Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Utah FORGE 6-3712: Probabilistic Estimation of Seismic Response Using Physics-Informed Recurrent Neural Networks - 2024 Annual Workshop Presentation

This is a presentation on the Probabilistic Estimation of Seismic Response Using Physics-Informed Recurrent Neural Networks by GTC Analytics, presented by Jesse Williams. This video slide presentation discusses the development of machine learning-based predictive tools to estimate the magnitude-frequency response of stimulation-induced seismicity. This presentation was featured in the Utah FORGE R&D Annual Workshop on August 15, 2024.

15 GEOTHERMAL ENERGY↗

Towards universal unfolding of detector effects in high-energy physics using denoising diffusion probabilistic models

Correcting for detector effects in experimental data, particularly through unfolding, is critical for enabling precision measurements in high-energy physics. However, traditional unfolding methods face challenges in scalability, flexibility, and dependence on simulations. We introduce a novel approach to multidimensional object-wise unfolding using conditional Denoising Diffusion Probabilistic Models (cDDPM). Our method utilizes the cDDPM for a non-iterative, flexible posterior sampling approach, incorporating distribution moments as conditioning information, which exhibits a strong inductive bias that allows it to generalize to unseen physics processes without explicitly assuming the underlying distribution. Our results highlight the potential of this method as a step towards a "universal" unfolding tool that reduces dependence on truth-level assumptions, while enabling the unfolding of a wide range of measured distributions with improved adaptability and accuracy.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A SCOPING STUDY: Development of Probabilistic Risk Assessment Models for Reactivity Insertion Accidents During Shutdown In U.S. Commercial Light Water Reactors

This report documents the scoping study of developing generic simplified fuel damage risk models for quantitative analysis from inadvertent reactivity insertion events during shutdown (SD) in light water pressurized and boiling water reactors. In the past, nuclear fuel reactivity accidents have been analyzed both mainly deterministically and probabilistically for at-power and SD operations of nuclear power plants (NPPs). Since then, many NPPs had power up-rates and longer refueling intervals, which resulted in fuel configurations that may potentially respond differently (in an undesirable way) to reactivity accidents. Also, as shown in a recent event, several inadvertent operator actions caused potential nuclear fuel reactivity insertion accident during SD operations. The set inadvertent operator actions are likely to be plant- and operation-state specific and could lead to accident sequences. This study is an outcome of the concern which arose after the inadvertent withdrawal of control rods at Dresden Unit 3 in 2008 due to operator actions in the plant inadvertently three control rods were withdrawn from the reactor without knowledge of the main control room operator. The purpose of this Standardized Plant Analysis Risk (SPAR) Model development project is to develop simplified SPAR Models that can be used by staff analysts to perform risk analyses of operating events and/or conditions occurring during SD operation. These types of accident scenarios are dominated by the operator actions, (e.g., misalignment of valves, failure to follow procedures and errors of commissions). Human error probabilities specific to this model were assessed using the methodology developed for SPAR model human error evaluations. The event trees, fault trees, basic event data and data sources for the model are provided in the report. The end state is defined as the reactor becomes critical. The scoping study includes a brief literature search/review of historical events, developments of a small set of comprehensive event trees and fault trees and recommendation for future work.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) Detailed Technical Framework Specification

A key area of the Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) strategy is the development of methodologies and tools that will be used to predict the safety, security, safeguards, performance, and deployment viability of SMR systems starting in the design process through the operation phase. The goal of the SMR PRA activity will be to develop quantitative methods and tools and the associated analysis framework for assessing a variety of risks. These risks will be focused on SMR designs and operational strategies as they relate to the technical basis behind safety and security characterization.

97 MATHEMATICS AND COMPUTING↗

230 Th/U ages Supporting Hanford Site-Wide Probabilistic Seismic Hazard Analysis

This product represents a USGS Administrative Report that discusses samples and methods used to conduct uranium-series isotope analyses and resulting ages and initial 234U/238U activity ratios of pedogenic cements developed in several different surfaces in the Hanford area middle to late Pleistocene. Samples were collected and dated to provide calibration of soil development in surface deposits that are being used in the Hanford Site-Wide probabilistic seismic hazard analysis conducted by AMEC. The report includes description of sample locations and physical characteristics, sample preparation, chemical processing and mass spectrometry, analytical results, and calculated ages for individual sites. Ages of innermost rinds on a number of samples from five sites in eastern Washington are consistent with a range of minimum depositional ages from 17 ka for cataclysmic flood deposits to greater than 500 ka for alluvium at several sites.

