Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Safety Case”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

The technical and economic impact of minor actinide transmutation in a sodium fast reactor

Within the frame work of the French National Act of June 28, 2006 pertaining to the management of high activity, long-lived radioactive waste, one of the proposed processes consists in transmuting the Minor Actinides (MA) in the radial blankets of a Sodium Fast Reactor (SFR). With this option, we may assess the additional cost of the reactor by comparing two SFR designs, one with no Minor Actinides, and the other involving their transmutation. To perform this exercise, we define a reference design called SFRref, of 1500 MWe that is considered to be representative of the Reactor System. The SFRref mainly features a pool architecture with three pumps, six loops with one steam generator per loop. The reference core is the V2B core that was defined by the CEA a few years ago for the Reactor System. This architecture is designed to meet current safety requirements. In the case of transmutation, for this exercise we consider that the fertile blanket is replaced by two rows of assemblies having either 20% of Minor Actinides or 20% of Americium. The assessment work is performed in two phases. - The first consists in identifying and quantifying the technical differences between the two designs: the reference design without Minor Actinides and the design with Minor Actinides. The main differences are located in the reactor vessel, in the fuel handling system and in the intermediate storage area for spent fuel. An assessment of the availability is also performed so that the impact of the transmutation can be known. - The second consists in making an economic appraisal of the two designs. This work is performed using the CEA's SEMER code. The economic results are shown in relative values. For a transmutation of 20% of MA in the assemblies (S/As) and a hypothesis of 4 kW allowable for the washing device, there is a large external storage demanding a very long cooling time of the S/As. In this case, the economic impact may reach 5% on the capital part of the Levelized Unit Electricity Cost (LUEC). A diminished concentration at 10% of MA, reduces the size of the external storage and the cooling time of the assemblies becomes compatible with the management of the irradiated fuel. Even with a low allowable power for the washing device, the economic impact on the capital cost is less than 2.5%. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Assessment of defense-related uranium mines in the United States and other US DOE office of legacy management domestic and international uranium initiatives - 15335

US DOE's Office of Legacy Management (LM) has taken several initiatives to improve domestic uranium mining and milling operations in the United States and to contribute to the management of legacy uranium mining and milling sites around the world. Initiatives include completing the 2014 Report to Congress on Defense-Related Uranium Mines, managing the Title X Uranium and Thorium Program with the Office of Environmental Management, and assisting IAEA with uranium issues in member state countries. The 2014 Report to Congress identified abandoned uranium mines (AUMs) in the United States that provided uranium ore to the US Atomic Energy Commission (AEC) between 1947 and 1970. The report identified AUM locations, reclamation/remediation status, radiological risks and other hazards, costs for reclamation and remediation, and potential prioritization schemes for mine cleanup. To develop reclamation and remediation cleanup cost estimates and assess risks, AUMs were grouped into six categories by tons of uranium ore produced, ranging from Small (less than 91 metric tons [100 tons]) to Very Large (greater than 453,900 metric tons [500,000 tons]). Radiological risk was calculated using the RESRAD computer code for five exposure scenarios: offsite resident, onsite resident, occasional visitor, recreational visitor, and mine reclamation worker. Results indicate that 69 percent of the AUMs are in Colorado and Utah and 23 percent are in Arizona, Wyoming, and New Mexico; and that the majority of the AUMs (68 percent) were considered Small or Small/Medium production mines, producing less than 908 metric tons (1,000 tons) of uranium ore. Although New Mexico has fewer AUMs (247) than the other states in the Colorado Plateau region, AUMs in that state (primarily those in the Grants Mineral Belt) produced 45 percent of the 79.5 million tons of AEC-purchased uranium ore. About 50 percent of the AUMs are on public land managed by the US Bureau of Land Management; 435 AUMs are on the Navajo Nation. Risk estimates for the onsite resident scenario (plausible on tribal and non-federal land) could result in an incremental cancer risk greater than 10{sup -4}. Radon inhalation was the dominant contributor to radiological risk for the five exposure scenarios evaluated. Different state and federal agencies are conducting cleanup of some AUMs under various remedial and legal authorities. Activities constituting mine 'reclamation' may reduce radiological risks to humans to acceptable levels for many mines on federal public lands if the occasional visitor and recreational visitor exposure scenarios are assumed. Addressing physical hazards (e.g., open shafts) at mines where conditions could cause serious injuries is typically a priority of public land management agencies. At locations where mine-related groundwater contamination occurs, it is a significant contributor to cleanup costs. However, most Small and Small/Medium AUMs were likely developed above the water table, and some wet mines are located in areas where groundwater has high, naturally occurring levels of the same constituents (including radioactive elements) that are typically associated with uranium mines. LM is also administering, with the US DOE Office of Environmental Management, the Title X program, which was developed by Congress to reimburse private companies (i.e., those that held active operating licenses prior to 1978) for a portion of their reclamation costs for mill sites that processed ore sold to AEC. LM recently updated the program guidance document and established internal protocols for annually auditing companies. LM is assisting IAEA on two different initiatives: assisting developing countries with training on the basic steps to take to perform reclamation of uranium mines, and developing technical guidance and case studies related to safety and environmental assessments and post-closure management of uranium legacy sites as part of the IAEA Regulatory Supervision of Legacy Sites initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A postprocessor system for the data reduction and post analysis of NASTRAN results

