Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Mathematical framework for the analysis of dynamic stochastic systems with the RAVEN code

RAVEN (Reactor Analysis and Virtual control Environment) is a software code under development at Idaho National Laboratory aimed at performing probabilistic risk assessment and uncertainty quantification using RELAP-7, for which it acts also as a simulation controller. In this paper we will present the equations characterizing a dynamic stochastic system and we will then discuss the behavior of each stochastic term and how it is accounted for in the RAVEN software design. Moreover we will present preliminary results of the implementation. (authors)

97 MATHEMATICS AND COMPUTING↗

Feasibility and Safety Assessment for Advanced Reactor Concepts Using Vented Fuel

Recent interest in fast reactor technology has led to renewed analysis of past reactor concepts such as Gas Fast Reactors and Sodium Fast Reactors. In an effort to make these reactors more economic, the fuel is required to stay in the reactor for extended periods of time; the longer the fuel stays within the core, the more fertile material is converted into usable fissile material. However, as burnup of the fuel-rod increases, so does the internal pressure buildup due to gaseous fission products. In order to reach the 30 year lifetime requirements of some reactor designs, the fuel pins must have a vented-type design to allow the buildup of fission products to escape. The present work aims to progress the understanding of the feasibility and safety issues related to gas reactors that incorporate vented fuel. The work was separated into three different work-scopes: 1. Quantitatively determine fission gas release from uranium carbide in a representative helium cooled fast reactor; 2. Model the fission gas behavior, transport, and collection in a Fission Product Vent System; and, 3. Perform a safety analysis of the Fission Product Vent System. Each task relied on results from the previous task, culminating in a limited scope Probabilistic Risk Assessment (PRA) of the Fission Product Vent System. Within each task, many key parameters lack the fidelity needed for comprehensive or accurate analysis. In the process of completing each task, the data or methods that were lacking were identified and compiled in a Gap Analysis included at the end of the report.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Risk Informed Design as Part of the Systems Engineering Process

This slide presentation reviews the importance of Risk Informed Design (RID) as an important feature of the systems engineering process. RID is based on the principle that risk is a design commodity such as mass, volume, cost or power. It also reviews Probabilistic Risk Assessment (PRA) as it is used in the product life cycle in the development of NASA's Constellation Program.

Deckert, George↗

Effect of Clouds on Optical Imaging of the Space Shuttle During the Ascent Phase: A Statistical Analysis Based on a 3D Model

Clouds are highly effective in obscuring optical images of the Space Shuttle taken during its ascent by ground-based and airborne tracking cameras. Because the imagery is used for quick-look and post-flight engineering analysis, the Columbia Accident Investigation Board (CAIB) recommended the return-to-flight effort include an upgrade of the imaging system to enable it to obtain at least three useful views of the Shuttle from lift-off to at least solid rocket booster (SRB) separation (NASA 2003). The lifetimes of individual cloud elements capable of obscuring optical views of the Shuttle are typically 20 minutes or less. Therefore, accurately observing and forecasting cloud obscuration over an extended network of cameras poses an unprecedented challenge for the current state of observational and modeling techniques. In addition, even the best numerical simulations based on real observations will never reach "truth." In order to quantify the risk that clouds would obscure optical imagery of the Shuttle, a 3D model to calculate probabilistic risk was developed. The model was used to estimate the ability of a network of optical imaging cameras to obtain at least N simultaneous views of the Shuttle from lift-off to SRB separation in the presence of an idealized, randomized cloud field.

