Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “adaptive scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Turbine endwall two-cylinder program

Progress is reported in an effort to study the three dimensional separation of fluid flow around two isolated cylinders mounted on an endwall. The design and performance of a hydrogen bubble generator for water tunnel tests to determine bulk flow properties and to measure main stream velocity and boundary layer thickness are described. Although the water tunnel tests are behind schedule because of inlet distortion problems, tests are far enough along to indicate cylinder spacing, wall effects and low Reynolds number behavior, all of which impacted wind tunnel model design. The construction, assembly, and operation of the wind tunnel and the check out of its characteristics are described. An off-body potential flow program was adapted to calculate normal streams streamwise pressure gradients at the saddle point locations.

Langston, L. S.↗

MRAC with Time-Varying Reference Model from Convex Combination

An extension of model reference adaptive control is presented that accommodates use of a time-varying reference model. Specifically, the reference model is taken to be a time-varying convex combination of two linear, time-invariant models. The design is intended to act as a way to smoothly transition between two different reference models without resorting to a scheduled switch. It also provides the ability to use an interpolated reference model when the plant is operating between design points. The time variation of the combination must satisfy some requirements to ensure stability but is otherwise user choice. Subject to these requirements, bounded tracking error behavior is demonstrated via Lyapunov stability analysis for the single-input, single-output, output feedback case. Tracking error convergence is asymptotic when time variation ceases. The proposed design is demonstrated in simulation of a numerical model.

Hashemi, Kelley E.↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

NASA Johnson Space Center Life Sciences Data System

The Life Sciences Project Division (LSPD) at JSC, which manages human life sciences flight experiments for the NASA Life Sciences Division, augmented its Life Sciences Data System (LSDS) in support of the Spacelab Life Sciences-2 (SLS-2) mission, October 1993. The LSDS is a portable ground system supporting Shuttle, Spacelab, and Mir based life sciences experiments. The LSDS supports acquisition, processing, display, and storage of real-time experiment telemetry in a workstation environment. The system may acquire digital or analog data, storing the data in experiment packet format. Data packets from any acquisition source are archived and meta-parameters are derived through the application of mathematical and logical operators. Parameters may be displayed in text and/or graphical form, or output to analog devices. Experiment data packets may be retransmitted through the network interface and database applications may be developed to support virtually any data packet format. The user interface provides menu- and icon-driven program control and the LSDS system can be integrated with other workstations to perform a variety of functions. The generic capabilities, adaptability, and ease of use make the LSDS a cost-effective solution to many experiment data processing requirements. The same system is used for experiment systems functional and integration tests, flight crew training sessions and mission simulations. In addition, the system has provided the infrastructure for the development of the JSC Life Sciences Data Archive System scheduled for completion in December 1994.

Rahman, Hasan↗

A Decision-Theoretic Approach to Autonomous Planetary Rover Control

The report discusses the: Decentralized Control of Markov Decision Processes. Study the complexity of decentralized control of Markov decision processes, and develop algorithms for finding optimal control policies. Scheduling Contract Algorithms. Develop an optimal method for scheduling runs of a contract anytime algorithm (one that takes the deadline as input) in situations where the deadline is unknown, multiple problem instances must be solved, and a multi-processor machine is available. Planetary Rover Control as a Markov Decision Process.Use the Markov decision process framework to formalize and solve problems in planetary rover control. Adaptive Peer Selection. Use reinforcement learning to maximize the expected down-load speed for a client in a peer-to-peer file sharing system.

