Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OPERATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

DEVELOPMENT AND DEMONSTRATION TESTBED FOR THE REMOTE OPERATIONS AND MONITORING OF MICROREACTORS

The nuclear industry is rapidly developing many advanced-reactor concepts for near-term deployment in both traditional and non-traditional nuclear-powered applications. One such category of advanced reactor is the microreactor, a class of reactor with less than 20MWth power output, intended for applications where the economics or logistics of traditional power sources are difficult. This includes applications such as remote communities, mining sites, defense installations, or humanitarian and disaster-relief missions. One key enabling feature for the successful deployment of microreactors is a remote operations capability. Remote operations provide monitoring and control capabilities which can significantly reduce staffing costs by eliminating the need for licensed operators at each reactor facility and improve the economic viability for microreactor deployment. A remote concept of operations is not currently an established capability in the nuclear industry. In addition, no demonstration microreactor is expected to complete construction or go critical until at least 2026. This leaves two major capability gaps: the successful demonstration of a remote concept of operations for microreactors and a test bed suitable for said demonstration. Both gaps must be addressed in order to advance the remote concepts of nuclear operation and, more broadly, microreactors themselves from paper to reality. This paper aims to fill these gaps and describes a test bed that would support development and deployment of a remote concept of nuclear operations, initial experimental results from that test bed, and the application of the test bed and experimental results for a digital-twin-based remote concept of operations underdevelopment at Idaho National Laboratory (INL). The platform chosen as a remote concept of nuclear operations test bed is the Single Primary Heat Extraction and Removal Emulator, known as SPHERE, located at INL. SPHERE is a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The small-scale and non-nuclear nature of SHPERE limit safety concerns associated with remote operations while still providing the physical response representative of a microreactor. A network connection was added to SPHERE that enables remote-monitoring capability. This allows for real-time data streaming to networked workstations, data historians, and human-machine interfaces (HMIs). These are all critical components in a remote concept of operations, thus providing a robust development and demonstration platform. An initial experiment was performed using the SPHERE remote operations testbed. This included running a comprehensively instrumented SPHERE through a series of steady-state and transient operating scenarios in both normal and abnormal operating conditions, all while streaming live test data to a remote HMI and data warehouse. This initial experiment served three purposes: (1) characterizing the response of SPHERE, (2) demonstrating the remote connection to SPHERE, and (3) providing a baseline data set for development of a digital-twin-based remote concept of operations that is under development at INL.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DEVELOPMENT AND DEMONSTRATION TESTBED FOR THE REMOTE OPERATIONS AND MONITORING OF MICROREACTORS

The nuclear industry is rapidly developing many advanced-reactor concepts for near-term deployment in both traditional and non-traditional nuclear-powered applications. One such category of advanced reactor is the microreactor, a class of reactor with less than 20MWth power output, intended for applications where the economics or logistics of traditional power sources are difficult. This includes applications such as remote communities, mining sites, defense installations, or humanitarian and disaster-relief missions. One key enabling feature for the successful deployment of microreactors is a remote operations capability. Remote operations provide monitoring and control capabilities which can significantly reduce staffing costs by eliminating the need for licensed operators at each reactor facility and improve the economic viability for microreactor deployment. A remote concept of operations is not currently an established capability in the nuclear industry. In addition, no demonstration microreactor is expected to complete construction or go critical until at least 2026. This leaves two major capability gaps: the successful demonstration of a remote concept of operations for microreactors and a test bed suitable for said demonstration. Both gaps must be addressed in order to advance the remote concepts of nuclear operation and, more broadly, microreactors themselves from paper to reality. This paper aims to fill these gaps and describes a test bed that would support development and deployment of a remote concept of nuclear operations, initial experimental results from that test bed, and the application of the test bed and experimental results for a digital-twin-based remote concept of operations underdevelopment at Idaho National Laboratory (INL). The platform chosen as a remote concept of nuclear operations test bed is the Single Primary Heat Extraction and Removal Emulator, known as SPHERE, located at INL. SPHERE is a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The small-scale and non-nuclear nature of SHPERE limit safety concerns associated with remote operations while still providing the physical response representative of a microreactor. A network connection was added to SPHERE that enables remote-monitoring capability. This allows for real-time data streaming to networked workstations, data historians, and human-machine interfaces (HMIs). These are all critical components in a remote concept of operations, thus providing a robust development and demonstration platform. An initial experiment was performed using the SPHERE remote operations testbed. This included running a comprehensively instrumented SPHERE through a series of steady-state and transient operating scenarios in both normal and abnormal operating conditions, all while streaming live test data to a remote HMI and data warehouse. This initial experiment served three purposes: (1) characterizing the response of SPHERE, (2) demonstrating the remote connection to SPHERE, and (3) providing a baseline data set for development of a digital-twin-based remote concept of operations that is under development at INL.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Synthesis of historical reservoir operations from 1980 to 2020 for the evaluation of reservoir representation in large-scale hydrologic models