FROM↗

Impact Outputs for A Representative Extended Duration Artemis Mission

BACKGROUND: As NASA and private industry begin preparation for long-duration spaceflight, quantifying the impact that potential human health and performance capabilities have on crew health outcomes is imperative for medical risk mitigation. NASA’s Informing Mission Planning via Analysis of Complex Tradespaces tool (IMPACT) applies Probabilistic Risk Assessment (PRA) methodology to estimate these outcomes. OVERVIEW: As NASA prepares to return to the Moon, medical system planning has already begun for extended Artemis missions, which will see humans spending months at a time in cis-lunar space and on the surface of the Moon. The Long Duration Lunar Orbital and Lunar Surface (LDLOLS) design reference mission (DRM) lasts 9 months, including 3 months on the lunar surface, and involves 2 male and 2 female crewmembers. LDLOLS assumes no extravehicular activities (EVAs) in orbit, but, while on the lunar surface, involves 2-4 EVAs/month in a pressurized rover and 2-4 EVAs/month in an unpressurized rover or on foot. This DRM assumes a physician level Crew Medical Officer with commensurate knowledge, skills, and abilities. The IMPACT tool was utilized to estimate in-flight medical risk for this mission. More specifically, 100,000 simulations of this DRM were modeled, and overall estimates for loss of crew life (LOCL), need for evacuation (RTDC; return to definitive care), and crew task time lost (TTL; a measure of disability) were calculated. A recommended medical capability set, with appropriate mass and volume constraints, was also generated. DISCUSSION: This abstract reviews the IMPACT-derived risk for these mission outcomes with and without treatment, a macroscopic look at the total mass and volume necessary for full diagnostic and treatment capability, and how these change with input mission parameters.

J G Steller↗

MEASURING RISK IMPORTANCE IN A DYNAMIC PRA FRAMEWORK

Risk importance measures are indexes that are used to rank systems, structures and components (SSCs) using risk-informed methods. The most used/known measures are: Risk Reduction Worth (RRW), Risk Achievement Worth (RAW), Birnbaum (B) and Fussell-Vesely (FV). Once obtained from classical Probabilistic Risk Analysis (PRA) analyses, these risk measures can be effectively employed to optimize component testing and maintenance. In contrast to classical PRA methods, Dynamic PRA methods couple stochastic methods with safety analysis codes to determine risk associate to complex systems such as nuclear plants. Compared to classical PRA methods, they can evaluate with higher resolution the safety impact of timing and sequencing of events on the accident progression. The objective of this paper is to present a series of algorithms that can be used to determine classical risk importance measures (RRW, RAW, B and FV) along with newly developed ones from a Dynamic PRA analysis.

97 MATHEMATICS AND COMPUTING↗

Johnson Space Center's Risk and Reliability Analysis Group 2008 Annual Report

The Johnson Space Center (JSC) Safety & Mission Assurance (S&MA) Directorate s Risk and Reliability Analysis Group provides both mathematical and engineering analysis expertise in the areas of Probabilistic Risk Assessment (PRA), Reliability and Maintainability (R&M) analysis, and data collection and analysis. The fundamental goal of this group is to provide National Aeronautics and Space Administration (NASA) decisionmakers with the necessary information to make informed decisions when evaluating personnel, flight hardware, and public safety concerns associated with current operating systems as well as with any future systems. The Analysis Group includes a staff of statistical and reliability experts with valuable backgrounds in the statistical, reliability, and engineering fields. This group includes JSC S&MA Analysis Branch personnel as well as S&MA support services contractors, such as Science Applications International Corporation (SAIC) and SoHaR. The Analysis Group s experience base includes nuclear power (both commercial and navy), manufacturing, Department of Defense, chemical, and shipping industries, as well as significant aerospace experience specifically in the Shuttle, International Space Station (ISS), and Constellation Programs. The Analysis Group partners with project and program offices, other NASA centers, NASA contractors, and universities to provide additional resources or information to the group when performing various analysis tasks. The JSC S&MA Analysis Group is recognized as a leader in risk and reliability analysis within the NASA community. Therefore, the Analysis Group is in high demand to help the Space Shuttle Program (SSP) continue to fly safely, assist in designing the next generation spacecraft for the Constellation Program (CxP), and promote advanced analytical techniques. The Analysis Section s tasks include teaching classes and instituting personnel qualification processes to enhance the professional abilities of our analysts as well as performing major probabilistic assessments used to support flight rationale and help establish program requirements. During 2008, the Analysis Group performed more than 70 assessments. Although all these assessments were important, some were instrumental in the decisionmaking processes for the Shuttle and Constellation Programs. Two of the more significant tasks were the Space Transportation System (STS)-122 Low Level Cutoff PRA for the SSP and the Orion Pad Abort One (PA-1) PRA for the CxP. These two activities, along with the numerous other tasks the Analysis Group performed in 2008, are summarized in this report. This report also highlights several ongoing and upcoming efforts to provide crucial statistical and probabilistic assessments, such as the Extravehicular Activity (EVA) PRA for the Hubble Space Telescope service mission and the first fully integrated PRAs for the CxP's Lunar Sortie and ISS missions.

