Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mission Data System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Validation of satellite solar occultation measurements 1975-1988

The Stratospheric Aerosol and Gas Experiment (SAGE II) is discussed. SAGE II was launched from the Space Shuttle in October, 1984 as part of the Earth Radiation Budget satellite and uses the solar occultation technique to measure the extinction of solar radiation caused by the earth's atmosphere. The solar radiance data are compared with data from ground-based systems, airborne missions, balloonborne in situ measurements, ancillary measurements, and other satellite systems. The SAGE II instrument, data processing methods, and correlative measurements program are examined.

Maddrea, G. L., Jr.↗

Ground data systems resource allocation process

The Ground Data Systems Resource Allocation Process at the Jet Propulsion Laboratory provides medium- and long-range planning for the use of Deep Space Network and Mission Control and Computing Center resources in support of NASA's deep space missions and Earth-based science. Resources consist of radio antenna complexes and associated data processing and control computer networks. A semi-automated system was developed that allows operations personnel to interactively generate, edit, and revise allocation plans spanning periods of up to ten years (as opposed to only two or three weeks under the manual system) based on the relative merit of mission events. It also enhances scientific data return. A software system known as the Resource Allocation and Planning Helper (RALPH) merges the conventional methods of operations research, rule-based knowledge engineering, and advanced data base structures. RALPH employs a generic, highly modular architecture capable of solving a wide variety of scheduling and resource sequencing problems. The rule-based RALPH system has saved significant labor in resource allocation. Its successful use affirms the importance of establishing and applying event priorities based on scientific merit, and the benefit of continuity in planning provided by knowledge-based engineering. The RALPH system exhibits a strong potential for minimizing development cycles of resource and payload planning systems throughout NASA and the private sector.

Berner, Carol A.↗

On-Board Propulsion System Analysis of High Density Propellants

The impact of the performance and density of on-board propellants on science payload mass of Discovery Program class missions is evaluated. A propulsion system dry mass model, anchored on flight-weight system data from the Near Earth Asteroid Rendezvous mission is used. This model is used to evaluate the performance of liquid oxygen, hydrogen peroxide, hydroxylammonium nitrate, and oxygen difluoride oxidizers with hydrocarbon and metal hydride fuels. Results for the propellants evaluated indicate that the state-of-art, Earth Storable propellants with high performance rhenium engine technology in both the axial and attitude control systems has performance capabilities that can only be exceeded by liquid oxygen/hydrazine, liquid oxygen/diborane and oxygen difluoride/diborane propellant combinations. Potentially lower ground operations costs is the incentive for working with nontoxic propellant combinations.

Schneider, Steven J.↗

The AIRSAR image browse system

The volume of data acquired by synthetic aperture radar (SAR) missions motivates the development of a technique that will provide investigators with timely access to image data, and the capability to visually inspect images to determine various characteristics of the data collected, as well as the extent of the data coverage. A system was designed for accessing and browsing an on-line archive of NASA Airborne SAR (AIRSAR) imagery and is being developed as an extension to the SAR Data Catalog System (SDCS). The AIRSAR browse system consists of three elements: (1) an on-line, compressed imagery archive; (2) a user interface for selecting and accessing the on-line images; and (3) a software application program for reconstructuring and displaying the images. Details of these elements are described. The goals are to maximize the utilization of the AIRSAR data set, and to demonstrate the image browse concept for SAR data so that baseline catalog systems supporting SIR-C and future SAR missions will feature this capability.

Pang, A.↗

Mars transportation system synthesis

Performance and requirements synthesized to support the manned Mars mission of the Space Exploration Initiative (SEI) are presented. Emphasis is placed on the Mars transportation system (MTS), which uses nuclear thermal rocket (NTR) propulsion technology associated with accomplishing the manned Mars mission. Data are also presented for a propulsion system options comparison of chemical/aerobrake and nuclear electric propulsion systems. Vehicle- and weight-scaling are used to determine the MTS mass, size, and performance range required for different Mars mission durations. The split sprint, opposition, and conjunction class mission modes are employed to determine the MTS requirements envelope. MTS sensitivity to Mars surface payload, crew size, Mars orbit payload, NTR engine thrust level, engine specific impulse, and NTR engine thrust-to-weight ratio are synthesized. A suggested NTR technology level to accomplish both cargo and piloted Mars missions is discussed.

Young, Archie C.↗

Cartographic potential of a spacecraft line-array camera system - Stereosat

A study of the Stereosat mission, which may acquire analog/digital stereo image data of cartographic quality with linear array camera systems, is presented, with attention given to the Stereosat system and the mission parameters, the utilization of the Stereosat studies in order to indicate the nature and scope of the problems associated with recording image data of high geometric fidelity from spacecraft equipped with line array sensors, and the assessing of the possibilities of meeting the completeness and accuracy requirements of cartographic products. A 713-km circular, sun-synchronous, near polar orbit, with an inclination of 98.24 deg and a repeat cycle of 48 days is designed to insure global coverage of the earth's land masses during the three-year lifetime of the mission. Three cameras (fore, vertical, and aft looking), mounted so as to record stereotriplets for a 61.4 km wide swath at a nominal focal plane scale of 1:1,000,000, are considered. The IFOV of 15 m should be adequate for producing thematic and image maps at scales of 1:50,000 to 1:250,000. The value of the coverage to cartographers will be dictated by the accuracy of the digital image data, which is largely a function of satellite control.

