Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulations of space charge in the Fermilab Main Injector

The Fermilab Project X plan for future high intensity operation relies on the Main Injector as the engine for delivering protons in the 60-120 GeV energy range. Project X plans call for increasing the number of protons per Main Injector bunch from the current value of 1.0 x 10{sup 11} to 3.0 x 10{sup 11}. Space charge effects at the injection energy of 8 GeV have the potential to seriously disrupt operations. We report on ongoing simulation efforts with Synergia, MARYLIE/Impact, and IMPACT, which provide comprehensive capabilities for parallel, multi-physics modeling of beam dynamics in the Main Injector including 3D space-charge effects.

43 PARTICLE ACCELERATORS↗

Test Plan Proposal for an International Joint Project for Transient Testing of Fast Reactor Fuels

EXECUTIVE SUMMARY An international joint project for transient testing of fast reactor fuels is proposed. Input from several countries is provided regarding their advanced/fast reactor programs, and the objectives and methods are given based on both historical projects and modern tools and methods. The full package would include irradiation testing using TREAT, use of existing facilities for non destructive exams/evaluations (NDE) and post irradiation exams (PIE), and integration of current state-of-the-art modeling and simulation (M&S) tools to aid in both experiment design, and prediction of experimental results.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Ute Mountain Ute Tribe Community-Scale Solar Project (Final Technical Report)

Deployment of Community-Scale solar power has been a goal of the Ute Mountain Ute Tribe (Tribe) for several years. The 1 MW AC photovoltaic power facility was built to power Tribal facilities in a manner that would allow the Tribe to credit residents’ electric bills and Tribal government electric bills with the dollar equivalent of the power generated. Other accomplished project objectives, in addition to learning the intricacies of such an endeavor, included strengthening the relationship with the local electric cooperative and their primary power provider, analysis of the generation and operations and maintenance during a one-year test phase, workforce development and training, and using the project to plan and drive future community scale solar projects. The Tribe’s vision of a net-zero electrical independence for its communities became a clearer reality with this project.

14 SOLAR ENERGY↗

Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

54 ENVIRONMENTAL SCIENCES↗

Integrated Energy-Water Planning in the Western and Texas Interconnections

While long-term regional electricity transmission planning has traditionally focused on cost, infrastructure utilization, and reliability, issues concerning the availability of water represent an emerging issue. Thermoelectric expansion must be considered in the context of competing demands from other water use sectors balanced with fresh and non-fresh water supplies subject to climate variability. An integrated Energy-Water Decision Support System (DSS) is being developed that will enable planners in the Western and Texas Interconnections to analyze the potential implications of water availability and cost for long-range transmission planning. The project brings together electric transmission planners (Western Electricity Coordinating Council and Electric Reliability Council of Texas) with western water planners (Western Governors’ Association and the Western States Water Council). This paper lays out the basic framework for this integrated Energy-Water DSS.

electricity↗

The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667

One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can find themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-J-99: Reconstruction of Cone Beam CT Image Using Volumetric Modulated Arc Therapy Exit Beams

Purpose: To test the possibility of obtaining an image of the treated volume during volumetric modulated arc therapy (VMAT) with exit beams. Method: Using a Varian Clinac 21EX and MVCT detector the following three sets of detector projection data were obtained for cone beam CT reconstruction with and without a Catphan 504 phantom. 1) 72 projection images from 20 × 16 cm{sup 2} open beam with 3 MUs, 2) 72 projection images from 20 × 16 cm{sup 2} MLC closed beam with 14 MUs. 3) 137 projection images from a test RapicArc QA plan. All projection images were obtained in ‘integrated image’ mode. We used OSCaR code to reconstruct the cone beam CT images. No attempts were made to reduce scatter or artifacts. Results: With projection set 1) we obtained a good quality MV CBCT image by optimizing the reconstruction parameters. Using projection set 2) we were not able to obtain a CBCT image of the phantom, which was determined to be due to the variation of interleaf leakage with gantry angle. From projection set 3), we were able to obtain a weak but meaningful signal in the image, especially in the target area where open beam signals were dominant. This finding suggests that one might be able to acquire CBCT images with rough body shape and some details inside the irradiated target area. Conclusion: Obtaining patient images using the VMAT exit beam is challenging but possible. We were able to determine sources of image degradation such as gantry angle dependent interleaf leakage and beams with a large scatter component. We are actively working on improving image quality.

