Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROJECT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

TH-A-18C-03: Noise Correlation in CBCT Projection Data and Its Application for Noise Reduction in Low-Dose CBCT

Purpose: To study the noise correlation properties of cone-beam CT (CBCT) projection data and to incorporate the noise correlation information to a statistics-based projection restoration algorithm for noise reduction in low-dose CBCT. Methods: In this study, we systematically investigated the noise correlation properties among detector bins of CBCT projection data by analyzing repeated projection measurements. The measurements were performed on a TrueBeam on-board CBCT imaging system with a 4030CB flat panel detector. An anthropomorphic male pelvis phantom was used to acquire 500 repeated projection data at six different dose levels from 0.1 mAs to 1.6 mAs per projection at three fixed angles. To minimize the influence of the lag effect, lag correction was performed on the consecutively acquired projection data. The noise correlation coefficient between detector bin pairs was calculated from the corrected projection data. The noise correlation among CBCT projection data was then incorporated into the covariance matrix of the penalized weighted least-squares (PWLS) criterion for noise reduction of low-dose CBCT. Results: The analyses of the repeated measurements show that noise correlation coefficients are non-zero between the nearest neighboring bins of CBCT projection data. The average noise correlation coefficients for the first- and second- order neighbors are about 0.20 and 0.06, respectively. The noise correlation coefficients are independent of the dose level. Reconstruction of the pelvis phantom shows that the PWLS criterion with consideration of noise correlation (PWLS-Cor) results in a lower noise level as compared to the PWLS criterion without considering the noise correlation (PWLS-Dia) at the matched resolution. Conclusion: Noise is correlated among nearest neighboring detector bins of CBCT projection data. An accurate noise model of CBCT projection data can improve the performance of the statistics-based projection restoration algorithm for low-dose CBCT.

60 APPLIED LIFE SCIENCES↗

U.S. China Carbon Capture and Storage Development Project at West Virginia University

The original overall objective of this activity was to undertake resource evaluation and planning for CCS projects and to describe and quantify the geologic, environmental, and economic challenges to successful development of large-scale CCS in China’s coal sector. Several project execution barriers were encountered in the course of this project, most notably a project stop/delay due to funds availability/costing restrictions from the US State Department to the US Department of Energy at the end of CY2012, which halted project execution from January 2, 2013 to April 1, 2013. At the resolution of this project delay, it was communicated to the project team that the overall project period would also be reduced, from a completion date of February 28, 2014 to December 31, 2013. The net impact of all these changes was a reduction in the project period from 24 months (3/1/2012-2/28/2014) to 22 months (3/1/2012-12/31/2013), with a 3 month stop from 1/1/2013-3/31/2013. The project team endeavored to overcome these project time impacts, focusing heavily on technoeconomic modeling that would be deliverable under Task 3 (Ordos Basin Feasibility Study), and choosing to abandon the full investigation into the Demonstration Site (Task 4) due to the reduced project time. The ultimate focus of this project changed to work with the Chinese on a carbon atlas/geologic characterization, and on mechanisms for CO2 storage options from high-quality streams within China.

