Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Design and Evaluation of joint resistance in SSC Rutherford type cable splices for Torus magnet for the Jefferson Lab 12 GeV Upgrade

The Hall B 3.6-T superconducting torus magnet is being designed and built as part of the Jefferson Lab 12-GeV upgrade. The magnet consists of six trapezoidal coils connected in series, with an operating current of 3770 A. The magnet and the joints (or splices) connecting the coils are all conduction cooled by supercritical 4.6-K helium. This paper studies the design and manufacturing process of the splices made between two SSC Rutherford-type cables and discusses the tests performed to evaluate the performance of the splices under varying incident magnetic fields.

Ghoshal, Probir K.↗

Progress in the Development of the Nb 3 Sn MQXFB Quadrupole for the HiLumi Upgrade of the LHC

The high-luminosity upgrade of the Large Hadron Collider (HL-LHC) requires new high field and large-aperture quadrupole magnets for the low-beta inner triplets (MQXF). With a nominal operating gradient of 132.2 T/m in a 150 mm aperture and a conductor peak field of 11.3 T, the new quadrupole magnets are based on Nb 3 Sn superconducting technology. After a series of short models constructed in close collaboration by LARP (LHC Accelerator Research Program) and CERN, the development program is entering in the series production phase with CERN on one side and the US Accelerator Upgrade Project (US-AUP) on the other side assembling and testing full-length magnets. This paper describes the status of the development activities at CERN, in particular on the cold powering test of the first MQFXB prototype and on the construction of the second full scale prototype. Critical operations such as reaction heat treatment, coil impregnation and magnet assembly are discussed. Finally, the plan towards the series production is described.

43 PARTICLE ACCELERATORS↗

Field quality of the 4.5 m-long MQXFA pre-series magnets for the HL-LHC Upgrade as observed during magnet assembly

We report that the U.S. High-Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP) is developing MQXFA magnets, a series of 4.5 m long 150 mm aperture high-field Nb 3 Sn quadrupole magnets for the HL-LHC upgrade at CERN. Five pre-series magnets, MQXFA03 through MQXFA07, have been developed. During the magnet assembly stage, we perform magnetic measurements on the coil-pack sub-assembly and magnets after loading to track the field quality for two purposes. First, it serves as a quality assurance tool to check if the magnetic field quality is on track to meet the acceptance criteria. Magnetic measurements are used to understand if magnetic shims are needed to compensate low-order field errors and to meet the field quality targets. Second, the measurements during the assembly stage can also help understand the field quality, especially the geometric field errors, for Nb 3 Sn accelerator magnets. Here we summarize the measurement results of the pre-series MQXFA magnets, including the magnetic axis and twist angle. The results will provide useful feedback for the series production of Nb 3 Sn magnets and on the optimization of field quality of accelerator magnets based on the wind-and-react Nb 3 Sn technology.

43 PARTICLE ACCELERATORS↗

Analysis of the Mechanical Performance of the 4.2-m-Long MQXFA Magnets for the Hi-Lumi LHC Upgrade

Under the U.S. High Luminosity LHC Accelerator Upgrade Project (HL-LHC AUP), the 150 mm bore, high-field Nb 3 Sn low-{eta}_MQXFA quadrupole magnets are being fabricated, assembled and tested, in the context of the CERN Hi-Luminosity LHC (HL-LHC) upgrade. These magnets have 4.2 m magnetic length and 4.56 m long iron yoke. To date, eight MQXFA magnets have been tested. One of the magnets additionally underwent a successful endurance test with 40 triggered quenches, and two magnets did not perform as expected. This work summarizes for the first time the available strain gauge data from eight identical Nb 3 Sn MQXFA tested magnets, focusing on the endurance test, and on a possible cause of underperformance of the two magnets that did not pass the vertical test. Here we applied methods to prevent this from happening in future MQXFA magnets, which shown to be effective for last two tested magnets.

43 PARTICLE ACCELERATORS↗

Design of the Trigger Interface and Distribution Board for TJNAF 12 GeV Upgrade

The design of the Trigger Interface and Distribution (TID) board for the 12 GeV Upgrade at Thomas Jefferson National Accelerator Facility (TJNAF) is described. The TID board distributes a low jitter system clock, synchronized trigger, and synchronized multi-purpose SYNC signal. The TID also initiates readout for the data acquisition front-end crate. With the TID boards, a multi-crate system can be setup for large scale nuclear physics experiments. The TID board can be selectively populated as a Trigger Interface (TI) board, or a Trigger Distribution (TD) board for the 12 GeV upgrade experiments. When the TID is populated as a TI, The TID can be located in the VXS crate and distribute the CLOCK/TRIGGER/SYNC (CTS) through the VXS/P0 connector; it can also be located in the standard VME64 crate, and distribute the CTS through the VME/P2 connector or front panel connectors. It initiates the data acquisition for the front-end crate where the TI is positioned in. When the TID is populated as a TD, it fans out the CTS from the trigger supervisor to the front-end crates through optical fibres. The TD board monitors the trigger processing on the TI boards, and sends feedback to the Trigger Supervisor (TS) board for event readout flow control. A Field Programmable Gate Arrays (FPGA) is utilised on the TID board to provide programmability. The TID board was intensively tested on the bench. The TID production version has been released to industry for contract manufacturing.