Zilberstein, Shlomo↗

A novel digital pulse processing architecture for nuclear instrumentation

The field of nuclear instrumentation covers a wide range of applications, including counting, spectrometry, pulse shape discrimination and multi-channel coincidence. These applications are the topic of many researches, new algorithms and implementations are constantly proposed thanks to advances in digital signal processing. However, these improvements are not yet implemented in instrumentation devices. This is especially true for neutron-gamma discrimination applications which traditionally use charge comparison method while literature proposes other algorithms based on frequency domain or wavelet theory which show better performances. Another example is pileups which are generally rejected while pileup correction algorithms also exist. These processes are traditionally performed offline due to two issues. The first is the Poissonian characteristic of the signal, composed of random arrival pulses which requires to current architectures to work in data flow. The second is the real-time requirement, which implies losing pulses when the pulse rate is too high. Despite the possibility of treating the pulses independently from each other, current architectures paralyze the acquisition of the signal during the processing of a pulse. This loss is called dead-time. These two issues have led current architectures to use dedicated solutions based on re-configurable components like Field Programmable Gate Arrays (FPGAs) to overcome the need of performance necessary to deal with dead-time. However, dedicated hardware algorithm implementations on re-configurable technologies are complex and time-consuming. For all these reasons, a programmable Digital pulse Processing (DPP) architecture in a high level language such as Cor C++ which can reduce dead-time would be worthwhile for nuclear instrumentation. This would reduce prototyping and test duration by reducing the level of hardware expertise to implement new algorithms. However, today's programmable solutions do not meet the need of performance to operate online and not allow scaling with the increase in the number of measurement channel. That is why an innovative DPP architecture is proposed in this paper. This architecture is able to overcome dead-time while being programmable and is flexible with the number of measurement channel. Proposed architecture is based on an innovative execution model for pulse processing applications which can be summarized as follow. The signal is not composed of pulses only, consequently, pulses processing does not have to operate on the entire signal. Therefore, the first step of our proposal is pulse extraction by the use of dedicated components named pulse extractors. The triggering step can be achieved after the analog-to-digital conversion without any signal shaping or filtering stages. Pileup detection and accurate pulse time stamping are done at this stage. Any application downstream this step can work on adaptive variable-sized array of samples simplifying pulse processing methods. Then, once the data flow is broken, it is possible to distribute pulses on Functional Units (FUs) which perform processing. As the date of each pulse is known, they can be processed individually out-of-order to provide the results. To manage the pulses distribution, a scheduler and an interconnection network are used. pulses are distributed on the first FU which is not busy without congesting the interconnection network. For this reason, the process duration does not result anymore in dead-time if there are enough FUs. FUs are designed to be standalone and to comprises at least a programmable general purpose processor (ARM, Microblaze) allowing the implementation of complex algorithms without any modification of the hardware. An acquisition chain is composed of a succession of algorithms which lead to organize our FUs as a software macro-pipeline, A simple approach consists in assigning one algorithm per FU. Consequently, the global latency becomes the worst latency of algorithms execution on FU. Moreover, as algorithms are executed locally - i.e. on a FU - this approach limits shared memory requirement. To handle multichannel, we propose FUs sharing, this approach maximize the chance to find a non-busy FU to process an incoming pulse. This is possible since each channel receive random event independently, the pulse extractors associated to them do not necessarily need to access simultaneously to all Computing resources at the same time to distribute their pulses. The major contribution of this paper is the proposition of an execution model and its associated hardware programmable architecture for digital pulse processing that can handle multiple acquisition channels while maintaining the scalability thanks to the use of shared resources. This execution model and associated architecture are validated by simulation of a cycle accurate architecture SystemC model. Proposed architecture shows promising results in terms of scalability while maintaining zero dead-time. This work also permit the sizing of hardware resources requirement required for a predefined set of applications. Future work will focus on the interconnection network and a scheduling policy that can exploit the variable-length of pulses. Then, the hardware implementation of this architecture will be performed and tested for a representative set of application.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Bioinstrumentation for evaluation of workload in payload specialists - Results of ASSESS II

Results of the medical experiment on payload specialist workloads conducted as part of the ASSESS II airborne simulation of Spacelab conditions are reported. Subjects were fitted with temperature probes and ECG, EEG and EOG electrodes, and hormone and electrolyte excretion was monitored in order to evaluate the changes in circadian rhythms, sleep patterns and stress responses brought about by mission schedules over the ten days of the experiment. Internal dissociations of circadian rhythms, sleep disturbances and increased stress levels were observed, especially during the first three days of the experiment, indicating a considerable workload to be imposed upon the payload specialists. An intensive premission simulation is suggested as a means of estimating overall workloads and allowing payload specialist adaptation to mission conditions. The bioinstrumentation which was developed and applied to the airborne laboratory is concluded to be a practical and reliable tool in the assessment of payload specialist workloads.