Welch, R.↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Ozone Monitoring Instrument (OMI) collection 4: establishing a 17-year-long series of detrended level-1b data

The Ozone Monitoring Instrument (OMI) was launched on 15 July 2004, with an expected mission lifetime of 5 years. After more than 17 years in orbit the instrument is still functioning satisfactorily and in principle can continue doing so until the expected decommissioning of its platform Aura in 2025. In order to continue the datasets acquired by OMI and the Microwave Limb Sounder, the mission was extended up to at least 2023. Actions have been taken to ensure the proper functioning of the OMI operations, the data processing, and the calibration monitoring system until the eventual end of the mission. For the data processing a new level-0 (L0) to level-1b (L1b) data processor was built based on the recent developments for the TROPOspheric Monitoring Instrument (TROPOMI). With corrections for the degradation of the instrument now included, it is feasible to generate a new data collection to supersede the current collection-3 data products and reprocess the data of the entire mission up to now. This paper describes the differences between the collection-3 and collection-4 data. It will be shown that the collection-4 L1b data comprise a clear improvement with respect to the previous collections. By correcting for the gentle optical and electronic aging that has occurred over the past 17 years, OMI’s ability to make trend-quality ozone measurements has further improved.

UV↗

Concept Verification Test - Evaluation of Spacelab/Payload operation concepts

The Concept Verification Test (CVT) procedure is used to study Spacelab operational concepts by conducting mission simulations in a General Purpose Laboratory (GPL) which represents a possible design of Spacelab. In conjunction with the laboratory a Mission Development Simulator, a Data Management System Simulator, a Spacelab Simulator, and Shuttle Interface Simulator have been designed. (The Spacelab Simulator is more functionally and physically representative of the Spacelab than the GPL.) Four simulations of Spacelab mission experimentation were performed, two involving several scientific disciplines, one involving life sciences, and the last involving material sciences. The purpose of the CVT project is to support the pre-design and development of payload carriers and payloads, and to coordinate hardware, software, and operational concepts of different developers and users.

Mcbrayer, R. O.↗

System control module diagnostic Expert Assistant

The Orbiter EXperiments (OEX) Program was established by NASA's Office of Aeronautics and Space Technology (OAST) to accomplish the precise data collection necessary to support a complete and accurate assessment of Space Transportation System (STS) Orbiter performance during all phases of a mission. During a mission, data generated by the various experiments are conveyed to the OEX System Control Module (SCM) which arranges for and monitors storage of the data on the OEX tape recorder. The SCM Diagnostic Expert Assistant (DEA) is an expert system which provides on demand advice to technicians performing repairs of a malfunctioning SCM. The DEA is a self-contained, data-driven knowledge-based system written in the 'C' Language Production System (CLIPS) for a portable micro-computer of the IBM PC/XT class. The DEA reasons about SCM hardware faults at multiple levels; the most detailed layer of encoded knowledge of the SCM is a representation of individual components and layouts of the custom-designed component boards.

Flores, Luis M.↗

Spitzer Pre Launch Mission Operations System - The Road to Launch

Spitzer Space Telescope was launched on 25 August 2003 into an Earth-trailing solar orbit to acquire infrared observations from space. Development of the Mission Operations System (MOS) portion prior to launch was very different from planetary missions from the stand point that the MOS teams and Ground Data System had to be ready to support all aspects of the mission at launch (i.e., no cruise period for finalizing the implementation). For Spitzer, all mission-critical events post launch happen in hours or days rather than months or years, as is traditional with deep space missions. At the end of 2000 the Project was dealt a major blow when the Mission Operations System (MOS) had an unsuccessful Critical Design Review (CDR). The project made major changes at the beginning of 2001 in an effort to get the MOS (and Project) back on track. The result for the Spitzer Space Telescope was a successful launch of the observatory followed by an extremely successful In Orbit Checkout (IOC) and operations phase. This paper describes how the project was able to recover the MOS to a successful Delta (CDR) by mid 2001, and what changes in philosophies, experiences, and lessons learned followed. It describes how projects must invest early or else invest heavily later in the development phase to achieve a successful operations phase.

observatory↗

Tropical Rainfall Measuring Mission (TRMM). Phase B: Data capture facility definition study

The National Aeronautics and Aerospace Administration (NASA) and the National Space Development Agency of Japan (NASDA) initiated the Tropical Rainfall Measuring Mission (TRMM) to obtain more accurate measurements of tropical rainfall then ever before. The measurements are to improve scientific understanding and knowledge of the mechanisms effecting the intra-annual and interannual variability of the Earth's climate. The TRMM is largely dependent upon the handling and processing of the data by the TRMM Ground System supporting the mission. The objective of the TRMM is to obtain three years of climatological determinations of rainfall in the tropics, culminating in data sets of 30-day average rainfall over 5-degree square areas, and associated estimates of vertical distribution of latent heat release. The scope of this study is limited to the functions performed by TRMM Data Capture Facility (TDCF). These functions include capturing the TRMM spacecraft return link data stream; processing the data in the real-time, quick-look, and routine production modes, as appropriate; and distributing real time, quick-look, and production data products to users. The following topics are addressed: (1) TRMM end-to-end system description; (2) TRMM mission operations concept; (3) baseline requirements; (4) assumptions related to mission requirements; (5) external interface; (6) TDCF architecture and design options; (7) critical issues and tradeoffs; and (8) recommendation for the final TDCF selection process.

Source record↗

Onboard Autonomy on the Earth Observing One Mission

The Earth Observing One Spacecraft is currently flying The Autonomous Sciencecraft Experiment (ASE) - onboard autonomy software to improve science return. The ASE software enables the spacecraft to autonomously detect and respond to science events occurring on the Earth. ASE includes software systems that perform science data analysis, mission planning, and run-time robust execution. In this article we describe the autonomy flight software and how it enables a new paradigm of autonomous science and mission operations.

autonomy↗