Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PERMITTING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Nevada National Security Site E-Tunnel Wastewater Disposal System Quarterly Monitoring Report, Water Pollution Control Permit NEV 96021 (First Quarter Calendar Year 2020)

This report includes the results of monthly inspections and monitoring for January, February, and March 2020. Monthly inspections and monitoring were conducted on January 15, February 12, and March 17, 2020. Inspections include a visual assessment of the berms, ponding, water levels relative to the overflow pipes, tunneling or burrowing into the berms, soil conditions on and around the berms, erosion or sloughing of the slopes of the berms, seeps at the toe of the berms, deep-rooting botanicals on the berms, and fencing. Monthly monitoring includes measurements of the instantaneous flow rate, hydrogen ion activity (pH), and specific conductance of the E-Tunnel Wastewater Disposal System discharge.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Discharge Permit-1845 Quarterly Status Report (Jul-Sep 2017)

Trichloroethene (TCE) and nitrate have been identified as constituents of concern in groundwater at the Sandia National Laboratories, New Mexico (SNL/NM) Technical Area (TA)-V Groundwater (TAVG) Area of Concern (AOC) based on detections above the U.S. Environmental Protection Agency (EPA) maximum contaminant level (MCL) in samples collected from monitoring wells. The EPA MCLs and the State of New Mexico drinking water standards for TCE and nitrate are 5 micrograms per liter and 10 milligrams per liter (as nitrogen), respectively. A phased Treatability Study/Interim Measure (TS/IM) of in-situ bioremediation (ISB) will be implemented to evaluate the effectiveness of ISB as a potential technology to treat the groundwater contamination at TAVG AOC (New Mexico Environment Department [NMED] April 2016). The NMED Hazardous Waste Bureau (HWB) approved the Revised Treatability Study Work Plan (TSWP) (SNL/NM March 2016) in May 2016 (NMED May 2016). The SNL/NM Environmental Restoration Operations (ER) personnel are responsible for implementing the TS/IM of ISB at TAVG AOC in accordance with the Revised TSWP.

54 ENVIRONMENTAL SCIENCES↗

Completed UIC Permit Document (SECARB Work Product 3.2.4.b)

The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the USA.

54 ENVIRONMENTAL SCIENCES↗

Completed Drilling Permit (SECARB Phase III Work Product 3.2.6.a)

The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage, and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the USA.

01 COAL, LIGNITE, AND PEAT↗

Complementing the CCS Class VI Well Permit Process with DOE-NETL's SMART Initiative Tools and Workflows

This is a presentation on model explorer developed under SMART initiative Task 2. Our team will present the current progress of the model explorer in using machine learning models to accelerate CCS project at GWPC meeting. Model explorer bring new capabilities, (fast, Realtime, and accurate) that can help CCS stakeholders including regulatory agencies, public and site operators make faster decisions and process information and data.

Hosseini, Seyyed↗

Hazardous Waste Facility Permit Community Relations Plan

The mission of Los Alamos National Laboratory (LANL or the Laboratory) is to solve national security challenges through scientific excellence. Our vision is delivering science and technology to protect our nation and promote world stability.

54 ENVIRONMENTAL SCIENCES↗

Permitting Commercial-Scale Carbon Dioxide Geologic Storage

Conference presentation at Energy Generation Conference, Bismarck, North Dakota, January 29-30, 2020. An overview of the Plains CO 2 Reduction (PCOR) Partnership Initiative and the steps to implement commercial carbon capture, utilization, and storage (CCUS) activity in North Dakota. Includes solutions for CCUS deployment challenges.

01 COAL, LIGNITE, AND PEAT↗

Application for Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solenoid permits remote control of stop watch and assures restarting

Stop watch which may be remotely controlled by the use of a solenoid mechanism is described. When the solenoid is energized, the coil spring pulls the lever arm and starts the balance wheel. When it is not energized, the spring pulls the lever and stops the watch.

Kodai, C.↗