Commissioning and Startup of a New Category 2 Nuclear Facility for RH TRU Sludge Packaging - 18614

For many years the Department of Energy (DOE) has been executing a plan to eliminate all threats of Radiological release to the Columbia River from the Hanford site, in Richland, Washington. While the River Corridor Closure Project is nearing completion, one of the last remaining facilities along the Columbia River is the 100K reactor complex. Since the 1950's the 105KW fuel storage basin has contained varying levels of spent reactor fuel and products of the degradation of aging stored fuel. Having previously removed all of the distinguishable spent fuel components, CH2M HILL Plateau Remediation Company (CH2M) is now in the final stages of readiness review to commence removal of the residual sludge material that has accumulated in the basin throughout the years of operation. There is approximately 27 m3 of sludge in the 105KW basin currently. This sludge material exhibits a very high radiation dose rate with levels reaching 100 R/hr. It is also very difficult to mobilize and transfer due to its physical characteristics. CH2M engineers have developed a novel mechanical system for mobilization and transfer of the sludge to specially designed storage containers. Once transferred to these containers, the sludge will be moved away from the river and taken to T Plant, a decontamination and repair facility on site, for interim storage, while a project to treat and package the material for final disposition is established. The Sludge Removal Project (SRP) is a $309 M capital line item project that was established to achieve the goals of this mission. Part of the project is to develop and install the equipment needed to do the transfer, and part of the project is to construct a new Category 2 sludge packaging facility. Construction of the facility is now complete, all equipment is installed and the project is well into the commissioning phase. Over the final three months of 2017, the project progressed into the final stages of readiness to transition to operations. This will represent the first commissioning of a new Category 2 process and facility at Hanford in over 10 years. The SRP team has crossed over many hurdles in establishing a workable plan for the safety basis for installing, commissioning and transitioning to operations within the boundaries of an existing Facility Safety Analysis Report. The project team has also applied extensive use of a mockup facility in the development and execution of the path to readiness and commencement of operations. At the time of the conference, the project will have completed a DOE Operational Readiness Review and will be very near of just entering full operation. This paper will share the experiences of the project team through these final steps and lessons learned on making the project successful. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Thermal Model for the Performance Analysis of Large Scale Spent Fuel Cooling Pond - 19173

This paper presents a thermal model for the performance analysis of a large scale cooling pond for the long term storage of spent nuclear fuel. The model has been developed using the knowledge gained from fundamental investigation using CFD and has been validated by comparing against reliable experimental and/or numerical data. It was then applied in the context of operation of a large scale pond to ascertain the sensitivity of various operational and environmental conditions. To develop the model, the water body along with the heating elements was considered as one zone and humid air inside the building as another zone, both of which are considered as well-mixed zones. Various input conditions namely, total heat load from the heat source, environmental temperature and relative humidity, ventilation rate, efficiency of the cooling tower, recirculation and make-up water flow rates have been programmed in the model. The statistical method AVONA has been used to assess the influence of the above variables. The results reveal that the efficiency of the cooling tower is the most influential parameter on the cooling performance of cooling pond within the considered values of heat load. It has also been found that the majority of the heat is taken by the recirculating water for very high heat load while the other modes of heat transfer are small but not insignificant. The model is capable of simulating the scenario of loss of cooling water and suggests that it can be used for managing a large pond efficiently as well as recovery from an accident situation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A calibration to predict the concentrations of impurities in plutonium oxide by prompt gamma analysis: Revision 1

Over 5,500 containers of excess plutonium-bearing materials have been packaged for long-term storage following the requirements of DOE-STD- 3013. Knowledge of the chemical impurities in the packaged materials is important because certain impurities, such as chloride salts, affect the behavior of the material in storage leading to gas generation and corrosion when sufficient moisture also is present. In most cases, the packaged materials are not well characterized, and information about the chemical impurities is limited to knowledge of the material’s processing history. The alpha-particle activity from the plutonium and americium isotopes provides a method of nondestructive self-interrogation to identify certain light elements through the characteristic, prompt gamma rays that are emitted from alpha-particle-induced reactions with these elements. Gamma-ray spectra are obtained for each 3013 container using a highresolution, coaxial high-purity germanium detector. These gamma-ray spectra are scanned from 800 to 5,000 keV for characteristic, prompt gamma rays from the detectable elements, which include lithium, beryllium, boron, nitrogen, oxygen, fluorine, sodium, magnesium, aluminum, silicon, phosphorus, chlorine, and potassium. The lower limits of detection for these elements in a plutonium-oxide matrix increase with atomic number and range from 100 or 200 ppm for the lightest elements such as lithium and beryllium, to 19,000 ppm for potassium. The peak areas from the characteristic, prompt gamma rays can be used to estimate the concentration of the light-element impurities detected in the material on a semiquantitative basis. The use of prompt gamma analysis to assess impurity concentrations avoids the expense and the risks generally associated with performing chemical analysis on radioactive materials. The analyzed containers are grouped by impurity content, which helps to identify high-risk containers for surveillance and in sorting materials before packaging.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Advancing the Robotic Air-slot Volumetric Inspection System (RAVIS) for Hanford Under-tank Inspection - 20519

