Electrospun Nanofiber Electrodes and Membrane for Energy Conversion and Storage

Electrospinning is one option for the hierarchal organization of polymers and nanoparticles into membrane and electrode components for high-performance energy storage and conversion devices. Electrospinning processes are cost competitive and simple to realize on a commercial scale, with process equipment readily available for large-scale manufacturing. This paper provides a brief overview on the use of nanofiber electrospinning for fabricating fuel cell and battery components.

25 ENERGY STORAGE↗

Synthesizing, Compounding, and Characterizing a Heat Labile Polyurethane Foam

ABSTRACT A need exists for a packaging foam material that can be converted from solid to gaseous degradation products at reasonably low energy levels or temperatures, such as 100O C. This paper will primarily discuss the approaches currently being used to synthesize and characterize such a material. These approaches include the incorporation of novel polyols such as azo containing diols, polycarbonate diols, and polypropylene carbonate polyols into polyurethane foams. Characterization methods include NMR, FTIR, TGA, finite element analysis, impact strength, and others. This project will be funded for a duration of three years. Year 1 focused on developing the proposed test methods and producing an initial rigid polyurethane foam. Year 2 focuses on refining the materials and test methods. If appropriate, design of experiment (doe) techniques will be used to optimize components, component levels, density and other variables to attain required final material properties (TGA weight loss, impact strength, etc.). Year 3 focuses on scaling up to larger engineering quantities. The application for this material is in load securement for transportation of low level radioactive waste materials within the US Department of Energy (DOE) complex. Foam in place process equipment and operators will be shielded using this novel method over current practice. Current practice can involve time consuming methods of load securement in low level radiation environments. This new technique would eliminate exposure time securing the load and greatly improve the As Low As Reasonably Attainable (ALARA) conditions. The objective is to progress to higher Technical Readiness Levels (TRL) and larger pilot scale quantities. This paper discusses methodologies and presents current results to date.

Kranjc, Mark D.↗

Analysis of Developing Gas/liquid Two-Phase Flows

The goal of this work is to develop a mechanistically based CFD model that can be used to simulate process equipment operating in the churn-turbulent regime. The simulations were performed using a state-of-the-art computational multiphase fluid dynamics code, NPHASE–CMFD [Antal et al,2000]. A complete four-field model, including the continuous liquid field and three dispersed gas fields representing bubbles of different sizes, was first carefully tested for numerical convergence and accuracy, and then used to reproduce the experimental results from the TOPFLOW test facility at Forschungszentrum Dresden-Rossendorf e.V. Institute of Safety Research [Prasser et al,2007]. Good progress has been made in simulating the churn-turbulent flows and comparison the NPHASE-CMFD simulations with TOPFLOW experimental data. The main objective of the paper is to demonstrate capability to predict the evolution of adiabatic churn-turbulent gas/liquid flows. The proposed modelling concept uses transport equations for the continuous liquid field and for dispersed bubble fields [Tselishcheva et al, 2009]. Along with closure laws based on interaction between bubbles and continuous liquid, the effect of height on air density has been included in the model. The figure below presents the developing flow results of the study, namely total void fraction at different axial locations along the TOPFLOW facility test section. The complete model description, as well as results of simulations and validation will be presented in the full paper.

10 SYNTHETIC FUELS↗

Space processing applications payload equipment study. Volume 3: Programmatics

The programmatic aspects of the space processing applications program and the methods of accommodating SPA payloads aboard the Shuttle/Spacelab host vehicle are discussed. An examination of the NASA traffic model shows that there exists a potential for 178 SPA payloads from the overall total of 727 flights specified. This could represent up to one quarter of the total shuttle flights during the 12-year-long period covered by the traffic model. The SPA payload will range from austere for shared flight opportunities to dedicated where space processing will encompass the total flight payload allocations. The major modes of use to SPA will include dedicated Spacelab missions, shared Spacelab missions and shared automated payloads attached to the pallet with the necessary control and display equipment in the host vehicle. Several layout drawings and artist's renderings have been completed to illustrate the various potential configurations available to accommodate the SPA payload equipment.