Valentine, Mark↗

Development of Advanced Numerical Tools for the Nonlinear Seismic Analysis of Nuclear Systems

In the framework of Probabilistic Risk Assessment (PRA) of nuclear facilities, a rigorous dynamic characterization of all structural and non-structural components is of paramount concern. The common features of nuclear facilities lies in the combination of three characteristics: 1. low aspect ratio; 2. large mass; and 3. significant embedment in soil. These characteristics make the interaction between the structural system and the surrounding soil a key aspect to consider for seismic risk evaluations. The methodologies and numerical tools currently in use for simulating the seismic response of a nuclear facility with significant Soil Structure Interaction (SSI) date back to the 1970's and rely on a number of simplifying idealizations, mainly related to the characterization of the incident seismic waveforms, the assumption of linear-elastic behavior of the superstructures, and idealization of equivalent linear behavior of the supporting soils. Given this background and taking advantage of the substantial progress in computational mechanics in the last decades, the ongoing research aims at developing advanced numerical tools for the nonlinear, time history simulation of nuclear facilities. This translates into the availability of a robust nonlinear time-domain simulation tool that can accurately model the nonlinearities of coupled soil-structure systems, and whose development includes robust verification and validation. The work described herein is supported by the U.S. Department of Energy (DOE) and focuses on delivering the next-generation, high performance simulation tool in support of DOE needs and mission. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Limitations imposed on fire PRA methods as the result of incomplete and uncertain fire event data.

Fire probabilistic risk assessment (PRA) methods utilize data and insights gained from actual fire events in a variety of ways. For example, fire occurrence frequencies, manual fire fighting effectiveness and timing, and the distribution of fire events by fire source and plant location are all based directly on the historical experience base. Other factors are either derived indirectly or supported qualitatively based on insights from the event data. These factors include the general nature and intensity of plant fires, insights into operator performance, and insights into fire growth and damage behaviors. This paper will discuss the potential methodology improvements that could be realized if more complete fire event reporting information were available. Areas that could benefit from more complete event reporting that will be discussed in the paper include fire event frequency analysis, analysis of fire detection and suppression system performance including incipient detection systems, analysis of manual fire fighting performance, treatment of fire growth from incipient stages to fully-involved fires, operator response to fire events, the impact of smoke on plant operations and equipment, and the impact of fire-induced cable failures on plant electrical circuits.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nuclear power plant risk-informed surveillance frequency control program implementation at the Duke Catawba nuclear plant with a focus on instrumentation and control systems - 333

This paper summarizes an updated process for risk-informed surveillance frequency control program (SFCP) implementation at the Catawba Nuclear Power Plant in the past year. This program includes selection and prioritization of specific target surveillance test interval extensions; and development, review, and implementation of surveillance test risk informed documented evaluation (STRIDE) packages designed to support extension of conventional surveillance requirement test intervals, in accordance with 'Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies, Industry Guideline,' NEI 04-10, Revision 1 . The scope of work associated with STRIDE development includes probabilistic risk assessment (PRA) case studies, deterministic assessment (DA) evaluations, and, where required, instrument drift evaluation (IDE). The STRIDE implementation efforts have also included support of independent decision-making panel (IDP) meetings at the implementing power stations and IDP member training. The purpose of this paper is to provide a presentation of a refined process for STRIDE development with a focus on instrumentation and control systems based on author experience, which includes support for the development of multiple STRIDE packages for the Catawba Nuclear Plant. This paper outlines a framework for practical implementation of an SFCP within the context of an integrated risk-informed performance-based regulation application program with emphasis on instrumentation and control systems. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Real-time fault detection and transient identification using extended Kalman filters - 254