NASTRAN analysis results are scanned to determine maximum and minimum displacements, forces and stresses. Allowables and margins of safety are computed, and in the case of multiple loading conditions, envelopes for displacements, forces, stresses and margins of safety are also produced for specified element sets. Graphical plots of the reduced or the regular NASTRAN results may be obtained superimposed either of a developed fuselage strip or on a projection of any specified part of the finite element model. The use of the data reduction, post analysis and graphical plotting capabilities provide the analyst with a fast and convenient tool for the study of NASTRAN analysis results and their presentation for project documentation.

Raibstein, A. I.↗

Environmental Management Waste Management Facility Operations Team Commitment to Safety - 18546

The Environmental Management Waste Management Facility (EMWMF) is an above-grade waste disposal facility that is owned by DOE and operated by URS | CH2M Oak Ridge LLC (UCOR), a contractor to DOE's Oak Ridge Office of Environmental Management. The EMWMF landfill is located on the Oak Ridge Reservation (ORR) and has a 2.18 M cubic yard capacity. EMWMF is a key component of the cost-effective ORR cleanup program and accepts remediation waste from across the ORR. Multiple low-level and low-level mixed CERCLA waste streams are disposed at EMWMF, mostly as direct-dumped demolition and remediation debris. EMWMF receives and disposes of a myriad of contaminated waste streams and waste types, including massive structural steel from some of the largest buildings ever constructed, contaminated soils from legacy disposal areas, containers that must be grouted under negative pressure, and special waste that must be tightly controlled. Support activities include managing several million gallons of landfill wastewater per year and driving around 20,000 miles per year to transport leachate to a treatment facility. Even with the wide range of waste accepted and the diversity of support activities, EMWMF Operations has maintained an impressive safety record of no lost workday cases in nearly 16 years of continuous operation and was recently awarded the National Safety Council's Superior Safety Performance Award. This safety record is a testament to the commitment to safety by both workers and management. Several factors are key to the EMWMF Operations safety record. UCOR senior management established safety as a priority and allocates proper funding and resources. EMWMF Operations management embraces safety as an integral part of the work and also 'walks the talk'-emphasizing safety over productivity and showing personal commitment to safety. A stable workforce promotes a culture where safety is valued and helps train new personnel in this culture. The UCOR integrated safety management approach to work control is fully embraced, where worker feedback is highly valued and used to better identify and control job hazards. Finally, job supervisors actively encourage input. Worker concerns, suggestions, and observations are encouraged and positively addressed. As a result, the entire Operations Team is committed to identifying and mitigating hazards. This team commitment to safety results in a culture where safety is not only valued, but is expected. Safety concerns are identified and addressed proactively, and communication is encouraged. This strong safety culture and outstanding safety record have also proven to be good business, with the facility available to receive waste 99.6% of available work hours and outstanding turnaround times on waste shipments. The EMWMF Operations team commitment to safety can be used in other environments to develop an engaged, safety-conscious workforce. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE TREATMENT PROJECT KOP DISPOSITION - THERMAL AND GAS ANALYSIS FOR THE COLD VACUUM DRYING FACILITY