Abstract. All the major river systems in the contiguous United States (CONUS) (and many in the world) are impacted by dams, yet reservoir operations remain difficult to quantify and model due to a lack of data. Reservoir operation data are often inaccessible or distributed across many local operating agencies, making the acquisition and processing of data records quite time-consuming. As a result, large-scale models often rely on simple parameterizations for assumed reservoir operations and have a very limited ability to evaluate how well these approaches match actual historical operations. Here, we use the first national dataset of historical reservoir operations in the CONUS domain, ResOpsUS, to analyze reservoir storage trends and operations in more than 600 major reservoirs across the US. Our results show clear regional differences in reservoir operations. In the eastern US, which is dominated by flood control storage, we see storage peaks in the winter months with sharper decreases in the operational range (i.e., the difference between monthly maximum and minimum storage) in the summer. In the more arid western US where storage is predominantly for irrigation, we find that storage peaks during the spring and summer with increases in the operational range during the summer months. The Lower Colorado region is an outlier because its seasonal storage dynamics more closely mirrored those of flood control basins, yet the region is classified as arid, and most reservoirs have irrigation uses. Consistent with previous studies, we show that average annual reservoir storage has decreased over the past 40 years, although our analyses show a much smaller decrease than previous work. The reservoir operation characterizations presented here can be used directly for development or evaluation of reservoir operations and their derived parameters in large-scale models. We also evaluate how well historical operations match common assumptions that are often applied in large-scale reservoir parameterizations. For example, we find that 100 dams have maximum storage values greater than the reported reservoir capacity from the Global Reservoirs and Dams database (GRanD). Finally, we show that operational ranges have been increasing over time in more arid regions and decreasing in more humid regions, pointing to the need for operating policies which are not solely based on static values.

Geology↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Implementing Distributed Operations: A Comparison of Two Deep Space Missions

Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption of web-based and telecommunication tools has been critical to the success of Cassini operations.

Cassini Mission↗

Digital Flight: A New Cooperative Operating Mode to Complement VFR and IFR

Digital Flight is a proposed new operating mode for all airspace users, complementing and adding to the existing operating modes of visual and instrument flight rules (VFR and IFR) and providing for cooperative integration in controlled airspace. Under new regulations (Digital Flight Rules, DFR) that set requirements for its sustained use, qualified operators employ Digital Flight to enhance their airspace access and operational flexibility in all visibility conditions and eventually all airspace classes without requiring segregation from incumbent operations. Enabled by connected digital information and technologies, Digital Flight operators employ cooperative practices and self-separation to ensure flight path safety in lieu of visual procedures or receiving separation services from Air Traffic Control. Its distributed structure and automated functions enable traffic densities and operational tempos not achievable with the existing operating modes. Various ongoing and emerging industry initiatives for enabling new entrants (e.g., unmanned aircraft systems, urban air taxis) and enhanced use of underserved airspace (e.g., ultra-high altitude), are pursuing various alternative operating modes with significant similarities, creating a unique and time-limited opportunity for harmonization and convergence. Digital Flight is proposed to serve that harmonizing role, creating a common new paradigm for airspace operations. Such convergence would not only bring together these emerging market segments but will also bolster the existing operators with access to this new operating mode and its advantages. Digital Flight provides an opportunity to focus regulatory development and benefit the aviation industry. This paper describes Digital Flight in sufficient detail to initiate community engagement and deliberation on a common new operating mode. It describes the essential elements, principal capabilities, and operational integration of DFR in shared airspace. It describes the value proposition from multiple perspectives and presents initial thoughts on the path forward.

