At least 433 records · Page 24

Modular, Crushed-Rock Thermal Energy Storage Pilot Design (Final Report)

The goal of this project was to design a next-step pilot to advance near-term energy storage integrated with a fossil plant to provide a facility capable of being viable and effective in a market with growing penetration of variable renewable energy (VRE). Thermal energy storage (TES) represents an ideal technology for this purpose. The completed effort included a feasibility study to prepare for the Phase II pre-front end engineering design (pre-FEED) for implementing a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. The crushed rock storage technology, which is being developed by Brenmiller Energy, is a modular TES system termed bGen™, which can accommodate both thermal and electrical inputs and output steam, hot water, or hot air. For this application, the estimated efficiency is 80% thermal to thermal. For the feasibility study, the Brenmiller technology was designed to operate on a slipstream from NYPA’s Eugene W. Zeltmann Power Project (Zeltmann) NGCC plant in Astoria, New York. The projected size of the system will be up to 4 MWe with at least 4 hours of storage duration, or 16 MWh-e total. The study also included a techno-economic evaluation of a 200 MWh commercial-scale demonstration. Prior to this project, EPRI had reviewed Brenmiller’s technology, which is being built to demonstrate bGen™ at 1.7 MWe on a solar plant (Rotem) and has been designed for an NGCC facility in Italy, assessing it at technology readiness level (TRL) 5. Brenmiller is also conducting a separate 1-MWth pilot with NYPA that pairs a bGen™ module with a microturbine for a combined-heat-and-power (CHP) application to improve efficiency and provide flexibility. The next-step pilot being designed as part of this project would represent a 5-fold increase in scale, versus Rotem, and would show the technology’s ability to provide effective and economical energy storage, bringing the technology to TRL 6. This pilot would represent the next-to-last demonstration scale before the technology could be commercial ready at GWh-e scales in the 2030 timeframe. The main objective of the work completed by the Electric Power Research Institute, Inc. (EPRI), Brenmiller Energy (Brenmiller), New York Power Authority (NYPA), and United E&C (formerly AECOM) was to perform a Phase I feasibility study on the integration of a crushed-rock thermal energy storage (TES) with a fossil plant. Under this project, the EPRI-led team successfully completed a feasibility study to prepare for the potential future Phase II pre-front end engineering design (pre-FEED) to implement a crushed-rock TES system integrated with a natural gas combined cycle (NGCC) plant. Specific deliverables under this project included the Technology Maturation Plan, Conceptual Study, Techno-Economic Assessment, Technology Gap Assessment, Project Plan for Phase II (submitted as Phase II Renewal Application), Commercialization Plan, and the Final Report (this document). This Final Report includes a compilation of the various summary reports that were prepared during the 12-month schedule of the Phase I project execution under award DE-FE0032017.

03 NATURAL GAS↗

Sorbent Based Post-Combustion CO 2 Slipstream Testing

TDA Research, Inc. has developed a low-cost sorbent (alkalized alumina) based technology for post-combustion CO 2 capture. The sorbent runs in an isothermal process for adsorption and regeneration. Neither temperature swing nor pressure swing is needed. TDA designed a system which operated 10 fixed beds to simulate a moving bed process. The flow pattern was optimized to minimize the steam usage for regeneration. An excellent sorbent (Batch 1) was also developed with collaboration with our partner. The sorbent degraded after long term operation. We developed a reprocessing procedure, which can be conducted in situ, to restore the sorbent capture capacity as the fresh sorbent after running for about 1250 hours. The reprocessing extended the sorbent longevity significantly. TDA designed a pilot unit (40’ x 32’ x 11.5’), processing flue gas equivalent to 0.5 MW of power generation. It had 10 beds and each bed could hold 1.75 m 3 of sorbent. We worked with Springs Fabrication, Inc. to complete the construction of the pilot unit. It was then shipped and installed at NCCC. The pilot unit was kept running in 24-hour mode when the flue gas and steam were available. It could run automatically without operator on site. Parametric and long-term (2 months) tests were carried out successfully. The results showed that TDA’s process can achieve 90% capture and 95% CO 2 purity for both coal and NG flue gases. For coal flue gas, the system reached performance target when processing up to 0.62 MW flue gas, 24% higher than the design capacity. Thus, capital cost could be saved on the reactors and sorbent. The strip air flow was designed to be 0.25 of that of the flue gas. The test data showed the strip/flue ratio can be reduced to as little as 0.18, which saves the power consumption for the strip air blower. The pressure drop was found to be lower than what the empirical equation calculated. The sorbent still had 91.7% of original capacity after 3-month test. With the data from the pilot test, we updated the TEA. For a 550-MW e supercritical coal fired power plant with CO 2 capture, the capture cost for TDA’s process is $34.9/tonne CO 2 captured, which meets DOE’s goal of $40/tonne and is 17.1% less than the DOE baseline Case 12. Therefore, TDA’s process has a good potential for commercialization.