Hammel, R. L.↗

NASA-STD-(I)-6016, Standard Materials and Processes Requirements for Spacecraft

This document is directed toward Materials and Processes (M&P) used in the design, fabrication, and testing of flight components for all NASA manned, unmanned, robotic, launch vehicle, lander, in-space and surface systems, and spacecraft program/project hardware elements. All flight hardware is covered by the M&P requirements of this document, including vendor designed, off-the-shelf, and vendor furnished items. Materials and processes used in interfacing ground support equipment (GSE); test equipment; hardware processing equipment; hardware packaging; and hardware shipment shall be controlled to prevent damage to or contamination of flight hardware.

Pedley, Michael↗

Space processing applications payload equipment study. Volume 1: Executive summary

A study was conducted to derive and collect payload information on the anticipated space processing payload requirements for the Spacelab and space shuttle orbiter planning activities. The six objectives generated by the study are defined. Concepts and requirements for space processing payloads to accommodate the performance of the shuttle-supported research phase are analyzed. Diagrams and tables of data are developed to show the experiments involved, the power requirements, and the payloads for shared missions.

Hammel, R. L.↗

Developing a Logistics Data Process for Support Equipment for NASA Ground Operations

The United States NASA Space Shuttle has long been considered an extremely capable yet relatively expensive rocket. A great part of the roughly US $500 million per launch expense was the support footprint: refurbishment and maintenance of the space shuttle system, together with the long list of resources required to support it, including personnel, tools, facilities, transport and support equipment. NASA determined to make its next rocket system with a smaller logistics footprint, and thereby more cost-effective and quicker turnaround. The logical solution was to adopt a standard Logistics Support Analysis (LSA) process based on GEIA-STD-0007 http://www.logisticsengineers.org/may09pres/GEIASTD0007DEXShortIntro.pdf which is the successor of MIL-STD-1388-2B widely used by U.S., NATO, and other world military services and industries. This approach is unprecedented at NASA: it is the first time a major program of programs, Project Constellation, is factoring logistics and supportability into design at many levels. This paper will focus on one of those levels NASA ground support equipment for the next generation of NASA rockets and on building a Logistics Support Analysis Record (LSAR) for developing and documenting a support solution and inventory of resources for. This LSAR is actually a standards-based database, containing analyses of the time and tools, personnel, facilities and support equipment required to assemble and integrate the stages and umbilicals of a rocket. This paper will cover building this database from scratch: including creating and importing a hierarchical bill of materials (BOM) from legacy data; identifying line-replaceable units (LRUs) of a given piece of equipment; analyzing reliability and maintainability of said LRUs; and therefore making an assessment back to design whether the support solution for a piece of equipment is too much work, i.e., too resource-intensive. If one must replace or inspect an LRU too much, perhaps a modification of the design of the equipment can make such operational effort unnecessary. Finally, this paper addresses processes of tying resources to a timeline of tasks performed in ground operations: this enables various overarching analyses, e.g., a summarization of all resources used for a given piece of equipment. Quality Control of data will also be discussed: importing and exporting data from product teams, including spreadsheets-todatabase or data exchange between databases.

Chakrabarti, Suman↗

Environmental Management Waste Management Facility Proxy Waste Lot Profile 6.999 for Building K-25 West Wing, East Tennessee Technology Park, Oak Ridge, Tennessee

In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitate the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).

54 ENVIRONMENTAL SCIENCES↗

Advanced Instrumentation and Control Methods for Small and Medium Reactors with IRIS Demonstration