Wegmann, H. M.↗

LWS/SET Technology Experiment Carrier

This paper examines the approach taken to building a low-cost, modular spacecraft bus that can be used to support a variety of technology experiments in different space environments. It describes the techniques used and design drivers considered to ensure experiment independence from as yet selected host spacecraft. It describes the technology experiment carriers that will support NASA's Living With a Star Space Environment Testbed space missions. NASA has initiated the Living With a Star (LWS) Program to develop a better scientific understanding to address the aspects of the connected Sun-Earth system that affect life and society. A principal goal of the program is to bridge the gap between science, engineering, and user application communities. The Space Environment Testbed (SET) Project is one element of LWS. The Project will enable future science, operational, and commercial objectives in space and atmospheric environments by improving engineering approaches to the accommodation and/or mitigation of the effects of solar variability on technological systems. The SET Project is highly budget constrained and must seek to take advantage of as yet undetermined partnering opportunities for access to space. SET will conduct technology validation experiments hosted on available flight opportunities. The SET Testbeds will be developed in a manner that minimizes the requirements for accommodation, and will be flown as flight opportunities become available. To access the widest range of flight opportunities, two key development requirements are to maintain flexibility with respect to accommodation constraints and to have the capability to respond quickly to flight opportunities. Experiments, already developed to the technology readiness level of needing flight validation in the variable Sun-Earth environment, will be selected on the basis of the need for the subject technology, readiness for flight, need for flight resources and particular orbit. Experiments will be accumulated by the Project and manifested for specific flight opportunities as they become available. The SET Carrier is designed to present a standard set of interfaces to SET technology experiments and to be modular and flexible enough to interface to a variety of possible host spacecraft. The Carrier will have core components and mission unique components. Once the core carrier elements have been developed, only the mission unique components need to be defined and developed for any particular mission. This approach will minimize the mission specific cost and development schedule for a given flight opportunity. The standard set of interfaces provided by SET to experiments allows them to be developed independent of the particulars of a host spacecraft. The Carrier will provide the power, communication, and the necessary monitoring features to operate experiments. The Carrier will also provide all of the mechanical assemblies and harnesses required to adapt experiments to a particular host. Experiments may be hosted locally with the Carrier or remotely on the host spacecraft. The Carrier design will allow a single Carrier to support a variable number of experiments and will include features that support the ability to incrementally add experiments without disturbing the core architecture.

Sherman, Barry↗

Adaptive remote sensing technology for feature recognition and tracking

A technology development plan designed to reduce the data load and data-management problems associated with global study and monitoring missions is described with a heavy emphasis placed on developing mission capabilities to eliminate the collection of unnecessary data. Improved data selectivity can be achieved through sensor automation correlated with the real-time needs of data users. The first phase of the plan includes the Feature Identification and Location Experiment (FILE) which is scheduled for the 1980 Shuttle flight. The FILE experiment is described with attention given to technology needs, development plan, feature recognition and classification, and cloud-snow detection/discrimination. Pointing, tracking and navigation received particular consideration, and it is concluded that this technology plan is viewed as an alternative to approaches to real-time acquisition that are based on extensive onboard format and inventory processing and reliance upon global-satellite-system navigation data.

Wilson, R. G.↗

NASA'S Standard Measures During Bed Rest: Adaptations in the Cardiovascular System