The purpose of this document is to present conceptual design phase thermal process calculations that support the process design and process safety basis for the cold vacuum drying of K Basin KOP material. This document is intended to demonstrate that the conceptual approach: (1) Represents a workable process design that is suitable for development in preliminary design; and (2) Will support formal safety documentation to be prepared during the definitive design phase to establish an acceptable safety basis. The Sludge Treatment Project (STP) is responsible for the disposition of Knock Out Pot (KOP) sludge within the 105-K West (KW) Basin. KOP sludge consists of size segregated material (primarily canister particulate) from the fuel and scrap cleaning process used in the Spent Nuclear Fuel process at K Basin. The KOP sludge will be pre-treated to remove fines and some of the constituents containing chemically bound water, after which it is referred to as KOP material. The KOP material will then be loaded into a Multi-Canister Overpack (MCO), dried at the Cold Vacuum Drying Facility (CVDF) and stored in the Canister Storage Building (CSB). This process is patterned after the successful drying of 2100 metric tons of spent fuel, and uses the same facilities and much of the same equipment that was used for drying fuel and scrap. Table ES-l present similarities and differences between KOP material and fuel and between MCOs loaded with these materials. The potential content of bound water bearing constituents limits the mass ofKOP material in an MCO load to a fraction of that in an MCO containing fuel and scrap; however, the small particle size of the KOP material causes the surface area to be significantly higher. This relatively large reactive surface area represents an input to the KOP thermal calculations that is significantly different from the calculations for fuel MCOs. The conceptual design provides for a copper insert block that limits the volume available to receive KOP material, enhances heat conduction, and functions as a heat source and sink during drying operations. This use of the copper insert represents a significant change to the thermal model compared to that used for the fuel calculations. A number of cases were run representing a spectrum of normal and upset conditions for the drying process. Dozens of cases have been run on cold vacuum drying of fuel MCOs. Analysis of these previous calculations identified four cases that provide a solid basis for judgments on the behavior of MCO in drying operations. These four cases are: (1) Normal Process; (2) Degraded vacuum pumping; (3) Open MCO with loss of annulus water; and (4) Cool down after vacuum drying. The four cases were run for two sets of input parameters for KOP MCOs: (1) a set of parameters drawn from safety basis values from the technical data book and (2) a sensitivity set using parameters selected to evaluate the impact of lower void volume and smaller particle size on MCO behavior. Results of the calculations for the drying phase cases are shown in Table ES-2. Cases using data book safety basis values showed dry out in 9.7 hours and heat rejection sufficient to hold temperature rise to less than 25 C. Sensitivity cases which included unrealistically small particle sizes and corresponding high reactive surface area showed higher temperature increases that were limited by water consumption. In this document and in the attachment (Apthorpe, R. and M.G. Plys, 2010) cases using Technical Databook safety basis values are referred to as nominal cases. In future calculations such cases will be called safety basis cases. Also in these documents cases using parameters that are less favorable to acceptable performance than databook safety values are referred to as safety cases. In future calculations such cases will be called sensitivity cases or sensitivity evaluations Calculations to be performed in support of the detailed design and formal safety basis documentation will expand the calculations presented in this document to include: additional features of the drying cycle, more realistic treatment of uranium metal consumption during oxidation, larger water inventory, longer time scales, and graphing of results of hydrogen gas concentration.

08 HYDROGEN↗

Investigations on optimization of accident management measures following a station blackout accident in a VVER-1000 pressurized water reactor

The reactor safety issues are of primary importance for preserving the health of the population and ensuring no release of radioactivity and fission products into the environment. A part of the nuclear research focuses on improvement of the safety of existing nuclear power plants. Studies, research and efforts are a continuing process at improving the safety and reliability of existing and newly developed nuclear power plants at prevention of a core melt accident. Station blackout (loss of AC power supply) is one of the dominant accidents taken into consideration at performing accident analysis. In case of multiple failures of safety systems it leads to a severe accident. To prevent an accident to turn into a severe one or to mitigate the consequences, accident management measures must be performed. The present paper outlines possibilities for application and optimization of accident management measures following a station blackout accident. Assessed is the behaviour of the nuclear power plant during a station blackout accident without accident management measures and with application of primary/secondary side oriented accident management measures. Discussed are the possibilities for operators ' intervention and the influence of the performed accident management measures on the course of the accident. Special attention has been paid to the effectiveness of the passive feeding and physical phenomena having an influence on the system behaviour. The performed simulations show that the effectiveness of the secondary side feeding procedure can be limited due to an early evaporation or flashing effects in the feed water system. The analyzed cases show that the effectiveness of the accident management measures strongly depends on the initiation criteria applied for depressurization of the reactor coolant system. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Automated Generation and Assessment of Autonomous Systems Test Cases

