filling vessel 4 with sodium to begin THETA testing. Sodium testing is expected to begin in early fiscal year 2022 as all THETA primary systems are operational.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Leading in Los Angeles: Demonstrating scalable emerging energy efficient technologies for integrated façade, lighting, and plug loads INTER System FLEXLAB Test Report

This report is a part of the California Energy Commission (Energy Commission) EPIC study Leading in Los Angeles: Demonstrating scalable emerging energy efficient technologies for integrated façade, lighting, and HVAC. The set of technologies are called the Integrated Technologies for Energy-efficient Retrofits (INTER) and are comprised of automated shading products and LED lighting systems with networked luminaire-level sensors and controls. In addition, the project will include control modifications and assessments of HVAC savings. This document includes the test plan and test results for the FLEXLAB® testing of the shading and lighting INTER system and related energy use impact. The test plan describes the test objectives and features, test cases, schedule, and measurements. The test results cover system performance in the lab; including lighting and HVAC energy, visual comfort, and thermal comfort.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Retrospective Analysis of Distributed Solar Interconnection Timelines and Related State Mandates

Most distributed residential photovoltaic (PV) systems must secure an interconnection agreement prior to operation that ensures the local electrical system will operate safely within the broader electrical grid. PV installers generally submit an interconnection application to the local utility that provides all the necessary details the utility needs to evaluate the proposed system. To encourage timely execution of this process, many states’ utility commissions have established mandates that limit the maximum number of days allowed for utility review and approval of interconnection for certain small, often residential applications. In this paper, we derive the median and range of cycle times for the pre-installation approval phase of the interconnection process (i.e., from application submission to approval by the utility) across 24 U.S. states, using a data set of approximately 170,000 projects. We evaluate the percentage of projects that are approved within respective state-mandated timelines from 2017– 2019. We further evaluate how timelines have evolved since 2012 for a subset of five states: Arizona, California, Colorado, New Jersey, and New York. The analyses are divided into two size ranges: systems that are ≤10 kilowatts (kW), and systems that are 11–50 kW.

14 SOLAR ENERGY↗

Beamline for E-beam processing at UITF

Electron beam irradiation is a method that has shown a good potential to reduce several pollutants in wastewater. One of the main challenges towards wider adoption of this method is the need for compact, reliable, cost-effective, high-power accelerators. Jefferson Lab is working on the design and prototyping of accelerator components, based on superconducting radio-frequency (SRF) technology, aiming at accelerators for industrial applications. The LDRD project aimed at designing, procuring, installing, and commissioning a beamline at the Upgraded Injector Test Facility (UITF) accelerator to allow electron-beam irradiation studies of different materials, beginning with wastewater. The availability of such beamline allows exploring the ability of electron-beam radiation to reduce or eliminate so-called “forever chemicals” that can be found in wastewater or industrial sites. After successful commissioning, the beamline was used to irradiate wastewater samples with different concentrations of 1,4-dioxane, in collaboration with Hampton Roads Sanitation District (HRSD).

42 ENGINEERING↗

CCF Parameter Estimations, 2020 Update

This report documents the quantitative results of the common-cause failure (CCF) data collection effort (which included data through 2020) and summarizes the results of the parameter estimation quantification process performed on CCF data in the U.S. Nuclear Regulatory Commission (NRC) CCF database. This is the 2020 update to NUREG/CR-5497, updating data and parameter estimations for CCFs. This release, CCF Parameter Estimation 2020, reflects the CCF data contained within the CCF database, https://rads.inl.gov/Pages/CCF.aspx, by executing (in August 2021) the CCF query rules in the folder SPAR Rules 2020. The data covers the period from 1/1/2006 to 12/31/2020, the most recent 15-year period in which data are available. The use of the most recent rolling 15-year data in parameter estimation differs from previous updates, in which 1/1/1997 was used as the starting date (e.g., 1/1/1997 to 12/31/2015 for the 2015 update, 1/1/1997 to 12/31/2012 for the 2012 update). The new date range (i.e., the most recent 15-year period), was selected for this CCF update so as to be consistent with the date range chosen for the component reliability parameter estimation, and with the effort to include sufficient data for analysis while simultaneously reflecting the most recent industry performance. These results are appropriate for use in probabilistic risk assessment (PRA) studies, including the Standardized Plant Analysis Risk (SPAR) models of commercial nuclear power plants (NPPs) in the U.S. This update may be referred as: U.S. Nuclear Regulatory Commission, "CCF Parameter Estimations, 2020 Update," https://nrcoe.inl.gov/publicdocs/CCF/ccfparamest2020.pdf, November 2021.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Machine Learning for Automated Metadata Assignment in Buildings: Cooperative Research and Development (Final Report, CRADA Number CRD-18-00767)