In this paper, real-time fault detection and transient identification are studied with adaptive estimation methods, in particular parallel processing methods by implementing a bank of extended Kalman filters. Adaptive estimation is combined with probabilistic risk assessment to allow for real-time continuous monitoring of initiating events. The approach provides a probability of an initiating event happening. Real-time monitoring of initiating events can reduce labor demand. Each extended Kalman filter is configured to operate at a single configuration, either at normal operation or a faulted state. Fault detection is based on calculating a likelihood function for each extended Kalman filter to determine the posteriori conditional probability that the system configuration is the true configuration. The transient identification is determined by performing a multivariate statistical analysis on each extended Kalman filter to provide a posterior probability assessment that the reactor states and its dynamics are within the allowable limits. The probability distribution being outside the allowable limits indicate a transient has occurred. The combination of parallel processing methods with the multivariate statistical analysis for transient identification allows for the operator to perform transient identification with having a high level of certainty of the current system configuration. We demonstrate the real-time fault detection and transient identification on a simple reactor example to determine the reactor power, reactor temperature, and coolant temperature in the presence of various faults. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk Acceptance Personality Paradigm: How We View What We Don't Know We Don't Know

The purpose of integrated hazard analyses, probabilistic risk assessments, failure modes and effects analyses, fault trees and many other similar tools is to give managers of a program some idea of the risks associated with their program. All risk tools establish a set of undesired events and then try to evaluate the risk to the program by assessing the severity of the undesired event and the likelihood of that event occurring. Some tools provide qualitative results, some provide quantitative results and some do both. However, in the end the program manager and his/her team must decide which risks are acceptable and which are not. Even with a wide array of analysis tools available, risk acceptance is often a controversial and difficult decision making process. And yet, today's space exploration programs are moving toward more risk based design approaches. Thus, risk identification and good risk assessment is becoming even more vital to the engineering development process. This paper explores how known and unknown information influences risk-based decisions by looking at how the various parts of our personalities are affected by what they know and what they don't know. This paper then offers some criteria for consideration when making risk-based decisions.

Massie, Michael J.↗

Tuning and Verification of an Internal Flooding Model for Dynamic PRA

In probabilistic risk assessment (PRA), the likelihoods and consequences of basic events are combined to determine possible system level outcomes and the likelihood of each outcome given an initial event. Both the consequences and likelihoods of basic events may be informed by the use of mathematical models or experimental data regarding the phenomena of interest. In either case, the impact of uncertainties on the results need to be evaluated. If a model is used to predict the evolution of an initiating event, uncertainty quantification can be computationally challenging for complex phenomena with many epistemic (e.g., model) uncertainties. In this work, a reduced order model is introduced for the flooding analysis of a multi-room building at a nuclear power plant under uncertainties which can require long run times using high fidelity computer models. The reduced order model focuses on macro-level transfer of water between rooms and tracks the water level within each room. In order to verify the model's fidelity, its results for the phenomena involved in a scenario of interest are compared to those of a computational fluid dynamics (CFD) code, which are taken to represent reality. This work does not focus on the overall fidelity of the flooding model, as the goal of the project for which it was developed is to develop a methodology rather than to analyze a particular case. The focus instead is on the tunability and verifiability of the reduced order model for relevant physical measures. In analyzing a particular case, the model may be required to incorporate more realistic description of phenomena; however, the procedure described in this work may be used to verify its performance as well. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Peer Review of NRC Standardized Plant Analysis Risk Models

