Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROCUREMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

JPL's Real-Time Weather Processor project (RWP) metrics and observations at system completion

As an integral part of the overall upgraded National Airspace System (NAS), the objective of the Real-Time Weather Processor (RWP) project is to improve the quality of weather information and the timeliness of its dissemination to system users. To accomplish this, an RWP will be installed in each of the Center Weather Service Units (CWSUs), located in 21 of the 23 Air Route Traffic Control Centers (ARTCCs). The RWP System is a prototype system. It is planned that the software will be GFE and that production hardware will be acquired via industry competitive procurement. The ARTCC is a facility established to provide air traffic control service to aircraft operating on Instrument Flight Rules (IFR) flight plans within controlled airspace, principally during the en route phase of the flight. Covered here are requirement metrics, Software Problem Failure Reports (SPFRs), and Ada portability metrics and observations.

Loesh, Robert E.↗

The development and test of a deformable diffraction grating for a stigmatic EUV spectroheliometer

The objectives were to address currently unanswered fundamental questions concerning the fine scale structure of the chromosphere, transition region, and corona. The unique characteristics of the spectroheliometer was used in combination with plasma diagnostic techniques to study the temperature, density, and velocity structures of specific features in the solar outer atmosphere. A unified understanding was sought of the interplay between the time dependent geometry of the magnetic field structure and the associated flows of mass and energy, the key to which lies in the smallest spatial scales that are unobservable with current EUV instruments. Toroidal diffraction gratings were fabricated and tested by a new technique using an elastically deformable substrate. The toroidal diffraction gratings was procured and tested to be used for the evaluation of the Multi-Anode Microchannel Array (MAMA) detector systems for the Solar Ultraviolet Measurements of Emitted Radiation (SUMER) and UV Coronagraph Spectrometer (UVCS) instruments on the SOHO mission.

Timothy, J. Gethyn↗

Bristol Today

The topics are presented in viewgraph form and include the following: corporate organization; product groups; the CRV7 rocket weapon system; Black Brant Sounding Rockets; apogee performance; space payload experience; the Orbital Express; and program and procurement requirements.

Source record↗

Near-critical point phenomena in fluids (19-IML-1)

Understanding the effects of gravity is essential if the behavior of fluids is to be predicted in spacecraft and orbital stations, and, more generally, to give a better understanding of the hydrodynamics in these systems. An understanding is sought of the behavior of fluids in space. What should emerge from the International Microgravity Lab (IML-1) mission is a better understanding of the kinetics of growth in off-critical conditions, in both liquid mixtures and pure fluids. This complex phenomenon is the object of intensive study in physics and materials sciences area. It is also expected that the IML-1 flight will procure key results to provide a better understanding of how a pure fluid can be homogenized without gravity induced convections, and to what extent the 'Piston Effect' is effective in thermalizing the compressible fluids.

Beysens, D.↗

Domestic mobile satellite systems in North America

Telest Mobile Inc. (TMI) and the American Mobile Satellite Corporation (AMSC) are authorized to provide mobile satellite services (MSS) in Canada and the United States respectively. They are developing compatible systems and are undertaking joint specification and procurement of spacecraft and ground segment with the aim of operational systems by late 1993. Early entry (phase 1) mobile data services are offered in 1990 using space segment capacity leased from Inmarsat. Here, an overview is given of these domestic MSS with an emphasis on the TMI component of the MSAT systen.

Wachira, Muya↗

Ramp Technology and Intelligent Processing in Small Manufacturing

To address the issues of excessive inventories and increasing procurement lead times, the Navy is actively pursuing flexible computer integrated manufacturing (FCIM) technologies, integrated by communication networks to respond rapidly to its requirements for parts. The Rapid Acquisition of Manufactured Parts (RAMP) program, initiated in 1986, is an integral part of this effort. The RAMP program's goal is to reduce the current average production lead times experienced by the Navy's inventory control points by a factor of 90 percent. The manufacturing engineering component of the RAMP architecture utilizes an intelligent processing technology built around a knowledge-based shell provided by ICAD, Inc. Rules and data bases in the software simulate an expert manufacturing planner's knowledge of shop processes and equipment. This expert system can use Product Data Exchange using STEP (PDES) data to determine what features the required part has, what material is required to manufacture it, what machines and tools are needed, and how the part should be held (fixtured) for machining, among other factors. The program's rule base then indicates, for example, how to make each feature, in what order to make it, and to which machines on the shop floor the part should be routed for processing. This information becomes part of the shop work order. The process planning function under RAMP greatly reduces the time and effort required to complete a process plan. Since the PDES file that drives the intelligent processing is 100 percent complete and accurate to start with, the potential for costly errors is greatly diminished.

Rentz, Richard E.↗

Doing business with NASA

A brochure that was designed to encourage contractors to do business with NASA is presented. The brochure is divided into six sections: (1) This is NASA; (2) The procurement process; (3) Marketing your capabilities; (4) Special assistance programs; (5) NASA field installations; and (6) Sources of additional help.

