Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Long-Term Performance of Transuranic Waste Inadvertently Disposed in a Shallow Land Burial Trench at the Nevada Test Site

In 1986, 21 m3 of transuranic (TRU) waste was inadvertently disposed in a shallow land burial trench at the Area 5 Radioactive Waste Management Site on the Nevada Test Site. U.S. Department of Energy (DOE) TRU waste must be disposed in accordance with Title 40, Code of Federal Regulations (CFR), Part 191, Environmental Radiation Protection Standard for Management and Disposal of Spent Nuclear Fuel, High-Level, and Transuranic Radioactive Wastes. The Waste Isolation Pilot Plant is the only facility meeting these requirements. The National Research Council, however, has found that exhumation of buried TRU waste for disposal in a deep geologic repository may not be warranted when the effort, exposures, and expense of retrieval are not commensurate with the risk reduction achieved. The long-term risks of leaving the TRU waste in-place are evaluated in two probabilistic performance assessments. A composite analysis, assessing the dose from all disposed waste and interacting sources of residual contamination, estimates an annual total effective dose equivalent (TEDE) of 0.01 mSv, or 3 percent of the dose constraint. A 40 CFR 191 performance assessment also indicates there is reasonable assurance of meeting all requirements. The 40 CFR 191.15 annual mean TEDE for a member of the public is estimated to reach a maximum of 0.055 mSv at 10,000 years, or approximately 37 percent of the 0.15 mSv individual protection requirement. In both assessments greater than 99 percent of the dose is from co-disposed low-level waste. The simulated probability of the 40 CFR 191.13 cumulative release exceeding 1 and 10 times the release limit is estimated to be 0.0093 and less than 0.0001, respectively. Site characterization data and hydrologic process modeling support a conclusion of no groundwater pathway within 10,000 years. Monte Carlo uncertainty analysis indicates that there is reasonable assurance of meeting all regulatory requirements. Sensitivity analysis indicates that the results are insensitive to TRU waste-related parameters. Limited quantities of TRU waste in a shallow land burial trench can meet DOE performance objectives for disposal of TRU waste and contribute negligibly to disposal site risk. Leaving limited quantities of buried TRU waste in-place may be preferred over retrieval for disposal in a deep geologic repository.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of Wind Generation and Load Forecast Uncertainties into Power Grid Operations

In this paper, a new approach to evaluate the uncertainty ranges for the required generation performance envelope, including the balancing capacity, ramping capability and ramp duration is presented. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (CAISO) real life data have shown the effectiveness and efficiency of the proposed approach.

17 WIND ENERGY↗

Wind Energy Management System EMS Integration Project: Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind and solar power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation), and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind/solar forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. To improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. Currently, uncertainties associated with wind and load forecasts, as well as uncertainties associated with random generator outages and unexpected disconnection of supply lines, are not taken into account in power grid operation. Thus, operators have little means to weigh the likelihood and magnitude of upcoming events of power imbalance. In this project, funded by the U.S. Department of Energy (DOE), a framework has been developed for incorporating uncertainties associated with wind and load forecast errors, unpredicted ramps, and forced generation disconnections into the energy management system (EMS) as well as generation dispatch and commitment applications. A new approach to evaluate the uncertainty ranges for the required generation performance envelope including balancing capacity, ramping capability, and ramp duration has been proposed. The approach includes three stages: forecast and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence levels. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis, incorporating all sources of uncertainties of both continuous (wind and load forecast errors) and discrete (forced generator outages and start-up failures) nature. A new method called the “flying brick” technique has been developed to evaluate the look-ahead required generation performance envelope for the worst case scenario within a user-specified confidence level. A self-validation algorithm has been developed to validate the accuracy of the confidence intervals.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wind Energy Management System Integration Project Incorporating Wind Generation and Load Forecast Uncertainties into Power Grid Operations