The Nuclear Regulatory Commission (NRC) Standardized Plant Analysis Risk (SPAR) Models underwent a Peer Review using ASME PRA standard (Addendum C) as endorsed by NRC in Regulatory Guide (RG) 1.200. The review was performed by a mix of industry probabilistic risk analysis (PRA) experts and NRC PRA experts. Representative SPAR models, one PWR and one BWR, were reviewed against Capability Category I of the ASME PRA standard. Capability Category I was selected as the basis for review due to the specific uses/applications of the SPAR models. The BWR SPAR model was reviewed against 331 ASME PRA Standard Supporting Requirements; however, based on the Capability Category I level of review and the absence of internal flooding and containment performance (LERF) logic only 216 requirements were determined to be applicable. Based on the review, the BWR SPAR model met 139 of the 216 supporting requirements. The review also generated 200 findings or suggestions. Of these 200 findings and suggestions 142 were findings and 58 were suggestions. The PWR SPAR model was also evaluated against the same 331 ASME PRA Standard Supporting Requirements. Of these requirements only 215 were deemed appropriate for the review (for the same reason as noted for the BWR). The PWR review determined that 125 of the 215 supporting requirements met Capability Category I or greater. The review identified 101 findings or suggestions (76 findings and 25 suggestions). These findings or suggestions were developed to identify areas where SPAR models could be enhanced. A process to prioritize and incorporate the findings/suggestions supporting requirements into the SPAR models is being developed. The prioritization process focuses on those findings that will enhance the accuracy, completeness and usability of the SPAR models.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Application of Nonlinear Seismic Soil-Structure Interaction Analysis for Identification of Seismic Margins at Nuclear Power Plants

Seismic probabilistic risk assessment (SPRA) methods and approaches at nuclear power plants (NPP) were first developed in the 1970s and aspects of them have matured over time as they were applied and incrementally improved. SPRA provides information on risk and risk insights and allows for some accounting for uncertainty and variability. As a result, SPRA is now used as an important basis for risk-informed decision making for both new and operating NPPs in the US and in an increasing number of countries globally. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in some instances the current SPRA approach contains large uncertainties, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility). INL has an advanced SPRA research and development (R&D) activity that will identify areas in the calculation process that contain significant uncertainties. One current area of focus is the use of nonlinear soil-structure interaction (NLSSI) analysis methods to accurately capture: 1) nonlinear soil behavior and 2) gapping and sliding between the NPP and soil. The goal of this study is to compare numerical NLSSI analysis results with recorded earthquake ground motions at Fukushima Daichii (Great Tohuku Earthquake) and evaluate the sources of nonlinearity contributing to the observed reduction in peak acceleration. Comparisons are made using recorded data in the free-field (soil column with no structural influence) and recorded data on the NPP basemat (in-structure response). Results presented in this study should identify areas of focus for future R&D activities with the goal of minimizing uncertainty in SPRA calculations. This is not a validation activity since there are too many sources of uncertainty that a numerical analysis would need to consider (variability in soil material properties, structural material properties, etc.). Rather the report will determine if the NLSSI calculations are following similar trends observed in the recorded data (i.e. reductions in maximum acceleration between the free-field and basemat) Numerical NLSSI results presented show maximum accelerations between the free field and basemat were reduced the EW and NS directions. The maximum acceleration in the UD direction increased slightly. The largest reduction in maximum accelerations between the modeled free-field and the NPP basemat resulted in nearly 50% reduction. The observation in reduction of numerical maximum accelerations in the EW and NS directions follows the observed trend in the recorded data. The maximum reductions observed in these NLSSI studies were due to soil nonlinearities, not gapping and sliding (although additional R&D is needed to develop an appropriate approach to model gapping and sliding). This exploratory study highlights the need for additional R&D on developing: (i) improved modeling of soil nonlinearities (soil constitutive models that appropriately capture cyclic soil behavior), (ii) improved modeling of gapping and sliding at the soil-structure interface (to appropriately capture the dissipation of energy at this interface), and (iii) experimental laboratory test data to calibrate the items (i) and (ii).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Brace For Impact – It’s Coming, Do You Know What to Do With It?