Development and deployment of small-scale nuclear power reactors and their maintenance, monitoring, and control are part of the mission under the Small Modular Reactor (SMR) program. The objectives of this NERI-consortium research project are to investigate, develop, and validate advanced methods for sensing, controlling, monitoring, diagnosis, and prognosis of these reactors, and to demonstrate the methods with application to one of the proposed integral pressurized water reactors (IPWR). For this project, the IPWR design by Westinghouse, the International Reactor Secure and Innovative (IRIS), has been used to demonstrate the techniques developed under this project. The research focuses on three topical areas with the following objectives. Objective 1 - Develop and apply simulation capabilities and sensitivity/uncertainty analysis methods to address sensor deployment analysis and small grid stability issues. Objective 2 - Develop and test an autonomous and fault-tolerant control architecture and apply to the IRIS system and an experimental flow control loop, with extensions to multiple reactor modules, nuclear desalination, and optimal sensor placement strategy. Objective 3 - Develop and test an integrated monitoring, diagnosis, and prognosis system for SMRs using the IRIS as a test platform, and integrate process and equipment monitoring (PEM) and process and equipment prognostics (PEP) toolboxes. The research tasks are focused on meeting the unique needs of reactors that may be deployed to remote locations or to developing countries with limited support infrastructure. These applications will require smaller, robust reactor designs with advanced technologies for sensors, instrumentation, and control. An excellent overview of SMRs is described in an article by Ingersoll (2009). The article refers to these as deliberately small reactors. Most of these have modular characteristics, with multiple units deployed at the same plant site. Additionally, the topics focus on meeting two of the eight needs outlined in the recently published 'Technology Roadmap on Instrumentation, Control, and Human-Machine Interface (ICHMI) to Support DOE Advanced Nuclear Energy Programs' which was created 'to provide a systematic path forward for the integration of new ICHMI technologies in both near-term and future nuclear power plants and the reinvigoration of the U.S. nuclear ICHMI community and capabilities.' The research consortium is led by The University of Tennessee (UT) and is focused on three interrelated topics: Topic 1 (simulator development and measurement sensitivity analysis) is led by Dr. Mike Doster with Dr. Paul Turinsky of North Carolina State University (NCSU). Topic 2 (multivariate autonomous control of modular reactors) is led by Dr. Belle Upadhyaya of the University of Tennessee (UT) and Dr. Robert Edwards of Penn State University (PSU). Topic 3 (monitoring, diagnostics, and prognostics system development) is led by Dr. Wes Hines of UT. Additionally, South Carolina State University (SCSU, Dr. Ken Lewis) participated in this research through summer interns, visiting faculty, and on-campus research projects identified throughout the grant period. Lastly, Westinghouse Science and Technology Center (Dr. Mario Carelli) was a no-cost collaborator and provided design information related to the IRIS demonstration platform and defining needs that may be common to other SMR designs. The results of this research are reported in a six-volume Final Report (including the Executive Summary, Volume 1). Volumes 2 through 6 of the report describe in detail the research and development under the topical areas. This volume serves to introduce the overall NERI-C project and to summarize the key results. Section 2 provides a summary of the significant contributions of this project. A list of all the publications under this project is also given in Section 2. Section 3 provides a brief summary of each of the five volumes (2-6) of the report. The contributions of SCSU are described in Section 4, including a summary of undergraduate research experience. The project management organizational chart is provided as Figure 1. Appendices A, B, and C contain the reports on the summer research performed at the University of Tennessee by undergraduate students from South Carolina State University.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Furnace and support equipment for space processing

A core facility capable of performing a majority of materials processing experiments is discussed. Experiment classes are described, the needs peculiar to each experiment type are outlined, and projected facility requirements to perform the experiments are treated. Control equipment (automatic control) and variations of the Czochralski method for use in space are discussed.

Mazelsky, R.↗

Development of a Technology Roadmap for Online Monitoring of Nuclear Power Plants