The 27 in-service double-shell tank (DST) systems at Hanford provide interim storage for nearly 56 million gallons of nuclear and hazardous chemical legacy waste. The safe and reliable storage of the waste is critical to the site's extended cleanup mission. While in service, the leak integrity of the DSTs must be demonstrated to satisfy the Washington Administrative Code, inform decisions on tank management, and gauge fitness for continued service beyond originally intended design lives. The carbon steel plates and welds that comprise DST primary tank sidewalls and lower knuckles are routinely 'sampled' for volumetric non-destructive testing using ultrasonic inspection technology to determine whether corrosion pitting, cracking, or general corrosion are occurring that could compromise tank leak integrity. However, the carbon steel plates and welds that comprise the bottoms of primary tanks have not been thoroughly inspected since the DSTs were constructed (i.e., since 1968-1986) due to limited physical access to the exterior tank bottoms. The Robotic Air-slot Volumetric Inspection System, or 'RAVIS,' is being engineered to overcome the challenge of tank bottom in-service inspection. The system will be deployed under primary tanks within the small cooling channels/air-slots in the refractory pads upon which the tanks rest and will use ultrasonic guided wave inspection technology to volumetrically inspect physically inaccessible regions that make up ∼90% of a tank bottom, as well as regions that are physically accessible from the air-slots but comprise only ∼10% of a tank bottom. This paper describes the air-slot sensor and robotic deployment system and focuses on the testing approach and methods that are being applied to support (1) design feedback and performance acceptance (requirement verification) and (2) performance repeatability/reliability assessments (qualification) to ensure the RAVIS is prepared for successful inservice inspections of primary tank bottoms. Test progress made against the test plan, the results of 2019 testing, and the future outlook are included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Humidity data for 9975 shipping packages with cane fiberboard

The 9975 surveillance program is developing a technical basis to support extending the storage period of 9975 packages in K-Area Complex beyond the currently approved 15 years. A key element of this effort is developing a better understanding of degradation of the fiberboard assembly under storage conditions. This degradation is influenced greatly by the moisture content of the fiberboard, which is not well characterized on an individual package basis. Direct measurements of humidity and fiberboard moisture content have been made on two test packages with cane fiberboard and varying internal heat levels from 0 up to 19W. With an internal heat load, a temperature gradient in the fiberboard assembly leads to varying relative humidity in the air around the fiberboard. However, the absolute humidity tends to remain approximately constant throughout the package. The moisture content of fiberboard varies under the influence of several phenomena. Changes in local fiberboard temperature (from an internal heat load) can cause fiberboard moisture changes through absorption or evaporation. Fiberboard degradation at elevated temperature will produce water as a byproduct. And the moisture level within the package is constantly seeking equilibrium with that of the surrounding room air, which varies on a daily and seasonal basis. One indicator of the moisture condition within a 9975 package might be obtained by measuring the relative humidity in the upper air space, by inserting a humidity probe through a caplug hole. However, the data indicate that for the higher internal heat loads (15 and 19 watts), a large variation in internal moisture conditions produces little or no variation in the air space relative humidity. Therefore, this approach does not appear to be sensitive to fiberboard moisture variations at the higher heat loads which are of most interest to maintaining fiberboard integrity.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Advancing Robotic Ultrasonic Volumetric Inspection Technology for Hanford Under-tank Inspection - 19474

The Hanford River Protection Project is reliant on safe interim storage of high-level waste at the Hanford site and will continue to depend on it until the waste has been treated and vitrified by the Hanford Waste Treatment and Immobilization Plant (WTP). The Hanford double-shell tanks (DSTs) have provided interim storage since the DSTs were put into service (1971 - 1986) and the RPP will continue to rely on their service until least 2050, at which time the 27 in-service DSTs will be 14-54 years beyond their original design lives. As the DSTs continue to age and be operated beyond design life, reliable leak integrity assessments of primary tanks and secondary liners will become increasingly important in order to provide situational awareness to tank operations personnel and to support risk-informed decisions on the selection of DSTs as waste feed staging tanks and the order and timing of future DST refurbishment or, alternatively, DST retrieval sequence. This paper summarizes progress made in fiscal year (FY) 2018 on the engineering of a robotic air-slot volumetric inspection system (RAVIS) that is designed to perform ultrasonic (volumetric) leak integrity inspections of physically inaccessible primary tank bottom plates and welds. Leak integrity inspections performed with the RAVIS will supplement today's primary tank leak integrity inspections, which are currently limited to physically accessible sidewall plates and welds. The RAVIS will be deployed into air slots of the insulating concrete (refractory) pad beneath the primary tanks and use its ultrasonic guided wave phased-array (GWPA) sensor to electronically steer an ultrasonic beam 360-degrees around the sensor to volumetrically examine adjacent carbon steel plates and welds covered by refractory pad material. Deployments of RAVIS down multiple air-slots will be performed to determine which regions of a tank bottom have sound leak integrity or which regions are in need of future wall thickness restoration or weld repair due to pitting corrosion, general corrosion, or heat/stress-induced cracks. The initial RAVIS design and the flaw detection test results for the first air-slot GWPA sensor that was designed to fit inside the air-slots will be presented in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GeoMelt{sup R} ICV{sup TM} Treatment of Sellafield Pond Solids Waste - 13414