01 COAL, LIGNITE, AND PEAT↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

Start-up and Emergency Shutdown Modeling for a Coal-fired 10MWe sCO₂ Power Plant

As part of a Phase II Front End Engineering Design (FEED) study for the DOE Fossil Fuel Large Scale Pilots program, investigations of novel start-up and emergency shutdown methods for a stoker-fed, coal-fired, 10MWe sCO₂ power plant proposal were performed. These investigations were performed using 1D transient system models of the plant created within the GT-SUITE system modeling platform. The system model components were created using vendor quotation data (heat exchangers), performance maps (turbomachines), or FMU models (fired heater). Previously, Echogen Power Systems (Echogen) has used a sCO₂ power cycle start-up method that fills the system with liquid CO₂ to facilitate easy use of an electrically-driven start pump to transition the system from initial CO₂ fill to turbo-compressor initialization. The novel start-up method presented attempts this transition with a minimal filling of the system with liquid CO₂, to reduce the total CO₂ inventory required. This method leaves the start pump vulnerable to a two phase inlet condition as system pressure is below the CO₂ saturation pressure for the condenser cooling water temperature (Tcw). System model cases at Tcw of 18°C, 26°C, and 32°C, corresponding to cold, design, and hot ambient days, were analyzed to determine if the SP inlet condition could be kept as a subcooled liquid and estimate the CO₂ inventory reduction amount./p> Stoker-fed, coal-fired heaters continue to emit heat for some time even after emergency shutdown from events such as a power failure. This heat emission would lead to a failure of the fired heater, as the metal overheats, if the CO₂ flow is shut off. The emergency shutdown method presented utilizes CO₂ vented by a controllable vent valve (CRV) to provide CO₂ cooling flow to the fired heater. To determine the effectiveness of this method at keeping the fired heater peak tubing metal temperature below the ASME material temperature limit, for pressures below 5 MPa, of 816 °C, system model cases with CRV diameters ranging from 4” to 10”, and an alternative CO₂ vent routing with CRV size of 6”, were investigated./p>

01 COAL, LIGNITE, AND PEAT↗

Metagenomes and metagenome-assembled genomes from microbial communities in a biological nutrient removal plant operated at Hamptons Road Sanitation District (HRSD) with high and low dissolved oxygen conditions

Aeration is a major cost at biological nutrient removal (BNR) plants. We report on microbial communities in a pilot-scale BNR system before and after a dissolved oxygen transition from 2.5 to 0.2 mg/L implemented over 18 months. Four PacBio metagenomes and 316 metagenome-assembled genomes are announced.

dissolved oxygen↗

Request for Information on Establishing a New Manufacturing Institute (DE-FOA-0002564)

Deep decarbonization of major industries such as metals manufacturing requires extensive process integration and controls to manage feedstocks, side reactions, heat, water, and waste streams. The scale of the energy and capital investment requires that process integration be validated to a high level of confidence with no bias. Industries such as steel production have very thin profit margins. Therefore, lack of confidence in process integration, product quality, and economics is a major deterrence to changes in manufacturing capital investment. Public sector investment in reconfigurable pilot testbeds and a first-of-a-kind plant would be necessary to de-risk technical and financial barriers prior to industry-wide buildout. DOE should consider a National Lab-led hub for the testbeds. Lab testbeds could be utilized in campaigns and allow multiple industrial partners to evaluate and validate technologies prior to making major capital investments.

08 HYDROGEN↗

Pilot Testing of Amine-Based Solvent at Low-Rank Coal Fired Power System

Conference presentation for the 2023 International Freiberg Conference on Circular Carbon Technologies, Rotterdam, Netherlands, September 24–29, 2023. This presentation describes pilot testing of an amine-based CO₂ capture system at Coal Creek Station, examining solvent performance, system design, and operating conditions for a low-rank coal-fired power plant. The Mitsubishi Heavy Industries KM CDR (KS-1) process is assessed using pilot-scale data to inform capture efficiency, solvent condition, and integration considerations.