Gu, Jianhui W.↗

Design and Evaluation of the LAr Trigger Digitizer Board in the ATLAS Phase-I Upgrade

The Phase-I upgrade of the trigger readout electronics for the ATLAS Liquid Argon (LAr) calorimeters will be installed during the second long shutdown of the Large Hadron Collider (LHC) in 2019-2020 which will enable enhanced instantaneous luminosities during LHC Run 3 from 2021 through 2023. In this trigger upgrade, so-called supercells are introduced to provide higher granularity, higher resolution and longitudinal shower shape information from the LAr calorimeters to the Level-1 trigger processors. A new LAr Trigger Digitizer Board (LTDB) will process and digitize up to 320 channels of supercell signals, and transmit them via 40 fiber optical links to the back end where the data are further processed and transmitted to the trigger processors. Five pairs of bidirectional GBT links are used for slow control and monitoring between LTDB and the Front-End LInk eXchange (FELIX) in the ATLAS Trigger and Data Acquisition (TDAQ) system. Here, the LTDB also outputs 64 summed analog legacy signals to the current Tower Builder Board via a new baseplane. A test system for the production of 124 LTDBs has been developed, supporting configuration and calibration of all ASICs

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Predicting the Cetane Number, Yield Sooting Index, Kinematic Viscosity, and Cloud Point for Catalytically Upgraded Pyrolysis Oil Using Artificial Neural Networks

Abstract The conversion of biomass using fast pyrolysis has the potential to be significantly less expensive at scale compared to alternative methods such as fermentation and gasification. Selective upgrading of the products of fast pyrolysis through chemical catalysis produces compounds with lower oxygen content and lower acidity; however, identifying the specific catalytic pathways for producing viable fuels and fuel additives often requires a trial-and-error approach. Specifically, key properties of the compounds must be experimentally tested to evaluate the viability of the resultant compounds. The present work proposes predictive models constructed with artificial neural networks (ANNs) for cetane number (CN), yield sooting index (YSI), kinematic viscosity (KV), and cloud point (CP), with blind test set median absolute errors of 5.14 cetane units, 3.36 yield sooting index units, 0.07 millimeters squared per second, and 4.89 degrees Celsius, respectively. Furthermore, the cetane number, yield sooting index, kinematic viscosity, and cloud point were predicted for over three hundred expected products from the catalytic upgrading of pyrolysis oil. It was discovered that 130 of these compounds have predicted cetane numbers greater than 40, with four of these compounds possessing predicted yield sooting index values significantly less than that of diesel fuel and predicted viscosities and cloud points comparable to that of diesel fuel.

09 BIOMASS FUELS↗

Tunable UV upgrade on OMEGA EP

The OMEGA EP laser has been upgraded to provide a UV wavelength-tunable beam to support the study of wavelength detuning for the mitigation of cross-beam energy transfer in direct-drive inertial confinement fusion. The beamline delivers up to 0.5 TW in pulses up to 1-ns duration (0.1 TW up to 2.5 ns), to either the OMEGA or OMEGA EP target chambers with wavelength tunable from 350.2 to 353.4 nm. The upgrade leverages the existing optical parametric amplification (OPA) system in the short-pulse front end of OMEGA EP Beamline 1 for amplification of a new tunable, narrowband fiber front end over a broad spectral range. The tunable OPA output is spatially shaped to form a round OMEGA-like beam, which is amplified in the OMEGA EP beamline, then frequency tripled and characterized using the existing OMEGA EP long-pulse infrastructure. A new 3ω beam-transport system intercepts the tunable UV beam near the OMEGA EP target chamber and image relays it to the P9 port of the OMEGA target chamber for joint shots with the OMEGA 60-beam laser. Commissioning of the tunable UV capability has been completed, and four experimental campaigns have been supported with the tunable beam.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Upgrade to the SHARP EUV mask microscope

© 2019 SPIE. The Sharp High-NA Actinic Reticle review Project (SHARP) is a synchrotron-based, extreme ultraviolet (EUV) microscope dedicated to photomask research. A potential upgrade to the SHARP microscope is presented. The upgrade includes changing the light path in the instrument from its current off-Axis configuration to an on-Axis configuration. This change allows for an increased working distance of 2.5 mm or more. A central obscuration, added to the zoneplate aperture, blocks stray light from reaching the central part of the image, thus improving the image contrast. The imaging performance of the two configurations is evaluated by means of ray tracing.