Kurion, Inc., in partnership with AMEC Ltd., is demonstrating its GeoMelt{sup R} In-Container Vitrification (ICV){sup TM} Technology to Sellafield Ltd. (SL). SL is evaluating the proposition of directly converting a container (skip/box/drum) of raw solid ILW into an immobilized waste form using thermal treatment, such that the resulting product is suitable for interim storage at Sellafield and subsequent disposal at a future Geological Disposal Facility. Potential SL feed streams include sludges, ion-exchange media, sand, plutonium contaminated material, concrete, uranium, fuel cladding, soils, metals, and decommissioning wastes. The solid wastes have significant proportions of metallic constituents in the form of containers, plant equipment, structural material and swarf arising from the nuclear operations at Sellafield. GeoMelt's proprietary ICV process was selected for demonstration, with the focus being high and reactive metal wastes arising from solid ILW material. A composite surrogate recipe was used to demonstrate the technology towards treating waste forms of diverse types and shapes, as well as those considered difficult to process; all the while requiring few (if any) pre-treatment activities. Key strategic objectives, along with their success criterion, were established by SL for this testing, namely: 1. Passivate and stabilize the raw waste simulant, as demonstrated by the entire quantity of material being vitrified, 2. Immobilize the radiological and chemo-toxic species, as demonstrated via indicative mass balance using elemental analyses from an array of samples, 3. Production of an inert and durable product as evidenced by transformation of reactive metals to their inert oxide forms and satisfactory leachability results using PCT testing. Two tests were performed using the GeoMelt Demonstration Unit located at AMEC's Birchwood Park Facilities in the UK. Post-melt examination of the first test indicated some of the waste simulant had not fully processed, due to insufficient processing time and melt temperature. A second test, incorporating operational experience from the first test, was performed and resulted in all of the 138 kg of feed material being treated. The waste simulant portion, at 41 kg, constituted 30 wt% of the total feed mass, with over 90% of this being made up of various reactive and non-reactive metals. The 95 liters of staged material was volume reduced to 41 liters, providing a 57% overall feed to product volume reduction in a fully passivated two-phase glass/metal product. The GeoMelt equipment operated as designed, vitrifying the entire batch of waste simulant. Post-melt analytical testing verified that 91-99+% of the radiological tracer metals were uniformly distributed within the glass/cast refractory/metal product, and the remaining fraction was captured in the offgas filtration systems. PCT testing of the glass and inner refractory liner showed leachability results that outperform the DOE regulatory limit of 2 g/m{sup 2} for the radiological species of interest (Sr, Ru, Cs, Eu, Re), and by more than an order of magnitude better for standard reference analytes (B, Na, Si). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Material Properties of Aged Rigid Polyurethane Foam

Foams are classified as either rigid or flexible and are commonly used in applications such as pipe insulation, carpet fibers, and chair foam cushions. Polyurethane foams are excellent thermal insulators, have excellent mechanical properties, and are chemically inert. With the addition of fire protective additives, polyurethane foams have the ability to intumescence when exposed to high temperatures. For the future storage of the 9977 nuclear shipping packages, the material properties of the General Plastics 3716 rigid polyurethane foam were evaluated for long term performance by comparing aged samples to unaged samples. General Plastics 3716 rigid polyurethane foam was aged from November 2014 to June 2019 at varying temperatures of: 160 deg. F, 160 deg. F + 50% relative humidity (RH), 185 deg. F, 215 deg. F, and 250 deg. F. The foam was then analyzed via Fourier Transform Infrared Spectroscopy (FTIR), 3D Optical Microscope, Thermal Gravimetric Analysis (TGA), Differential Scanning Calorimetry (DSC). FTIR and Optical Microscope: No significant change to chemical or physical structure was evident by FTIR or optical microscope analysis. DSC: Decrease of heat capacity over time for all oven temperatures except a slight increase for the 185 deg. F conditioned foams. Largest decrease evident with foams conditioned at 250 deg. F. A slight increase in heat capacity for humid samples. Similar trends in heat capacities at 71 deg. C and 102 deg. C. TGA: As conditioning temperature increased, a decline was evident in the average percent weight loss, onset temperature, and first derivative peak temperature. No significant effect due to humidity except for a decrease in first derivative peak temperature. Unaged samples exhibited strong intumescence. Foams conditioned at 160 deg. F exhibited slight intumescence. Results suggest fire protective additives decomposed at higher temperatures, which contributed to a lower average percent mass loss in higher temperature conditioning. Further thermal degradation testing would be beneficial to evaluate the ability of the conditioned foams to intumesce. Evaluate irradiation dose rate effects on conditioned foam. Possible conditioning in an environment with a known humidity or analyzing a new aliquot of sample for each trial to achieve a more representative heat capacity calculation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex FUSRAP Site - A Path to Site-Wide Closure - 13416

