Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Viking Mars mission support investigations in the Langley transonic dynamics tunnel

Six experimental investigations conducted in the transonic dynamics tunnel, which supported elements of the entry and the landed phases of the Viking mission, are described. The objective of each investigation and selected experimental results are presented. How these particular wind tunnel results contributed to spacecraft development and ultimately to the success of the Viking mission is indicated. Experimental studies applicable to the entry phase of the mission included parachute environment and performance definition, aerodynamic characteristics exhibited by two separating bodies, and pressure measurements in the transonic range to optimize the location and orientation of a stagnation-pressure sensor on the Lander. The experimental investigations which supported the landed phase of the mission included a convective heat transfer test to establish the requirements for wind covers for the radioisotope thermoelectric generators and two tests which supported the development and calibration of the meteorological science experiment.

Foughner, J. T., Jr.↗

Manned Mars mission surface transportation elements

The necessity and advantage of surface transportation was well demonstrated by the Apollo 15, 16, and 17 missions. Baseline surface transportation elements for further studies are Lunar Rover, Elastic Loop Mobility System, Mobile Laboratory, Airplane, and Rocket Powered Flying Vehicles.

S Gregg McDaniel↗

Manned Mars mission and planetary quarantine considerations

A short review of the history of planetary quarantine, the issues, and changes in official advisory groups' pronouncements are presented. Then a discussion of the current situation and some ideas on how best to address them are outlined. Both manned and unmanned or automatic missions are discussed and their advantages and impediments outlined.

Sharp, Joseph C.↗

The design of a multimegawatt heat pipe radiator for an inertial fusion rocket powered manned Mars mission

A system of heat pipe radiators has been designed to provide waste heat rejection for an inertial fusion powered spacecraft capable of manned missions to other planets. The radiators are arrays of unfinned, arterial heat pipes operating at 1500 and 900 K. Liquid metal coolant carries up to 8000 MW of waste heat through feed pipes from on-board components (laser drivers and coil shield). The radiators do not rely on armor for protection from micrometeoroid penetration. An armored radiator design for this application with a 99 percent survivability would have a specific mass of 0.06 to 0.11 kg/kW at 1500 K. Instead, a segmentation of heat pipes is used, and bumpers are utilized to protect the feed pipes. This design reduces the specific mass to 0.015 to 0.04 kg/kW for the coil shield radiator (1500 K) and 0.06 to 0.12 kg/kW for the laser driver radiator (900 K).

Murray, K. A.↗

Earth return aerocapture for manned Mars missions

Lift to drag ratio (L/D) requirements and stagnation point heating have been examined for a variety of probable entry conditions and vehicle configurations. It is found that vehicles with an L/D of 0.5 or more provide a corridor width of at least 0.7 degrees while keeping the peak deceleration load below 5 g for approach velocities up to 14.5 km/s. It is shown that stagnation point peak heating rates and integrated heat load critically depend on both entry velocity and ballistic coefficient. For the most severe cases under consideration, peak heating and integrated heat load are five times greater than those encountered by Apollo but within the range of experience for unmanned vehicles.

Tauber, M. E.↗

Review of Mars mission scenarios

The following paper is presented in viewgraph format and covers topics including: mission scenario; exposure to reduced gravity; exposure to space radiation; and initial mass in low Earth orbit.

Walberg, Gerald↗

Human Mars Mission Performance Crew Taxi Profile

This timeline was generated on the Integrated Mission Program (IMP). All burn events over 2 seconds are finite with IMP solving a two point boundary value setup for begin burn time, burn time and control angles. Perigee and apogee shown above are mean orbital values. Significant events are listed. Each finite thrust event has two lines. The first is the beginning time showing the initial conditions, thrust and ISP used. The second has the end burn conditions and the delta v and time of burn. This case is an abort from the 750 x 750 phasing abort, using the taxi's main engines. An abort using the Reaction Control System (RCS) was also investigated but required a large increase in RCS propellant and was abandoned.