20 FOSSIL-FUELED POWER PLANTS↗

Exe-Guard Project

The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirus methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a typical manual scanning process. Control systems are vulnerable to performance losses if off-the-shelf blacklist antivirus solutions aren’t implemented with care. This investment in configuration in addition to constant decommissioning to perform manual signature file updates is unprecedented and impractical. Additionally, control systems are often disconnected or islanded from the network making the delivery of signature updates difficult. Exe-Guard project developed a white list antivirus solution that mitigated the above drawbacks and allows control systems to cost-effectively apply malware protection while maintaining high reliability. The application of security patches can also be minimized since white listing maintains constant defense against unauthorized code execution. Security patches can instead be applied in less frequent intervals where system decommissioning can be scheduled and planned for. Since control systems are less dynamic than IT environments, the feasibility of maintaining a secure baselined state is more practical. Because upgrades are performed in infrequent, calculated intervals, it allows a new security baseline to be established before the system is returned to service. Exe-Guard built on the efforts of SNL under the Code Seal project. SNL demonstrated prototype Trust Anchors on the project which are independent monitoring and control devices that can be integrated into untrustworthy components. The exe-Guard team started with the lessons learned under this project then designed commercial solution for white list malware protection. Malware is a real threat, even on islanded or un-networked installations, since operators can unintentionally install infected files, plug in infected mass storage devices, or infect a piece of equipment on the islanded local area network that can then spread to other connected equipment. Protection at the device level is one of the last layers of defense in a security-in-depth defense model before an asset becomes compromised. This project provided non-destructive intrusion, isolation and automated response solution, achieving a goal of the Department of Energy (DOE) Roadmap to Secure Control Systems. It also addressed CIP-007-R4 which requires asset owners to employ malicious software prevention tools on assets within the electronic security perimeter. In addition, the CIP-007-R3 requirement for security patch management is minimized because white listing narrows the impact of vulnerabilities and patch releases. The exe-Guard Project completed all tasks identified in the statement of project objective and identified additional tasks within scope that were performed and completed within the original budget. The cost share was met and all deliverables were successfully completed and submitted on time. Most importantly the technology developed and commercialized under this project has been adopted by the Energy sector and thousands of devices with exe-Guard technology integrated in them have now been deployed and are protecting our power systems today

24 POWER TRANSMISSION AND DISTRIBUTION↗

FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipeline and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.

54 ENVIRONMENTAL SCIENCES↗

Watchdog Project

The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control system owners have very little choice on how to protect communications on the local network. The Watchdog project reduces security risks in electric sector control system local area networks (LANs) by providing: Network access control (NAC) Multi-Layer firewall (physical through transport layer) Containment of malware or unauthorized traffic spreading across the network White list protocols and application message types filtering Configurable, proactive traffic engineering The Watchdog project achieved all of the above by developing an SDN switch.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mid-Atlantic U.S. Offshore Carbon Storage Resource Assessment Project (Final Technical Report)