60 APPLIED LIFE SCIENCES↗

Iraq liquid radioactive waste tanks maintenance and monitoring program plan.

The purpose of this report is to develop a project management plan for maintaining and monitoring liquid radioactive waste tanks at Iraq's Al-Tuwaitha Nuclear Research Center. Based on information from several sources, the Al-Tuwaitha site has approximately 30 waste tanks that contain varying amounts of liquid or sludge radioactive waste. All of the tanks have been non-operational for over 20 years and most have limited characterization. The program plan embodied in this document provides guidance on conducting radiological surveys, posting radiation control areas and controlling access, performing tank hazard assessments to remove debris and gain access, and conducting routine tank inspections. This program plan provides general advice on how to sample and characterize tank contents, and how to prioritize tanks for soil sampling and borehole monitoring.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying SE Methods Achieves Project Success to Evaluate Hammer and Fixed Cutter Grinders Using Multiple Varieties and Moistures of Biomass Feedstock for Ethanol Production

Applying basic systems engineering (SE) tools to the mission analysis phases of a 2.5-million dollar biomass pre-processing project for the U.S. Department of Energy directly assisted the project principal investigator understand the complexity and identify the gaps of a moving-target project and capture the undefined technical/functional requirements and deliverables from the project team and industrial partners. A creative application of various SE tools by non-aerospace systems engineers developed an innovative “big picture” product that combined aspects of mission analysis with a project functional flow block diagram, providing immediate understanding of the depth and breath of the biomass preprocessing effort for all team members, customers, and industrial partners. The “big picture” diagram became the blue print to write the project test plan, and provided direction to bring the project back on track and achieve project success.

09 BIOMASS FUELS↗

The Department of Energy and IDEA team up to document industry best practices

This article describes a collaboration between the U.S. Department of Energy and the International District Energy Association (IDEA) to document best practices in district energy systems. The initiative focuses on analyzing real-world performance data and highlighting effective strategies for improving efficiency, integrating renewable energy, and supporting decarbonization efforts. It highlights case studies from the University of California, Davis, and Princeton University to show how long-term master planning, phased project implementation, and strong financial analysis can drive successful transitions to more sustainable energy systems. U.C. Davis emphasizes incremental, results-driven planning and pilot projects, while Princeton focuses on aligning climate goals with financially viable infrastructure investments and life-cycle cost analysis. Overall, the article demonstrates that combining strategic planning, data-driven decision-making, and financial accountability is essential for advancing sustainable district energy systems.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Balancing renewable energy and river resources by moving from individual assessments of hydropower projects to energy system planning

As governments and non-state actors strive to minimize global warming, a primary strategy is the decarbonization of power systems which will require a massive increase in renewable electricity generation. Leading energy agencies forecast a doubling of global hydropower capacity as part of that necessary expansion of renewables. While hydropower provides generally low-carbon generation and can integrate variable renewables, such as wind and solar, into electrical grids, hydropower dams are one of the primary reasons that only one-third of the world’s major rivers remain free-flowing. This loss of free-flowing rivers has contributed to dramatic declines of migratory fish and sediment delivery to agriculturally productive deltas. Further, the reservoirs behind dams have displaced tens of millions of people. Thus, hydropower challenges the world’s efforts to meet climate targets while simultaneously achieving other Sustainable Development Goals. In this paper, we explore strategies to achieve the needed renewable energy expansion while sustaining the diverse social and environmental benefits of rivers. These strategies can be implemented at scales ranging from the individual project (environmental flows, fish passage and other site-level mitigation) to hydropower cascades to river basins and regional electrical power systems. While we review evidence that project-level management and mitigation can reduce environmental and social costs, we posit that the most effective scale for finding balanced solutions occurs at the scale of power systems. We further hypothesize that the pursuit of solutions at the system scale can also provide benefits for investors, developers and governments; evidence of benefits to these actors will be necessary for achieving broad uptake of the approaches described in this paper. We test this hypothesis through cases from Chile and Uganda that demonstrate the potential for system-scale power planning to allow countries to meet low-carbon energy targets with power systems that avoid damming high priority rivers (e.g., those that would cause conflicts with other social and environmental benefits) for a similar system cost as status quo approaches. We also show that, through reduction of risk and potential conflict, strategic planning of hydropower site selection can improve financial performance for investors and developers, with a case study from Colombia.