Digital flight↗

Advanced Capabilities for Emergency Response Operations (ACERO)

The Advanced Capabilities for Emergency Response Operations (ACERO) project is expected to develop, integrate, demonstrate, and transition to operations, evolving aviation technologies from NASA and industry to identify, monitor, and suppress wildland fires as a means to enhance safety, improve operational efficiency, and prevent economic loss. Some of the concepts ACERO explores are: wildfire airspace mangement to improve safety and resource utilization during a disaster, applying new aviation technologies to improve safety and demonstrate new mission-support capabilities, second-shift operations to enable progress towards 24/7 aerial response, and the integration of capabilities across NASA's Aeronautics Research, Science, and Space Technology mission directorates to enable expanded and scalable operations. Realizing this vision is expected to bring positive impact to such areas as: consistency of technology adoption through a unified concept of operations, airspace coordination and deconfliction that integrates portable solutions and enables diverse operations, remote sensing and data fusion for modeling and predictions that support in-time decision making, aircraft technologies for hazard avoidance and state management, and increased response capabilities through persistent communications and surveillance. ACERO continues the research begun under the Scalable Traffic Management for Emergency Response Operations (STEReO) activity, which brings together several technologies in Unmanned Aircraft Systems (UAS) Traffic Management (UTM), Autonomy, Communications, Human Factors, and Domain Expertise & Tools, aimed at providing scalability and flexibility, as well as operational resiliency to dynamic changes during a disaster event. Some of the concepts STEReO explores are: collaborative tools to ingest remote sensing information and distribute a common mission operating picture, apply ad-hoc communication networks to facilitate timely information sharing and communication of changes, vehicle-to-vehicle and onboard autonomy technologies ensure the safety and resiliency of operations, and apply NASA’s UAS traffic management system (UTM) as a public safety UAS Service Supplier (USS) to access and coordinate use of the airspace by both manned and unmanned operations. The potential benefits of STEReO include: standardized, cross-platform communication means increased interoperability and ease of cooperation/collaboration, increased situation awareness and common operating picture allow for earlier detection and decision making, and scalable to size and complexity of environment, operations, and mission objectives. This presentation gives an informational overview of the ACERO and STEReO projects to the Council of Western State Foresters (CWSF) Western State Fire Managers (WSFM) Committee.

emergency response operations↗

LANDO: Developing Autonomous Payload Offloading Capabilities for Lunar Surface Operations

Introduction: The Lightweight Surface Manipulation System (LSMS) AutoNomy capabilities Development for surface Operations and construction (LANDO) project is an Early Career Initiative selected for funding by NASA Space Technology Mission Directorate. LANDO is developing a general-purpose autonomy framework applicable to serial and tension-actuated manipulation agents, that will be validated using an existing prototype of the LSMS-L35 (35-kg wrist lift capacity on the lunar surface [Fig. 1], sized for a Commercial Lunar Pay-load Services (CLPS) mission). The autonomous LSMS-L35 will be used to demonstrate autonomous payload handling capabilities for Lunar and other planetary surfaces, directly addressing STMD capability gaps in autonomous excavation and construction operations, advanced robotics and spacecraft autonomy technologies, and technologies supporting emerging space industries including the In-Space Servicing, Assembly and Manufacturing national strategy. LSMS: The LSMS is a tension actuated robotic agent that is scalable (reach and lifting capacity in different gravity environments), versatile (types of surface operations), and reusable. Compared to serial arms, the LSMS provides significantly higher structural efficiency and mechanical advantage, enabling a greater payload lift capacity at a lower system mass. The LSMS is envisioned to be a crucial part of the excavation and construction portfolio, capable of supporting a variety of activities on the lunar surface. Autonomous payload handling is one of the first activities the LSMS can support that develops capabilities that are extensible to other surface operations. Payload handling is required to: remove payloads from a lander; place payloads on mobile agents for transport from a lander to construction site/assembly point; emplace payloads in their operational configuration, and aggregate components to create an asset. As an example of this critical gap, manifested CLPS missions do not currently have a ubiquitous payload offloading capability; payloads (excluding rovers) are designed to remain on the lander. Why Autonomy? Autonomous robotic systems capable of carrying out excavation and construction operations are a fundamental and critical capability required for realizing the NASA Artemis program vision to “emplace and build the infrastructure, systems, and robotic missions that can enable a sustained lunar surface presence.” While teleoperation is still feasible for lunar surface operations, increased latency at Mars will require validated supervised autonomous technologies capable of operating with minimal human involvement (human-on-the-loop) unless an unexpected event occurs requiring human intervention. Autonomy reduces operator burden, allows operations to continue during uncrewed periods, in-creases the safety of operations by automatically detecting and handling faults, and allows operating in high latency environments. Development Activities: LANDO is extending critical autonomous operations to the manipulation domain and creating an integrated system, based on reusable software modules, that is capable of planning and executing payload handling and autonomous surface operations without requiring hu-man intervention beyond a supervisory role. The priority features under development are 1) autonomously offload payloads from a tilted lander deck without buckling the LSMS; 2) sensing whether a payload is safe to lift and handle; and 3) integrate with Astrobotic’s CLPS lander. The poster presentation will highlight current development activities over the past year on LSMS-L35 prototype hard-ware design, and autonomy software.