The greatest potential for carbon storage in the northeastern United States lies in the offshore geologic formations comprising the outer continental shelf (Monteverde et al., 2011). Offshore storage can be linked to large point-sources of carbon dioxide (CO 2 ) while avoiding many of the logistical difficulties and potential risks encountered when siting onshore projects, especially in densely populated areas of the East Coast. Offshore CO 2 storage assessment and research in the United States is underway to address uncertainty in potential storage resources, particularly in the mid- and north-Atlantic offshore area. Given the current knowledge base and access to publicly available data, the objectives of the Mid-Atlantic U.S. Offshore Carbon Storage Resource Assessment Project (MAOCSRAP) were fourfold: (1) complete a systematic carbon storage resource assessment of the mid-Atlantic offshore coastal region from the Georges Bank Basin (GBB) through the Long Island Platform (LIP) to the southern Baltimore Canyon Trough (BCT); (2) define key input parameters to reduce uncertainty for offshore storage resource and efficiency estimates; (3) perform a preliminary assessment of risk factors, uncertainties, and data gaps; and (4) engage industry and regulatory stakeholders through development of a Road Map to assist future project planning and implementation. The MAOCSRAP project has compiled, inventoried, and assimilated various publicly available data sets to provide a strong technical basis on which future carbon storage studies and applications can be built. The knowledge infrastructure necessary to support the development of full-scale offshore carbon storage include: Defining the geologic characteristics of candidate storage sites (Chapter 2). Using existing seismic data to better define the continuity of the storage zones and seals (Chapter 3). Cataloguing the hydrogeologic properties of mid-Atlantic offshore storage sites (Chapter 4). Calculating prospective CO 2 storage resources using net effective pore volumes and fluid displacement properties specific to offshore lithologies (Chapter 5). Examining risk factors related to offshore storage (Chapter 6). Communicating with industry and other stakeholders about the future prospects for offshore storage (Chapter 7). Ensuring technology transfer to industry and other stakeholders (Chapter 8). Led by Battelle, this project was conducted by public and private entities with expertise in offshore geology and resources for the study region, including state geological surveys of Delaware, Maryland, and Pennsylvania; United States Geological Survey-Woods Hole Coastal and Marine Science Center and Haifa University; Rutgers University; Harvard University; and Lamont-Doherty Earth Observatory (LDEO) at Columbia University. The storage resource assessment was completed for a broad region offshore of the U.S. East Coast, from Massachusetts to Virginia. The results include high-level storage resource estimates for areas not previously characterized and improved storage resource estimates for geographically expansive portions of offshore geologic units. Results of the project provide a foundation for developing CO 2 storage along offshore areas of the mid-Atlantic United States. A combination of information was used to provide confidence in project results. Key findings of the major project tasks are summarized as follows. Subsurface Data Analysis: Legacy seismic, well-log, core, and biostratigraphic data were digitized, reprocessed, and analyzed using modern techniques, augmenting previous characterization efforts. The sequence stratigraphic framework for the Cretaceous and Jurassic strata was developed by correlating well-log depositional sequences to seismic reflectors identified in the BCT, LIP, and GBB. The integration of well-log stratigraphy with seismic stratigraphy and petrophysical analysis helped to identify and map potential storage zones within sequences of the Logan Canyon (LC), Missisauga, and Mohawk formations, as well as the regionally extensive caprock comprised of the Dawson Canyon shale. Approximately 4,000 kilometers (km) of seismic data was reprocessed to create a structural framework that was used to tie together all available well data, constrain sequence stratigraphic interpretations, and make regional assessments of offshore carbon storage resources. Prospective storage resource estimates were 150 to 1136 megatons (Mt) for the combined storage zones. This suggests mid-Atlantic U.S. offshore formations can store decades of CO 2 from industrial sources in the region. Preliminary local reservoir simulations suggest that injection rates of 1 Mt CO 2 /year may be sustained for 30 years in single injection wells in the BCT. Advanced geologic modeling and new data acquisition are needed to address data gaps and advance carbon capture and storage (CCS) in key offshore areas selected for further investigation. Offshore Risk Factors: Offshore geologic risk factors include soft sediment deformation, unit continuity, sedimentological and structural features, seismicity and hydrates. CO 2 storage risks include inadequate seals, migration/leakage, and chemical interactions leading to decreased storage. Sensitive habitats, environmental impacts, disturbance to seafloor, and other risks need to be identified in advance of project activities and integrated into detailed mitigation plans for all project phases. Stakeholder Engagement: Input and participation from government, industry, and environmental groups provided input into the Road Map and address next steps needed for project deployment. Early engagement and ongoing communication, as well as policy framework development, is key to large-scale deployment of CCS. Next Steps: This project represents an important first step by completing a high-level CO 2 storage resource assessment and building the knowledge infrastructure necessary to improve quantitative storage resource estimates. The data sets that have been curated under this project provide an opportunity to conduct research and development (R&D) needed to address data gaps and reduce risk and uncertainty. Offshore characterization and validation strategies that are systematically designed to provide data and infrastructure that can be upscaled to meet commercial requirements could be developed off of this foundation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

IACMI Project 4.7: Pultruded Textile Carbon Fiber for Spar Caps (Final Report)