This slide presentation reviews some of the issues concerning verification and validation testing of autonomous spacecraft routinely culminates in the exploration of anomalous or faulted mission-like scenarios using the work involved during the Dawn mission's tests as examples. Prioritizing which scenarios to develop usually comes down to focusing on the most vulnerable areas and ensuring the best return on investment of test time. Rules-of-thumb strategies often come into play, such as injecting applicable anomalies prior to, during, and after system state changes; or, creating cases that ensure good safety-net algorithm coverage. Although experience and judgment in test selection can lead to high levels of confidence about the majority of a system's autonomy, it's likely that important test cases are overlooked. One method to fill in potential test coverage gaps is to automatically generate and execute test cases using algorithms that ensure desirable properties about the coverage. For example, generate cases for all possible fault monitors, and across all state change boundaries. Of course, the scope of coverage is determined by the test environment capabilities, where a faster-than-real-time, high-fidelity, software-only simulation would allow the broadest coverage. Even real-time systems that can be replicated and run in parallel, and that have reliable set-up and operations features provide an excellent resource for automated testing. Making detailed predictions for the outcome of such tests can be difficult, and when algorithmic means are employed to produce hundreds or even thousands of cases, generating predicts individually is impractical, and generating predicts with tools requires executable models of the design and environment that themselves require a complete test program. Therefore, evaluating the results of large number of mission scenario tests poses special challenges. A good approach to address this problem is to automatically score the results based on a range of metrics. Although the specific means of scoring depends highly on the application, the use of formal scoring - metrics has high value in identifying and prioritizing anomalies, and in presenting an overall picture of the state of the test program. In this paper we present a case study based on automatic generation and assessment of faulted test runs for the Dawn mission, and discuss its role in optimizing the allocation of resources for completing the test program.

Testing challenges↗

Application of Objectives-Driven Assurance Cases to System Development in an Evolving Acquisition Model

System properties such as “safety” and “dependability” cannot, in practice, be proven, and must be argued in an “assurance case” aimed at supporting risk-acceptance decisions that have to be made by system acquirers and/or regulatory authorities. The paper is concerned with applications of the “assurance case” idea early in design and development of new systems, when (apart from dedicated testing) the only available operating experience information derives from previous (non-identical) systems. Much of the discussion is based on an evolving acquisition model at the US National Aeronautics and Space Administration; previously, most major systems were developed in-house, but some major systems will now be developed by and acquired from commercial providers. Key points discussed include the following. (1) By promoting a particular kind of focused discussion between acquirers and providers, the use of assurance cases should be particularly valuable under the new acquisition model. (2) In principle, objectives-driven (sometimes called “performance-based”) approaches to assurance of performance have significant advantages in cases where they are applicable. (3) For truly novel systems, completeness of the safety analysis is a significant issue; it is important for the assurance case to include a commitment by the provider (or applicant) to seriously pursue analysis of operating experience, so that previously unrecognized hazards can be identified and addressed. (4) Inquiries into major accidents often point to deficiencies in management oversight in all parts of the life cycle; management processes need to be addressed in the formulation and the implementation of an assurance case. Under the new acquisition model, these considerations imply a serious reconsideration of the way in which the development process is managed by both providers and acquirers.

Objectives-driven↗

Software development for safety-critical medical applications

There are many computer-based medical applications in which safety and not reliability is the overriding concern. Reduced, altered, or no functionality of such systems is acceptable as long as no harm is done. A precise, formal definition of what software safety means is essential, however, before any attempt can be made to achieve it. Without this definition, it is not possible to determine whether a specific software entity is safe. A set of definitions pertaining to software safety will be presented and a case study involving an experimental medical device will be described. Some new techniques aimed at improving software safety will also be discussed.