RealTerm Energy and NREL have identified a shared vision to evaluate opportunities to facilitate the organization and assignment of metadata to building control system (BCS) data via industry-informed machine learning (ML). Manual metadata assignment is labor intensive and costly, slowing down any Energy Management and Information System (EMIS) deployment in the building space. This project aims to develop methodologies to accurately assign this metadata and significantly decrease the level of effort associated with deploying EMIS. The objective of this project is to identify/design methodologies to assign metadata to HVAC control points automatically. The identified methodologies will be programmed in analytics algorithms so they can ingest a list of points and produce a detailed tagging following the Haystack classification nomenclature. To validate the efficacy of each methodology, tagging results will be compared utilizing a list of points extracted from RealTerm's building database-as well as data extracted from the NREL campus via the Intelligent Campus program-enabling testing against large datasets with real world challenges. The developed methodologies may leverage building manager/operator input on a limited basis to add context to the classifying algorithms. The partnership aims to advance global efforts in areas related to the DOE missions through improving operational performance of commercial buildings. It is well documented that buildings fall out of commission after they are occupied, wasting significant energy and incurring associated costs simply due to poor operational performance. Emerging EMIS technologies that perform continuous commissioning help to address this issue, yet integration of these systems can be labor intensive both for the technology vendor and the building owner/operator. This project will enable more efficient and cost-effective analytics for buildings, enabling improvement in building operations at lower cost points.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Medium and Heavy Duty Vehicle Powertrain Electrification and Fleet Demonstration

The Contract Award Grant # EE0007513 dated 2 June, 2016 is for the design, development and demonstration of medium duty package delivery vehicles that will result in a 100% increase in fuel economy as measured in miles per gallon. The project was proposed in 3 phases over two budget periods. The Phases were: 1. Modeling and Simulation – This phase was completed and formed the basis of the specifications for the design and build of the physical systems. The modeling and simulation was conducted by AVL and used real world package delivery routes that AVL mapped. The motors, battery pack, range extender and balance of plant support systems were modeled and iterated until a system with the desired fuel economy improvement was realized. Early design of the major subsystems using the actual vehicle space constraints was also completed. This phase was successfully completed in May of 2017. 2. 1st Build and FE Confirmation - This phase was completed and resulted in the final design, release, procurement and build of all major vehicle systems for commissioning into the first vehicle. The work was a partnered effort between McLaren and AVL. McLaren built the eAxle system while AVL built the range extender and integrated the range extender, battery and balance of plant sub-systems into the first vehicle with a control system to make it operate. Prior to the end of this phase a real world HIL system test gave evidence that the fuel economy improvement would be achieved in the real world. This phase was exited with a 7 month delay due mostly to procurement and supply base issues and ended in May, 2018. 3. Final Build and Demonstration - This phase included the final build and commissioning of the four program vehicles and the operation of a demonstration on a set of routes near San Diego California. During this phase, a multitude of issues arose in different systems in the vehicle. These issue resolution exercises were quite complex and caused repeated delays but were all successfully completed. It should also be noted that an early commercialization analysis resulted in the conclusion that the complexity of the system would not make it cost effective, leading to the start of a follow-on design that used newly available component technologies to specify a more cost effective system. This design will be repurposed and put into demonstration on a separately (non-DOE) funded program. It was decided and agreed with DOE that this phase should be considered completed. The knowledge and know-how gained on this program has been incorporated into and transferred to the new program. This phase and the entire program was considered closed on June 1, 2021.

33 ADVANCED PROPULSION SYSTEMS↗

Glass Property-Composition Models for Support of Hanford WTP LAW Facility Operation

Current plans for the River Protection Project envision starting to vitrifying low-activity waste (LAW) by 2023 using a Direct Feed Low-Activity Waste (DFLAW) approach and subsequently using a full-pretreatment approach. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) LAW Facility will be operated and controlled using a LAW glass formulation algorithm (GFA), which requires several inputs based on research and development results. LAW glass property-composition models for several product quality and processing properties are key inputs for the LAW GFA. It is envisioned that the preliminary LAW GFA discussed by Kim and Vienna (2012) will be used for commissioning and initial radioactive operations of the WTP LAW Facility under Bechtel National, Inc. using the DFLAW approach. Then, an updated LAW GFA will be developed for implementation by the WTP operating contractor that takes over after WTP LAW Facility commissioning. This report documents the enhanced LAW glass property-composition models developed for use in the updated LAW GFA. The properties for which models were developed include Product Consistency Test (PCT) response, Vapor Hydration Test (VHT) response, viscosity at 1150 °C, electrical conductivity at 1150 °C, melter SO 3 tolerance at 1150 °C, and K-3 refractory corrosion at 1208 °C. Table S.1 lists the tables in this report that contain the recommended models for each of these properties. The model types recommended include partial quadratic mixture (PQM) models for viscosity, electrical conductivity, melter SO 3 tolerance and K-3 corrosion, bias corrected PQM model (bcPQM) for PCT, and logistic PQM model for VHT. The fits of model and validation subsets were found to be well predicted by the recommended models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