Duaro, Vince A.↗

Human Mars Mission: Launch Window from Earth Orbit

The determination of orbital window characteristics is of major importance in the analysis of human interplanetary missions and systems. The orbital launch window characteristics are directly involved in the selection of mission trajectories, the development of orbit operational concepts, and the design of orbital launch systems. The orbital launch window problem arises because of the dynamic nature of the relative geometry between outgoing (departure) asymptote of the hyperbolic escape trajectory and the earth parking orbit. The orientation of the escape hyperbola asymptotic relative to the earth is a function of time. The required hyperbola energy level also varies with time. In addition, the inertial orientation of the parking orbit is a function of time because of the perturbations caused by the Earth's oblateness. Thus, a coplanar injection onto the escape hyperbola can be made only at a point in time when the outgoing escape asymptote is contained by the plane of parking orbit. Even though this condition may be planned as a nominal situation, it will not generally represent the more probable injection geometry. The general case of an escape injection maneuver performed at a time other than the coplanar time will involve both a path angle and plane change and, therefore, a delta V penalty. Usually, because of the delta V penalty the actual departure injection window is smaller in duration than that determined by energy requirement alone. This report contains the formulation, characteristics, and test cases for five different launch window modes for Earth orbit. These modes are: 1) One impulsive maneuver from a Highly Elliptical Orbit (HEO); 2) Two impulsive maneuvers from a Highly Elliptical Orbit (HEO); 3) One impulsive maneuver from a Low Earth Orbit (LEO); 4) Two impulsive maneuvers form LEO; and 5) Three impulsive maneuvers form LEO. The formulation of these five different launch window modes provides a rapid means of generating realistic parametric data for space exploration studies. Also the formulation provides vector and geometrical data sufficient for use as a good starting point in detail trajectory analysis based on calculus of variations, steepest descent, or parameter optimization program techniques.

Young, Archie↗

Human Mars Mission: Launch Window from Earth Orbit

The determination of orbital window characteristics is of major importance in the analysis of human interplanetary missions and systems. The orbital launch window characteristics are directly involved in the selection of mission trajectories, the development of orbit operational concepts, and the design of orbital launch systems. The orbital launch window problem arises because of the dynamic nature of the relative geometry between outgoing (departure) asymptote of the hyperbolic escape trajectory and the earth parking orbit. The orientation of the escape hyperbola asymptotic relative to earth is a function of time. The required hyperbola energy level also varies with time. In addition, the inertial orientation of the parking orbit is a function of time because of the perturbations caused by the Earth's oblateness. Thus, a coplanar injection onto the escape hyperbola can be made only at a point in time when the outgoing escape asymptote is contained by the plane of parking orbit. Even though this condition may be planned as a nominal situation, it will not generally represent the more probable injection geometry. The general case of an escape injection maneuver performed at a time other than the coplanar time will involve both a path angle and plane change and, therefore, a DELTA V penalty. Usually, because of the DELTA V penalty the actual departure injection window is smaller in duration than that determined by energy requirement alone. This report contains the formulation, characteristics, and test cases for five different launch window modes for Earth orbit. These modes are: (1) One impulsive maneuver from a Highly Elliptical Orbit (HEO) (2) Two impulsive maneuvers from a Highly Elliptical Orbit (HEO) (3) One impulsive maneuver from a Low Earth Orbit (LEO) (4) Two impulsive maneuvers from LEO (5) Three impulsive maneuvers from LEO.

Young, Archie↗

Movable Lander for Manned Mars Mission

In the second half of the workshop, participants split into three groups to develop a concensus on the following questions: (1) What are the current space drive resources and issues? (2) What are the future space drive technology needs and issues? and (3) Should we hold regular workshops on space mechanisms and space drives? The three groups considered these questions from the perspective of researchers working in (1) manned spacecraft; (2) unmanned spacecraft; and (3) planetary surface exploration vehicles.

Source record↗

Charting the Course: Life Cycle Management of Mars Mission Digital Information

This viewgraph presentation reviews the life cycle management of MER Project information. This process was an essential key to the successful launch of the MER Project rovers. Incorporating digital information archive requirements early in the project life cycle resulted in: Design of an information system that included archive metadata, Reduced the risk of information loss through in-process appraisal, Easier transfer of project information to institutional online archive and Project appreciation for preserving information for reuse by future projects

information life cycles↗