The nuclear power industry has recently recognized the potential cost saving that can be achieved from migrating the current manual and labor dependent surveillance and preventive maintenance activities to data-driven online monitoring methods. Since then, several efforts have been launched with various degrees of momentum to tackle specific surveillance or preventive maintenance activities. The light water reactor sustainability program (LWRS) program has anticipated this need and launched an effort that aimed to develop a technology roadmap for the nuclear power industry. Because the roadmap has to be focused towards the user or application’s value, and because nuclear power plants have different process efficiencies and deficiencies, the technology roadmap has to be plant independent. Achieving this objective required optimizing the extent of details described by a technology roadmap. The approach followed is for the roadmap to describe the sequence of activities needed to automate a process or equipment activity, but not describe the sequence of processes or equipment to target. For example, the steps required to migrate the inspection of a pump are plant independent. However, defining that the migration of feed water pumps inspections to online monitoring should be performed before inspections of feed water valves is dependent on multiple plant factors such as the plant requirements, labor work capacity, and process or equipment conditions. The technology roadmap was broken down into six elements, four of which have a sequential path of advancement, while the other two are supporting elements to the sequential elements. The sequential part of the roadmap analyzes data collection, analytics, visualization, and management. For these elements of the technology roadmap, the migration of an activity is defined in three states. The base state is defined as the most primitive, manual, and labor dependent process used by some nuclear power plants. The modern state is defined as the state that can be achieved if the activities are augmented or replaced by current technologies that are commercially available or are soon to be available. The state of the art is defined as using technologies of the future, i.e. concept and technologies that are being researched. The data collection part of the technology roadmap defines three states of every process performed in a nuclear power plant. However, the data analytics part is described based on equipment, because automating an activity performed on one equipment required considering multiple data sources. The visualization and data management elements are process or equipment independent. Visualization describes the means to use human factor science and technologies advancement in presenting the data collected and the data analytics results. The data management targets storage, communication, and computational power need, in addition to data integration and sharing. Since storage, communication, and computational power technologies and path for deployment are known to any information technology organization, this effort targeted the cost of data management. This has a direct impact on the feasibility of the automation effort. The supporting elements analyzes the value of automating the activity and the change challenges to tackle. For the support elements, the roadmap targeted describing activities that need to be performed as part of the roadmap development. The value element of the roadmap describes how to analyze the cost saving and the associated risk. The change management identifies multiple factors to consider such as regulation, cybersecurity, resource availability, supporting infrastructure availability, feasibility (power, fitness, environment tolerance, facilities), and cultural change.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Establishing no credible risk of inadvertent criticality for the K-25 demolition project - 14310

Demolition of the K-25 Gaseous Diffusion Plant required establishing a non-credible risk of inadvertent criticality because a Criticality Accident Alarm System (CAAS) could not be reliably maintained operable as the building was being torn down. Preparation for, and demolition of, the facility was a multi-year long effort with significant changes in approach. The most significant change was to demolish the facility with as much of the process gas equipment and piping left in the facility as possible, rather than removing all process gas equipment and piping from the facility prior to demolishing the building structure only. The contractor had to adapt their approach to accommodate these changes. The normal approach to demolition was to remove all process gas equipment and piping prior to demolition, using Nuclear Criticality Safety (NCS) controls based on the double contingency principle, while CAAS coverage was intact. Then, the building structure was demolished with no requirement for a CAAS. This was the method used to demolish the K-33 Building, for example. In the case of K-25 demolition, all equipment and piping that met the Environmental Management Waste Management Facility (EMWMF) disposal cell Waste Acceptance Criteria (WAC) was left in the building and removed as part of the building demolition process. This resulted in significant quantities of fissionable material remaining in the building and being handled during demolition. The NCS Organization worked closely with several groups during preparation activities. A Data Management organization was established to specifically identify every piece of process gas equipment and piping in the facility so that it could be accounted for and characterized. Deactivation and Decommissioning (D and D) personnel conducted internal visual inspections, by remote camera, of all process gas equipment and piping larger than 3' diameter, to reveal any large deposits that would require removal. Non-Destructive Assay (NDA) of the vast majority of equipment and piping was required to quantify the amount of fissionable material remaining. Finally, all process gas equipment and piping larger than 3'' diameter was internally filled with foam, which was credited by NCS with immobilizing the remaining fissionable material such that large migration and accumulation could not occur during demolition activities. NCS personnel worked closely with all of these groups in order to acquire the data and information needed to establish a non-credible risk of inadvertent criticality during building demolition. Good communication and a close working relationship between NCS, the various D and D/characterization personnel, and the Department of Energy (DOE) ensured the success of the modified approach to building demolition. The same successful approach is currently underway in the K-27 Building as well. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Feedstock Supply System Design and Economics for Conversion of Lignocellulosic Biomass to Hydrocarbon Fuels Conversion Pathway: Fast Pyrolysis and Hydrotreating Bio-Oil Pathway "The 2017 Design Case"

The U.S. Department of Energy promotes the production of liquid fuels from lignocellulosic biomass feedstocks by funding fundamental and applied research that advances the state of technology in biomass sustainable supply, logistics, conversion, and overall system sustainability. As part of its involvement in this program, Idaho National Laboratory (INL) investigates the feedstock logistics economics and sustainability of these fuels. Between 2000 and 2012, INL quantified and the economics and sustainability of moving biomass from the field or stand to the throat of the conversion process using conventional equipment and processes. All previous work to 2012 was designed to improve the efficiency and decrease costs under conventional supply systems. The 2012 programmatic target was to demonstrate a biomass logistics cost of $\$$55/dry Ton for woody biomass delivered to fast pyrolysis conversion facility. The goal was achieved by applying field and process demonstration unit-scale data from harvest, collection, storage, preprocessing, handling, and transportation operations into INL’s biomass logistics model.

