Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Transmission Switching”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Theoretical Analysis and Experimental Validation of Flying-Capacitor Multilevel Converters Under Short-Circuit Fault Conditions

Addressing the increasing demand for high- efficiency and high-power-density converters, the flying-capacitor multilevel converter has shown itself as a promising topology. A key advantage of this topology is the reduced voltage rating of the switches, though also makes it vulnerable to device failure during short-circuit conditions. Despite large interest in fault-tolerant operation of these converters, alongside detailed descriptions of flying capacitor balancing, little research has focused on the converter short-circuit fault analysis, which may cause a switch failure if not properly designed for. Therefore, this work presents a comprehensive model describing the large- signal short-circuit switching behavior of a general N -level flying- capacitor multilevel converter. Highly simplified models used to predict the evolution of the switch current and voltage stress during the fault are proposed, targeted at practicing engineers for conservative design guidelines. These models are used to determine the critical time for remedial action of the converter before reaching some predefined maximum conditions. A 2-to-10- level fully-configurable flying-capacitor multilevel converter and a fault circuit hardware prototype are used to experimentally perform different short-circuit tests that show a good match to the measured behavior.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FLISR in the Presence of DERs ADMS Test Bed Use Case

Fault location, isolation, and restoration (FLISR) is one of the distribution automation applications that utilities are most interested in. It operates groups of switches on distribution feeders to improve the reliability of power delivery after localizing outages. FLISR is an essential function for enabling a self-healing grid, and it directly affects grid reliability and resilience. The presence of DERs brings both new opportunities and challenges for FLISR applications. For instance, some DERs can work as backup generation sources and help energize local networks so more switching options can be achieved with the coordination of FLISR operations; however, the existence of DERs also brings new challenges. The bidirectional power flow resulting from DERs might require dynamic changes to protective devices' fault current settings, and thus the FLISR application will need to dynamically adjust its operations in coordination with the dynamic protection settings. Also, some FLISR applications make their service restoration decisions and close tie-switches based on predefined rules; however, the presence of DERs and their impact on altering net loads on the local feeder network are not considered. For this use case, the project team is using the FLISR application of the Survalent ADMS operating on a real-time simulation of a feeder from Central Georgia EMC, a cooperative electric utility. The performance of the FLISR application is being evaluated for different locations and combinations of DERs, including grid-forming battery energy storage systems.

ADMS↗

Power-Hardware-in-the-Loop Experiments of a Microgrid With a Grid-Forming Battery Inverter: Preprint

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Power Application Developer’s Guide to the Common Information Model: An Introduction for Power Systems Engineers and Application Developers – CIM17v40

A key issue in creating the next generation of energy management system (EMS) and advanced distribution management system (ADMS) platforms will be the ability to represent and exchange power system network model data in a consistent manner. To this end, the Common Information Model (CIM) stands out as the only standardized vocabulary (or ontology) for defining power system network models and asset data in a comprehensive, consistent manner across the generation-transmission-distribution boundary. The CIM is freely available to use and extend. The CIM is maintained by the UCAiug (informally known as the CIM User’s Group) under an Apache 2.0 license. The CIM Users Group collaborates with the IEC and other standards communities for the development of technical and informative specifications. Although portions of the information model are referred to by the corresponding IEC standards naming, it is not necessary to purchase any of the IEC standards to use the CIM information model. This document provides a roadmap for power system engineers and application developers not familiar with semantic modeling to start using the CIM for modeling, simulation, optimization, and development of advanced power applications. The key classes needed for defining power system topology and equipment are explained systematically. Key focus areas include modeling of lines, transformers, generators, switching equipment, loads, and distributed energy resources (DERs).

97 MATHEMATICS AND COMPUTING↗

A Novel Design for Switchable Grid-Following and Grid-Forming Control

This paper presents the design of a novel grid- forming (GFM) control structure adapted from a typical grid- following (GFL) control structure with minimal edits, thereby enabling a switchable control structure for voltage sourced converters (VSCs) to operate in either GFL or GFM mode by simply switching a flag manually. The VSC is shown to be able to operate in the GFL control mode synchronizing to the main grid through a phase-locked-loop (PLL) and operate as a GFM controller with power-based synchronization for both grid-connected and islanded conditions. To guarantee smooth operation, the control schemes and the mode switching logic have been carefully designed and examined via a series of experiments. Here, the experiment results show that the switchable control structure can fulfill the desired control and operation functions and enable smooth transition between control modes.