Opperman, Jeffrey J.↗

Follow-on Report of Analysis of Approaches to Supplemental Treatment of Low-Activity Waste at the Hanford Nuclear Reservation (Vol. I)

The Hanford Site, in southeast Washington State, is preparing to disposition approximately 56,000,000 gallons (56 Mgal) of radioactive and chemically hazardous wastes currently stored in underground tanks at the site. Tank wastes will be divided into a high-activity fraction and a low-activity fraction for subsequent treatment and disposition. A waste processing and treatment facility, the Waste Treatment and Immobilization Plant (WTP), will include the high-level waste (HLW) vitrification facility (WTP HLW Vitrification Facility) for immobilizing the high-activity fraction and a low-activity waste (LAW) vitrification facility (WTP LAW Vitrification Facility) for immobilizing the low-activity fraction. Both facilities will use vitrification technology to immobilize the Hanford tank wastes in a glass waste form. The volume of LAW to be treated and disposed of following waste retrieval and WTP operations will exceed the planned processing capacity of the WTP LAW Vitrification Facility. ORP-11242,-River Protection Project System Plan, estimates a shortfall in LAW treatment capacity of approximately 56 Mgal, approximately 50% of the projected LAW volume. To maintain the planned tank waste processing mission schedule, the U.S. Department of Energy (DOE) will require additional LAW treatment capacity (termed “supplemental LAW”) external to the WTP process. LAW must be solidified by a treatment technology before the waste can be permanently disposed of in an approved DOE on-site disposal facility or a commercial (state or U.S. Nuclear Regulatory Commission [NRC-licensed]) off-site mixed low-level waste disposal facility. A decision on the approach to supplemental LAW treatment, processing, and disposal has not yet been made

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-D-BRF-04: Digital Tomosynthesis for Improved Daily Setup in Treatment of Liver Lesions

Purpose: Daily localization of liver lesions with cone-beam CT (CBCT) is difficult due to poor image quality caused by scatter, respiratory motion, and the lack of radiographic contrast between the liver parenchyma and the lesion(s). Digital tomosynthesis (DTS) is investigated as a modality to improve liver visualization and lesion/parenchyma contrast for daily setup. Methods: An in-house tool was developed to generate DTS images using a point-by-point filtered back-projection method from on-board CBCT projection data. DTS image planes are generated in a user defined orientation to visualize the anatomy at various depths. Reference DTS images are obtained from forward projection of the planning CT dataset at each projection angle. The CBCT DTS image set can then be registered to the reference DTS image set as a means for localization. Contour data from the planning CT's associate RT Structure file and forward projected similarly to the planning CT data. DTS images are created for each contoured structure, which can then be overlaid onto the DTS images for organ volume visualization. Results: High resolution DTS images generated from CBCT projections show fine anatomical detail, including small blood vessels, within the patient. However, the reference DTS images generated from forward projection of the planning CT lacks this level of detail due to the low resolution of the CT voxels as compared to the pixel size in the projection images; typically 1mm-by-1mm-by-3mm (lat, vrt, lng) for the planning CT vs. 0.4mm-by-0.4mm for CBCT projections. Overlaying of the contours onto the DTS image allows for visualization of structures of interest. Conclusion: The ability to generate DTS images over a limited range of projection angles allows for reduction in the amount of respiratory motion within each acquisition. DTS may provide improved visualization of structures and lesions as compared to CBCT for highly mobile tumors.

