Dilute and Dispose Cost Estimate for Equipment Installation per the LCCE
As directed in the Consolidation Appropriations Act, 2016, the National Nuclear Security Administration (NNSA) initiated the preconceptual design and development of a Lifecycle Cost Estimate for the Surplus Plutonium Disposition (SPD) Dilute and Dispose Program. Based on August 2016 Program Requirements Document and subsequent supplemental guidance, LANL prepared the Lifecycle Cost Estimate under key assumptions that meet the program’s requirements. For Dilute and Dispose, the program would disposition surplus Pu by diluting oxide produced at LANL with inhibitor materials, packaging the materials in containers, and shipping the containers to a deep geologic repository for permanent disposal. The base assumption is that LANL would disassemble pits, convert the Pu metal to oxide, and characterize and package the material for shipment to SRS, where it would be diluted prior to geologic disposal at the WIPP site in New Mexico. Another major assumption for the Dilute and Dispose option is that LANL would increase the current oxide production rate (or throughput) to 1500 kg/year, 5 times higher than the maximum annual production of ~300 Kgs executed by the ARIES Oxide Production Program at LANL. Analysis based on the ARIES program’s throughput model revealed that 15 pieces of equipment would need to be installed within PF-4 and certain facility improvements would need to be accomplished in order to meet the desired throughput levels. The additional equipment would be essentially identical to equipment already used within PF-4 for existing operations.