in-space assembly↗

Improving Operational Efficiency, Compliance and Community Perception with Real-time Data - 19260

The nuclear and medical radiation industry has always faced a significant burden in effectively balancing exposure and productivity. Maintenance operations and development of new techniques require significant staffing resources to monitor and review personnel exposures and changes in operational radiation levels. Currently utilised monitoring technology and review techniques remain unchanged since the 1950's, relying upon mostly analogue instrumentation and paper reporting. After utilising isolated-area monitoring during a reactor decommissioning project it became apparent that current systems created false assurance as the units continually failed without warning due to 'dirty' power. These instrument failures could have easily led to an unnecessary exposure while operators continued to assume they were being safely monitored. This paper is a philosophical discussion on how current shortcomings could be addressed, security increased, and exposure risks minimised, by utilising real-time monitoring and automated reporting. The community and media expectations of reported data and nuclear monitoring systems continue to be coloured by sensational technology seen in movies and emerging technology available through smart homes and smart cities initiatives. For the general public to be more engaged with real radiation levels and effects, the nuclear industry needs to more effectively communicate safe levels. Organisations can have regain control of exposure levels discussions through the controlled release of background and expected exposure level data. An increase in real world monitoring data communicated in a controlled and more effective way will aid in the general public accepting, and being educated about, the minimal increase above natural background levels of the nuclear industry and other radiation facilities. This is particularly as Australia is in the process of implementing its Nuclear Waste Facility, with community acceptance the number one inhibitor of being able to move forward. Storage, mobile assets, and processing all present unique management, security, exposure, and telemetry challenges for a facility operations manager. Active monitoring and automated review of the monitoring data can alert operators to any unexpected events before any resultant increases in radiation levels cause an unplanned exposure to operators or the environment. Integration of radiation monitoring data with global positioning telemetry enables better organisational awareness of mobile asset location and early detection of any potential shifting and reduction in shielding integrity of sources and encapsulated waste during transport. Additionally, the real-time monitoring can be set-up to enhance an organisations' or nation's security capabilities. For instance, the real time monitor will send an automated alert in the case of an unexpected movement of a source through a monitored facility or for an unscheduled movement of a monitored vehicle. There are further benefits to be gained in control, ALARA principles and effluent management by increasing real-time monitoring capabilities through the stages of the waste cycle. Increasing operational effectiveness while delivering operational cost savings sounds like an attractive proposition. With increased access to operational area radiation data comes drastically improved real-time management of exposures for new, and experimental practices. Increased live data can be utilised to identify optimum practices for reducing operational and environmental exposures or releases. This increased operational data effectively comes with the added benefit of a reduction in the required health physics personnel resources for general operations. By reducing exposure and the detachment of required health physics resources from routine operations, there is greater availability for these resources to support maintenance operations and project-based work. The review of this increased data will create internal capability to identify low-- and high-risk activities, resulting in the ability to reduce the number of highly skilled workers in an industry where the availability of this talent is declining. During my time as the Radiation Safety and Nuclear Security Manager at a research facility, I implemented a real-time monitoring system. The system identified a secondary risk that had previously been unidentified and posed a higher exposure and security risk than the radiation practice being monitored. What stops industry from implementing technology that encourages agile work practices, while minimising security risks and personnel exposure? (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling for a Digital Twin-Based Remote Operation System Framework

