Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “S-BAND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

STS-8 bet results

The final Best Estimate Trajectory (BET) products, i.e., the reconstructed trajectory, the Extended BET, AEROBET and MMLE input files, generated for the eighth NASA Space Shuttle flight are documented. The reconstructed trajectory (inertial BET) for this Challenger flight, the first night landing is discussed. State (position, velocity, and attitude) plus three accelerometer scale factors were determined from fitting the Guam S-band data, seven C-band passes, and pseudo Doppler and altimeter during rollout on Runway 22. The anchor epoch utilized for the batch weighted-least-squares determination was Sept. 5, 1983 7h1m50s.0 (25310 GMT seconds). The spacecraft altitude at epoch is approx. 617 kft. IMU2 data were selected for the reconstruction.

Findlay, J. T.↗

Solid state transmitters for spaceborne radars

The SEASAT-A synthetic aperture radar, the first spaceborne SAR, utilized an all solid state RF signal synthesizer and L-band transmitter to drive a corporately fed flat plate array. The RF signal synthesizer generated a linear FM ""CHIRP'' waveform and provided stable CW reference signals used to upconvert the received signal to a unified S-band downlink channel, and to synchronize satellite control logic. The transmitter generated 1200 watts peak RF power (66 watts average) at a center frequency of 1.275 GHz from 354 watts of DC prime power. Linear FM CHIRP swept symmetrically around the center frequency with a bandwidth of 19.05 MHz and a pulse duration of 33.8 sec. Pulse repetition rate was variable from 1647 to 1944 pps. These transmitter signal parameters combined with the flat plate 34 x 7.5 ft aperture at an orbital altitude of 498 miles and a look angle 20 deg off nadir gave the SAR an 85 foot resolution over a 15.5 mile wide swath.

Turlington, T. R.↗

Tracking and data acquisition system for the 1990's. Volume 8: TDAS frequency planning

Current planning calls for the TDAS to support new user and crosslink services, in addition to TDRSS-compatible services. TDRSS-compatible services would operate in current S-band and K-band channels used by TDRSS. New services, however, can take advantage of technology advances at microwave and optical frequencies. For augmented space-to-space services, 60 GHz and GaAs laser systems offer technical advantages, relative freedom from RFI, and a benign regulatory environment (i.e., minimal congestion and, in the case of 60 GHz, maximum regulatory support for TDAS-type services). For TDAS Earth-to-space and space-to-Earth services, the 30/20 GHz band offers the best mix of technical and regulatory advantages. But use of these bands would have to be coordinated with the U.S. military.

Heppe, S. B.↗

STS-9 BET products

The final products generated for the STS-9, which landed on December 8, 1983 are reported. The trajectory reconstruction utilized an anchor epoch of GMT corresponding to an initial altitude of h 356 kft, selected in view of the limited tracking coverage available. The final state utilized IMU2 measurements and was based on processing radar tracking from six C-bands and a single S-band station, plus six photo-theodolite cameras in the vicinity of Runway 17 at Edwards Air Force Base. The final atmosphere (FLAIR9/UN=581199C) was based on a composite of the remote measured data and the 1978 Air Force Reference Atmosphere model. The Extended BET is available as STS9BET/UN=274885C. The AEROBET and MMLE input files created are discussed. Plots of the more relevant parameters from the AEROBET (reel number NL0624) are included. Input parameters, final residual plots, a trajectory listing, and data archival information are defined.

Findlay, J. T.↗

Response of the mobile VLBI design to error sources

The response of Mobile VLBI design to error sources is addressed. The sensitivity of the hydrogen maser to variations in ambient temperature is discussed, with an example of drifts in the frequency system causing excursions in the time-delay observable exceeding + or - 200 cm. It is shown that baselines determined only from S-band data can contain errors in excess of 30 cm during periods of high ionospheric activity. The effect of the troposphere on baseline solutions is examined by comparing calibrations from the Water Vapor Radiometer (WVR) to those from a surface model. The apparent ability of the WVR to track relatively short-period fluctuations in water vapor is noted. Finally, consideration is given to the effects of source structure and the technique of monitoring closure of the time-delay observable around a closed figure of baselines.

Trask, D. W.↗

An advanced generation land mobile satellite system and its critical technologies

A conceptual design for a Land Mobile Satellite System (LMSS) for the 1990s is presented. LMSS involves small tranceivers accessing satellites directly, with ground reception through small car-top antennas. The satellite would have a large antenna and blanket coverage areas in the UHF. The call may originate from a home, be carried by wire to a gateway, transmitted to satellite on the S-band, converted to UHF on the satellite, and transmitted to the vehicle. The system design is constrained by the number of users in an area during the busiest hours, Shuttle storage, controllability factors, and the total area served. A 55-m antenna has been selected, with 87 spot beams and two 10 MHz UHF bands in the 806-890 MHz band. A 17 dB interbeam isolation level is required, implying that sufficient sub-bands can be generated to assure 8265 total channels. The mobile satellite (MSAT) would have an 83 m mast lower segment, a 34 m upper segment, and a second, 10 m antenna made of a deployable mesh. Various antenna function modes are considered.