The primary objective of this project was to demonstrate the potential to significantly reduce the cost of wind turbine blades with carbon fiber reinforced polymer (CFRP) structure. Applicability of textile carbon fibers (TCF) were evaluated for use in pultruded spar cap (SC) elements as a path to cost reduction for utility scale wind turbine blades. In earlier work for the Department of Energy (DOE) Wind Energy Technologies Office (WETO), a collaboration of Sandia National Laboratory (SNL), Oak Ridge National Laboratory (ORNL), and Montana State University has demonstrated potential for pultruded TCF to compete with infused fiberglass and commercially available carbon fiber pultruded sections for spar cap construction. In the design cases evaluated, the TCF sections fared well when compared on cost per unit composite stiffness and cost per unit composite compressive strength for those designs [1]. Both stiffness and compressive strength tend to be key factors in the design of blade composite Spar Cap which carry the bulk of the blade structural loads in bending. Spar Cap design tends to distribute largely symmetric tensile and compressive stresses to opposite sides of the spar structure, but since carbon fiber composite compressive strength is typically 20-50% lower than tensile strength, the compressive loading reaches failure levels well before the tensile loading. Stiffness is critical in containing the large tip deflection in high wind loading situations. However, materials and process development were very limited in the earlier study and the work in this project was expanded to make the comparative information more representative of what will be required in order to make further inroads towards implementation. Similar to that study, this project team confirmed that the primary materials of interest for pultruded spar cap elements should be thermoset (TS) resins reinforced by carbon fibers, utilizing as high a percentage of TCF as practical to benchmark cost and performance against commercial carbon fibers. To make the closest comparison possible and eliminate specific test article size, resin selection, and equipment/operational nuance effects, the team planned to pultrude sections with 100% commercially available carbon fiber (Panex 35 carbon fiber from Zoltek) as well as samples utilizing high fractions of TCF. The resin system chosen was based on formulations recommended by large wind industry supplier Hexion and consisted of Hexion resin RSL-4597, curing agent CCA-138, and internal mold release additive 117, along with common kaolin filler ASP400P from BASF. As commonly deployed in spar cap configurations, the team had a mold built to pultrude a rectangular spar cap element of 100mm width and 3mm thickness. The extremely limited number of samples produced for the earlier study were produced with a “generic” epoxy utilized for a variety of applications by the pultruder contracted to produce test articles for demonstration purposes. More importantly, those samples were produced at a fiber fraction only slightly over 50%. Based on feedback from our industrial advisory team for that project and strongly recommended by this project team, the consensus is that it is highly desirable to obtain fiber fractions of 65-68% for significant penetration in wind blade spar cap. Although this requirement has yet to be exhaustively confirmed in readily available information, this was established as a project goal and informally decided we needed to exceed 60% fiber fraction to gain serious industry consideration. Previous TCF pultrusion trials have been challenged by the lack of robust TCF packages, resulting in non-uniform tension across and between tows, as well as excess labor and waste for removal of interleaved paper. The non-uniform tension and associated intermingling of tows in textile acrylic fiber tows and associated difficulties created from broken filaments in carbon fiber conversion inhibit the ordered packing necessary to enhance fiber fraction elevation. (These “cross-overs” are not considered undesirable for textile applications and there is some sense that they might be advantageous for those applications). In addition to work that is ongoing at the acrylic fiber manufacturers to improve their formats, The Institute of Advanced Composites Manufacturing Innovation (IACMI) Project 6.12 (report PA16-0349-6.12-01) [2] has developed and demonstrated a more robust packaging and creeling approach that at least partially addresses these issues, thus improving control of the TCF feed into the pultrusion unit. It was hoped that these and other improvements currently being implemented would allow us to achieve fiber fractions at least approaching these fiber fraction targets. During this project, sections utilizing 100% commercially available carbon fiber reinforcement were produced as a baseline, as well as sections reinforced with about 94% TCF and the balance being commercially available fiber for comparison. The most important finding was that similar to results reported in the earlier WETO-funded project and results from tests of TCF reported at IACMI meetings, this work demonstrated that sections pultruded with TCF in an epoxy resin frequently utilized in actual spar cap production had stiffness and compressive strengths largely comparable to similar sections pultruded with a commercially available carbon fiber also frequently utilized in the wind industry. Although the amount of that data is limited, some of the tensile strength results were actually closer than would have been expected based on fiber strength results provided by the TCF and commercial fiber producers. The actual test data are reported and discussed in detail in Section 5. The pultruded sections dominated by TCF reinforcement were approximately 8-10% lower in fiber fraction than for the sections produced using commercial fiber alone, making direct comparison difficult. The COVID-19 project has provided significant insight into the current state-of-the-art with various TCF product forms. The data obtained in this project will guide the planned improvements at the precursor level, especially in attaining uniform tensioning and payout to facilitate enhanced fiber fractions and overall processability of the TCF composites. The project team is providing guidance to stakeholders concerning the attributes, needs, and potential demand for TCF in wind blade spar caps. Results achieved in this project are consistent with findings in the related work cited [1] and support this guidance and the high potential for this product type. TCF precursor-producing partners continue to express interest in enhancing their product forms and the team looks forward to working with these improved materials as they become available.