New reactor designs and technologies are being developed to grow and advance the nuclear industry. Microreactors are one of the many new concepts for advancing the industry. Microreactors are very small reactors generally designed to have an operating power of 20 MWth or less. They are ideal for many applications in which it would not be feasible to have a large-scale reactor, such as powering remote communities, military bases, and mining sites. Many of these applications currently rely on diesel generators for power, and replacing those generators with the carbon-free energy of a microreactor is a major driving factor for microreactor development. However, most of the use cases for microreactors are in isolated locations where construction and labor costs are much higher. Microreactors will need to be comparable to other energy production methods for their deployment to be successful. Remotely operating the microreactor has a great potential to benefit the economics and make it more cost competitive. With remote operations, the operation facility location could be strategically chosen based on factors such as construction costs, workforce size, etc. The benefits of remote operations could be leveraged even more if the remote operation system is semi-autonomous. If the remote operation system is semi-autonomous, more microreactors could be operated and monitored from one remote operation facility. Additionally, with the system handling some tasks for the human operator, it could reduce the number of operating staff necessary for the microreactor. Digital twins can be used to introduce a level of automation to the remote operation system. Digital twins are capable of component monitoring, system operation and control, and predictive performance [1]. All of those features are important for a successful semi-autonomous remote operation system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Extended Low Load Boiler Operation to Improve Performance and Economics of an Existing Coal Fired Power Plant (Final Report)

The overall goal is to improve the performance and economics of existing coal fired power plants by extending low load boiler operation to lower loads than is currently achievable. The objective of this program is to develop and validate sensor hardware and analytical algorithms to lower plant operating expenses (OPEX) for the currently operating pulverized coal utility boiler fleet. Coal fired utility boilers are increasingly under grid dispatch pressure. In some cases, the coal fired cost of generation is noncompetitive with respect to natural gas generation and subsidized renewable sources. To remain profitable and remain fully compliant with existing environmental regulations, the installed coal fired fleet must find technologies which allow it to move into a more flexible cyclic load dispatch model. Today the installed coal fired utility fleet must be cost of generation competitive, fully emissions compliant, and responsive to the variability inherent in renewable energy generation sources. In the Phase I of the project, GE Steam Power, Inc. (GE) performed modeling of different operating scenarios for low load operation using an existing full plant dynamic model developed for a 660MW steam power plant. Sensors and analytic algorithms to enable a stable and steady coal supply for low load pulverizer operation were identified and tested at the Pulverizer Development Facility (PDF) at GE’s Clean Energy Center in Bloomfield, Connecticut. Sensors and analytic algorithms to enable stable combustion for low load operation were identified and tested at the 15 MWth Industrial Scale Burner facility (ISBF) at GE’s Clean Energy Center. A concept was developed to test the sensors and control algorithms, down selected after testing, at a full-scale coal fired power plant. A budget estimate was then developed, and the concept was implemented at an existing utility power plant. The specific objectives of the experimental work were to: • Identify and select sensors and analytic algorithms for monitoring coal pulverizer operation at lower loads to provide stable operation and appropriate coal fineness at lower coal throughput; Identify and select sensors and analytic algorithms for a Boiler Flame Stability Monitor to better balance air and fuel at each burner. This enables a reduction in a coal boiler’s safe low load power level while maintaining stable flame characteristics; Develop a concept in Phase I for low load operation of a full-scale power plant and develop a budget estimate for testing and execute the test plan at an existing plant in Phase II; Validate the capability of the extended low load boiler system to extend the minimum load operating point in a safe and reliable manner on an existing full-scale utility boiler. At the completion of this experimental study, GE has developed a set of sensors and analytic algorithms, down selected after testing, that have the potential to enable safe low load operation of a utility boiler. GE has also identified a host site for testing these identified sensors and analytic algorithms. GE has generated a full set of deliverables that provide sufficient information to proceed with the next step of testing at a host site. This includes a potential host site and budget estimate for concept testing at host site. In the Phase II of the project, a series of field tests were completed to validate the extended low load boiler operation, which consisted of detailed engineering, installation, commissioning, and testing the additional sensors and analytics for the coal-fired combustion system on an existing full-scale utility boiler. The optimization work has been supported by the host plant and endorsed by their engineering and operation staff.