The road-map to obtaining closure of the Middlesex Sampling Plant FUSRAP site in Middlesex, New Jersey (NJ) has required a multi-faceted approach, following the CERCLA Process. Since 1998, the US ACE, ECC, and other contractors have completed much of the work required for regulatory acceptance of site closure with unrestricted use. To date, three buildings have been decontaminated, demolished, and disposed of. Two interim storage piles have been removed and disposed of, followed by the additional removal and disposal of over 87,000 tons of radiologically and chemically-impacted subsurface soils by the summer of 2008. The US ACE received a determination from the EPA for the soils Operable Unit, (OU)-1, in September 2010 that the remedial excavations were acceptable, and meet the criteria for unrestricted use as required by the 2004 Record of Decision (ROD) for OU-1. Following the completion of OU-1, the project delivery team performed additional field investigation of the final Operable Unit for Middlesex, OU-2, Groundwater. As of December 2012, the project delivery team has completed a Supplemental Remedial Investigation, which will be followed with a streamlined Feasibility Study, Proposed Plan, and ROD. Several years of historical groundwater data was available from previous investigations and the FUSRAP Environmental Surveillance Program. Historical data indicated sporadic detections of Volatile Organic Compounds (VOCs), primarily trichloroethylene (TCE), carbon tetrachloride (CT), and methyl tert-butyl ether (MTBE), with no apparent trend or pattern indicating extent or source of the VOC impact. In 2008, the project delivery team initiated efforts to re-assess the Conceptual Site Model (CSM) for groundwater. The bedrock was re-evaluated as a leaky multi-unit aquifer, and a plan was developed for additional investigations for adequate bedrock characterization and delineation of groundwater contaminated primarily by CT, TCE, and tetrachloroethene (PCE). The investigation was designed to accumulate multiple lines of evidence to determine the source and to delineate the extent of contamination, as required to complete the CERCLA Process and gain regulatory acceptance. Investigative techniques included in-well vertical flow tracing, borehole geophysics and packer testing of temporary test holes to characterize contamination in the bedrock fractures beneath the site, and to delineate likely source areas. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Co-Disposal Waste Package Loading Options for DOE SNF and HLW - 20331

The U.S. Department of Energy (DOE) is responsible for managing spent nuclear fuel (SNF) that is currently in, or will in the future come into, its possession. DOE must continue to safely store that SNF, transport it to an interim storage site or a repository, and dispose of it. These fuels come from a wide range of reactor types with various cladding materials and enrichments. Many of these reactors, now decommissioned, had unique design features, such as core configuration, fuel element and assembly geometry, moderator and coolant materials, operational characteristics, and neutron spatial and spectral properties, resulting in a large diversity of reactor and fuel designs. Because of the wide variety and conditions of SNF, a robust DOE Standard Canister was proposed that would confine radionuclides and preclude moderator. The DOE Standard Canister had four variations: 3.05-meter (10-foot) or 4.57-meter (15-foot) length, and 45.7-cm (18-inch) or 61.0-cm (24-inch) diameter. For ultimate disposal in the Yucca Mountain Repository, these canisters were to be grouped with 61.0-cm (24-inch) diameter high level waste (HLW) canisters in a 2.13-meter (84-inch) diameter co-disposal waste package. The smaller 45.7-cm (18-inch) diameter DOE Standard Canister could be placed in the middle of five HLW canisters. The larger 61.0-cm (24-inch) diameter DOE Standard Canister would take the place of one of the five HLW canisters on the outer ring in the co-disposal waste package. No DOE Standard Canisters have been loaded. A preliminary evaluation has estimated the number of elements of a fuel type that can fit into the different sizes of the DOE Standard Canister, but no definitive loading configuration has been selected. Changing the loading configuration could impact the number of loadable DOE Standard Canisters and the number of co-disposal waste packages needed for eventual disposition. This paper conveys the ranges of DOE Standard Canisters and HLW canisters that may be produced under certain conditions. It also examines the differences in the estimated number of co-disposal waste packages produced for eventual disposal when using different loading strategies in the DOE Standard Canister for Advanced Test Reactor (ATR), Peach Bottom, and High Flux Isotope Reactor (HFIR) SNF. Changing the loading configurations of ATR, Peach Bottom, and HFIR SNF slightly impacted the number of co-disposal waste packages that may be needed for ultimate disposal. The change in loading configuration was more impactful when a different canister was used, as opposed to varying the number of elements that could fit inside the same size canister. In one case, a reduction of co-disposal waste packages could be achieved by allowing mixing of short HLW canisters with long DOE Standard Canisters. The main conclusion from this analysis is that the ratio between HLW canisters and DOE Standard Canisters will drive the total number of co-disposal waste packages. If too many HLW canisters (i.e., more than five times the number of 18-inch DOE standard canisters) or DOE Standard Canisters are produced, some co-disposal waste packages may not have all positions filled. A co-disposal waste package may be filled with all HLW with no DOE Standard Canister, or a co-disposal waste package could be filled with a single DOE Standard Canister. A ratio that does not closely align to optimum could allow for the design of waste packages that hold just HLW canisters or just DOE SNF canisters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improvements in Hanford TRU Program Utilizing Systems Modeling and Analyses