58 GEOSCIENCES↗

Advanced Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) Demonstration

A key area of the Advanced Small Modular Reactor (SMR) Probabilistic Risk Assessment (PRA) strategy is the development of methodologies and tools that will be used to predict the safety, security, safeguards, performance, and deployment viability of SMRs. The goal of the SMR PRA activity will be to develop quantitative methods and tools and the associated analysis framework for assessing a variety of risks. Development and implementation of SMR-focused safety assessment methods may require new analytic methods or adaptation of traditional methods to the advanced design and operational features of SMRs. We will need to move beyond the current limitations such as static, logic-based models in order to provide more integrated, scenario-based models based upon predictive modeling which are tied to causal factors. The development of SMR-specific safety models for margin determination will provide a safety case that describes potential accidents, design options (including postulated controls), and supports licensing activities by providing a technical basis for the safety envelope. This report documents the progress that was made to implement the PRA framework, specifically by way of demonstration of an advanced 3D approach to representing, quantifying and understanding flooding risks to a nuclear power plant.

97 MATHEMATICS AND COMPUTING↗

Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

58 GEOSCIENCES↗

Dynamical systems probabilistic risk assessment

Probabilistic Risk Assessment (PRA) is the primary tool used to risk-inform nuclear power regulatory and licensing activities. Risk-informed regulations are intended to reduce inherent conservatism in regulatory metrics (e.g., allowable operating conditions and technical specifications) which are built into the regulatory framework by quantifying both the total risk profile as well as the change in the risk profile caused by an event or action (e.g., in-service inspection procedures or power uprates). Dynamical Systems (DS) analysis has been used to understand unintended time-dependent feedbacks in both industrial and organizational settings. In dynamical systems analysis, feedback loops can be characterized and studied as a function of time to describe the changes to the reliability of plant Structures, Systems and Components (SSCs). While DS has been used in many subject areas, some even within the PRA community, it has not been applied toward creating long-time horizon, dynamic PRAs (with time scales ranging between days and decades depending upon the analysis). Understanding slowly developing dynamic effects, such as wear-out, on SSC reliabilities may be instrumental in ensuring a safely and reliably operating nuclear fleet. Improving the estimation of a plant's continuously changing risk profile will allow for more meaningful risk insights, greater stakeholder confidence in risk insights, and increased operational flexibility.

97 MATHEMATICS AND COMPUTING↗

Probabilistic Seismic Hazards Update for LLNL

Fugro Consultants, Inc. (FCL) completed the Probabilistic Seismic Hazard Analysis (PSHA) performed for Building 332 at the Lawrence Livermore National Laboratory (LLNL), near Livermore, CA. The study performed for the LLNL site includes a comprehensive review of recent information relevant to the LLNL regional tectonic setting and regional seismic sources in the vicinity of the site and development of seismic wave transmission characteristics. The Seismic Source Characterization (SSC), documented in Project Report No. 2259-PR-02 (FCL, 2015b), and Ground Motion Characterization (GMC), documented in Project Report No. 2259-PR-06 (FCL, 2015a) were developed in accordance with ANS/ANSI 2.29- 2008 Level 2 PSHA guidelines. The ANS/ANSI 2.29-2008 Level 2 PSHA framework is documented in Project Report No. 2259-PR-05 (FCL, 2016a). The Hazard Input Document (HID) for input into the PSHA developed from the SSC and GMC is presented in Project Report No. 2259-PR-04 (FCL, 2016b). The site characterization used as input for development of the idealized site profiles including epistemic uncertainty and aleatory variability is presented in Project Report No. 2259-PR-03 (FCL, 2015c). The PSHA results are documented in Project Report No. 2259-PR-07 (FCL, 2016c).