42 ENGINEERING↗

Map Projection Induced Variations in Locations of Polygon Geofence Edges

This Paper under-estimates answers to the following question under various constraints: If a geofencing algorithm uses a map projection to determine whether a position is inside/outside a polygon region, how far outside/inside the polygon can the point be and the algorithm determine that it is inside/outside (the opposite and therefore incorrect answer)? Geofencing systems for unmanned aircraft systems (UAS) often model stay-in and stay-out regions using 2D polygons with minimum and maximum altitudes. The vertices of the polygons are typically input as latitude-longitude pairs, and the edges as paths between adjacent vertices. There are numerous ways to generate these paths, resulting in numerous potential locations for the edges of stay-in and stay-out regions. These paths may be geodesics on a spherical model of the earth or geodesics on the WGS84 reference ellipsoid. In geofencing applications that use map projections, these paths are inverse images of straight lines in the projected plane. This projected plane may be a projection of a spherical earth model onto a tangent plane, called an orthographic projection. Alternatively, it may be a projection where the straight lines in the projected plane correspond to straight lines in the latitudelongitude coordinate system, also called a Plate Carr´ee projection. This paper estimates distances between different edge paths and an oracle path, which is a geodesic on either the spherical earth or the WGS84 ellipsoidal earth. This paper therefore estimates how far apart different edge paths can be rather than comparing their path lengths, which are not considered. Rather, the comparision is between the actual locations of the edges between vertices. For edges drawn using orthographic projections, this maximum distance increases as the distance from the polygon vertices to the projection point increases. For edges drawn using Plate Carr´ee projections, this maximum distance increases as the vertices become further from the equator. Distances between geodesics on a spherical earth and a WGS84 ellipsoidal earth are also analyzed, using the WGS84 ellipsoid as the oracle. Bounds on the 2D distance between a straight line and a great circle path, in an orthographically projected plane rather than on the surface of the earth, have been formally verified in the PVS theorem prover, meaning that they are mathematically correct in the absence of floating point errors.

Neeley, Paula↗

U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008

The U.S. energy service company (ESCO) industry is an example of a private sector business model where energy savings are delivered to customers primarily through the use of performance-based contracts. This study was conceived as a snapshot of the ESCO industry prior to the economic slowdown and the introduction of federal stimulus funding mandated by enactment of the American Recovery and Reinvestment Act of 2009 (ARRA). This study utilizes two parallel analytic approaches to characterize ESCO industry and market trends in the U.S.: (1) a ?top-down? approach involving a survey of individual ESCOs to estimate aggregate industry activity and (2) a ?bottom-up? analysis of a database of ~;;3,250 projects (representing over $8B in project investment) that reports market trends including installed EE retrofit strategies, project installation costs and savings, project payback times, and benefit-cost ratios over time. Despite the onset of a severe economic recession, the U.S. ESCO industry managed to grow at about 7percent per year between 2006 and 2008. ESCO industry revenues were about $4.1 billion in 2008 and ESCOs anticipate accelerated growth through 2011 (25percent per year). We found that 2,484 ESCO projects in our database generated ~;;$4.0 billion ($2009) in net, direct economic benefits to their customers. We estimate that the ESCO project database includes about 20percent of all U.S. ESCO market activity from 1990-2008. Assuming the net benefits per project are comparable for ESCO projects that are not included in the LBNL database, this would suggest that the ESCO industry has generated ~;;$23 billion in net direct economic benefits for customers at projects installed between 1990 and 2008. There is empirical evidence confirming that the industry is evolving by installing more comprehensive and complex measures?including onsite generation and measures to address deferred maintenance?but this evolution has significant implications for customer project economics, especially at K-12 schools. We found that the median simple payback time has increased from 1.9 to 3.2 years in private sector projects since the early-to-mid 1990s and from 5.2 to 10.5 years in public sector projects for the same time period.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NYSEG Seneca Compressed Air Energy Storage (CAES) Demonstration Project