The power system balancing process, which includes the scheduling, real time dispatch (load following) and regulation processes, is traditionally based on deterministic models. Since the conventional generation needs time to be committed and dispatched to a desired megawatt level, the scheduling and load following processes use load and wind power production forecasts to achieve future balance between the conventional generation and energy storage on the one side, and system load, intermittent resources (such as wind and solar generation) and scheduled interchange on the other side. Although in real life the forecasting procedures imply some uncertainty around the load and wind forecasts (caused by forecast errors), only their mean values are actually used in the generation dispatch and commitment procedures. Since the actual load and intermittent generation can deviate from their forecasts, it becomes increasingly unclear (especially, with the increasing penetration of renewable resources) whether the system would be actually able to meet the conventional generation requirements within the look-ahead horizon, what the additional balancing efforts would be needed as we get closer to the real time, and what additional costs would be incurred by those needs. In order to improve the system control performance characteristics, maintain system reliability, and minimize expenses related to the system balancing functions, it becomes necessary to incorporate the predicted uncertainty ranges into the scheduling, load following, and, in some extent, into the regulation processes. It is also important to address the uncertainty problem comprehensively, by including all sources of uncertainty (load, intermittent generation, generators’ forced outages, etc.) into consideration. All aspects of uncertainty such as the imbalance size (which is the same as capacity needed to mitigate the imbalance) and generation ramping requirement must be taken into account. The latter unique features make this work a significant step forward toward the objective of incorporating of wind, solar, load, and other uncertainties into power system operations. In this report, a new methodology to predict the uncertainty ranges for the required balancing capacity, ramping capability and ramp duration is presented. Uncertainties created by system load forecast errors, wind and solar forecast errors, generation forced outages are taken into account. The uncertainty ranges are evaluated for different confidence levels of having the actual generation requirements within the corresponding limits. The methodology helps to identify system balancing reserve requirement based on a desired system performance levels, identify system “breaking points”, where the generation system becomes unable to follow the generation requirement curve with the user-specified probability level, and determine the time remaining to these potential events. The approach includes three stages: statistical and actual data acquisition, statistical analysis of retrospective information, and prediction of future grid balancing requirements for specified time horizons and confidence intervals. Assessment of the capacity and ramping requirements is performed using a specially developed probabilistic algorithm based on a histogram analysis incorporating all sources of uncertainty and parameters of a continuous (wind forecast and load forecast errors) and discrete (forced generator outages and failures to start up) nature. Preliminary simulations using California Independent System Operator (California ISO) real life data have shown the effectiveness of the proposed approach. A tool developed based on the new methodology described in this report will be integrated with the California ISO systems. Contractual work is currently in place to integrate the tool with the AREVA EMS system.

17 WIND ENERGY↗

SOARCA Peach Bottom Atomic Power Station Long-Term Station Blackout Uncertainty Analysis: Convergence of the Uncertainty Results

This paper describes the convergence of MELCOR Accident Consequence Code System, Version 2 (MACCS2) probabilistic results of offsite consequences for the uncertainty analysis of the State-of-the-Art Reactor Consequence Analyses (SOARCA) unmitigated long-term station blackout scenario at the Peach Bottom Atomic Power Station. The consequence metrics evaluated are individual latent-cancer fatality (LCF) risk and individual early fatality risk. Consequence results are presented as conditional risk (i.e., assuming the accident occurs, risk per event) to individuals of the public as a result of the accident. In order to verify convergence for this uncertainty analysis, as recommended by the Nuclear Regulatory Commission’s Advisory Committee on Reactor Safeguards, a ‘high’ source term from the original population of Monte Carlo runs has been selected to be used for: (1) a study of the distribution of consequence results stemming solely from epistemic uncertainty in the MACCS2 parameters (i.e., separating the effect from the source term uncertainty), and (2) a comparison between Simple Random Sampling (SRS) and Latin Hypercube Sampling (LHS) in order to validate the original results obtained with LHS. Three replicates (each using a different random seed) of size 1,000 each using LHS and another set of three replicates of size 1,000 using SRS are analyzed. The results show that the LCF risk results are well converged with either LHS or SRS sampling. The early fatality risk results are less well converged at radial distances beyond 2 miles, and this is expected due to the sparse data (predominance of “zero” results).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