Long-duration human exploration spaceflight missions to the Moon and Mars present unprecedented challenges for providing in-mission medical care. Compared with the International Space Station, the greater distance from Earth will mean increased mission durations, communication delays, limited to no resupply opportunities, and significant limitations on the evacuation of ill or injured crew. Spacecraft mass, volume, and power will be curtailed while higher demands will be placed on the crew’s knowledge, skills, and abilities. In this higher risk environment, it is important to define and quantitatively estimate human system risk attributable to medical conditions. IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a probabilistic risk assessment (PRA) and medical trade space analysis tool being developed by NASA to advance medical system design for exploration missions. IMPACT has made a number of enhancements on the Integrated Medical Model, the PRA tool currently used by NASA. These updates include a novel medical evidence base baselined to a long duration, deep space exploration environment; an expanded medical condition list; and a trade space analysis capability (e.g. comparing risk profiles and mass/volume constraints for medical capabilities and resources). IMPACT core functionality includes quantification of a medical capability set and assisting with identification of specific medical resources/hardware for exploration missions. In addition, IMPACT provides sophisticated trade space capabilities to estimate how human system risk varies with changes to the mission architecture or medical capability set. This presentation will provide a brief overview of the IMPACT tool, discuss representative use cases, and show example results.

Benjamin Easter↗

CHP-PRA: Sensorimotor Countermeasures Proof of Concept

The capabilities included in Crew Health and Performance (CHP) systems are designed to keep the crew healthy, happy, and productive. In doing so, the CHP system allows reductions in human related risks to be realized. All human missions, though particularly future Artemis and Mars missions, have constraints on the mass and volume allocated to the CHP system. Thus, trades must be made on how to best buy down risk while still meeting other requirements. Understanding how different CHP capabilities influence medical, performance, and long-term health risks is key to making informed choices among these trades. To address this, an integrated CHP Probabilistic Risk Assessment (PRA) model is being developed. Much like how IMPACT is designed to allow medical resource trades informed by medical risks, CHP PRA will enable analogous trades in human system risks across all CHP functions and capabilities. There are 29 Human System Risk Board (HSRB) risk areas to consider for model implementation. This effort focused solely on the implementation of countermeasures associated with sensorimotor risk. The framework and lessons learned from this proof of concept will benefit the implementation of other risks and countermeasures. Astronauts experience sensorimotor changes when entering or exiting a microgravity environment. While most sensorimotor issues are resolved within a few days, they pose a serious risk to crew health and performance during the adaptation period. This adaptation period aligns with gravity transitions and key mission phases where the crew members may be required to complete challenging tasks ideally with an undisturbed sensorimotor system. Countermeasures such as training or pharmaceuticals can be used to mitigate risk. This effort began by identifying physiological changes to the sensorimotor system that could lead to functional performance decrements or medical conditions and potential countermeasures, so that the overall effect of sensorimotor disturbance on human risk could be captured. We then selected example countermeasures, mapped relationships between countermeasures and outcomes, and used results from existing sensorimotor investigations to define the relationship between a sensorimotor countermeasure and subsequent performance of a sensorimotor-affected task. Specifically, using shuttle landing performance data, we compared the use or absence of inflight training capabilities to yield a relative performance change that can be applied to the prediction of the risk associated with manual control performance in future missions, as depicted in the figure. This sensorimotor proof of concept demonstrates how HRP research information can be transformed into quantifiable relationships to describe changes in HSRB medical and performance risks.

Caroline R Austin↗

Accounting for Point Estimate Uncertainty in Space Systems Reliability and Risk Analysis

Understanding and accounting for uncertainty in risk analysis is a critical step in the management and communication of risk in engineered systems. The component and system-level analysis to determine the probability of a negative outcome and its consequence is often quantified by a point estimate. Many Program and Enterprise decisions involving technical concerns and issues rely on reliability engineering activities to produce quantified risk analysis to inform the decision making process. At NASA, it is common to use a Probabilistic Risk Analysis (PRA) to inform the overall risk to Loss of Mission or Loss of Crew that involves integration across all spacecraft subsystem fault trees to produce an overall probability of mission failure. The point estimate is an estimate of this overall probability and is an immediate result of a fault tree model. It is the result of a model where the probability of each event is taken to be equal to its mean. The value provides an approximation of the overall mean without running any uncertainty calculations (e.g., no sampling). Using only the point estimate can lead to a false sense of precision and the point estimate may not match the resulting mean when uncertainty is taken into consideration. This paper will explore five conditions that can cause the PRA model mean to diverge from the point estimate and will provide engineers and managers insight into the importance of understanding uncertainty in the elements of PRA models.

Paul J Collier↗