Compressed Air Energy Storage (CAES) is a hybrid energy storage and generation concept that has many potential benefits especially in a location with increasing percentages of intermittent wind energy generation. The objectives of the NYSEG Seneca CAES Project included: for Phase 1, development of a Front End Engineering Design for a 130MW to 210 MW utility-owned facility including capital costs; project financials based on the engineering design and forecasts of energy market revenues; design of the salt cavern to be used for air storage; draft environmental permit filings; and draft NYISO interconnection filing; for Phase 2, objectives included plant construction with a target in-service date of mid-2016; and for Phase 3, objectives included commercial demonstration, testing, and two-years of performance reporting. This Final Report is presented now at the end of Phase 1 because NYSEG has concluded that the economics of the project are not favorable for development in the current economic environment in New York State. The proposed site is located in NYSEG’s service territory in the Town of Reading, New York, at the southern end of Seneca Lake, in New York State’s Finger Lakes region. The landowner of the proposed site is Inergy, a company that owns the salt solution mining facility at this property. Inergy would have developed a new air storage cavern facility to be designed for NYSEG specifically for the Seneca CAES project. A large volume, natural gas storage facility owned and operated by Inergy is also located near this site and would have provided a source of high pressure pipeline quality natural gas for use in the CAES plant. The site has an electrical take-away capability of 210 MW via two NYSEG 115 kV circuits located approximately one half mile from the plant site. Cooling tower make-up water would have been supplied from Seneca Lake. NYSEG’s engineering consultant WorleyParsons Group thoroughly evaluated three CAES designs and concluded that any of the designs would perform acceptably. Their general scope of work included development of detailed project construction schedules, capital cost and cash flow estimates for both CAES cycles, and development of detailed operational data, including fuel and compression energy requirements, to support dispatch modeling for the CAES cycles. The Dispatch Modeling Consultant selected for this project was Customized Energy Solutions (CES). Their general scope of work included development of wholesale electric and gas market price forecasts and development of a dispatch model specific to CAES technologies. Parsons Brinkerhoff Energy Storage Services (PBESS) was retained to develop an air storage cavern and well system design for the CAES project. Their general scope of work included development of a cavern design, solution mining plan, and air production well design, cost, and schedule estimates for the project. Detailed Front End Engineering Design (FEED) during Phase 1 of the project determined that CAES plant capital equipment costs were much greater than the $\$$125.6- million originally estimated by EPRI for the project. The initial air storage cavern Design Basis was increased from a single five million cubic foot capacity cavern to three, five million cubic foot caverns with associated air production wells and piping. The result of this change in storage cavern Design Basis increased project capital costs significantly. In addition, the development time required to complete the three cavern system was estimated at approximately six years. This meant that the CAES plant would initially go into service with only one third of the required storage capacity and would not achieve full capability until after approximately five years of commercial operation. The market price forecasting and dispatch modeling completed by CES indicated that the CAES technologies would operate at only 10 to 20% capacity factors and the resulting overall project economics were not favorable for further development. As a result of all of these factors, the Phase 1 FEED developed an installed CAES plant cost estimate of approximately $\$$2,300/KW for the 210MW CAES 1A and 2 cycles. The capital cost for the 136 MW CAES 1 cycle was even higher due to the lower generating capacity of the cycle. Notably, the large equipment could have generated additional capacity (up to 270MW) which would have improved the cost per KW; however, the output was limited by the night time transmission system capability. The research herein, therefore, is particular to the site-specific factors that influenced the design and the current and forecasted generation mix and energy prices in Upstate New York and may not necessarily indicate that CAES plants cannot be economically constructed in other places in New York State or the world.