Knight, John C.↗

Progress and Goals for INMM ASC N15 Consensus Standard "Administrative Practices for the Determination and Reporting of Results of Non-Destructive Assay Measurements of Nuclear Material in Situ for Safeguards Nuclear Criticality Safety and Other Purposes"

This paper will discuss the goals and progress to date on the development of INMM Accredited Standard Committee (ASC) N15 consensus standard Administrative Practices for the Determination and Reporting of Results of Non-Destructive Assay Measurements of Nuclear Material in situ for Safeguards, Nuclear Criticality Safety, and Other Purposes. This standard will define administrative practices in the areas of data generation and reporting of NDA assay of holdup deposits with consideration of the stakeholders of the reported results. These stakeholders may include nuclear material accounting and safeguards, nuclear criticality safety, waste management, health physics, facility characterization, authorization basis, radiation safety, and site licensing authorities. Stakeholder input will be solicited from interested parties and incorporated during the development of the document. Currently only one consensus standard exists that explicitly deals with NDA holdup measurements: ASTM C1455 Standard Test Method for Nondestructive Assay of Special Nuclear Material Holdup Using Gamma-Ray Spectroscopic Methods. The ASTM International standard emphasizes the activities involved in actually making measurements and was developed by safeguards and NDA experts. This new INMM ASC N15 standard will complement the existing ASTM international standard. One of the largest driving factors for writing this new standard was the recent emphasis on in situ NDA measurements by the safeguards community due to the Defense Nuclear Facility Safety Board (DNFSB) recommendation 2007-1 on in situ NDA measurements. Specifically, DNFSB recommendation 2007-1 referenced the lack of programmatic requirements for accurate in situ measurements and the use of measurement results for compliance with safety-based requirements. That being the case, this paper will also discuss the progress made on the Implementation Plan for Defense Nuclear Facilities Safety Board Recommendation 2007-1 Safety-Related In Situ Nondestructive Assay of Radioactive Materials. Some of the information that will be presented includes observations made during site visits, how information useful to all facilities using nondestructive assay to determine holdup material quantities will be disseminated, and preliminary results of a gap analysis performed on current in situ nondestructive assay holdup measurements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Safety of hydrogen pressure gauges.

Study of the relative safety afforded an operator by various hydrogen-pressure gauge case designs. It is shown that assurance of personnel safety, should a failure occur, requires careful selection of available gauge designs, together with proper mounting. Specific gauge case features and mounting requirements are recommended.

Voth, R. O.↗

Are your employees sick of hearing about safety? Ways to improve how safety is communicated at your company

Companies that care about their employees care about their employees’ safety and will go to great lengths to communicate the importance of working safely. Monthly safety meetings, creative safety contests, safety websites, sharing lessons learned—safety communicators tend to use a variety of methods to distribute procedures and critical safety information to help employees plan and perform work. However, the safety message falls on deaf ears in some cases, especially when employees feel they’re being overloaded with safety information to the point where they are sick of hearing about it. This poses a conundrum for safety communicators: Should they keep pouring on the safety, or should they lighten up? How much is the right amount?

99 GENERAL AND MISCELLANEOUS↗

Recent developments in DYNSUB: New models, code optimization and parallelization

DYNSUB is a high-fidelity coupled code system consisting of the reactor simulator DYN3D and the sub-channel code SUBCHANFLOW. It describes nuclear reactor core behavior with pin-by-pin resolution for both steady-state and transient scenarios. In the course of the coupled code system's active development, super-homogenization (SPH) and generalized equivalence theory (GET) discontinuity factors may be computed with and employed in DYNSUB to compensate pin level homogenization errors. Because of the largely increased numerical problem size for pin-by-pin simulations, DYNSUB has bene fitted from HPC techniques to improve its numerical performance. DYNSUB's coupling scheme has been structurally revised. Computational bottlenecks have been identified and parallelized for shared memory systems using OpenMP. Comparing the elapsed time for simulating a PWR core with one-eighth symmetry under hot zero power conditions applying the original and the optimized DYNSUB using 8 cores, overall speed up factors greater than 10 have been observed. The corresponding reduction in execution time enables a routine application of DYNSUB to study pin level safety parameters for engineering sized cases in a scientific environment. (authors)

97 MATHEMATICS AND COMPUTING↗

MIKA: Manager for Intelligent Knowledge Access Toolkit for Engineering Knowledge Discovery and Information Retrieval