01 COAL, LIGNITE, AND PEAT↗

Integrated Operations for Nuclear: Work Reduction Opportunity Demonstration Strategy

EXECUTIVE SUMMARY The Light Water Reactor Sustainability Program Plant Modernization Pathway has been working with industry for a number of years to leverage digital technology to extend the life and improve the performance of the existing fleet through modernized technologies and improved processes for plant operation and power generation. This includes development of modernization solutions to improve reliability and economic performance while addressing US nuclear industry’s aging and obsolescence challenges. The objective of these efforts is to deliver a sustainable business model that enables US nuclear industry to remain competitive. Digital Infrastructure (DI) research has established a technical foundation for these efforts. This effort began with technical analysis and support for a safety-related instrumentation and control (I&C) pilot upgrade being performed at Constellation Energy Generation’s Limerick Nuclear Plant. The following publicly available reports were produced as part of this effort. • INL/EXT-20-61079, Vendor-Independent Design Requirements for a Boiling Water Reactor Safety System Upgrade [1] • INL/EXT-20-59371, Business Case Analysis for Digital Safety-Related Instrumentation & Control System Modernizations [2] • INL/EXT-20-59809, “Safety-Related Instrumentation and Control Pilot Upgrade: Initial Scoping Phase Implementation Report and Lessons Learned [3] • INL/RPT-23-72105, Safety-Related Instrumentation and Control Upgrade: Conceptual – Detailed Design Phase Report and Lessons Learned [4]

99 GENERAL AND MISCELLANEOUS↗

Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned

Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Potential for Applying Continuous Directed Evolution to Plant Enzymes: An Exploratory Study

Plant evolution has produced enzymes that may not be optimal for maximizing yield and quality in today’s agricultural environments and plant biotechnology applications. By improving enzyme performance, it should be possible to alleviate constraints on yield and quality currently imposed by kinetic properties or enzyme instability. Enzymes can be optimized more quickly than naturally possible by applying directed evolution, which entails mutating a target gene in vitro and screening or selecting the mutated gene products for the desired characteristics. Continuous directed evolution is a more efficient and scalable version that accomplishes the mutagenesis and selection steps simultaneously in vivo via error-prone replication of the target gene and coupling of the host cell’s growth rate to the target gene’s function. However, published continuous systems require custom plasmid assembly, and convenient multipurpose platforms are not available. We discuss two systems suitable for continuous directed evolution of enzymes, OrthoRep in Saccharomyces cerevisiae and EvolvR in Escherichia coli, and our pilot efforts to adapt each system for high-throughput plant enzyme engineering. To test our modified systems, we used the thiamin synthesis enzyme THI4, previously identified as a prime candidate for improvement. Our adapted OrthoRep system shows promise for efficient plant enzyme engineering.

59 BASIC BIOLOGICAL SCIENCES↗

Supporting Bioproducts Industry Growth with a System Dynamics Decision-Support Tool

A bio-based economy requires chemical products as well as fuels to be produced from biomass. Although a variety of universities, government agencies, start-ups and established firms have engaged in bioproduct development, many projects have failed to reach the point of commercialization and commercialized bioproducts struggle to capture and maintain market share. To date, there has been no general research into the factors that contribute to bioproduct failure or success. This work presents the Bioproduct Transition Dynamics (BTD) system dynamics model, a decision-support tool that simulates the bioproduct development process from pre-piloting research through construction of the first commercial-scale plant, as well as the processes of obtaining funding from investors and government agencies. The core of the BTD is a feedback loop between bioproduct developers and funders, which relates development progress measured with indicators such as net present value to funders’ decisions to continue investing. External factors such as feedstock prices, market size and growth, and the existence of bioproduct consumers also influence a development project’s chances of receiving follow-on funding. Virtually any bioproduct can be represented with the BTD: direct replacements, performance-advantaged products, niche and commodity markets can all be modeled. The goal of the BTD project is to inform decisions made by developers in both established firms and start-ups, investors, government agencies, and other stakeholders interested in growing the nascent U.S. bioproducts industry. This talk will cover the general structure and functionality of the BTD, and present results from an analysis performed with the BTD to demonstrate its use as a decision-support tool and the insights it can provide. The goal of the analysis is to identify the most critical factors that lead to direct replacement and performance-advantaged bioproduct projects emerging successfully from the “Valley of Death”, and to determine if these factors differ between the two bioproduct types.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