Hanford's Transuranic (TRU) Program is responsible for certifying contact-handled (CH) TRU waste and shipping the certified waste to the Waste Isolation Pilot Plant (WIPP). Hanford's CH TRU waste includes material that is in retrievable storage as well as above ground storage, and newly generated waste. Certifying a typical container entails retrieving and then characterizing it (Non-Destructive Examination [NDE], Non-Destructive Assay [NDA], and Head Space Gas Sampling [HSG]), validating records (data review and reconciliation), and designating the container for a payload. The certified payload is then shipped to WIPP. Systems modeling and analysis techniques were applied to Hanford's TRU Program to help streamline the certification process and increase shipping rates. The modeling and analysis yields several benefits: - Maintains visibility on system performance and predicts downstream consequences of production issues. - Predicts future system performance with higher confidence, based on tracking past performance. - Applies speculation analyses to determine the impact of proposed changes (e.g., apparent shortage of feed should not be used as basis to reassign personnel if more feed is coming in the queue). - Positively identifies the appropriate queue for all containers (e.g., discovered several containers that were not actively being worked because they were in the wrong 'physical' location - method used previously for queuing up containers). - Identifies anomalies with the various data systems used to track inventory (e.g., dimensional differences for Standard Waste Boxes). A model of the TRU Program certification process was created using custom queries of the multiple databases for managing waste containers. The model was developed using a simplified process chart based on the expected path for a typical container. The process chart was augmented with the remediation path for containers that do not meet acceptance criteria for WIPP. Containers are sorted into queues based on their current status in the process. A container can be in only one queue at any given time. Existing data systems are queried to establish the quantity of containers in each queue on any given day. This sets the amount of feed available that is then modeled to be processed according to the daily production plans. The daily production plans were created by identifying the equipment necessary and the staff that performs each process step, and determining the expected production rate for each step. Production performance is monitored on a weekly basis with Project senior staff to establish a total operating efficiency (TOE) for each step (comparing actual performance to production capacity). The unit operations were modeled to be constrained by each day's feed queue plus the performance of the preceding step. The TOE for each unit operation was applied to an integrated model to determine bottlenecks and identify areas for improvement. All of the steps were linked to predict future system performance based on available feed and integrated system-level TOE. It has been determined that at times sub-optimization of a particular unit operation is necessary to ensure the system remains balanced (e.g., having excess capacity in assay does no good if there is no feed available because the real-time radiography [RTR] is working at half capacity). Several recommendations have been provided to the Project management team resulting in improvements in the performance of TRU certification activities by Hanford's TRU Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sodium silicate treatment for uranium (vi) bearing groundwater systems at f/h area at savannah river site - 15709

The Savannah River Site (SRS) was one of the most significant manufacturing facilities during the Cold War era for producing nuclear materials. At the end of the Cold War, the Site's mission changed to support the environmental restoration of the Site due to over six decades of research, development, and production of nuclear weapons. Currently SRS is a major hazardous waste management facility responsible for nuclear materials storage, and remediation of contaminated soil and groundwater from radionuclides. This research focuses on controlling the mobilization of the contaminants, specifically uranium (VI) located in groundwater plumes at the Site's F/H Area Seepage Basin, where approximately 1.8 billion gallons of hazardous waste were deposited. Objective: To evaluate the potential use of sodium silicate for uranium removal from the aqueous phase, as well as to restore the pH of the treatment zone. Adding sodium silicate increases the pH of the treatment zone and uranium precipitation is achieved, therefore immobilizing the contaminant. Through a series of experiments the optimal concentration of sodium silicate was investigated. Part 1: An experiment was conducted in order to determine the effect of sodium silicate on the pH of a solution containing Savannah River Site soil and synthetic groundwater replicated after the Site's natural groundwater composition. Each sample was spiked with the appropriate volume from the sodium silicate stock solution in order to achieve final desired sodium silicate concentrations of 10, 20, 40,50,60,70, and 80 parts per million. The samples were placed on a platform shaker for three days during which pH readings were collected in regular intervals to determine which silicate concentration produced a pH in the neutral range (6 > pH < 8). Part 2: A sequential experiment was conducted specifically using 40 and 50 ppm of sodium silicate with Savannah River Site soil, synthetic groundwater, and 0.5 ppm of uranium (VI), in order to investigate the removal of uranium in the aqueous phase via precipitation. Samples were extracted and categorized into a filtered and non-filtered control group. Each sample was diluted 1:20 with 1% nitric acid and analyzed using the Kinetic Phosphorescence Analyzer (KPA) in order to measure uranium concentrations in the supernatant. By measuring the concentration of uranium in the supernatant the percent removal is obtained for the comparison between the filtered and non-filtered samples, revealing the amount of uranium precipitation that occurred for each silicate concentration. Results: A sodium silicate concentration of between 40-50 ppm proved ideal for achieving uranium precipitation and creating a circum-neutral pH environment in the aqueous phase. 50 ppm achieved the larger percent of uranium precipitation with a range of 30-50% removal for the filtered samples and between 60-95% removal for the non-filtered samples. A large difference between the removal of filtered and non- filtered samples from the same day was observed for both sodium silicate concentrations tested, indicating that there is a considerable amount of uranium species retained in the filter. The addition of sodium silicate proved effective in the removal of uranium precipitation from the aqueous phase. Future work: Determine potential re-solubilization of uranium concentrations; Examine mineralogy and surface morphology of dried precipitate using XRD and SEM/EDS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dynamic Leaching Method for Intact Salt-stone Samples - 18495

