Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “appendix”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Development of control systems for space shuttle vehicles. Volume 2: Appendixes

A launch phase random normal wind model is presented for delta wing, two-stage, space shuttle control system studies. Equations, data, and simulations for conventional launch studies are given as well as pitch and lateral equations and data for covariance analyses of the launch phase of MSFC vehicle B. Lateral equations and data for North American 130G and 134D are also included along with a high-altitude abort simulation.

Stone, C. R.↗

Study of automatic and manual terminal guidance and control systems for space shuttle vehicles. Volume 2: Section 4 through appendix B

Guidance and control design studies that were performed for three specific space shuttle candidate vehicles are described. Three types of simulation were considered. The manual control investigations and pilot evaluations of the automatic system performance is presented. Recommendations for systems and equipment, both airborne and ground-based, necessary to flight test the guidance and control concepts for shuttlecraft terminal approach and landing are reported.

Osder, S.↗

Experiment module concepts study. Volume 5 book 1, appendix A: Shuttle only task

Results of a preliminary investigation of the effect on the candidate experiment program implementation of experiment module operations in the absence of an orbiting space station and with the availability of the space shuttle orbiter vehicle only are presented. The fundamental hardware elements for shuttle-only operation of the program are: (1) integrated common experiment modules CM-1, CM-3, and CM-4, together with the propulsion slice; (2) support modules capable of supplying on-orbit crew life support, power, data management, and other services normally provided by a space station; (3) dormancy kits to enable normally attached modules to remain in orbit while shuttle returns to earth; and (4) shuttle orbiter. Preliminary cost estimates for 30 day on-orbit and 5 day on-orbit capabilities for a four year implementation period are $4.2 billion and $2.1 billion, respectively.

Source record↗

Space station (modular) mission analysis. Volume 2: Appendix

The experiment requirements summary is prepared for use in manned space flight design studies and provides the basis for sizing space station, shuttle payloads, and experiment modules. Requirements are derived for a space station, and 30-day and 5-day shuttle missions.

Source record↗

Advanced study of global oceanographic requirements for EOS A/B: Appendix volume

Tables and graphs are presented for a review of oceanographic studies using satellite-borne instruments. The topics considered include sensor requirements, error analysis for wind determination from glitter pattern measurements, coverage frequency plots, ground station rise and set times, a technique for reduction and analysis of ocean spectral data, rationale for the selection of a 2 PM descending orbit, and a priority analysis.

Source record↗

Information management system study results. Volume 2: IMS study results appendixes

Computer systems program specifications are presented for the modular space station information management system. These are the computer program contract end item, data bus system, data bus breadboard, and display interface adapter specifications. The performance, design, tests, and qualification requirements are established for the implementation of the information management system. For Vol. 1, see N72-19972.

Source record↗