14 SOLAR ENERGY↗

Direct Imaging of Asymmetric Interfaces and Electrostatic Potentials inside a Hafnia–Zirconia Ferroelectric Nanocapacitor

In hafnia-based thin-film ferroelectric devices, chemical phenomena during growth and processing, such as oxygen vacancy formation and interfacial reactions, appear to strongly affect device performance. However, the correlation between the structure, chemistry, and electrical potentials at the nanoscale in these devices is not fully known, making it difficult to understand their influence on device properties. Here, we directly image the composition and electrostatic potential with nanometer resolution in the cross section of a nanocrystalline W/Hf 0.5 Zr 0.5 O 2−δ (HZO)/W ferroelectric capacitor using multimodal electron microscopy. This reveals a 1.4 nm wide tungsten suboxide interfacial layer formed at the bottom interface during fabrication, which introduces a potential dip and leads to asymmetric switching fields. Additionally, we compare the measured potentials to DFT calculations and find it is nearly 3 V lower than expected in the HZO, which appears to be caused by oxygen vacancies and a resulting negative built-in potential. In conclusion, these chemical and electrostatic details are important to characterize and tune to achieve high-performance ferroelectric devices.

Defects in solids↗

Switch Opening and Exchange Method for Stochastic Distribution Network Reconfiguration

The purpose of distribution network reconfiguration (DNR) is to determine the optimal topology of an electricity distribution network, which is an efficient measure to reduce network power losses. Electricity load demand and photovoltaic (PV) output are uncertain and vary with time of day, and will affect the optimal network topology. Single-hour deterministic DNR is incapable of handling this uncertainty and variability. Therefore, this paper proposes to solve a multi-hour stochastic DNR (SDNR). Existing solution methods for DNR are either inaccurate or excessively time-consuming, and are therefore incapable of solving multi-hour SDNRs for large distribution networks. In this regard, a switch opening and exchange (SOE) method is proposed. Starting from a looped network with all switches closed, the SOE consists of three steps. The first step is to sequentially open the switches until all of the loops are opened. The second and third steps modify the status of branches obtained in the first step to obtain better radial topologies. Five test systems are used to validate the accuracy and fast solution speed of the SOE and the superiority of multi-hour SDNR over single-hour deterministic DNR.

distribution network reconfiguration↗

Power-Hardware-in-the-Loop Experiments of a Microgrid with a Grid-Forming Battery Inverter

Microgrids continue to proliferate, and they are transitioning away from using conventional generating resources to increasingly relying on inverter-based resources (IBRs) as the voltage and frequency leaders. It is crucial to evaluate the capability of IBRs to provide microgrid stability and resilience. Hardware-in-the-loop (HIL) experiments were conducted to de-risk the field deployment of the San Diego Gas & Electric Company Borrego Springs Microgrid, where a battery inverter was upgraded with grid-forming (GFM) capability to serve as the island leader. This paper presents the HIL experimental results from an HIL test bed that uses a power-hardware-in-the-loop (PHIL) interface with a power inductor that was previously developed for PHIL simulations of microgrids where the inverters need to switch modes, i.e., between grid-following and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents more details on the interface and HIL simulation results of the planned islanding and load steps in islanded operation to show the effectiveness of the inverters in managing the voltage and frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modular Battery Charge Controller

A new approach to masterless, distributed, digital-charge control for batteries requiring charge control has been developed and implemented. This approach is required in battery chemistries that need cell-level charge control for safety and is characterized by the use of one controller per cell, resulting in redundant sensors for critical components, such as voltage, temperature, and current. The charge controllers in a given battery interact in a masterless fashion for the purpose of cell balancing, charge control, and state-of-charge estimation. This makes the battery system invariably fault-tolerant. The solution to the single-fault failure, due to the use of a single charge controller (CC), was solved by implementing one CC per cell and linking them via an isolated communication bus [e.g., controller area network (CAN)] in a masterless fashion so that the failure of one or more CCs will not impact the remaining functional CCs. Each micro-controller-based CC digitizes the cell voltage (V(sub cell)), two cell temperatures, and the voltage across the switch (V); the latter variable is used in conjunction with V(sub cell) to estimate the bypass current for a given bypass resistor. Furthermore, CC1 digitizes the battery current (I1) and battery voltage (V(sub batt) and CC5 digitizes a second battery current (I2). As a result, redundant readings are taken for temperature, battery current, and battery voltage through the summation of the individual cell voltages given that each CC knows the voltage of the other cells. For the purpose of cell balancing, each CC periodically and independently transmits its cell voltage and stores the received cell voltage of the other cells in an array. The position in the array depends on the identifier (ID) of the transmitting CC. After eight cell voltage receptions, the array is checked to see if one or more cells did not transmit. If one or more transmissions are missing, the missing cell(s) is (are) eliminated from cell-balancing calculations. The cell-balancing algorithm is based on the error between the cell s voltage and the other cells and is categorized into four zones of operation. The algorithm is executed every second and, if cell balancing is activated, the error variable is set to a negative low value. The largest error between the cell and the other cells is found and the zone of operation determined. If the error is zero or negative, then the cell is at the lowest voltage and no balancing action is needed. If the error is less than a predetermined negative value, a Cell Bad Flag is set. If the error is positive, then cell balancing is needed, but a hysteretic zone is added to prevent the bypass circuit from triggering repeatedly near zero error. This approach keeps the cells within a predetermined voltage range.