At the Savannah River Site (SRS) low activity salt solution is stabilized via encapsulation within a grout termed salt-stone. Salt-stone is emplaced into large (multi-million liter) concrete storage containers referred to as Salt-stone Disposal Units (SDUs). Technetium-99 (Tc-99) and iodine-129 (I-129) are long-lived radionuclides contained in the low activity salt waste and subsequently incorporated into the grout waste form: both radionuclides are contributors to the potential long-term radiation exposure of the public and environment surrounding the SDUs. With respect to Tc-99, in the reducing, high pH environment within the grout, Tc-99 is expected to be relatively immobile since it exists in a reduced Tc(IV) oxidation state in the form of sparingly soluble hydrated oxides (TcO{sub 2}.xH{sub 2}O) or sulfides (TcS{sub x}). However, in the presence of O{sub 2} (associated with the future infiltration of air or oxygenated ground waters into the salt-stone monolith) it is possible for redox-sensitive Tc(IV) to transition into highly soluble (and mobile) Tc(VII) species, such as pertechnetate (TcO{sub 4}{sup -}), which are more readily transported to the surrounding environment. In contrast, I-129 is highly soluble and its leaching behavior is not anticipated to be significantly impacted by potential changes in redox environment or pH within salt-stone. Traditional approaches to quantifying the leaching behavior of Tc-99 and I-29 from cementitious matrices have involved partitioning experiments using size-reduced (crushed/ground) samples, and determination of the radionuclide fraction immobilized by the cementitious solids. Such experiments create artificially high solid-liquid contact areas that likely result in higher Tc-99 and I-129 leachate concentrations than would be expected for intact, monolithic samples. In the current study a new technique, termed the Dynamic Leaching Method (DLM), is being used to initially investigate the Tc-99 leaching behavior from monolithic salt-stone samples; the system will be used at a later date to evaluate the leaching characteristics of I-129. The data derived using this technique is intended to inform the SRS Salt-stone Disposal Facility (SDF) Performance Assessment (PA) which models the long-term transport of radionuclides from the SDUs to the environment. The DLM utilizes a flexible-wall permeameter to achieve saturated leaching under an elevated hydraulic gradient to simulate and accelerate the future transport of groundwater through salt-stone. Leachates are regularly analyzed with respect to radionuclide concentrations, key constituent concentrations (e.g., Al, Ca, Mg, Na, Si, CO{sub 3}{sup 2-}, NO{sub 2}{sup -}, NO{sub 3}{sup -}, SO{sub 4}{sup 2-}), pH, and reduction potential (E{sub h}) in order to develop an understanding of how chemical changes associated with the pore solution influence grout weathering and radionuclide leaching behavior. This paper provides a brief update with respect to data derived from preliminary Tc-99 leaching evaluations as the DLM was being developed, but the paper is predominantly focused on new sample data in which the DLM technique, pre- and post-DLM salt-stone sample characterization, and leachate analysis protocols have been optimized. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verification of Reactor Activation Modelling with Physical Characterization Data and the Impact on Long Term Assessments - 20303

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on Whiteshell Reactor 1 (WR-1), an organically cooled, heavy water moderated nuclear reactor. WR-1 was safely shut down in 1985, defueled and drained, and has been in a safe Storage with Surveillance (Deferred Decommissioning) state until present day. In support of an Environmental Assessment for proposed in-situ disposal of WR-1, detailed characterization information regarding the reactor core components (calandria, calandria tubes, and pressure tubes) was necessary to provide confidence that the long-term impacts of the facility can be assessed adequately. A simplified estimate of the total activation of core components was completed in 1992 using conservative assumptions, expected reactor configuration and computer models built with WIMS-CRNL, ONEDANT and ORIGEN-S. Due to the simplification, and age of the work, there was considerable doubt that the modelled inventory estimate of the core components was sufficient to support long-term performance modeling of the planned in-situ decommissioning. Additional data would be required to provide this confidence. Several options were considered for characterizing the WR-1 core components, but it was decided to collect only a limited number of samples in an effort to validate the 1992 simplified estimate as bounding. The limited number of samples reduced risks to workers, both radiological and non-radiological, and significantly reduced the costs required to confidently define and bound the radiological inventory of activation products in the core. The results of the sampling were compared to the simplified activation estimation. There was good agreement between the modelled and sampled results, with all major contributors to total activity showing similar relative quantities. The samples were generally lower than predicted by the models, with few exceptions. Notable exceptions included Nb-94, which were higher in the sample results than the model. This was determined to be caused by the use of Niobium containing steel alloys in the stainless steel pressure tube that were not accounted for in the models. The comparison of results provided confidence that the original inventory estimates produced through the simplified model are conservative and bounding, and therefore suitable for use in the long-term assessment of in situ disposal of the WR-1 reactor. This paper provides details of the simplified computer model results, their comparison to results of the sampling, and the changes adopted in the assessment of the in-situ decommissioning of WR-1 as a result. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure of the Fast Flux Test Facility: Current Status and Future Plans

