Accelerated test protocols to predict service life and durability of solid oxide fuel cells

Reliable accelerated test protocols are needed for solid oxide fuel cell research to facilitate rapid learning on key durability issues, identify potential modes of failure expeditiously, and eventually predict the calendar lifetime of an electrochemical cell. In this work, solid oxide fuel cells operated at a constant current density were compared to cells undergoing accelerated measurements, which are composed of intermittent current injection to the cell. A general accelerated test profile was developed by cycling a solid oxide fuel cell from open circuit to a predetermined operating current density that is the same as the current density during a steady-state operation, to accelerate the local redox environment. The following parameters were studied: current density, operation temperature, moist level, sintering temperature, cycling current, cycling frequency, and operation time. Up to 1,320,000 cycles were generated in this work. The cell degradation was accelerated by nearly 10 times, suggesting the feasibility of using this protocol for acceleration test to predict life performance and durability of solid oxide fuel cells.

08 HYDROGEN↗

Profile of a cell test database and a corresponding reliability database

The development of computerized control, and data retrieval for aerospace cell testing affords an excellent opportunity to incorporate three specific concepts to both manage the test area and to track product performance on a real-time basis. The adoption and incorporation of precepts fostered by this total quality management (TQM) initiative are critical to us for retaining control of our business while substantially reducing the separate quality control inspection activity. Test discrepancies are all 'equally bad' in cell acceptance testing because, for example, we presently do not discriminate between 1 or 25 mV for an overvoltage condition. We must take leadership in classifying such discrepancies in order to expedite their clearance and redirect our resources for prevention activities. The development and use of engineering alerts (or guardbanding) which more closely match our product capabilities and are toleranced tighter than the required customer specification are paramount to managing the test unit in order to remain both quality and cost effective.

Brearley, George R.↗

Short-Term Load Forecasting Considering EV Charging Loads with Prediction Interval Evaluation

Short-term load forecasting plays a critical role in power system planning and operation. Along with the electrification of various loads, electricity demands are becoming increasingly hard to predict. Notably, the recent rise in electric vehicles (EVs) has further contributed to this unpredictability. To address this issue, this paper proposes a probabilistic load forecasting strategy utilizing Gaussian process regression, structured in a day-ahead manner. While many works focus on deterministic prediction, probabilistic forecasting offers additional insights into variability and uncertainty, enabling more flexible and reliable operation for power systems. To enhance the accuracy of the load forecasting model, the inputs include features related to EV charging habits as well as commonly used weather information. The load forecasting results are evaluated using various metrics, including conventional ones that assess the accuracy of point forecasts, as well as additional metrics that test the reliability of prediction intervals. The proposed load forecasting method is finally tested on real residential power consumption data and EV charging data sampled from real-world sources. The results prove that the new features can greatly improve the performance of the load forecasting method.

electrical vehicle↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Safety Design Strategy for the Advanced Test Reactor Primary Coolant Pump and Motor Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety Design Strategy for the Advanced Test Reactor Emergency Firewater Injection System Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safety Design Strategy for the Advanced Test Reactor Diesel Bus (E-3) and Switchgear Replacement Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3B, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3B and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Advanced Test Reactor Reliability Sustainment Project. While this project does not introduce new hazards to the ATR, it has the potential for significant impacts to safety-related systems, structures, and components that are credited in the ATR safety basis and are being replaced. Thus the project has been determined to meet the definition of a major modification and is being managed accordingly.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A New Method for Evaluating Elastomeric Materials for Use in High Pressure Oxygen

The seal configuration tester (SCT) developed at the Stennis Space Center (SSC) was designed to replicate the intended application of different seat and seal materials in a high pressure oxygen system and assess the wearibility of those materials. Statistical models were used to test the reliability of the SCT in its intended application, and the tests showed very consistent measurements over time, indicating that the device was working as intended. Other statistical designs were used to test different O-ring materials in a high-pressure oxygen system. Those tests indicated that the SCT could be used to rank the performance of O-ring materials in certain environments. The results indicated that some cheaper materials performed as well as, if not better than, other more expensive materials. Different lubrications were integrated in the testing as well and had a significant impact on the performance of the materials. Testing of seat materials is the next stage of this project. An augmentation grant (JAG) was obtained to further this experimental testing at the Stennis Space Center. This part of the project is ongoing at this time and therefore there are no significant accomplishments with respect to seat materials as of yet.