Button, Robert↗

A Flexible Operation of Distributed Generation in Distribution Networks With Dynamic Boundaries

Distributed generators performing black start to form isolated microgrids offer a flexible and resilient solution to service restoration in distribution systems. Employing the dynamic microgrid concept, distributed generators can form isolated microgrids by changing their physical boundaries through smart switches and conventional circuit breakers. However, the flexibility of distributed generators has not been thoroughly investigated and utilised in existing works. To address this issue, this letter presents a new model to the reconfiguration formulation in active distribution networks considering different operation modes of distributed generators. Compared with the existing models, this study provides a new formulation supporting different DGs' operation modes and fully making use of their flexibility. Illustrative results on IEEE 34-test systems verify the effectiveness of the proposed model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

United States Navy - Canadian forces solid state flight data recorder/crash position locator experiment on the B-720 controlled impact demonstration

The operation of a radio beacon position locator during and after the remotely controlled transport aircraft is discussed. The radio beacon transmission was actuated and was picked up by the Navy P-3A chase aircraft for a short time, after which reception was lost. The pilot reported that he received a signal on both 121.5 MHz and 243 MHz for a period of approximately 5 seconds. Five minutes after the crash a portable direction finding unit located on the roof of the NASA Dryden Flight Research Facility, 4 miles distant from the crash, was unable to pick up the beacon transmission. The fire crews started fighting the fires approximately 90 seconds after the time of impact. Navy personnel access to the crash site was allowed on the morning of December 2, 1984. Radio beacon locator was found resting top side up, 15 feet forward and 13 feet perpendicular from the tray location the starboard side of the aircraft. An immediate inspection indicated the airfoil suffered moderate fire damage with paint peeling but not intumescing. The visual marker strobe lamp housings were intact but extensively burned such that it was impossible to see if the lamps had survived. The airfoil suffered minor structural damage, with assorted dents, etc. The extended plunger on the ARU-21 release unit indicated that the pyrotechnic deployment system operated. The radio beacon base (tray) suffered some heat and fire damage, and was charred and blackened by smoke. The frangible switch in the nose survived and the switch in the belly was recovered and found to have actuated. It is assumed that this switch fired the ARU-21 squib. There were no other release switches installed in the normally open system in the aircraft.

Watters, D. M.↗

System Resilience Benefits of Dual-Fuel Capable Generators

The growing dependency on natural gas (NG) for power generation raises challenges for ensuring the resilience of power systems during extreme cold weather. Dual-fuel capable generators that can switch from burning NG to distillate fuel oil during an NG shortage over one way to alleviate these challenges. In this study, the impacts of gas unavailability on the IEEE 73-bus reliability test system (RTS) with 2019 updated generation mixture are explored. An extension to the standard production cost model formulation of unit commitment and economic dispatch is proposed to allow the representation of dual-fuel capable generators that can switch fuels between NG and distillate oil with a specified oil tank capacity and tank refueling capability. The operation of the system under gas unavailability with 0%, 25%, 50%, 75%, and 100% of combined cycle and combustion turbine generators as dual-fuel capable with a one-day supply of fuel oil are simulated using PLEXOS, a production cost model. The dual-fuel generator performance, unserved energy, and system costs are fully assessed.

dual-fuel capable generator↗

Antiferromagnetic Fe Te 2 1 T - phase formation at the Sb 2 Te 3 / Ni 80 Fe 20 interface