CCF Parameter Estimations, 2020 Update

This report documents the quantitative results of the common-cause failure (CCF) data collection effort (which included data through 2020) and summarizes the results of the parameter estimation quantification process performed on CCF data in the U.S. Nuclear Regulatory Commission (NRC) CCF database. This is the 2020 update to NUREG/CR-5497, updating data and parameter estimations for CCFs. This release, CCF Parameter Estimation 2020, reflects the CCF data contained within the CCF database, https://rads.inl.gov/Pages/CCF.aspx, by executing (in August 2021) the CCF query rules in the folder SPAR Rules 2020. The data covers the period from 1/1/2006 to 12/31/2020, the most recent 15-year period in which data are available. The use of the most recent rolling 15-year data in parameter estimation differs from previous updates, in which 1/1/1997 was used as the starting date (e.g., 1/1/1997 to 12/31/2015 for the 2015 update, 1/1/1997 to 12/31/2012 for the 2012 update). The new date range (i.e., the most recent 15-year period), was selected for this CCF update so as to be consistent with the date range chosen for the component reliability parameter estimation, and with the effort to include sufficient data for analysis while simultaneously reflecting the most recent industry performance. These results are appropriate for use in probabilistic risk assessment (PRA) studies, including the Standardized Plant Analysis Risk (SPAR) models of commercial nuclear power plants (NPPs) in the U.S. This update may be referred as: U.S. Nuclear Regulatory Commission, "CCF Parameter Estimations, 2020 Update," https://nrcoe.inl.gov/publicdocs/CCF/ccfparamest2020.pdf, November 2021.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Unified View of Engineering Creep Parameters

Creep data are often analyzed using derived engineering parameters to correlate creep life (either time to rupture, or time to a specified strain) to applied stress and temperature. Commonly used formulations include Larson-Miller, Orr-Sherby-Dorn, Manson-Haferd, and Manson-Succop parameterizations. In this paper, it is shown that these parameterizations are all special cases of a common general framework based on a linear statistical model. Recognition of this fact allows for statistically efficient estimation of material model parameters and quantitative statistical comparisons among the various parameterizations in terms of their ability to fit a material database, including assessment of a stress-temperature interaction in creep behavior. This provides a rational basis for choosing the best parameterization to describe a particular material. Furthermore, using the technique of maximum likelihood estimation to estimate model parameters allows for a statistically proper treatment of runouts in a test database via censored data analysis methods, and for construction of probabilistically interpretable upper and lower bounds on creep rate. A generalized Larson-Miller formulation is developed, which is comparable in complexity to the Manson-Haferd parameter, but utilizes a reciprocal temperature dependence. The general framework for analysis of creep data is illustrated with analysis of Alloy 617 and Alloy 230 test data.

36 MATERIALS SCIENCE↗

Applying Bayesian belief networks in rapid response situations

The authors have developed an enhanced Bayesian analysis tool called the Integrated Knowledge Engine (IKE) for monitoring and surveillance. The enhancements are suited for Rapid Response Situations where decisions must be made based on uncertain and incomplete evidence from many diverse and heterogeneous sources. The enhancements extend the probabilistic results of the traditional Bayesian analysis by (1) better quantifying uncertainty arising from model parameter uncertainty and uncertain evidence, (2) optimizing the collection of evidence to reach conclusions more quickly, and (3) allowing the analyst to determine the influence of the remaining evidence that cannot be obtained in the time allowed. These extended features give the analyst and decision maker a better comprehension of the adequacy of the acquired evidence and hence the quality of the hurried decisions. They also describe two example systems where the above features are highlighted.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Systematic Enterprise Risk Management by Integrating the RISMC Toolkit and Cost-Benefit Analysis (Final Report)