01 COAL, LIGNITE, AND PEAT↗

ISS Remote User Payload Operations Training and Support

For more than ten years hundreds of payloads have been, and are currently being, successfully operated onboard the ISS. These payloads are operated by a diverse set of users all over the world. Due to the current international economic environment payload operations are being streamlined, in more and more cases, by using the payload investigators and scientists to also fill the role of operators. Taking this into consideration, increasingly, we have payload operators that are new to space operations and practices, therefore ground systems training and support have become a more critical aspect in ensuring a successful payload mission. The ISS ground systems payload interface is the Payload Operations and Integration Center (POIC), located at Marshall Space Flight Center. ISS ground systems training for all remote ISS payload operators, as well as the ISS POIC CADRE, are centralized at this facility. The POIC is the starting point for a remote payload operator to learn how to integrate, and operate their payload, successfully onboard the ISS. Additionally, the CADRE that supports the payload user community are trained and operate from this facility. This paper will give an overview of the ISS ground systems at the POIC, as it relates to the payload user/operator and CADRE community. The entire training process from initial contact with the POIC to in-flight operations will be reviewed and improvements to this process will be presented. More importantly we will present current training methods and proposed methodology whereby the user community will be trained more efficiently and thoroughly. Also, we will discuss how we can more effectively support users in their operations concept to programmatically conduct certain aspects of payload operations to reduce costs.

Roth, Karl↗

Effectiveness of Redundant Communications Systems in Maintaining Operational Control of Small Unmanned Aircraft

NASA has been researching prototype technologies for an Unmanned Aircraft System (UAS) Traffic Management (UTM) system to facilitate enabling of safe and efficient civilian low-altitude airspace and UAS operations, in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for beyond visual line-of-sight (BVLOS) operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 will build on the earlier TCLs and focus on technologies and requirements for operations in higher-density urban areas for tasks such as news gathering, package delivery and for managing large-scale contingencies. This paper describes a communications test conducted in TCL3 and discusses insights gained from the test. In the test, operators were directed to equip UAS with redundant Command and Control (C2) communications systems, send a maneuver command to Unmanned Aircraft (UA) via the primary system, then verify execution of the sent command. This exercise was repeated with each redundant system. The test was designed to assess effectiveness of redundant C2 systems in maintaining operational control of UA. Several UAS were configured with varying arrangements to achieve redundancy, including two identical radio modems using the same frequency band, WiFi and Long-Term Evolution (LTE) cellular modems, etc. From the test, digital data such as time maneuver command sent, time maneuver verified, etc., were collected. Descriptions of methods to detect loss of C2 communications and contingency steps for such event were collected and assessed. The final paper will include a detailed analysis of the collected data leading to the following insights. First, effectiveness of redundant C2 systems depends on several factors, such as operational environment and communications service availability. For example, use of two identical point-to-point radio to connect operator and UA on the same frequency band can be effective in mitigating radio malfunction when operating in an environment where possibility of Radio Frequency (RF) interference is low, such as over open plains. However, the same arrangement may not be effective where high level of RF transmissions in broad spectrum ranges can be expected, such as over or near urban areas. For redundant systems that consist of external communications services, such as cellular and satellite communications network, redundancy is maintained only in the areas where more than one services are available. Therefore, UAS operators should have the means to plan for and monitor the performance of external communications services they are relying on to control UA. Second, communications performance needs, such as the minimum data transfer rate and the maximum tolerable latency, should be assessed to reflect the potential hazard that can come from loss of UA control. For example, UA operations over desolate area pose less hazard to people than operations over densely populated area and performance need for the former would be less than the latter.