25 ENERGY STORAGE↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Modeling Transient Response of Forests to Climate Change

Our hypothesis is that a high diversity of dominant life forms in Tennessee forests conveys resilience to disturbance such as climate change. Because of uncertainty in climate change and their effects, three climate change scenarios for 2030 and 2080 from three General Circulation Models (GCMs) were used to simulate a range of potential climate conditions for the state. These climate changes derive from the Intergovernmental Panel on Climate Change (IPCC) A1B storyline that assumes rapid global economic growth. The precipitation and temperature projections from the three GCMs for 2030 and 2080 were related to changes in five ecological provinces using the monthly record of temperature and precipitation from 1980 to 1997 for each 1 km cell across the state as aggregated into the provinces. Temperatures are projected to increase in all ecological provinces in all months for all three GCMs for both 2030 and 2080. Precipitation differences from the long-term average are more complex but less striking. The forest ecosystem model LINKAGES was used to simulate conditions for five ecological provinces from 1989 to 2300. Average output projects changes in tree diversity and species composition in all ecological provinces in Tennessee with the greatest changes in the Southern Mixed Forest province. Projected declines in total tree biomass are followed by biomass recovery as species replacement occurs in stands. The Southern Mixed Forest province results in less diversity in dominant trees as well as lower overall biomass than projections for the other four provinces. The biomass and composition changes projected in this study differ from forest dynamics expected without climate change. These results suggest that biomass recovery following climate change is linked to dominant tree diversity in the southeastern forest of the US. The generality of this observation warrants further investigation, for it relates to ways that forest management may influence climate change effects.

09 BIOMASS FUELS↗

TH-E-17A-05: Optimizing Four Dimensional Cone Beam Computed Tomography Projection Allocation to Respiratory Bins

Purpose: Four dimensional cone beam computed tomography (4DCBCT) is an emerging image guidance strategy but it can suffer from poor image quality. To avoid repeating scans it is beneficial to make the best use of the imaging data obtained. For conventional 4DCBCT the location and size of respiratory bins is fixed and projections are allocated to the respiratory bin within which it falls. Strictly adhering to this rule is unnecessary and can compromise image quality. In this study we optimize the size and location of respiratory bins and allow projections to be sourced from adjacent phases of the respiratory cycle. Methods: A mathematical optimization framework using mixed integer quadratic programming has been developed that determines when to source projections from adjacent respiratory bins and optimizes the size and location of the bins. The method, which we will call projection sharing, runs in under 2 seconds of CPU time. Five 4DCBCT datasets of stage III-IV lung cancer patients were used to test the algorithm. The standard deviation of the angular separation between projections (SD-A) and the standard deviation in the volume of the reconstructed fiducial gold coil (SD-V) were used as proxies to measure streaking artefacts and motion blur respectively. Results: The SD-A using displacement binning and projection sharing was 30%–50% smaller than conventional phase based binning and 59%–76% smaller than conventional displacement binning indicating more uniformly spaced projections and fewer streaking artefacts. The SD-V was 20–90% smaller when using projection sharing than using conventional phase based binning suggesting more uniform marker segmentation and less motion blur. Conclusion: Image quality was visibly and significantly improved with projection sharing. Projection sharing does not require any modifications to existing hardware and offers a more robust replacement to phase based binning, or, an option if phase based reconstruction is not of a suitable quality. This project is supported by an NHMRC Australia Fellowship and NHMRC project grant number 1034060.