Bed rest is a well-accepted analog of space flight that has been used extensively to investigate physiological adaptations in a larger number of subjects in a shorter amount of time than can be studied with space flight and without the confounding effects associated with normal mission operations. However, comparison across studies of different bed rest durations, between sexes, and between various countermeasure protocols have been hampered by dissimilarities in bed rest conditions, measurement protocols, and testing schedules. To address these concerns, NASA instituted standard bed rest conditions and standard measures for all physiological disciplines participating in studies conducted at the Flight Analogs Research Unit (FARU) at the University of Texas-Medical Branch. Investigators for individual studies employed their own targeted study protocols to address specific hypothesis-driven questions, but standard measures tests were conducted within these studies on a non-interference basis to maximize data availability while reducing the need to implement multiple bed rest studies to understand the effects of a specific countermeasure. When possible, bed rest standard measures protocols were similar to tests nominally used for medically-required measures or research protocols conducted before and after Space Shuttle and International Space Station missions. Specifically, bed rest standard measures for the cardiovascular system implemented before, during, and after bed rest at the FARU included plasma volume (carbon monoxide rebreathing), cardiac mass and function (2D, 3D and Doppler echocardiography), and orthostatic tolerance testing (15- or 30-minutes of 80 degree head-up tilt). Results to-date indicate that when countermeasures are not employed, plasma volume decreases and the incidence of presyncope during head-up tilt is more frequent even after short-duration bed rest while reductions in cardiac function and mass are progressive as bed rest duration increases. Additionally, while plasma volume loss can be corrected and cardiac mass can be prevented with properly applied countermeasures, orthostatic tolerance is more difficult to protect when supine exercise is the only countermeasure. Similar results have been observed after space flight. Plasma volume, cardiac chamber volume, and orthostatic tolerance recover relatively quickly with resumption of ambulation and normal activity levels after bed rest but restoration of cardiac mass is prolonged.

Lee, Stuart M. C.↗

Automation of Flight Software Regression Testing

NASA is developing the Space Launch System (SLS) to be a heavy lift launch vehicle supporting human and scientific exploration beyond earth orbit. SLS will have a common core stage, an upper stage, and different permutations of boosters and fairings to perform various crewed or cargo missions. Marshall Space Flight Center (MSFC) is writing the Flight Software (FSW) that will operate the SLS launch vehicle. The FSW is developed in an incremental manner based on "Agile" software techniques. As the FSW is incrementally developed, testing the functionality of the code needs to be performed continually to ensure that the integrity of the software is maintained. Manually testing the functionality on an ever-growing set of requirements and features is not an efficient solution and therefore needs to be done automatically to ensure testing is comprehensive. To support test automation, a framework for a regression test harness has been developed and used on SLS FSW. The test harness provides a modular design approach that can compile or read in the required information specified by the developer of the test. The modularity provides independence between groups of tests and the ability to add and remove tests without disturbing others. This provides the SLS FSW team a time saving feature that is essential to meeting SLS Program technical and programmatic requirements. During development of SLS FSW, this technique has proved to be a useful tool to ensure all requirements have been tested, and that desired functionality is maintained, as changes occur. It also provides a mechanism for developers to check functionality of the code that they have developed. With this system, automation of regression testing is accomplished through a scheduling tool and/or commit hooks. Key advantages of this test harness capability includes execution support for multiple independent test cases, the ability for developers to specify precisely what they are testing and how, the ability to add automation, and the ability of the harness and cases to be executed continually. This test concept is an approach that can be adapted to support other projects.

Tashakkor, Scott B.↗

Approach to adaptive allocation of shared resources in computer systems

A request management subsystem is configured to establish service classes for clients that issue requests for a shared resource on a computer system. The subsystem also is configured to determine the state of the system with respect to bandwidth, current latency, frequency and voltage levels, among other characteristics. Further, the subsystem is configured to evaluate the requirements of each client with respect to latency sensitivity and required bandwidth, among other characteristics. Finally, the subsystem is configured to schedule access to shared resources, based on the priority class of each client, the demands of the application, and the state of the system. With this approach, the subsystem may enable all clients to perform optimally or, alternatively, may cause all clients to experience an equal reduction in performance.