58 GEOSCIENCES↗

Probabilistic Seismic Hazard Assessment for Iraq

Probabilistic Seismic Hazard Assessments (PSHA) form the basis for most contemporary seismic provisions in building codes around the world. The current building code of Iraq was published in 1997. An update to this edition is in the process of being released. However, there are no national PSHA studies in Iraq for the new building code to refer to for seismic loading in terms of spectral accelerations. As an interim solution, the new draft building code was considering to refer to PSHA results produced in the late 1990s as part of the Global Seismic Hazard Assessment Program (GSHAP; Giardini et al., 1999). However these results are: a) more than 15 years outdated, b) PGA-based only, necessitating rough conversion factors to calculate spectral accelerations at 0.3s and 1.0s for seismic design, and c) at a probability level of 10% chance of exceedance in 50 years, not the 2% that the building code requires. Hence there is a pressing need for a new, updated PSHA for Iraq.

58 GEOSCIENCES↗

SSHAC Level 1 Probabilistic Seismic Hazard Analysis for the Idaho National Laboratory

A Probabilistic Seismic Hazard Analysis (PSHA) was completed for the Materials and Fuels Complex (MFC), Advanced Test Reactor (ATR), and Naval Reactors Facility (NRF) at the Idaho National Laboratory (INL). The PSHA followed the approaches and procedures for Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 study and included a Participatory Peer Review Panel (PPRP) to provide the confident technical basis and mean-centered estimates of the ground motions. A new risk-informed methodology for evaluating the need for an update of an existing PSHA was developed as part of the Seismic Risk Assessment (SRA) project. To develop and implement the new methodology, the SRA project elected to perform two SSHAC Level 1 PSHAs. The first was for the Fuel Manufacturing Facility (FMF), which is classified as a Seismic Design Category (SDC) 3 nuclear facility. The second was for the ATR Complex, which has facilities classified as SDC-4. The new methodology requires defensible estimates of ground motion levels (mean and full distribution of uncertainty) for its criteria and evaluation process. The INL SSHAC Level 1 PSHA demonstrates the use of the PPRP, evaluation and integration through utilization of a small team with multiple roles and responsibilities (four team members and one specialty contractor), and the feasibility of a short duration schedule (10 months). Additionally, a SSHAC Level 1 PSHA was conducted for NRF to provide guidance on the potential use of a design margin above rock hazard levels for the Spent Fuel Handling Recapitalization Project (SFHP) process facility.

58 GEOSCIENCES↗

Probabilistic Seismic Hazards Update for LLNL: PSHA Results Report

This report presents the Probabilistic Seismic Hazard Analysis (PSHA) performed for Building 332 at the Lawrence Livermore National Laboratory (LLNL), near Livermore, CA by Fugro Consultants, Inc. (FCL). This report is specific to Building 332 only and not to other portions of the Laboratory. The study performed for the LLNL site includes a comprehensive review of recent information relevant to the LLNL regional tectonic setting and regional seismic sources in the vicinity of the site and development of seismic wave transmission characteristics. The Seismic Source Characterization (SSC), documented in Project Report No. 2259-PR-02 (FCL, 2015a), and Ground Motion Characterization (GMC), documented in Project Report No. 2259-PR-06 (FCL, 2015c) were developed in accordance with ANS/ANSI 2.29-2008 Level 2 PSHA guidelines. The ANS/ANSI 2.29-2008 Level 2 PSHA framework is documented in Project Report No. 2259-PR-05 (FCL, 2016a). The Hazard Input Document (HID) for input into the PSHA developed from the SSC is presented in Project Report No. 2259-PR-04 (FCL, 2016b). The site characterization used as input for development of the idealized site profiles including epistemic uncertainty and aleatory variability is presented in Project Report No. 2259-PR-03 (FCL, 2015b).

42 ENGINEERING↗

Probabilistic Economic Valuation of Safety Margin Management

The goal of this project was to explore a new methodology for evaluation of potential safety margin upgrades to add a new instrument to the Risk Informed Safety Margin Characterization (RISMC) toolkit. To this end, the RAVEN code developed by the Idaho National Laboratory was used to perform a cost-benefit analysis of several potential power plant safety upgrades to compare the material cost of the upgrades with the probabilistic benefit of avoiding accident scenario consequences to find the most cost-effective safety upgrades. By coupling RAVEN to MELCOR to drive Monte-Carlo method stochastic parameter analysis and using data from existing nuclear codes, as well as MELCOR’s radionuclide relocation tracking capabilities, the radionuclide release source term activity in a severe accident scenario can be estimated. Severe Accident Mitigation upgrades were benchmarked against the Hardened Containment Ventilation upgrade mandated by the USNRC for Mk1 BWRs using dollars spent per Curie of release prevented as a metric by which to evaluate the economic efficacy of the upgrades. Additionally, Fault Tree/Event Tree-based analyses were performed to compare older methods of evaluation to the methodology pioneered in this work, and Monthly Operating Report (MORP) outage data was analyzed for insights into power plant outage optimization and reduction.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Experimental Breeder Reactor II (EBR-II) Level 1 Probabilistic Risk Assessment