60 APPLIED LIFE SCIENCES↗

GEOPHIRES Simulations for Deep Direct Use (DDU) Projects

This folder contains the GEOPHIRES codes and input files for running the base case scenarios for the six deep direct-use (DDU) projects. The six DDU projects took place during 2017-2020 and were funded by the U.S. Department of Energy Geothermal Technologies Office. They investigated the potential of geothermal deep direct-use at six locations across the country. The projects were conducted by Cornell University, West Virginia University (WVU), University of Illinois (U of IL), Sandia National Laboratory (SNL), Portland State University (PSU), and National Renewable Energy Laboratory (NREL). Four projects (Cornell, WVU, U of IL, SNL) investigated geothermal for direct heating of a local campus or community, the project by PSU considered seasonal subsurface storage of solar heating, and the NREL project investigated geothermal heating for turbine inlet cooling using absorption chillers. To allow comparison of techno-economic results across the six DDU projects, GEOPHIRES simulations were set up and conducted for each project. The GEOPHIRES code was modified for each project to simulate the local application and incorporate project-specific assumptions and results such as reservoir production temperature or financing conditions. The base case input file is included which simulates the base case conditions assumed by each project team. The levelized cost of heat (LCOH) is calculated and matches the base case LCOH reported by the project teams.

15 GEOTHERMAL ENERGY↗

TidGen Power System Commercialization Project

ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.

16 TIDAL AND WAVE POWER↗

Properties, Theory, and Measurements for Understanding the Function of Heavy Elements (Project 20180474CR, Final Technical Report)

The FY18-20 Laboratory Directed Research and Development (LDRD) funded Properties, Theory, and Measurements for Understanding the Function of Heavy Elements Project aim has been to advance heavy element science in a comprehensive project connecting targeted research with Los Alamos mission imperatives. The mechanisms for project implementation were (1) support of a multi-year broad-based postdoctoral fellows project, (2) a summer student fellows research project and two seminar series, and (3) organization of structured workshops and integrated educational and career development opportunities. The project was successfully administered by the Glenn T. Seaborg Institute (GTSI) for Transactinium Science and has shown to be an exceptional investment in supporting the Los Alamos National Laboratory (LANL) mission areas requiring heavy element and actinide science by attracting and funding the future generation of scientists and engineers. This project exhibited its value across the laboratory in heavy element and actinide science areas include materials, material properties, signatures, modeling, predictions, fabrication, detection, disposal, global security implications, forensics, and the specialized science surrounding plutonium, uranium, and their surrogates as fuels for energy and nuclear weapons. In this report, the GTSI project staff documents the “high return on investment” implementation as measured against the successes of previous actinide research and science-based projects and as evidenced by the retention of 30% of G.T. Seaborg Postdoctoral Fellows as permanent employees. With additional funding through LDRD Reserve funding during this project period, the GTSI expanded its support for heavy element and actinide science research with a Visiting Research Seaborg Scholar and a Rapid Response Small Projects call. These innovations have served to advance GTSI pursuits as communicated in our FY21-23 LDRD Proposal Project#: 20210527CR Seaborg Institute: Center for Advancing Actinide Science and Technology at LANL

36 MATERIALS SCIENCE↗

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

LAMP Project Facility and Space Requirements

The project will require significant space over the lifetime of the project to successfully execute design, technology maturation, component testing and verification, and final removal and installation. The types of space required falls into three general categories: office, storage, and laboratory. Figure 1 below summarizes the project space requirements by project lifecycle. The specific color coding indicates the availability (and potential risk to the project) of the particular type of space: green indicates space that is already allocated and in use by the LAMP project; yellow indicates space that is expected to be easily transitioned from its current use to the project; red indicates a space that is use by multiple users or other projects, and will most likely require high-level negotiations and planning to become available to the project. Figure 2 summarizes the LAMP Space Requirements by calendar year and type throughout the duration of the project. As can be seen in Fig. 2, the maximum space needed by the project exceeds 40,000 square feet, with an average space requirement over the lifetime of the project equal to approximately 25,000 square feet.

43 PARTICLE ACCELERATORS↗