09 BIOMASS FUELS↗

Computational Fluid Dynamics Simulations to Support Efficiency Improvements in Aluminum Smelting Process

Smelting is broadly described as the extraction of a metal from its ore. In the United States, aluminum is commonly produced by smelting alumina in bauxite using the Hall-Héroult process. Optimization of equipment and processes in conventional smelting is crucial to enhancing process efficiency and productivity, is necessary for improving the techno-economic feasibility, which directly manifests as the growth of the American economy. To achieve optima, insightful data on the multiphysics phenomena that are inherent to the process must be obtained through physical investigation or high-fidelity numerical simulations. The resolution of relevant scales in time and space for smelting operations requires intensive, high-performance computing (HPC) simulations. Hostile operating conditions limit physical data acquisition to specific techniques; therefore, these data do not describe the multiscale interaction of simultaneous effects. Fortunately, in recent decades, significant advancements in computing hardware and computational methods have made the numerical resolution of such a complex process possible. In this study, a high-fidelity simulation of aluminum smelting was performed using an open-source tool, OpenFOAM, which analyzed many parameters characteristic to underlying phenomena. A multiphysics model based on the Eulerian-Eulerian multifluid approach was adopted. This model can resolve critical issues in the electrolytic smelting of aluminum, such as bubbling of carbon dioxide from the anode(s), magnetohydrodynamics from electromagnetic effects, ionic dissolution of the alumina in the electrolyte, and the evolution of thermal profiles. This study provides valuable connectivity for characteristic data that can direct the future designs of efficient smelters. A basic framework to model and simulate the smelting process using OpenFOAM is presented for user modification in keeping with process development. Of relevance to the flow field, a detailed investigation of vortices produced by bubble motion and electromagnetics is discussed, along with their impact on the evolution of thermal profiles. The predictions show small-scale vortices in the clearance between the anode and cathode caused by magnetic forces. Predictions also indicate relatively large-scale vortices in the inter-anode space resulting from carbon dioxide rising through the electrolytic flow field. The formation of vortices at the edges of anodes was shown to direct alumina charged by the feeder to the bottom of the anodes, thus preventing the entrapment of gas bubbles in the periphery of the bottom of the anode. Symmetry was observed in the location of cold spots in the electrolytic mixture in the vicinity of the feeder. Cold spots were also observed in the clearance between the anode and cathode due to the flow’s transmission of unconverted alumina to this region.

36 MATERIALS SCIENCE↗

Custom Equipment Development for Processing of Surplus Plutonium

Facilities and Material • Location: Savannah River Site K-Area, South Carolina • Plutonium designated as surplus is blended with adulterant material, re-packaged and shipped to WIPP in New Mexico • Currently one operational glovebox for downblending, facility modifications and construction of three additional glovebox lines in progress • Current operations are highly manual requiring full PPE and reader/worker steps

Krementz, Daniel [Savannah River National Laborato↗

Space processing applications payload equipment study. Volume 2B: Payload interface analysis (power/thermal/electromagnetic compatibility)

As a part of the task of performing preliminary engineering analysis of modular payload subelement/host vehicle interfaces, a subsystem interface analysis was performed to establish the integrity of the modular approach to the equipment design and integration. Salient areas that were selected for analysis were power and power conditioning, heat rejection and electromagnetic capability (EMC). The equipment and load profiles for twelve representative experiments were identified. Two of the twelve experiments were chosen as being representative of the group and have been described in greater detail to illustrate the evaluations used in the analysis. The shuttle orbiter will provide electrical power from its three fuel cells in support of the orbiter and the Spacelab operations. One of the three shuttle orbiter fuel cells will be dedicated to the Spacelab electrical power requirements during normal shuttle operation. This power supplies the Spacelab subsystems and the excess will be available to the payload. The current Spacelab sybsystem requirements result in a payload allocation of 4.0 to 4.8 kW average (24 hour/day) and 9.0 kW peak for 15 minutes.

Hammel, R. L.↗