Bilayer topological insulator/ferromagnet (TI/FM) heterostructures are promising for spintronic applications due to their low switching energy and therefore power efficiency. Until recently, the reactivity of TI with FM films was overlooked in the spin orbit-torque literature, even though there are reports that it is energetically favorable for TIs to react with transition metals and form interfacial layers. Here, in this study we fabricated a TI/FM heterostructure comprised of molecular beam epitaxy grown Sb 2 Te 3 and DC sputtered Ni 80 Fe 20 . Broadband ferromagnetic resonance revealed spin-pumping evident by the significant enhancement in Gilbert damping, which is likely a signature of the topological surface states or the presence of large spin-orbit-coupling in the adjacent Sb 2 Te 3 . With low-temperature magnetometry, an exchange bias is observed which indicates an exchange interaction between an antiferromagnet (AFM) and an adjacent FM. Cross-section high-angle annular dark field scanning transmission electron microscopy (HAADF-STEM) characterization of the Sb 2 Te 3 - Ni 80 Fe 20 bilayer revealed a complex interface showing diffusion of Fe and Ni into the Sb 2 Te 3 film yielding the formation of a FeTe 2 1T-type structural phase. Furthermore, density functional theory calculations revealed that the FeTe 2 1T-phase has an AFM ground state. Due to experimental limitations in the electron energy loss spectroscopy measurements precise chemistry of the interfacial phase could not be determined, therefore it is possible that the FeTe 2 1T and/or an intermixed (Fe 1-x Ni x )Te 2 1T is the AFM interfacial phase contributing to exchange bias in the system. This work emphasizes the chemical complexity of TI/FM interfaces that host novel, metastable magnetic topological phases and require more in-depth studies of other similar interfaces.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Beyond DERMS: Demonstration of Automated Grid Services, Mode Transition, and Resilience

This report describes the results of more advanced use cases including Ancillary Services, Black-sky-day operation, and Mode Switching from Phase 3 of the “Beyond DERMS” project aiming to build, deploy, and demonstrate a holistic platform that supports the integrated operation and planning of future power distribution networks with bi-directional power flows, many diverse distributed energy resources (DERs), and inverter-based resources. These test results demonstrated how a Beyond DERMS platform can fuse together AMI, SCADA, and DER data to provide a utility with deep insights into distribution network operations and planning, extending the value of DERMS and BTM DER resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient Distributed Frequency Regulation of Renewable Generators under Communication Interruptions

Modern power systems (MPSs) face significant challenges due to the high penetration of renewable energy sources (RESs) and new types of loads such as electric vehicles (EVs). Traditional load frequency control (LFC) methods struggle with the intermittent, stochastic nature of RESs, the near-zero inertia of power-electronics-based generators, and the mobility of controllable loads and battery systems. This paper introduces a novel resilient distributed frequency regulation method to address these issues. The proposed method employs a state space model to represent the dynamic behavior of participating power sources while accounting for stochastic switching processes to model structural and parameter variations caused by disruptions such as generator connection/disconnection, communication interruptions, and physical faults. By integrating these dynamic and stochastic components, the method treats power grids as a comprehensive stochastic hybrid system. Our method enhances conventional frequency control by incorporating local stability control, neighborhood control decoupling, and coordination feedback. Theoretical analyses establish the stability, convergence, and resilience of the proposed method, and its effectiveness is validated through case studies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep Reinforcement Learning for Distribution System Restoration Using Distributed Energy Resources and Tie-Switches

Distributed energy resources (DERs), such as solar PVs and energy storage, can be used to restore distribution system critical loads after the extreme weather events to increase grid resilience. However, coordinating multiple DERs together with tie-switches for multi-step restoration process under renewable uncertainty is challenging. This paper proposes a deep reinforcement learning to control discrete actions of switching on/off tie switches and DERs for critical load restoration. The restoration problem is first cast into the Markov decision process suitable for DRL. Then, the original soft actor critic (SAC) method for continuous actions has been extended to handle discrete and continuous actions. Numerical comparison results with other stochastic optimization-based approaches on the modified IEEE 33-bus system show that the proposed method can achieve fast critical load restoration in the presence of substation power outage while maintaining system voltage limit throughout the restoration process.

active distribution systems↗

Power Hardware-in-the-Loop Interfaces for Inverter-Based Microgrid Experiments Including Transitions: Preprint

Microgrids continue to proliferate, particularly those that rely on inverter-based resources as the microgrid's voltage and frequency leader. Hardware-in-the-loop (HIL) simulations can de-risk microgrid deployments, and therefore we need power-hardware-in-the-loop (PHIL) interfaces for grid-forming (GFM) inverters to enable simulations of seamless transitions between islanded and grid-connected operation. Such microgrid interfaces are particularly challenging to model when the inverters need to switch modes, i.e., between grid-following (GFL) and GFM as the microgrid transitions between grid-connected and islanded operation. This paper presents two PHIL interfaces for such microgrids and the preliminary experimental results: One interface is suitable for those who have access to a power amplifier that can operate as a controllable current source, and the other is for those who need a solution that uses a voltage-mode power amplifier.

battery energy storage system↗