60 APPLIED LIFE SCIENCES↗

Carbon Capture and Sequestration (via Enhanced Oil Recovery) from a Hydrogen Production Facility in an Oil Refinery

The project proposed a commercial demonstration of advanced technologies that would capture and sequester CO2 emissions from an existing hydrogen production facility in an oil refinery into underground formations in combination with Enhanced Oil Recovery (EOR). The project is led by Praxair, Inc., with other project participants: BP Products North America Inc., Denbury Onshore, LLC (Denbury), and Gulf Coast Carbon Center (GCCC) at the Bureau of Economic Geology of The University of Texas at Austin. The project is located at the BP Refinery at Texas City, Texas. Praxair owns and operates a large hydrogen production facility within the refinery. As part of the project, Praxair would construct a CO2 capture and compression facility. The project aimed at demonstrating a novel vacuum pressure swing adsorption (VPSA) based technology to remove CO2 from the Steam Methane Reformers (SMR) process gas. The captured CO2 would be purified using refrigerated partial condensation separation (i.e., cold box). Denbury would purchase the CO2 from the project and inject the CO2 as part of its independent commercial EOR projects. The Gulf Coast Carbon Center at the Bureau of Economic Geology, a unit of University of Texas at Austin, would manage the research monitoring, verification and accounting (MVA) project for the sequestered CO2, in conjunction with Denbury. The sequestration and associated MVA activities would be carried out in the Hastings field at Brazoria County, TX. The project would exceed DOE’s target of capturing one million tons of CO2 per year (MTPY) by 2015. Phase 1 of the project (Project Definition) is being completed. The key objective of Phase 1 is to define the project in sufficient detail to enable an economic decision with regard to proceeding with Phase 2. This topical report summarizes the administrative, programmatic and technical accomplishments completed in Phase 1 of the project. It describes the work relative to project technical and design activities (associated with CO2 capture technologies and geologic sequestration MVA), and Environmental Information Volume. Specific accomplishments of this Phase include: 1. Finalization of the Project Management Plan 2. Development of engineering designs in sufficient detail for defining project performance and costs 3. Preparation of Environmental Information Volume 4. Completion of Hazard Identification Studies 5. Completion of control cost estimates and preparation of business plan During the Phase 1 detailed cost estimate, project costs increased substantially from the previous estimate. Furthermore, the detailed risk assessment identified integration risks associated with potentially impacting the steam methane reformer operation. While the Phase 1 work identified ways to mitigate these integration risks satisfactorily from an operational perspective, the associated costs and potential schedule impacts contributed to the decision not to proceed to Phase 2. We have concluded that the project costs and integration risks at Texas City are not commensurate with the potential benefits of the project at this time.

03 NATURAL GAS↗

Real time computations of cryogenic He properties

The Fermilab PIP-II (proton improvement plan - II) project is being constructed at Fermilab to deliver $800\,MeV$ protons of $>1\,MW$ beam power to replace the present LINAC and provide protons to the remainder of the existing accelerator complex. The new LINAC consists of a warm front end, 23 superconducting RF cryomodules, and a beam transfer line to the existing complex. The cryomodules (CMs) are to be tested at Fermilab's CryoModule Test Facility (CMTF).An important measurement in cryogenic testing is the heat load of each CM. Traditionally, at Fermilab, these measurements were made collecting archived data offline and analyzing it. The new control system for PIP-II is being developed with the EPICS (Experimental Physics and Industrial Control System) framework, which allows us to compute the heat load in real time using the HePak library.We are exploring other $He$ properties, such as flow, where flow meters are not available, which can also be calculated in real time and fed back to the cryogenics engineers.This paper details the real time heat load calculation and $He$ flow software developed for CM testing at CMTF, as well as the first results from the prototype HB650 CM. Future plans for 2-phase $LHe$ flow will also be outlined.

Hanlet, Pierrick [Fermilab]↗

Sampling and Analysis Plan for Supplemental Environmental Project: Aquatic Life Surveys