Benk, M↗

Simulations for CMS hadron endcap calorimeter upgrade at HL-LHC

The upgrade of the present endcap calorimeters is foreseen to prepare the CMS experiment for the High Luminosity LHC. Integrated doses at the location of the front layers of the hadron endcap calorimeter are expected to reach 20 Mrad. Studies of radiation fields are presented in this report. At the same time, the effects of pileup will become more severe, making the identification of jet objects more challenging. We estimated the effects of different transverse segmentations of back hadron calorimeter (BH) for CMS upgrade.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Overview of NSTX Upgrade Initial Results and Modelling Highlights

The National Spherical Torus Experiment (NSTX) has undergone a major upgrade, and the NSTX Upgrade (NSTX-U) Project was completed in the summer of 2015. NSTX-U first plasma was subsequently achieved, diagnostic and control systems have been commissioned, H-Mode accessed, magnetic error fields identified and mitigated, and the first physics research campaign carried out. During 10 run weeks of operation, NSTX-U surpassed NSTX-record pulse-durations and toroidal fields, and high-performance ~1MA H-mode plasmas comparable to the best of NSTX have been sustained near and slightly above the n=1 no-wall stability limit and with H-mode confinement multiplier H98y2 above 1. Transport and turbulence studies in L-mode plasmas have identified the coexistence of at least two ion-gyro-scale turbulent micro-instabilities near the same radial location but propagating in opposite (i.e. ion and electron diamagnetic) directions. These modes have the characteristics of ion-temperature gradient and micro-tearing modes, respectively, and the role of these modes in contributing to thermal transport is under active investigation. The new second more tangential neutral beam injection was observed to significantly modify the stability of two types of Alfven Eigenmodes. Improvements in offline disruption forecasting were made in the areas of identification of rotating MHD modes and other macroscopic instabilities using the Disruption Event Characterization and Forecasting (DECAF) code. Lastly, the Materials Analysis and Particle Probe (MAPP) was utilized on NSTX-U for the first time and enabled assessments of the correlation between boronized wall conditions and plasma performance. These and other highlights from the first run campaign of NSTX-U are described.

Alfven Eigenmodes↗

Numerical simulation of diverse thermal in situ upgrading processes for the hydrocarbon production from kerogen in oil shale reservoirs

© 2017, © The Author(s) 2017. We investigate the productivity and product selectivity of diverse thermal in situ upgrading processes in oil shale reservoirs. In situ upgrading processes applying the ideas of Shell In situ Conversion Process, ExxonMobil Electrofrac, and Texas A&M Steamfrac are simulated by using sector models with the assumption of symmetric patterns. In-house fully functional simulator is used, which has been developed for the kerogen pyrolysis and hydrocarbon production. In the simulation cases, sensitivity analyses to the factors having major influence on the productivity and product selectivity are conducted. The effects of the temperature of vertical heaters, the spacing of hydraulic fractures, and the position of horizontal production wells are analyzed in the applied In situ Conversion Process, Electrofrac, and Steamfrac, respectively. In the applied In situ Conversion Process cases, hydrocarbon production increases with the increasing heater temperature. In the applied Electrofrac cases, hydrocarbon production increases with the increasing spacing of hydraulic fractures, even though longer time period for the process is needed. In the applied Steamfrac cases, the case of production well located at the same depth to the injection well shows the least hydrocarbon production. Among the processes, the applied In situ Conversion Process cases show the highest weight percentage of total hydrocarbon components in the produced fluid, and the applied Electrofrac cases follow it. The applied Steamfrac cases show far lower weight percentage of hydrocarbon production than the other methods. In terms of the mass ratio of produced hydrocarbon to decomposed kerogen, the applied Steamfrac cases show the largest value among the processes by aqueous phase sweeping liquid organic phase, but they also show the huge water oil mass ratio by the continuous injection of hot water. All the applied In situ Conversion Process cases and the Electrofrac case with the short spacing of hydraulic fractures show good heating efficiency by decomposing whole kerogen in the system.

Lee, Kyung Jae↗

RPI LINAC refurbishment and upgrade project

The Electron Linear Accelerator at Rensselaer Polytechnic Institute (RPI) was constructed in the late 1950s and started operation in 1961 [1]. The facility was designed and used primarily for measurements of Nuclear Data (ND) with emphasis on the resonance energy region. As such it was designed to produce short pulses of neutrons (5-5000 ns) and equipped with detection stations at different neutron flight path distances from the source (15 m-250 m). When the LINAC started operation it was one of the most powerful accelerators in the world for high energy-resolution measurements in the resonance region. The original LINAC with some upgrades is still in operation but no longer provides world class capabilities for measurements with short pulses. In 2011 discussions between the RPI ND group, Naval Reactors, and the Nuclear Criticality Safety Program about the future of the LINAC concluded that maintaining the capability to perform world-class nuclear data measurements at RPI was desirable. To that end, it was decided to refurbish the facility and upgrade the accelerator capabilities to enable high accuracy measurement in the resonance region with narrow neutron pulse and high electron beam power. Located at a major US technical university, this project provides a needed US nuclear data capability for both research and education, and also includes external users and industrial applications.