UKy-CAER Heat Integrated Transformative CO 2 Capture Process in Pulverized Coal Power Plants

The goal of this Phase II Topical Report is to summarize the work for public domain conducted on project DE-FE0031583. Building upon the Design Basis completed during Phase I and in accordance with the Statement of Project Objectives (SOPO), the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) along with team members has completed the Front End Engineering Design (FEED) for its advanced, versatile post-combustion CO 2 capture system (CCS) at the 10 MWe large pilot scale to be installed at the Wyoming (WY) Integrated Test Center (ITC), using a heat integrated process with split-rich fed, two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance and lower the cost of CO 2 capture. The proposed project (Phases I-III) involves the design, fabrication, installation, testing and evaluation of a large pilot scale facility that will demonstrate the UK CAER transformative CCS integrated with an operating power plant. The work performed in Phase I, detailed in the Phase I Topical Report that was submitted in March 2019, included formation of a project team, securing the host site, and completing pre-FEED design basis, a cost estimation, a preliminary techno-economic analysis (TEA) and an environmental information volume (EIV). The work performed in Phase II, detailed in this Phase II Topical Report, includes completion of FEEDs, completion of a process risk analysis (PRA), obtaining necessary permits, updating the EIV and TEA, updating the cost and schedule estimate for the Phase III scope of work (SOW) and securing the necessary cost share. Updated information is provided on the current status of the UK CAER CCS technology and the project is ready to begin immediately detailed design, construction and operation of the proposed pilot.

20 FOSSIL-FUELED POWER PLANTS↗

Development of Tools Training and Outreach to Address Solar Glare and Flux-Related Avian Impacts

Millions of dollars and significant resources are being spent by developers of utility-scale solar photovoltaic (PV) and concentrating solar power (CSP) plants to address federal and local requirements regarding glare and avian hazards. Solar glare can occur from the glass surfaces of PV modules and from mirrors in CSP systems, which can produce safety and health risks for pilots, motorists, and residents located near these systems. In addition, concentrated solar flux at CSP plants has the potential to singe birds as they fly through regions of high solar flux. This work will develop tools to characterize and mitigate these potential hazards, which will address regulatory policies and reduce costs and efforts associated with the proposed deployment of gigawatts of solar energy systems throughout the nation. The development of standardized and publicly available tools to address these regulatory policies and ensure public and environmental safety is an appropriate role for the government.

14 SOLAR ENERGY↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

Treatment of brackish water reverse osmosis brine using only solar energy

Post-treatment of brine produced by reverse osmosis (RO) is a great challenge as it often requires high energy input and works under extreme operating conditions. In this study, brine from a RO plant in El Paso, TX USA was successfully treated using a pilot-scale nanophotonics enhanced solar membrane distillation (NESMD) system. The novel NESMD reactor has a nanophotonic membrane surface area of 0.2 m 2 and an internal heat recovery system to recover the latent heat released during vapor condensation. By utilizing a sweeping gas operational mode under real solar irradiation (585–827 W m -2 ), the NESMD realized successful desalination of RO brine with the membrane flux reaching 0.45–0.65 kg m -2 h -1 and total dissolved solids (TDS) removal greater than 99.5% without an external heat condenser. The decrease in the feed flow rate to the evaporation channel of the NESMD system led to an increase in the gained output ratio (GOR) from 0.35 to 0.62. We report to the best of our knowledge, this is the largest photothermal reactor utilized for the desalination of real RO brine under practical solar irradiation. Compared with conventional brine treatment processes that require high temperature or pressure, the NESMD desalinates RO brine at near-ambient temperature and pressure with free solar energy, providing a promising approach for water desalination, and RO brine post treatment.