Repositories of safety reports are often underutilized and only analyzed manually by trained experts, despite safety management systems requiring reports. These collections of documents contain a wealth of information from past projects and operations that could improve system safety and design. Advances in natural language processing techniques have improved information extraction and retrieval in consumer technology, biomedicine, and finance, for instance, but have not been applied to engineering documents on the same scale. To this end, the Manager for Intelligent Knowledge Access (MIKA) open-source toolkit has been developed for rapid knowledge discovery and information retrieval in safety engineering applications. The MIKA toolkit uses state-of-the-art natural language processing algorithms and allows a user to apply these methods to their own dataset. This paper describes the MIKA toolkit and its two primary capabilities, knowledge discovery and information retrieval, and demonstrates the toolkit via a case study on National Transportation Safety Board (NTSB) reports.

Machine Learning↗

MIKA: Manager for Intelligent Knowledge Access Toolkit for Engineering Knowledge Discovery and Information Retrieval

Repositories of safety reports are often underutilized and only analyzed manually by trained experts, despite safety management systems requiring reports. These collections of documents contain a wealth of information from past projects and operations that could improve system safety and design. Advances in natural language processing techniques have improved information extraction and retrieval in consumer technology, biomedicine, and finance, for instance, but have not been applied to engineering documents on the same scale. To this end, the Manager for Intelligent Knowledge Access (MIKA) open-source toolkit has been developed for rapid knowledge discovery and information retrieval in safety engineering applications. The MIKA toolkit uses state-of-the-art natural language processing algorithms and allows a user to apply these methods to their own dataset. This paper describes the MIKA toolkit and its two primary capabilities, knowledge discovery and information retrieval, and demonstrates the toolkit via a case study on National Transportation Safety Board (NTSB) reports.

Systems Engineering↗

Beam Transport and Diagnostics for the NSLS-II Injection System

The NSLS-II is a state of the art 3 GeV synchrotron light source being developed at BNL. The injection system will consist of a 200 MeV linac, 3 GeV booster synchrotron, and associated transfer lines. The transport lines between the linac and booster (LtB) and the booster and storage ring (BSR) must satisfy a number of requirements. In addition to transporting the beam while maintaining the beam emittance, these lines must allow for commissioning, provide appropriate diagnostics, allow for the appropriate safety devices and in the case of the BSR line, provide a stable beam for top off injection. Appropriate diagnostics are also necessary in the linac and booster to complement the measurements in the transfer lines and to allow for fast commissioning. In this paper we discuss the design of the transfer lines for the NSLSII along with the incorporated diagnostics and safety systems. Necessary diagnostics in the linac and booster are also discussed.

43 PARTICLE ACCELERATORS↗

APPLICATION OF OBJECTIVES-DRIVEN ASSURANCE CASES TO SYSTEM DEVELOPMENT IN AN EVOLVING ACQUISITION MODEL

System properties such as “safety” and “dependability” cannot, in practice, be proven, and must be argued in an “assurance case” aimed at supporting risk-acceptance decisions that have to be made by system acquirers and/or regulatory authorities. The paper is concerned with applications of the “assurance case” idea early in design and development of new systems, when (apart from dedicated testing) the only available operating experience information derives from previous (non-identical) systems. Much of the discussion is based on an evolving acquisition model at the US National Aeronautics and Space Administration; previously, most major systems were developed in-house, but some major systems will now be developed by and acquired from commercial providers. Key points discussed include the following. (1) By promoting a particular kind of focused discussion between acquirers and providers, the use of assurance cases should be particularly valuable under the new acquisition model. (2) In principle, objectives-driven (sometimes called “performance-based”) approaches to assurance of performance have significant advantages in cases where they are applicable. (3) For truly novel systems, completeness of the safety analysis is a significant issue; it is important for the assurance case to include a commitment by the provider (or applicant) to seriously pursue analysis of operating experience, so that previously unrecognized hazards can be identified and addressed. (4) Inquiries into major accidents often point to deficiencies in management oversight in all parts of the life cycle; management processes need to be addressed in the formulation and the implementation of an assurance case. Under the new acquisition model, these considerations imply a serious reconsideration of the way in which the development process is managed by both providers and acquirers.

99 GENERAL AND MISCELLANEOUS↗