Bolotin, Evgeny↗

Hydropower Optimization Using Artificial Neural Network Surrogate Models of a High-Fidelity Hydrodynamics and Water Quality Model

Hydropower operations optimization subject to environmental constraints is limited by challenges associated with dimensionality and spatial and temporal resolution. The need for high-fidelity hydrodynamic and water quality models within optimization schemes is driven by improved computational capabilities, increased requirements to meet specific points of compliance with greater resolution, and the need to optimize operations of not just single reservoirs but systems of reservoirs. This study describes an important advancement for computing hourly power generation schemes for a hydropower reservoir using high-fidelity models, surrogate modeling techniques, and optimization methods. The predictive power of the high-fidelity hydrodynamic and water quality model CE-QUAL-W2 is successfully emulated by an artificial neural network, then integrated into a genetic algorithm optimization approach to maximize hydropower generation subject to constraints on dam operations and water quality. This methodology is applied to a multipurpose reservoir near Nashville, Tennessee, USA. The model successfully reproduced high-fidelity reservoir information while enabling 6.8% and 6.6% increases in hydropower production value relative to actual operations for dissolved oxygen (DO) limits of 5 and 6 mg/L, respectively, while witnessing an expected decrease in power generation at more restrictive DO constraints. Exploration of simultaneous temperature and DO constraints revealed capability to address multiple water quality constraints at specified locations. Here, the reduced computational requirements of the new modeling approach demonstrated an ability to provide decision support for reservoir operations scheduling while maintaining high-fidelity hydrodynamic and water quality information as part of the optimization decision support routines.

13 HYDRO ENERGY↗

Active workflow system for near real-time extreme-scale science. In: PPAA '14 Proceedings of the first workshop on Parallel programming for analytics applications

In recent years, streaming-based data processing has been gaining substantial traction for dealing with overwhelming data generated by real-time applications, from both enterprise sources and scientific computing. In this work, however, we look at an emerging class of scientific data with Near Real-Time (NRT) requirement, in which data is typically generated in a bursty fashion with the near real-time constraints being applied primarily between bursts, rather than within a stream. A key challenge for this types of data sources is that the processing time per data element is not uniform, and not always feasible to predict. Given the observations on the increasing unpredictability of compute load and system dynamics, this work looks to adapt streaming-based approach to the context of this new class of large experiments and simulations that have complex run-time control and analysis issues. In particular, we deploy a novel two-tier scheme for handling the increasing unpredictability of runtime behaviors: Instead of relying on determining what and where to run the scientific workflows beforehand or partial dynamically, the decision will also be adaptively enhanced online according to system runtime status. This is enabled by embedding workflow along with data streams. Specifically, we break data outputs generated from experiments or simulations into multiple self-describing "chunks", which we call active data objects. As such, if there is a transient hotspot observed, a data object with unfinished workflow pipeline can break its previous schedule and search for a least loaded location to continue the execution. Our preliminary experiment results based on synthetic workloads demonstrate the proposed active workflow system as a very promising solution by outperforming the state-of-the-art semi-dynamic workflow schedulers with an improved workflow completion time, as well as a good scalability.

Zhang, Yanwei↗

Programmatic and technical parameters associated with Shuttle/Centaur development and operations

The cost, schedule, technical, integration, and performance parameters associated with the development of the Shuttle/Centaur configurations, Centaur G and Centaur G-Prime, for compatibility with various elements of the STS are discussed. It is noted that the design concepts for these configurations involved the use of as much flight-proven hardware from the Atlas/Centaur program as possible. Forward and aft adapters were designed using graphite/epoxy composite structures for strength, weight, and thermal flow considerations. The Centaur integrated support system serves as the system interface for all systems between the Shuttle and Centaur from prelaunch through deployment of the Centaur in LEO. As a result of the Shuttle accident of January 28, 1986, the earliest possible flight for the Centaur mission appears to be December 1987.