The Fast Flux Test Facility (FFTF) was a 400 MWt sodium cooled fast reactor designed and constructed in the 1970's. The original purpose of the facility was to develop and test advanced fuels and materials for the liquid metal fast breeder reactor program. The facility operated very successfully from 1982 through 1992, fulfilling its original mission as well as other identified missions. However, in 1993 the Department of Energy concluded that there was no longer a need for the FFTF and thus ordered that it be shut down. Following eight years of additional study of potential new missions, the final decision to shut down the facility was made in 2001. (During this eight year period the plant was maintained in a condition to allow safe and efficient shut down or restart). The complete closure of the FFTF consists of the following phases: - Deactivation - removal/stabilization of hazards to allow long-term storage (2001-2009); - Surveillance and maintenance - minimum cost compliant storage (2010-2015); - Decontamination and decommissioning (2016-2024). All of the FFTF fuel has been removed from the site except the sodium-bonded fuel that is destined for transportation to Idaho National Laboratory for final disposition. The sodium-bonded fuel had metallic sodium inside of the fuel pin to increase the heat transfer from the fuel pellet to the clad in order to reduce pellet centerline temperature. Three hundred and seventy-six (376) fuel assemblies have been washed (sodium removed) and transferred to storage at other Hanford locations. The majority of the spent fuel is stored in interim storage casks designed for a 50 year storage life, holding seven assemblies each. All sodium systems have been drained and the sodium stored under an inert gas blanket at ambient temperature in a Sodium Storage Facility at the FFTF site. This facility consists of four large tanks and associated piping. The main contaminants are sodium-22, cesium-137 and tritium. The sodium-potassium (NaK) that was used as an intermediate cooling fluid in several FFTF systems has been drained and removed or flushed to sodium systems where it became mixed with the sodium. The in-containment hot cell has minimal sodium contamination, is currently inerted with argon and is being used for loading of the T-3 transportation cask with the sodium-bonded fuel for transportation to Idaho National Laboratory. The majority of the fuel handling machines are still operational and being used for loading the sodium-bonded fuel into the T-3 casks. This equipment will be shut down immediately following completion of shipment of the sodium-bonded fuel. The majority of hotel systems are still operating. Four of the eight 400-ton chillers have been shut down and four of the cooling towers have been shut down. The argon system is operational and supplying gas for sodium systems cover gas, in-containment hot cell atmosphere and fuel handling systems. The nitrogen system remains in service supplying cover gas to the demineralized water system and fire suppression systems. Eleven of the facilities nineteen transformers containing polychlorinated biphenyls (PCBs) have been removed and significant re-routing of power has been performed to support the long term minimum cost surveillance mode. Future plans include the complete deactivation, the long-term surveillance and maintenance, the sodium disposition and the decontamination and decommissioning The most complex and costly activity during the decontamination and decommissioning phase will be the removal of the 'residual sodium' in the sodium systems. It was impractical to remove the residual sodium during the systems draining evolution. It is estimated that approximately 24,000 liters (6,400 gallons) remain within the systems. The complexity of design of the FFTF exceeds any sodium facility in the United States in which sodium removal has occurred. There are a total of 21 miles of sodium piping in the FFTF as well as three large vessels (the reactor vessel and two spent fuel pool vessels) that will require partial disassembly and drilling in order react/remove remaining sodium.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Material Investigation and Long-term Sealing Behavior of Helicoflex{sup R} Metal Seals used in Containers for Spent Nuclear Fuel - 17135

In Germany spent nuclear fuel is stored and transported in casks that possess bolted lid systems equipped with double jacket metal seals of Helicoflex{sup R} type in order to enable safe enclosure of the radioactive inventory. A dry interim storage period of 40 years was planned and the casks are licensed for that time span. However, due to political reasons and delayed disposal projects this time span is expected to increase significantly. It is therefore necessary to evaluate the long-term sealing behavior of the casks exceeding 40 years of operating time. In this paper, we discuss our approach to investigate the aging behavior of such metal seals, and to predict the long-term sealing behavior. Accelerated aging component tests with seals are performed at temperatures up to 150 deg. C to investigate the course of seal force, usable resilience and leakage rate. Even though these tests have already shown a significant decrease in seal force and usable resilience after aging times of less than 1 year, for most seals the leakage rate stayed better than the specified value. However, observation of the leakage rate has to be continued to determine the aging effect on the seal properties. As a main influence on the seal long-term behavior the increasing permanent deformation of the outer jacket has been recognized. It is made of aluminum or silver which means that the temperatures that are relevant for the aforementioned application in casks lead to creep deformation. For further investigation of seal behavior a comprehensive research program concerning the material characteristics and aging behavior of the individual seal components, with an emphasis on the outer jacket material, has been launched. The aim is to get a better understanding of the time and temperature dependent creep mechanisms and deformation. The examinations are separated into tests on seal segments and tests on standardized specimen. In order to be able to study the aging process, seal segments are compressed in flanges and stored at temperatures ranging from room temperature to 150 deg. C. After defined time intervals the segments are analyzed by using standardized tests including structure investigation and creep tests. The results are compared with the behavior of the specimen basic raw material. This is done to ensure comparability of the thin jacket material and additional sheet material used for standardized tests. Thus, the prediction of component changes after different aging times at different temperatures can be made. As a result forecasts on the long term seal behavior are intended. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding and Controlling Cesium Loading on Crystalline Silicotitanate - 19601