The goal of this research is to theorize and quantify the relationships between safety and the financial performance of nuclear power plants (NPPs). The Socio-Technical Risk Analysis (SoTeRiA) theoretical framework, which connects the social aspects (e.g., safety culture) and structural features (e.g., safety practices) of an organization with organizational safety and financial risks, is used to theorize the direct and indirect relationships between safety and the financial performance of NPPs. An Integrated Enterprise Risk Management (I-ERM) methodological framework is developed to operationalize SoTeRiA to quantify NPP safety and financial performance in a unified platform where their underlying physical degradation mechanisms, coupled with maintenance performance (considering human and organizational factors), are explicitly incorporated to depict the interconnections and dependencies between safety and financial performance. In this study, NPP safety refers to both occupational safety and system safety (estimated from Probabilistic Risk Assessment, PRA), and financial performance refers to the monetary values associated with NPP operation and maintenance (O&M) strategies. This report covers a case study demonstrating the feasibility of the I-ERM methodological framework. More detailed development of one of the I-ERM modules, i.e., Probabilistic Physics-of-Failure (PPoF) analysis, and its connection with other I-ERM modules is demonstrated in a second case study. The outcome of this research will help NPP decision-makers create cost-saving maintenance strategies while maintaining safety by providing cost- and risk-informed recommendations regarding maintenance work processes and operational strategies.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Operating Experiences from Existing Fusion Facilities in View of ITER Safety and Reliability

The objective of this ongoing activity is to develop a fusion specific component failure rate database useful to quantify probabilistic safety assessment, support traditional safety analysis, quantify reliability, availability, maintainability, and inspectability (RAMI) analyses, and support any other uses where field experience can provide feedback to fusion facility design and operation. The activity supported by European, American, and Japanese programs is established in the context of the International Energy Agency Agreement on the Environmental, Safety and Economic Aspects of Fusion Power (IEA ESE). The data collection began in 1989. At first, it was to "harvest" already-published data from high-technology industries that can be readily applied to fusion components. Several years later, attention was also directed to collecting and analyzing operating experience data from existing tokamaks and other fusion experiments. For some fusion facilities, the investigations on causes and effects of failures of components and systems have also interested worker exposures and radiological releases induced by maintenance activities on failed components.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Accelerated Gibbs Sampling for Infinite Sparse Factor Analysis

The Indian Buffet Process (IBP) gives a probabilistic model of sparse binary matrices with an unbounded number of columns. This construct can be used, for example, to model a fixed numer of observed data points (rows) associated with an unknown number of latent features (columns). Markov Chain Monte Carlo (MCMC) methods are often used for IBP inference, and in this technical note, we provide a detailed review of the derivations of collapsed and accelerated Gibbs samplers for the linear-Gaussian infinite latent feature model. We also discuss and explain update equations for hyperparameter resampling in a 'full Bayesian' treatment and present a novel slice sampler capable of extending the accelerated Gibbs sampler to the case of infinite sparse factor analysis by allowing the use of real-valued latent features.

97 MATHEMATICS AND COMPUTING↗

Development of a leading simulator/trailing simulator methodology as part of an integrated safety-security analysis for nuclear power plants

Nuclear power plant (NPP) risk assessment is broadly separated into disciplines of nuclear safety, security, and safeguards. Different analysis methods and computer models have been constructed to analyze each of these as separate disciplines. However, due to the complexity of NPP systems, there are risks that can span all these disciplines and require consideration of safety-security (2S) interactions which allows a more complete understanding of the relationship among these risks. In this work, a novel leading simulator/trailing simulator (LS/TS) method is introduced to integrate multiple generic safety and security computer models into a single, holistic 2S analysis. A case study is performed using this novel method to determine its effectiveness. The case study shows that the LS/TS method avoided introducing errors in simulation, compared to the same scenario performed without the LS/TS method. A second case study is then used to illustrate an integrated 2S analysis which shows that different levels of damage to vital equipment from sabotage at a NPP can affect accident evolution by several hours.