Jung, Jaewoo↗

Corridor Design and Analysis for UAM Operations

The Urban Air Mobility (UAM) concept is a part of Advanced Air Mobility (AAM), a joint initiative between the Federal Aviation Administration (FAA), NASA, and industry to develop an air transportation system that uses new electric (i.e., green) air vehicles in geographical areas previously underserved by traditional aviation. Market forecast studies predict that there will be demand for alternate modes of air transportation using electric Vertical Take-off and Landing aircraft. UAM expands transportation networks by introducing short flights to move people and goods around metropolitan areas​. UAM is expected to improve mobility for the public, decongest road traffic, reduce trip time, and decrease strain on existing public transportation networks. Various challenges exist to make the introduction of UAM operations successful in the U.S. National Airspace System (NAS). These include but are not limited to integration with existing airports and airspace, provision of air traffic services (e.g., separation), vehicle design and certification, and community acceptance. The focus of this paper is on integration of UAM operations into the NAS via introduction of new airspace structures. UAM will operate within a regulatory, operational, and technical environment that is incorporated into the NAS​. As per the UAM Concept of Operations (ConOps), the FAA retains regulatory authority and is responsible for establishing operational parameters and maintaining oversight. The FAA’s UAM ConOps describes flights at low altitudes (below 5,000 ft) with minimal disruption to established conventional aircraft traffic and limited voice interactions with the Air Traffic Control (ATC). Early stages of UAM may use existing procedures to safely integrate UAM with conventional flights. This would involve flying under Part 91 Visual Flight Rules (VFR) and using voice for communications. The initial UAM ecosystem will utilize the current infrastructure such as routes, helipads, and ATC services, where practicable. ​A NASA study explored the use of existing helicopter routes in Dallas Fort Worth (DFW) airspace for initial UAM operations with a Letter of Agreement (LOA) that included procedures to request a Class B (controlled airspace) clearance. The research showed that the chosen approach was feasible for near-term, low-demand UAM traffic, but was not scalable. The growth of operations in today’s aviation system has resulted in airspace reorganization and procedures to ensure safety and efficiency as traffic rates increase. One proposed operating innovation that can help with the scalability of UAM is establishing routes and corridors. This may look similar to the Area Navigation (RNAV) procedures used today to streamline operations into busy airports. However, instead of FAA automation systems and ATC managing the flow of traffic, some UAM concepts envision a third-party service provider performing this role as part of the Provider of Services for UAM (PSU) network. The FAA’s UAM ConOps posits that new airspace structures such as UAM corridors include the following design criteria: 1) Minimal impact on existing NAS operations, 2) no or minimal additional ATC services, 3) public interest considerations such as noise, safety, and security, and 4) customer needs. The airspace available in urban environments is limited by the height of buildings, the effect of weather including wind gusts, privacy needs, and a clearance envelope. The new airspace structure would need to be designed around large airports and urban areas where the initial market demand is likely to exist. NASA has started evaluating airspace in the Dallas Fort Worth area to design new airspace structures, keeping the first two design criteria in mind. It is assumed that there will be an on-board pilot-in-command, and the flights will operate under VFR in Visual Meteorological Conditions. Corridors will be required in controlled airspace, whereas UAM operations can fly in uncontrolled Class G and E airspace using current day rules. Keeler et. al identified factors and heuristics for development of routes for UAM operations for integration with airspace close to large airports such as Dallas Fort Worth and Dallas Love Field. This paper describes the heuristics applied to define the corridors, analyzes them with respect to legacy traffic and presents key results.