Savannah River Remediation (SRR) contracted with Westinghouse Electric Corporation (WEC), Columbia Energy and Environmental Services (CEES), to build and deliver a modular ion exchange process that will be used to remove radioactive cesium from dissolved salt solution contained in Tank 10 at the Savannah River Site (SRS). The resulting decontaminated salt solution will be sent to Tank 11 and then to Tank 50 for final disposition in grout at the Saltstone facility. At the end of processing, the loaded ion exchange (IX) columns are drained, rinsed, and dried. The IX columns are removed from the modular unit and stored at Interim Safe Storage (ISS). This ion exchange process is called the Tank Closure Cesium Removal (TCCR) system. The TCCR system consists of several unit operations and process monitoring capability housed within three modular units. The first modular unit contains the process control computer, the second modular unit contains the main process equipment (two prefilters, four IX columns, and resin trap (post filtration)), and the third modular unit is the ventilation system. The main unit operations of the TCCR system are filtration, ion exchange, and ventilation. The ion exchange media utilized is a form of inorganic Crystalline Silicotitanate (CST), IONSIV{sup TM} R9120-B supplied by UOP Honeywell. CST has a high selectivity for cesium (Cs) and has some affinity for other Group IA alkali metals on the periodic chart (hydrogen, lithium, sodium, potassium, rubidium, and francium). CST has also been shown to have affinity for strontium and actinides. Cesium loading on the CST is dependent on many factors including chemical composition (cations and anions), temperature, and pH of the salt solution. The actual amount of Cs loaded onto an IX column is dependent on the factors above along with the salt solution volume fed to the IX column. Because of CST's high selectivity for Cs, the Cs-137 equilibrium loading can contribute enough decay heat to result in an ion exchange column boiling event under no flow conditions in the IX column. The boiling event under no flow is a safety concern that must be prevented from occurring. To prevent boiling of the column under no flow conditions, the Cs-137 equilibrium loading must be determined and understood. Several methodologies were evaluated for performing the Cs-137 equilibrium loading determination for CST. After review of available research and development (R and D), batch equilibrium contact test data, and Zheng Anthony Miller (ZAM) model predictions for the salt solution chemistry in Tank 10, a methodology for determining the Cs-137 equilibrium loading on CST was selected. The methodology selected involves an in-tank batch equilibrium contact test performed in duplicate that considers additional corrections to account for anticipated operational evolutions. The in-tank batch equilibrium contact test utilizes ∼0.1 grams of CST secured in a slotted sample vial. The slotted sample vial design allows for salt solution to be in contact with the CST. The slotted sample vials containing the CST are submerged in Tank 10 and exposed to the salt solution for ten days. After ten days, the samples are retrieved and sent to the Savannah River National Laboratory (SRNL) for analysis of the Cs-137 equilibrium loading. Additional corrections are then made to the Cs-137 results to account for anticipated operational evolutions. Anticipated operational evolutions include external additions (water/caustic) to Tank 10 that result in a change to its chemical composition, tank temperature effects, departures from the laboratory testing (mixed vs. stagnant tank conditions), and IX column flushes. A description of the methodologies considered, feasibility of methodology deployment, and the down select process (benefits vs. risks) is discussed in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preparing the FUSRAP Colonie Interim Storage Site for Transfer Back to the US Department of Energy Office of Legacy Management - 19215

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Colonie Interim Storage Site was transferred from the US Department of Energy (US DOE) to the US Army Corps of Engineers (USACE) in 1997. The USACE initiated remediation efforts at the Site under FUSRAP. The Site was separated into three distinct operable units (OU) to more efficiently manage the remedial process: 1) Groundwater OU, 2) Main Site Soils OU, and 3) Vicinity Property OU. The USACE has completed remedial actions at each of these three OUs and has advanced the OU remedies at the Site to the long-term stewardship stage to be executed by the US DOE Office of Legacy Management (LM). The US DOE LM is the current real property owner of record of the Colonie Main Site. A summary of each OU and the activities needed to prepare for site transfer follows: OU 1 - USACE issued the Colonie Groundwater OU Record of Decision (ROD) (USACE 2010a) on April 9, 2010. The Groundwater ROD remedy is monitored natural attenuation (MNA) and long-term monitoring (LTM) of groundwater after source removal completion. Results of groundwater monitoring indicate reductions in concentrations of contaminants of concern (COC). Based on the marked progress to date, USACE has optimized the groundwater LTM program (USACE, 2014) by reducing the well network, sampling frequency, and analytical parameters, and by abandoning wells that are no longer needed. A Groundwater ROD Five-Year Review report was submitted to the New York State Department of Environmental Conservation (NYSDEC) for review in 2018. NYSDEC agreed that MNA is still an appropriate remedial method although it is progressing at a slower rate than predicted. OU 2 - From 1999 to 2007, USACE completed the large-scale removal of soil at the Main Site, which included the adjacent Town of Colonie Vicinity Property. Radioactively contaminated soil along with accessible metals-contaminated soil and soil containing volatile organic compounds (VOC) were removed during this effort. A total of 103,402 cubic meters (m{sup 3}) of soil was excavated and disposed offsite. On March 26, 2015, USACE signed the Main Site Soils OU ROD (USACE, 2015a). The ROD remedy included provisions for Land Use Controls (LUC) consisting of institutional controls (IC) through an Environmental Easement for management of three small and discrete inaccessible locations within three of the 27 Final Status Survey units of the Main Site. The Environmental Easement provides a means of protection based on both current and future land use by placing restrictions on soil excavation and reuse. The easement and a supporting Site Management Plan (SMP) will be finalized by LM in coordination with NYSDEC. OU 3 - the Vicinity Property OU ROD was signed on 20 September 2017. This ROD declared No Action (NA) for dust and No Further Action (NFA) for soil and other media for the Vicinity Properties. Prior to the ROD, USACE performed dust sampling and other characterization activities at representative commercial and residential Vicinity Property locations. These efforts were reported in the Colonie FUSRAP Site Vicinity Property Operable Unit Remedial Investigation Summary Report (USACE, 2016). A Site Closeout Report (SCOR) was issued to NYSDEC and approved in 2018. The approval of this report starts the transfer process back to the LM. Ongoing and future transfer activities include records retention and management, preparation and filing of real estate records, physical site management (fencing, landscape maintenance, well abandonment) and coordination with state regulators and LM staff. This presentation is intended to make all stakeholders aware of the necessary steps for site transfer from the USACE back to the LM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