Naderi, F.↗

The electronic switching spherical array antenna for the Earth Radiation Budget Spacecraft

The ESSA is a microprocessor-controlled antenna for low orbiting spacecraft for telemetry and command relay through the Tracking and Data Relay Satellite System (TDRSS). The array is a hemispherical shape covered with disk radiating elements. A group of radiating elements are continuously selected by the microprocessor controller to form a beam in the direction of a TDRS. A radial switching power divider uses PIN diodes to select the desired radiating elements. The antenna gain is a function of the size of the hemispherical dome. A 30-inch diameter dome is presently being built for the Earth Radiation Budget Spacecraft (ERBS). Gain of this antenna over a hemisphere is 14 dBi and polarization is lefthand circular. There are 145 radiating elements with 12 being used at one time to form a beam. The ESSA subsystem weights 74 pounds and power consumption is 20 watts. RF power handling capability is 30 watts. The S-Band radiating elements have a 10 percent bandwidth that allows simultaneous transmission and reception.

Kudrna, K.↗

Definitive orbit determination for the HEAO-2 spacecraft

Precise ephemerides for the High Energy Astronomy Observatory-2 (HEAO-2) were computed to assist in the Charles Stark Draper Laboratory development of an onboard orbit determination technique. Weighted least-squares, batch orbit solutions were calculated using a high-precision earth gravity model and an approximate model for intermittent spacecraft thrusting. With these improvements, orbit solution consistencies at the 50- to 100-meter level were attained using the Goddard Trajectory Determination System and NASA S-band tracking data.

Smith, R. L.↗

A scatter model for vegetation up to Ku-band

A scatter model is developed based on the matrix doubling method for volume scattering and the Kirchhoff method in rough surface scattering. Scattering from vegetation is assumed to be dominated by leaves and a single leaf is modeled by a thin dielectric disk. In developing the phase matrix for the disk, field within the disk is taken to be constant over the disk thickness, but phase changes across the surface of the disk are accounted for. Comparisons of this scatter model with radar measurements indicate good agreements in polarization, angular trends, and frequency up to Ku-band. This represents a considerable improvement over low-frequency scatter models which are valid up to S-band.

Eom, H. J.↗

ISEE-3/ICE navigation analysis

Efforts to assure communications continuity and navigational accuracy for the ISEE-3 (now called the International Cometary Explorer - ICE) spacecraft as it heads toward a passage through the Giacobini-Zimmer (G-Z) comet tail are reviewed. Sufficient energy was gained with a series of lunar swingbys to take the rendezvous attempt possible. Communications will be by an S-band link though the upgraded Deep Space Network. The G-Z encounter is scheduled for September 1983. A 512 bps data rate will be supported by 64-3 m dishes at various global sites. The tracking will continue for 6 mos as the spacecraft moves into an orbit that parallels that of Halley's Comet. Ground-based recovery of the G-Z location in the spring of 1984 provided data for calculating the ephemerides required for configuring a major course correction for ICE 100 days before rendezvous.

Efron, L.↗

Slant path attenuation and cross-polarization prediction

The accuracy with which slant-path attenuation and cross-polarization are predicted using differential reflectivity (ZDR) radar data is discussed. Consideration is given to the use of generalized relationships between radar reflectivity (Z), ZDR, and rainfall rate (R); and between R, attenuation, and cross-polarization (XPD) on a slant path. The forward-scatter matrix which is used to calculate the slant path attenuation and XPD is described. It is shown that the use of a double exponential drop size distribution and forward-scatter matrices improves the accuracy of the prediction of slant-path attenuation and XPD. Data obtained with the VPI & SU S-band radar, using slow switching between orthorzonal polarizations is presented. The results are illustrated in graphs.

Pratt, T.↗

Low-level microburst wind structure using Doppler radar and PAM data

The Joint Airport Weather Studies (JAWS) observation network used at an airport in Denver, CO consisted of one S-band and two C-band radars, together with 27 Portable Automated Mesonet (PAM) stations. Each of the three microburst case studies observed during the JAWS experiment occurred within the surface PAM network, and these surface data were compared with the radar analyses. It emerges that if microburst vertical motions are to be accurately resolved, the spacing of the surface stations must be considerably less than 4 km.

Kessinger, C.↗

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record↗