Source record↗

Geostationary Operational Environmental Statellite(GEOS-N report)

The Advanced Missions Analysis Office (AMAO) of GSFC has completed a study of the Geostationary Operational Environmental Satellites (GOES-N) series. The feasibility, risks, schedules, and associated costs of advanced space and ground system concepts responsive to National Oceanic and Atmospheric Administration (NOAA) requirements were evaluated. The study is the first step in a multi-phased procurement effort that is expected to result in launch ready hardware in the post 2000 time frame. This represents the latest activity of GSFC in translating meteorological requirements of NOAA into viable space systems in geosynchronous earth orbits (GEO). GOES-N represents application of the latest spacecraft, sensor, and instrument technologies to enhance NOAA meteorological capabilities via remote and in-situ sensing from GEO. The GOES-N series, if successfully developed, could become another significant step in NOAA weather forecasting space systems, meeting increasingly complex emerging national needs for that agency's services.

Source record↗

Geostationary Operational Environmental Satellite (GOES-N report). Volume 1: Technical

The GOES-N study consisted of five distinct tasks including: determining replication costs of GOES I-M and GOES-7 in the GOES-N time frame; defining and evaluating modifications to GOES I-M to improve efficiency or reduce costs; and defining evolutionary changes to the GOES I-M design to satisfy National Weather Service (NWS) 1983 and NOAA 1989 requirements. The categorization and disposition of NOAA requirements is reported in volume 1 section 4. Results of the GOES I-M efficiency/cost improvement modifications study are described in Section 7.1. The system concept options 1, 2, and 3 that generally represent the results of the Task 2, 3A, and 3B studies are summarized in Section 7.2. Another result of the GOES-N study, the determination of which NWS 1983 and NOAA 1989 requirements can be met with the three options, is contained in volume 1 section 7. Conclusions and recommendations are covered in volume 1 section 8. Imager, sounder, control system, space environment monitor, search and rescue, weather facsimile, data collection system, and products/process/communications recommendations were extracted from sections 9, 10, and 11. Section 8 also contains conclusions pertaining to programmatic operational satellite issues (prerequisite development strategies, the direct procurement of instruments by the government, protoflight mission, etc.). Sections 9, 10, and 11 address instrument, control system, image/navigation/registration, and other system design considerations and surveys. These sections are supported by the appendices in volume 2.

Source record↗

Collaborative research on V/STOL control system/cockpit display tradeoffs under the NASA/MOD joint aeronautical program

Summarized here are activities that have taken place from 1979 to the present in a collaborative program between NASA Ames Research Center and the Royal Aerospace Establishment (now Defence Research Agency), Bedford on flight control system and cockpit display tradeoffs for low-speed and hover operations of future V/STOL aircraft. This program was created as Task 8A of the Joint Aeronautical Program between NASA in the United States and the Ministry of Defence (Procurement Executive) in the United Kingdom. The program was initiated based on a recognition by both parties of the strengths of the efforts of their counterparts and a desire to participate jointly in future simulation and flight experiments. In the ensuing years, teams of NASA and RAE engineers and pilots have participated in each other's simulation experiments to evaluate control and display concepts and define design requirements for research aircraft. Both organizations possess Harrier airframes that have undergone extensive modification to provide in-flight research capabilities in the subject areas. Both NASA and RAE have profited by exchanges of control/display concepts, design criteria, fabrication techniques, software development and validation, installation details, and ground and flight clearance techniques for their respective aircraft. This collaboration has permitted the two organizations to achieve jointly substantially more during the period than if they had worked independently. The two organizations are now entering the phase of flight research for the collaborative program as currently defined.

Franklin, J. A.↗

Advanced information processing system: The Army fault tolerant architecture conceptual study. Volume 1: Army fault tolerant architecture overview

Digital computing systems needed for Army programs such as the Computer-Aided Low Altitude Helicopter Flight Program and the Armored Systems Modernization (ASM) vehicles may be characterized by high computational throughput and input/output bandwidth, hard real-time response, high reliability and availability, and maintainability, testability, and producibility requirements. In addition, such a system should be affordable to produce, procure, maintain, and upgrade. To address these needs, the Army Fault Tolerant Architecture (AFTA) is being designed and constructed under a three-year program comprised of a conceptual study, detailed design and fabrication, and demonstration and validation phases. Described here are the results of the conceptual study phase of the AFTA development. Given here is an introduction to the AFTA program, its objectives, and key elements of its technical approach. A format is designed for representing mission requirements in a manner suitable for first order AFTA sizing and analysis, followed by a discussion of the current state of mission requirements acquisition for the targeted Army missions. An overview is given of AFTA's architectural theory of operation.