Jordan, Scott M.↗

United States manned spacecraft reliability experience

Attention is given to the reliability controls in manned spacecraft programs, taking into account the project Mercury, the Gemini program, the Apollo program, the Skylab program, and the Apollo-Soyuz test project. Reliability controls used in these programs are related to reliability management, parts and materials control, failure mode and effects analysis, reliability quantitative analysis, problem reporting and corrective action control, test control, limited-life control, and milestone reviews. A summary is presented of the major reliability tasks and innovations being used on the Space Shuttle program. Examples of these innovations include improved management techniques and an early identification of specific certification tests.

Kleinknecht, K. S.↗

Demonstrating the Safety and Reliability of a New System or Spacecraft: Incorporating Analyses and Reviews of the Design and Processing in Determining the Number of Tests to be Conducted

Design Safety/Reliability is associated with the probability of no failure-causing faults existing in a design. Confidence in the non-existence of failure-causing faults is increased by performing tests with no failure. Reliability-Growth testing requirements are based on initial assurance and fault detection probability. Using binomial tables generally gives too many required tests compared to reliability-growth requirements. Reliability-Growth testing requirements are based on reliability principles and factors and should be used.

Vesely, William E.↗

Gearbox Reliability Collaborative High Speed Shaft Tapered Roller Bearing Calibration

The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) is a project investigating gearbox reliability primarily through testing and modeling. Previous dynamometer testing focused upon acquiring measurements in the planetary section of the test gearbox. Prior to these tests, the strain gages installed on the planetary bearings were calibrated in a load frame.

17 WIND ENERGY↗

Static Torsion Testing and Modeling of a Variable Thickness Hybrid Composite Bull Gear

Torsional strength of a variable thickness hybrid gear web was measured by performing static testing on the part in a large torsion test frame. The outer rim of the hybrid gear web was fixed to the bottom of the test frame and loading was applied to the web through a shaft. The test setup included the installation of digital image correlation (DIC) systems to obtain deformation and strain measurements from the surfaces of the hybrid gear web and the mechanical test equipment to ensure reliability of the test. The results indicated that the variable thickness hybrid gear web achieved approximately twice the torsional strength compared to that of previous hybrid gear designs. The DIC analysis showed significantly more straining of the loading shaft than the actual test article. Additionally, the results demonstrated the importance and affect that the metallic, lobed interlock features had on the principal strain and out-of-plane displacement fields. The analysis revealed that the fixed outer rim was in fact rotating and a rigid body motion compensation (RBMC) function was computed to determine the actual rotation of the hub and composite web relative to the outer rim. Modeling simulations were performed for the variable thickness hybrid gear web and correlated well with the RBMC rotational deformation seen in the DIC analysis. In addition to benchmarking the load capacity of the hybrid gear web, measuring its strength is useful information to define the parameters needed for dynamic, endurance, and other testing of the part.

Johnston, Joel P.↗

Designing of a Fleet-Leader Program for Carbon Composite Overwrapped Pressure Vessels

Composite Overwrapped Pressure Vessels (COPVs) are often used for storing pressurant gases on board spacecraft when mass saving is a prime requirement. Substantial weight savings can be achieved compared to all metallic pressure vessels. For example, on the space shuttle, replacement of all metallic pressure vessels with Kevlar COPVs resulted in a weight savings of about 30 percent. Mass critical space applications such as the Ares and Orion vehicles are currently being planned to use as many COPVs as possible in place of all-metallic pressure vessels to minimize the overall mass of the vehicle. Due to the fact that overwraps are subjected to sustained loads during long periods of a mission, stress rupture failure is a major concern. It is, therefore, important to ascertain the reliability of these vessels by analysis, since it is practically impossible to show by experimental testing the reliability of flight quality vessels. Also, it is a common practice to set aside flight quality vessels as "fleet leaders" in a test program where these vessels are subjected to slightly accelerated operating conditions so that they lead the actual flight vessels both in time and load. The intention of fleet leaders is to provide advanced warning if there is a serious design flaw in the vessels so that a major disaster in the flight vessels can be averted with advance warning. On the other hand, the accelerating conditions must be not so severe as to be prone to false alarms. The primary focus of the present paper is to provide an analytical basis for designing a viable fleet leader program for carbon COPVs. The analysis is based on a stress rupture behavior model incorporating Weibull statistics and power-law sensitivity of life to fiber stress level.

Murthy, Pappu L.N.↗