Urban Air Mobility↗

“Just Do It” Mission Operations Training in a COVID World

“No”- “not”- “can’t do it” – these words don’t fly in M2020 Mission Operations. The M2020 Surface Mission Operations Team trained for landing the Perseverance Rover under COVID-19 remote work/mandatory stay-at-home conditions. Training activities included presenting Flight Schools to the team via video conferencing, training COVID personal safety requirements to on-premises staff, and constantly updating and communicating COVID restrictions to the team as safety requirements changed. This paper explores the impact of COVID on the Mission System Training for M2020 Mission Operations. The layers of COVID, aptly named the “COVID Tax” by team management, affected project roles, communications, personnel interactions, operations facility usage and training exercises practiced by the team. Flight Schools and Operational Readiness Tests (ORTs) are driving forces behind the surface mission operations training. These activities work hand-in-hand to prepare the team for landing day, surface operations that transition from cruise to nominal operations, and nominal operations. Under normal training conditions, Flight Schools and ORTs are only concerned with tactical operations for the Uplink (Command) Downlink (Analysis) and Campaign Implementation (Planning) Teams of scientists and system engineers. Due to COVID, and the necessity to maintain physical distance between people, training for the landing team needed to include the new category of COVID personal safety. COVID also necessitated remote teams and video conferencing of the entirety of Flight Schools. This reliance on distance learning had not been done on previous missions. We will explore the advantages and disadvantages of video conferencing as a training platform; training effectiveness in communicating and practicing the multiple changes to the COVID safety protocols; and the timing in which we received and responded to COVID directives. Additionally, this paper will review the practical measures taken by the on-premises team and how the team adapted during the readiness tests, landing, and early mission operations, as well as how the team responded to the post-vaccine ramping down of COVID Protocols. The M2020 Surface Mission Operations Team responded very well to the challenges of COVID. All pre-landing operational and COVID-related training was completed. Post-landing COVID Training was provided as needed to new on-premises personnel. Training presented on COVID for the first operational readiness test (ORT) consisted of 2.5 hours of training. Each ORT had COVID Training. A person who had participated in all of the ORTs from September 2020 – February 2021 would have received over 7 hours of COVID Training. By ORT-12 (approximately 8 weeks after the first ORT), the Training team consolidated the original COVID training to a one-hour COVID Basic Training course, with additional recommended training. The Basic training course was updated after landing, as vaccines became available. COVID Training had multiple Flight Schools in the self-directed Blackboard Learning system, as well as a Quick Reference Wiki for Onboarding of new on-premises personnel and keeping on-premises personnel up-to-date. COVID Training covered many topics including practical methods of 6-foot distancing, how to interact with an IT professional when help was needed at a workstation, and challenging indoor meal-eating protocols. COVID Training continued to be updated, as the lab and the project respond to the virus variants and federal, state and local ordinances.

Rosette, Theresa↗

Viper Science Operations: Lunar Dynamic Science Table and ‘Tracker’ Tool.

Introduction: The NASA VIPER lunar rover mission [1] presents a unique operational paradigm within the history of robotic spaceflight. The proximity of the Moon to the Earth and the terrain elements (surface characteristics, light/shadow dynamics, communication links) of the Lunar South Polar landing site create unprecedented operational conditions between these two planetary bodies. Apollo era lunar science and exploration included humans in situ to operate instruments and assimilate observational inputs in real-time. Previous lunar orbital missions have worked to operational timescales, e.g., decisional timelines and communication exchanges, that were weeks in duration. Mars rover missions have worked to operational timescales, e.g., decisional timelines and communication exchanges between Mars and Earth, that were hours, days, and weeks in length. In the case of the VIPER mission, our operational decisioning for rover driving and instrument commanding will be compressed to minute-scale timeframes. These operational conditions will directly impact the workflow and speed with which the VIPER Science Team (VST) will be required to synthesize and analyze data and produce timely science-driven decisions throughout surface mission operations [2]. The VST in the VIPER Mission Science Center (MSC) and the Mission Operations Center (MOC) shall provide mission-enhancing scientific input to guide traverse planning and drill site confirmation/selection throughout surface operations. Further, the VST input will be of vital importance to the mission’s ability to maximize science return and to meet broader NASA objectives for future lunar ISRU and exploration activities. Specifically, the VST in the MSC and MOC will provide science-driven, consensus-based, timely input and decision-making to enhance mission operations and align mission science return with broader Agency goals. They will enable the characterization of the distribution (lateral and vertical extent, concentration, variability), form (chemical/physical state of these reservoirs of lunar water and key isotopes), and context (e.g., accessibility/overburden, environment, soil mechanics, trafficability, and temperatures) of lunar polar volatiles and water content for the VIPER mission. Additionally, the MSC will be selecting or reconfirming the location and path towards and from the third drill site (Drill Site Charlie) within each Science Station [6]. To enable scientific decision-making within the operational paradigm of the VIPER lunar rover mission requires detailed articulation of the VST’s scientific objectives and goals, and the operationalization of these objectives and goals through their association with specific data products, tasks, and decisional procedures. Further, defining and tracking scientific success metrics throughout surface operations will enable the VST to have a quantified understanding of the mission’s evolving ability to accomplish the stated scientific objectives and goals both during and after the mission. This abstract provides an overview of the methods and development activities towards defining, operationalizing, and tracking scientific objectives and goals throughout VIPER surface operations. Specifically, we focus on the VIPER Lunar Dynamic Science Table (LDST) and the VIPER “Tracker” tool.

Darlene Sze Shien Lim↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility Operations

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic . Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Urban Air Mobility↗