42 ENGINEERING↗

Overview of New Tools to Perform Safety Analysis: BWR Station Black Out Test Case

Dynamic Probabilistic Risk Assessment (DPRA) methodologies couple system simulator codes (e.g., RELAP, MELCOR) with simulation controller codes (e.g., RAVEN, ADAPT). While system simulator codes accurately model system dynamics deterministically, simulation controller codes introduce both deterministic (e.g., system control logic, operating procedures) and stochastic (e.g., component failures, parameter uncertainties) elements into the simulation. Typically, a DPRA is performed by: 1) sampling values of a set of parameters from the uncertainty space of interest (using the simulation controller codes), and 2) simulating the system behavior for that specific set of parameter values (using the system simulator codes). For complex systems, one of the major challenges in using DPRA methodologies is to analyze the large amount of information (i.e., large number of scenarios ) generated, where clustering techniques are typically employed to allow users to better organize and interpret the data. In this paper, we focus on the analysis of a nuclear simulation dataset that is part of the Risk Informed Safety Margin Characterization (RISMC) Boiling Water Reactor (BWR) station blackout (SBO) case study. We apply a software tool that provides the domain experts with an interactive analysis and visualization environment for understanding the structures of such high-dimensional nuclear simulation datasets. Our tool encodes traditional and topology-based clustering techniques, where the latter partitions the data points into clusters based on their uniform gradient flow behavior. We demonstrate through our case study that both types of clustering techniques complement each other in bringing enhanced structural understanding of the data.

97 MATHEMATICS AND COMPUTING↗

Challenges in leveraging existing human performance data for quantifying the IDHEAS HRA method

Our article documents an exploratory study for collecting and using human performance data to inform human error probability (HEP) estimates for a new human reliability analysis (HRA) method, the IntegrateD Human Event Analysis System (IDHEAS). The method was based on cognitive models and mechanisms underlying human behaviour and employs a framework of 14 crew failure modes (CFMs) to represent human failures typical for human performance in nuclear power plant (NPP) internal, at-power events [1]. A decision tree (DT) was constructed for each CFM to assess the probability of the CFM occurring in different contexts. Data needs for IDHEAS quantification are discussed. Then, the data collection framework and process is described and how the collected data were used to inform HEP estimation is illustrated with two examples. Next, five major technical challenges are identified for leveraging human performance data for IDHEAS quantification. Furthermore, these challenges reflect the data needs specific to IDHEAS. More importantly, they also represent the general issues with current human performance data and can provide insight for a path forward to support HRA data collection, use, and exchange for HRA method development, implementation, and validation.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Identification of Performance Shaping Factor Lag and Linger Effects for Dynamic Human Reliability Analysis: Application of Experimental Data

Many researchers have emphasized the importance of dynamic probabilistic safety assessment (PSA), which highlights the necessity of studies for dynamic human reliability analysis (HRA). Dynamic HRA concentrates on a dynamic account of human actions or how performance shaping factors (PSFs) can dynamically modify the human error probability (HEP) over time. In contrast, existing static HRA does not consider human actions as changes over time or event progressions. Accordingly, previous research on dynamic HRA conceptually suggested PSF lag and linger effects to treat dependence between operator actions in dynamic HRA versus existing approaches. As follow-up research, this study attempted to identify PSF lag and linger effects for dynamic HRA on the basis of experimental data. Firstly, mathematical models for PSF lag and linger effects were developed based on a literature survey in the field of biology. Secondly, we analyzed experimental scenarios from a control room study to identify operator actions considered in PSA. Lastly, based on the experimental data, the effect of the stress PSF with lag and linger effects was compared to that without PSF lag and linger effects. This paper concludes with an overall discussion of PSF lag and linger effects based on the relation between the stress PSF and error occurrence.