42 ENGINEERING↗

Improving bioenergy recovery from municipal wastewater with a novel cloth-filter anaerobic membrane bioreactor

Anaerobic membrane bioreactors (AnMBR) have been used for treating high-strength industrial wastewater at full-scale and the potential to use them for mainstream municipal wastewater treatment presents an important opportunity to turn energy-intensive plants into net-energy producers. However, several limitations of the AnMBR technology have prevented their adoption in the municipal wastewater industry, namely, high membrane cleaning energy demand and low membrane flux. This study demonstrated a novel AnMBR configuration that uses a commercially available cloth filter technology to address the key limitations of cleaning energy and membrane flux. The cloth filter anaerobic membrane bioreactor (CFAnMBR) is comprised of an anaerobic fixed-film bioreactor coupled with a cloth filter membrane with nominal pore size of 5 µm. The pilot CFAnMBR was operated for 150 days through the winter at a municipal wastewater plant in central Illinois (minimum/average influent temperature 5/13°C). The CFAnMBR increased membrane flux by more than 2 orders of magnitude (3,649 ± 1,246 L per meter squared per hour) and reduced cleaning energy demand by 78%—92% (0.0085 kWh/m 3 ) relative to previously reported AnMBR configurations. With the CFAnMBR, average chemical oxygen demand and total suspended solids removal were 66% and 91%, respectively, and were shown to be increased up to 88% and 96% by in-line coagulant dosing with ferric chloride. Average headspace methane yield was 154 mL CH 4 /g COD removed by the end of the study period with influent temperatures of 11°C± 4°C. The CFAnMBR resolves major limitations of AnMBR technology by employing a commercially-available technology already used for other municipal wastewater treatment applications.

59 BASIC BIOLOGICAL SCIENCES↗

Subtask 2.6 – Optimization of Aerosol Mitigation Technology for Postcombustion CO 2 Capture

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion CO 2 capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery (EOR). The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the aerosols present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and aerosols provide nucleation sites where amine vapors can condense. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, aerosol components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to optimize aerosol mitigation technology for PCCC at a lignite-fired power plant. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on collection of aerosols at a low-rank coal-fired power station. Determine the impact of aerosols on the efficiency and degradation products of amine-based carbon capture systems fired with low-rank fuels. Work was conducted at Minnkota Power Cooperative’s (MPC’s) Milton R. Young (MRY) Station Unit 2 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. To gather initial data for sizing and specifying a WESP for this system, a temporary pilot-scale WESP was rented and installed on-site. Several different conditions were tested to examine the impact of flow rate, voltage, and current on WESP performance. The WESP was effective at removing large particulate (>200 nm) but caused an increase in fine particulate (<75 nm). Fine particulate material at the inlet and outlet of the WESP was collected, analyzed, and showed that crystalline sulfates carried over from the plant’s FGD unit were being converted to fine aerosols and SO 2 was being converted to SO 3 through the WESP. Additionally, the high moisture content of the flue gas stream at this sample location also contributed to an overall increase in aerosol mass under some of the test conditions. Using the results from the rented WESP, the project team installed a smaller-scale WESP upstream of the EERC’s slipstream CO 2 capture system. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then routed through the new WESP before passing to the CO 2 absorber columns. Fluor’s amine-based solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Aerosols and sulfur species were measured at multiple locations throughout the pilot-scale system. The inlet FGD and DCC removed much of the particulate matter and gaseous sulfur upstream of the WESP. With this configuration, the WESP achieved >95% particulate capture. The new WESP did not show any of the increases in SO 3 or other aerosol species that had been consistently observed with the larger-scale WESP installed immediately downstream of the plant’s full-scale FGD unit. Particulate samples captured and analyzed from the WESP inlet did not show any presence of crystalline sulfate materials, indicating that the pilot-scale FGD and DCC were efficient at reducing carryover from the plant’s full-scale FGD unit. A set of parametric tests were conducted on the new WESP to assess the impacts of flow rate, voltage, number of online WESP fields, and gas-phase sulfur content on aerosol and sulfur transformations. The results showed that the WESP performed similarly well at all sets of conditions. Sulfur and particulate matter exiting the WESP were further reduced through the absorber column as the amine-based solvent captured some of the residual contaminants. Solvent analysis showed that these species were slowly concentrating in the solvent over the duration of the test. When the WESP was taken offline and the sulfur slip through the FGD allowed to rise, the sulfate content in the solvent rose sharply, showing that the extra FGD and WESP were effective at reducing sulfate and cation uptake. This would be expected to extend amine-based solvent life by slowing the formation of heat-stable salts and other degradation products. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission and MPC.

01 COAL, LIGNITE, AND PEAT↗