Clark, Harry J.↗

NASA's Space Launch System Development Status

Development of the National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) heavy lift rocket is shifting from the formulation phase into the implementation phase in 2014, a little more than 3 years after formal program establishment. Current development is focused on delivering a vehicle capable of launching 70 metric tons (t) into low Earth orbit. This "Block 1" configuration will launch the Orion Multi-Purpose Crew Vehicle (MPCV) on its first autonomous flight beyond the Moon and back in December 2017, followed by its first crewed flight in 2021. SLS can evolve to a130t lift capability and serve as a baseline for numerous robotic and human missions ranging from a Mars sample return to delivering the first astronauts to explore another planet. Benefits associated with its unprecedented mass and volume include reduced trip times and simplified payload design. Every SLS element achieved significant, tangible progress over the past year. Among the Program's many accomplishments are: manufacture of core stage test barrels and domes; testing of Solid Rocket Booster development hardware including thrust vector controls and avionics; planning for RS- 25 core stage engine testing; and more than 4,000 wind tunnel runs to refine vehicle configuration, trajectory, and guidance. The Program shipped its first flight hardware - the Multi-Purpose Crew Vehicle Stage Adapter (MSA) - to the United Launch Alliance for integration with the Delta IV heavy rocket that will launch an Orion test article in 2014 from NASA's Kennedy Space Center. The Program successfully completed Preliminary Design Review in 2013 and will complete Key Decision Point C in 2014. NASA has authorized the Program to move forward to Critical Design Review, scheduled for 2015 and a December 2017 first launch. The Program's success to date is due to prudent use of proven technology, infrastructure, and workforce from the Saturn and Space Shuttle programs, a streamlined management approach, and judicious use of new technologies. The result is a safe, affordable, sustainable, and evolutionary path to development of an unprecedented capability for future missions across the solar system. In an environment of economic challenges, the nationwide SLS team continues to meet ambitious budget and schedule targets. This paper will discuss SLS Program and technical accomplishments over the past year and provide a look at the milestones and challenges ahead.

Lyles, Garry↗

Assessment of Spatial Navigation and Docking Performance During Simulated Rover Tasks

INTRODUCTION: Following long-duration exploration transits, pressurized rovers will enhance surface mobility to explore multiple sites across Mars and other planetary bodies. Multiple rovers with docking capabilities are envisioned to expand the range of exploration. However, adaptive changes in sensorimotor and cognitive function may impair the crew s ability to safely navigate and perform docking tasks shortly after transition to the new gravitoinertial environment. The primary goal of this investigation is to quantify post-flight decrements in spatial navigation and docking performance during a rover simulation. METHODS: Eight crewmembers returning from the International Space Station will be tested on a motion simulator during four pre-flight and three post-flight sessions over the first 8 days following landing. The rover simulation consists of a serial presentation of discrete tasks to be completed within a scheduled 10 min block. The tasks are based on navigating around a Martian outpost spread over a 970 sq m terrain. Each task is subdivided into three components to be performed as quickly and accurately as possible: (1) Perspective taking: Subjects use a joystick to indicate direction of target after presentation of a map detailing current orientation and location of the rover with the task to be performed. (2) Navigation: Subjects drive the rover to the desired location while avoiding obstacles. (3) Docking: Fine positioning of the rover is required to dock with another object or align a camera view. Overall operator proficiency will be based on how many tasks the crewmember can complete during the 10 min time block. EXPECTED RESULTS: Functionally relevant testing early post-flight will develop evidence regarding the limitations to early surface operations and what countermeasures are needed. This approach can be easily adapted to a wide variety of simulated vehicle designs to provide sensorimotor assessments for other operational and civilian populations.

Wood, S. J.↗

Adaptive building load control to enable high penetration of solar photovoltaic generation

This paper investigates the ability of a collection of deferrable heating, ventilation and air conditioning (HVAC) loads to directly emulate energy storage devices (ESD), that is, to absorb any low frequency fluctuations in solar generation. We find the optimal number of aggregated HVAC loads to absorb solar fluctuation in the same frequency band based on frequency analysis. To guarantee quality of service in afleet of residential buildings, an optimization problem is formed to compute optimal schedule of the HVAC loads considering temperature comfort band and available solar generation. By minimizing the tracking error between solar generation and total consumption, the proposed method also quantifies the minimum capacity of ESD (battery or fly-wheel) . The simulation results show that the proposed techniques are able to achieve good solar tracking performance as well as obtain a minimal ESD capacity. Therefore, we show that most of the renewable generation can be consumed locally through an intelligent coordination of HVAC loads, their impacts on the grid would be minimal and the required ESD capacity can be minimized.

Dong, Jin↗