43 PARTICLE ACCELERATORS↗

Performance Test of the Next Generation X-Ray Beam Position Monitor System for The APS Upgrade

The Advanced Photon Source is developing its next major upgrade (APS-U) based on the multi-bend achromat lattice. Improved beam stability is critical for the upgrade and will require keeping short-time beam angle change below 0.25 µrad and long-term angle drift below 0.6 µrad. A reliable white x-ray beam diagnostic system in the front end will be a key part of the planned beam stabilization system. This system includes an x-ray beam position monitor (XBPM) based on x-ray fluorescence (XRF) from two specially designed GlidCop A-15 absorbers, a second XBPM using XRF photons from the Exit Mask, and two white beam intensity monitors using XRF from the photon shutter and Compton-scattered photons from the front end beryllium window or a retractable diamond film in windowless front ends. We present orbit stability data for the first XBPM used in the feedback control during user operations, as well as test data from the second XBPM and the intensity monitors. They demonstrate that the XBPM system meets APS-U beam stability requirements.

Yang, B.↗

Multiplexer System for the SPEAR3 Booster BPM Upgrade

BPM measurements in booster synchrotrons are often only critical during accelerator commissioning or when a problem occurs. As a result, many facilities do not make large investments in booster BPM signal processors; they either have very few BPMs and/or use older generation processors. The SPEAR3 booster BPM processor system, for instance, has operated since 1990 with commercial multiplexers to switch between BPM button signals into a single dated analog BPM processor that was developed at SLAC*. This system has reached its end-of-life so we are in the process of upgrading to modern multiplexers that feed a pair of turn-by-turn Libera SPARK-ERXR processors. This low-cost solution gives us the ability to arbitrarily multiplex between BPM signals during the energy ramp with modern BPM processors. The system can either measure 2 BPMs turn-by-turn in parallel during the entire energy ramp, or sequentially measure all BPMs (2 at a time) at different time slices within the ramp. Here we show measurements of the MiniCircuits switch we chose as well as our architecture for the upgrade.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

IMPEDANCE MEASUREMENT OF VACUUM CHAMBER COMPONENTS FOR THE ADVANCE PHOTON SOURCE (APS) UPGRADE

The proposed Advance Photon Source Upgrade (APS-U) employs a multi-bend achromat (MBA) lattice to increase the photon brightness by two to three orders of magnitude. One of the main design challenges of the upgrade is to minimize rf heating and collective instabilities associated with the impedance of small-aperture vacuum components. As part of this effort, my research focuses on impedance measurement and simulation of various MBA vacuum components. Here, we present the summary of the impedance contributions for the APS-U and describe our planned impedance measurement technique, including some measurement results for the non-evaporative getter (NEG)-coated copper chamber and simulation results for other critical components using a novel Goubau line (G-line) set up.

APS↗

Design of β=0.65, 5 Cells, 644 MHz Elliptical Cavity for FRIB Upgrade

The superconducting (SC) linac of the Facility for Rare Isotope Beams (FRIB) under construction will deliver 200 MeV/u, 400 kW beam to the target for producing rare isotopes at Michigan State of University (MSU). For further beam energy upgrade, we have designed the β = 0.65, 5 cells, 644 MHz elliptical cavity. The beam energy can be upgraded to 400 MeV/u by installing 11 cryomodules to the available space in the FRIB tunnel.

43 PARTICLE ACCELERATORS↗

Multibunch Studies for LCLS-II High Energy Upgrade

The Linac Coherent Light Source (LCLS) X-ray free-electron laser at SLAC is being upgraded to LCLS-II with a superconducting linac and 1 MHz bunch repetition rate. The proposed high-energy upgrade (LCLS-II-HE) will increase the beam energy from 4 to 8 GeV, extending the reach of accessible X-ray photon energies. With the increased repetition rate and longer linac of LCLS-II-HE, multi-bunch effects are of greater concern. We use recently introduced capabilities in the beam transport code ELEGANT to study dipole and monopole beam breakup effects for LCLS-II HE beam parameters. The results indicate that resonant dipole kicks have steady-state settle times on the order of 500 bunches or less and appear manageable. We also consider a statistical variation of the cavity frequencies and transverse offsets of cavities and quadrupoles. Resonant emittance growth driven by monopole kicks is found to be disrupted by frequency variation between cavities.

43 PARTICLE ACCELERATORS↗