99 GENERAL AND MISCELLANEOUS↗

Assessment of verification and validation status - RELAP5-3D and RAVEN

The United States nuclear industry is facing a strong challenge to ensure maximum safety while enhancing economic benefit. Safety is a key parameter to all aspects related to light water reactor (LWR) nuclear power plants (NPPs), especially cost savings. Since the goal is to extend the lifetimes of these NPPs, the traditional deterministic safety concept may not guarantee a current economic asset. The Light Water Reactor Sustainability (LWRS) Program has been promoting a wide range of research and development (R&D) in this field to maximize the safety, economics, and performance of these NPPs through improved scientific understanding. One of the best practices to achieve this goal is to identify and optimize safety margins, which can lead to cost reduction. To do this, under the LWRS framework, the Risk-Informed Systems Analysis (RISA) Pathway will focus on the optimization of safety margin and minimization of uncertainties to ensure both safety and economics at the highest level. The RISA Pathway will provide enhanced capabilities for analyzing and characterizing LWR systems performance by developing and demonstrating methods, tools, and data to enable risk-informed margins management (RIMM). The goals of the RISA Pathway are twofold: (1) deploy the risk-informed tools and methods that enable better representation of safety margins and factors that contribute to cost and safety; and (2) conduct advanced risk assessment applications with industry to support margin management strategies that enable more cost-effective plant operation. The tools and methods provided by the RISA Pathway will support effective margin management for both active and passive safety systems, structures, and components (SSC) of an NPP. The tools and methods used in the RISA Pathway should have high confidence and highest technical maturity for and implementation to industry at its current setting. They should also have a capability to support risk-informed decision making for both probabilistic and deterministic elements of safety. The RISA Pathway will, therefore, perform a comprehensive assessment of verification and validation (V&V) status of RISA Toolkit to enhance credibility RISA Toolkit which be used by industry. This report summarizes assessment technical maturity of RISA thermal-hydraulics accident analysis code RELAP5-3D and multi-purpose probabilistic risk analysis tool RAVEN V&V status including specific information of the tool such as capability and features, quality assurance program, developer/independent V&V record, separation/integral tests history, user documents, and feedback.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Advanced Numerical Tools for the Nonlinear Seismic Analysis of Nuclear Systems

In the framework of Probabilistic Risk Assessment (PRA) of nuclear facilities, a rigorous dynamic characterization of all structural and non-structural components is of paramount concern. The common features of nuclear facilities lies in the combination of three characteristics: 1. low aspect ratio; 2. large mass; and 3. significant embedment in soil. These characteristics make the interaction between the structural system and the surrounding soil a key aspect to consider for seismic risk evaluations. The methodologies and numerical tools currently in use for simulating the seismic response of a nuclear facility with significant Soil Structure Interaction (SSI) date back to the 1970's and rely on a number of simplifying idealizations, mainly related to the characterization of the incident seismic waveforms, the assumption of linear-elastic behavior of the superstructures, and idealization of equivalent linear behavior of the supporting soils. Given this background and taking advantage of the substantial progress in computational mechanics in the last decades, the ongoing research aims at developing advanced numerical tools for the nonlinear, time history simulation of nuclear facilities. This translates into the availability of a robust nonlinear time-domain simulation tool that can accurately model the nonlinearities of coupled soil-structure systems, and whose development includes robust verification and validation. The work described herein is supported by the U.S. Department of Energy (DOE) and focuses on delivering the next-generation, high performance simulation tool in support of DOE needs and mission. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

EVALUATION OF HRA METHODOLOGIES FOR APPLICATION IN SDP WORK

This study critically evaluates human reliability analysis (HRA) methodologies applicable to regulatory probabilistic safety assessment (PSA) model, with a particular focus on their role in supporting the significance determination process (SDP) in nuclear safety assessment. Firstly, three widely utilized HRA methods – IDHEAS-ECA, SPAR-H, and ASEP/THERP – were qualitatively and quantitatively assessed. Qualitative assessments were conducted using attributes from the NEA/CSNI/R(2015)1 report, while quantitative evaluations employed regression and correlation analyses to compare predicted human error probabilities (HEPs) against empirical data. Results reveal distinct strengths, for example, IDHEAS-ECA’s robust predictive accuracy and K-HRA’s alignment with operational practices. In addition, dependency analysis and recovery analysis were critically evaluated. For dependency analysis, the methods’ handling of inter-task dependencies and their impact on HEPs were examined, while recovery analysis highlighted strategies for mitigating failure events. Furthermore, strategies were proposed to evaluate performance-shaping factors under conditions of reduced human performance, such as stress, fatigue, or cognitive overload, addressing specific challenges faced in SDP evaluations. Human errors from KINS’s operational performance information system event reports were evaluated as a case study. This study identifies gaps and provides actionable insights to ensure their validity and applicability in SDP HRA applications. This paper is a part of research conducted by KINS, and it should be noted that this result does not represent the regulatory position of KINS.

99 - GENERAL AND MISCELLANEOUS↗