Harper, R. E.↗

Mars Observer spacecraft description

The Mars Observer spacecraft implements the science and mission objectives for a planetary observer program with a design baseline evolving from existing, proven, flight subsystem designs and production techniques. The spacecraft conforms to a set of high-level functional requirements, allowing a development process with a high degree of flexibility in meeting performance, mission, and science requirements. The intent of the implementation approach is to procure a design-to-cost, reliable, production-type spacecraft that can accommodate the complement of science instruments and meet mission requirements with adequate margins.

Potts, Dennis L.↗

Case for real-time systems development - Quo vadis?

The paper focuses on the distinctive issues of computer-aided software engineering (CASE) products for the development of real-time systems. CASE technologies and associated standardization efforts are evolving from sets of conflicting interests. The majority of case products are intended for use in the development of management information systems. CASE products to support the development of large, complex real-time systems must provide additional capabilities. Generic concerns include the quality of the implementation of the required method for the phase of the system's development and whether the vendor is stable and committed to evolving the products in parallel with nonproprietary standards. The CASE market is undergoing considerable consolidation. The paper describes the major forces, cooperating entities, and remaining uncertainties that need to be weighed in near-term CASE procurements to limit risk of loss of investment in project time, trianing, and money.

Erb, Dona M.↗

Shuttle abort landing site emergency medical services

NASA and DOD studies of medical-planning and logistical problems are reviewed as applicable to providing emergency medical care at remote transoceanic abort landing (TAL) sites. Two options are analyzed including a modified surgical response team and a combination physician/medical technician team. The two concepts are examined in terms of cost-effectiveness, specific types of medical support such as blood procurement, and search-and-rescue requirements. It is found that the physician/technician team is more economically efficient, and the description of the concept permits the development of an effective TAL-site astronaut medical-support system. A balance is struck between the competing problems of cost and medical capability by planning for on-scene medical stabilization and air evacuation to DOD tertiary medical centers.

Mckenas, David K.↗

SIRTF primary mirror design, analysis, and testing

The primary mirror assembly (PMA) requirements and concepts for the Space Infrared Telescope Facility (SIRTF) program are discussed. The PMA studies at NASA/ARC resulted in the design of two engineering test articles, the development of a mirror mount cryogenic static load testing system, and the procurement and partial testing of a full scale spherical mirror mounting system. Preliminary analysis and testing of the single arch mirror with conical mount design and the structured mirror with the spherical mount design indicate that the designs will meet all figure and environmental requirements of the SIRTF program.

Sarver, George L., III↗

The impact of new business approaches derived from the Manned Transportation System Study

The results are reported of a survey conducted among senior managers within the government and participating companies to identify the items that could improve industry's way of doing business with NASA. New and recommended practices in management, operations, organization, procurement, and procedures are discussed. The development of multitiered requirement systems for NASA programs is addressed.

Mccandless, B., II↗

Nickel-hydrogen cell low-earth-orbit life test update

When individual pressure vessel (IPV) nickel-hydrogen (Ni/H2) cells were selected as the energy storage system for Space Station Freedom in March of 1986, a limited database existed on life and performance characteristics of these cells in a low earth orbit (LEO) regime. Therefore, NASA LeRC initiated a Ni/H2 cell test program with the primary objectives of building a test facility, procuring cells from existing NASA contracts, and screening several cell designs by life testing in a LEO 35 percent depth of discharge (DOD) scenario. A total of 40 cells incorporating 13 designs were purchased from Yardney, Hughes, and Eagle-Picher. Thirty-two of the cells purchased were 65 A-hr nameplate capacity and eight cells were 50 A-Hr. Yardney and Eagle-Picher cells were built with both the Air Force recirculating and the advanced back-to-back electrode stack configurations and incorporated 31 and 26 percent KOH. Acceptance testing of the first delivered cells began in March of 1988, with life testing following in September of that year. Performance comparisons of these cells are made here while specifically addressing life test data relative to the design differences.

Frate, David T.↗

The VRT gas turbine combustor - Phase II

An innovative annular combustor configuration is being developed for aircraft and other gas turbine engines. This design has the potential of permitting higher turbine inlet temperatures by reducing the pattern factor and providing a major reduction in NO(x) emission. The design concept is based on a Variable Residence Time (VRT) technique which allows large fuel particles adequate time to completely burn in the circumferentially mixed primary zone. High durability of the combustor is achieved by dual-function use of the incoming air. In Phase I, the feasibility of the concept was demonstrated by water analogue tests and 3D computer modeling. The flow pattern within the combustor was as predicted. The VRT combustor uses only half the number of fuel nozzles of the conventional configuration. In Phase II, hardware was designed, procured, and tested under conditions simulating typical supersonic civil aircraft cruise conditions to the limits of the rig. The test results confirmed many of the superior performance predictions of the VRT concept. The Hastelloy X liner showed no signs of distress after nearly six hours of tests using JP5 fuel.

Melconian, Jerry O.↗