The National Academy of Sciences Study of the USDOE Category A Reactors recommended that a Probabilistic Risk Assessment (PRA) should be performed on the EBR-11 Reactor. In January 1989, a Level 1 PRA was initiated. This report documents work performed in completing the Level 1 PRA except for seismic analysis; it describes the methodology used, assumptions made, the analysis performed, and the final results. The seismic risk assessment is in progress. It will be separately documented.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Probabilistic Seismic Hazard Assessment for Georgia

Probabilistic Seismic Hazard Assessments (PSHA) form the basis for most contemporary seismic provisions in building codes around the world. The current building code of Georgia (2009) is not fully compatible with seismic hazard and design concepts of modern codes. The Ministry of Economy and Sustainable Development of Georgia is currently undertaking an update to the building code to align it with EuroCode. In conjunction with EuroCode, a National Annex specific to Georgia is needed, including seismic hazard values for the territory of Georgia. A comprehensive earthquake catalogue is fundamental to a robust PSHA in the region. The Caucasus has had an uneven seismic recording and reporting history both temporally and spatially. Therefore, there has been a strong regional effort to bring together data from all the countries in the Caucasus, to digitize and standardize paper-based data from the Soviet era, and to re-examine magnitude and location calculations. The earthquake catalogue resulting from this effort forms the basis for a reliable seismic hazard assessment. Recognizing these needs, the U.S. Department of Energy through Lawrence Livermore National Laboratory (LLNL) initiated a project in 2015 to engage and train local scientists in the Caucasus to install new equipment, to enhance the quality of seismic monitoring and reporting, and to improve and harmonize the regional earthquake catalogue. In 2016, the project scope was expanded to include the modernization of seismic hazard assessments. To this end, a series of workshops were held in Georgia, the first one of which presented an overview of PSHA and its components to various participants from the universities and other research organizations in the region. This kick-off workshop was followed by numerous hands-on training workshops in 2017 and 2018, covering all aspects of PSHA. In addition to their training goals, the workshops brought together existing and new information relevant to PSHA studies in the region, providing a platform for local scientists/engineers and experts from other parts of the world to interact, cooperate and discuss various pieces of the PSHA input. This report outlines the aspects of the earthquake catalogue development and PSHA project that were specifically undertaken to form the basis for the building code update in Georgia. Georgia straddles the Greater Caucasus and Lesser Caucasus Fold and Thrust belts, where the convergent tectonic setting generates significant earthquake activity. To the east of the country, evidence indicates the possibility of a remnant subducting slab that causes earthquakes deeper than 40km. This study systematically compiles and improves all available data on local seismicity, active faults, and ground motion attenuation characteristics of the region; and builds a framework to enable a contemporary PSHA to be carried out with the engagement of local scientists. To this end, six regional workshops were organized in total over a three-year period of time, with participation from the United States, Canada and Hungary as well as countries in the Caucasus: Georgia, Armenia, Azerbaijan and Turkey. The workshops served multiple purposes such as training, data collection, interactions between local earth scientists and engineers, and brainstorming and knowledge exchange among local and international experts.

Geosciences↗

Inventory and Probabilistic Function of Natural Hazards in the United States: July 19, 2018 - September 18, 2018

The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) developed a standardized risk assessment process that considers the location-specific vulnerabilities and threats (climate-related as well as human-caused) at a site to generate a ranked list of organizational risks and associated mitigation options for reducing those risks. To support this effort, the Southern Climate Impacts Planning Program (SCIPP), a National Oceanic and Atmospheric (NOAA) Regional Integrated Sciences and Assessments (RISA) team, was selected to provide climate science expertise to develop a comprehensive inventory and probabilistic function of natural hazards (e.g., hurricanes, tornadoes, flooding, and sea level rise) for the entire United States by region. The inventory of climate-related hazards and the associated likelihood scores are incorporated into a companion risk assessment tool enabling standardized comparisons of risk at sites across the country.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