As part of a settlement agreement for nuclear waste incidents in 2014, several supplemental environment projects (SEPs) were initiated at Los Alamos National Laboratory (LANL or the Laboratory) between the U.S. Department of Energy and the state of New Mexico. One SEP from this agreement consists of performing aquatic life surveys and will be used to assess the applicability of using generic ambient water-quality criteria (AWQC) for aquatic life. AWQC are generic criteria developed by the U.S. Environmental Protection Agency (EPA) to cover a broad range of aquatic species and are not unique to a specific region or state. AWQC are established by a composition of toxicity data, called species sensitivity distributions (SSDs), and are determined by LC50 (lethal concentration of 50% of the organisms studied) acute toxicity experiments for chemicals of interest. It is of interest to determine whether aquatic species inhabiting waters on the Pajarito Plateau are adequately protected using the current generic AWQC. The focus of this study will determine which aquatic species are present in ephemeral, intermittent, and perennial waters within LANL boundaries and from reference waters adjacent to LANL. If the species identified from these waters do not generally represent species used in the SSDs, then SSDs may need to be modified and AWQC may need to be updated. This sampling and analysis plan details the sampling methodology, surveillance locations, temporal scheduling, and analytical approaches that will be used to complete aquatic life surveys. A significant portion of this sampling and analysis plan was formalized by referring to Appendix E: SEP Aquatic Life Surveys DQO (Data Quality Objectives).

54 ENVIRONMENTAL SCIENCES↗

Scale-up of Novel Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch

The project started in September, 2012 with the goal of scaling up from the existing laboratory scale process for producing carbon fiber (CF) from polyolefin (PO) based precursor fiber using a Dow proprietary sulfonation-desulfonation stabilization process. The award was used to develop a process that was capable of producing market development quantities of CF from PO precursor fiber at a rate of 4 kg/h of CF. The CF would target properties that met or exceeded the Department of Energy (DOE) Vehicles Technology [1] standard; i.e., 172 GPa modulus and 1.72 GPa strength at greater than or equal to 1% strain. The Dow proprietary process was capable of meeting and exceeding these targets properties. Project DE-EE0005760 resulted from a Collaborative Research and Development Agreement (CRADA) between Dow and Oak Ridge National Laboratory (ORNL) with support from the Michigan Economic Development Corporation (MEDC) and DOE. In the first budget period, the main goal was to design a sulfonation-desulfonation market development plant capable of stabilizing PO precursor fiber at a rate of 5 kg/h using a sulfonation solution. The detailed design, location, and cost estimate were determined as scheduled in the Project Management Plan (PMP). In parallel with this DOE award project was a fundamentals and economic evaluation funded by The Dow Chemical Company (Dow). The goal of the Dow sponsored project was to finalize the mass balances, energy balances, and levelized cost to produce CF using the Dow process. A Go-No-Go decision was scheduled in June, 2013 based on the findings of the DOE sponsored scale up project and the Dow sponsored project. In June, 2013, Dow made the No-Go decision to halt and abandon the Dow proprietary sulfonation-desulfonation process for stabilizing PO precursor fibers for the manufacturing of CF. This No-Go decision was identified in the original proposal and at the start of this project, and the decision was made as scheduled. The decision was based on the high levelized economic cost of the process relative to the manufacture of CF from polyacrylonitrile (PAN) precursor fibers. The capital required to sulfonate the fibers adds a significant cost to the process due to the need for investment in a sulfuric acid recovery plant. This high additional capital over the capital for a PAN based CF plant, reduces the levelized economic cost to slightly advantaged over PAN based CF. The sulfonation-desulfonation stabilization route failed to meet the Dow’s return on investment criterion and the cost advantage target set forth for the DOE project. The DOE and Dow decided to halt spending on the project until a new PO fiber stabilization process could be identified that met the DOE physical properties standard and the levelized economic cost constraints of Dow. When the new technology was developed, then award DE-EE0005760 would be re-started with the same goals of the development of a market development plant capable of producing CF at 4 kg/h with the properties that met or exceed those set forth by the Department of Energy Vehicles Technology standard. Progress on the development of the new process has been slow and thus has delayed the scale up project. Dow’s efforts to date have not progressed to the point of demonstrating a commercially-viable process for production of low cost CF from PO precursors for Dow’s rigorous economic constraints. After extensive discussions within Dow and consultation with DOE’s Advanced Manufacturing Office (AMO) Headquarters and Golden Field Office teams, Dow has decided to proceed with the formal recommendation to terminate subject project. DOE’s AMO Headquarters and Golden Field Office teams agreed with the termination of the project.

36 MATERIALS SCIENCE↗