Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LOCATION CLOSURE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Simulation of Crack Propagation in Engine Rotating Components under Variable Amplitude Loading

The crack propagation life of tested specimens has been repeatedly shown to strongly depend on the loading history. Overloads and extended stress holds at temperature can either retard or accelerate the crack growth rate. Therefore, to accurately predict the crack propagation life of an actual component, it is essential to approximate the true loading history. In military rotorcraft engine applications, the loading profile (stress amplitudes, temperature, and number of excursions) can vary significantly depending on the type of mission flown. To accurately assess the durability of a fleet of engines, the crack propagation life distribution of a specific component should account for the variability in the missions performed (proportion of missions flown and sequence). In this report, analytical and experimental studies are described that calibrate/validate the crack propagation prediction capability ]or a disk alloy under variable amplitude loading. A crack closure based model was adopted to analytically predict the load interaction effects. Furthermore, a methodology has been developed to realistically simulate the actual mission mix loading on a fleet of engines over their lifetime. A sequence of missions is randomly selected and the number of repeats of each mission in the sequence is determined assuming a Poisson distributed random variable with a given mean occurrence rate. Multiple realizations of random mission histories are generated in this manner and are used to produce stress, temperature, and time points for fracture mechanics calculations. The result is a cumulative distribution of crack propagation lives for a given, life limiting, component location. This information can be used to determine a safe retirement life or inspection interval for the given location.

Bonacuse, P. J.↗

Simulation of Crack Propagation in Engine Rotating Components Under Variable Amplitude Loading

The crack propagation life of tested specimens has been repeatedly shown to strongly depend on the loading history. Overloads and extended stress holds at temperature can either retard or accelerate the crack growth rate. Therefore, to accurately predict the crack propagation life of an actual component, it is essential to approximate the true loading history. In military rotorcraft engine applications, the loading profile (stress amplitudes, temperature, and number of excursions) can vary significantly depending on the type of mission flown. To accurately assess the durability of a fleet of engines, the crack propagation life distribution of a specific component should account for the variability in the missions performed (proportion of missions flown and sequence). In this report, analytical and experimental studies are described that calibrate/validate the crack propagation prediction capability for a disk alloy under variable amplitude loading. A crack closure based model was adopted to analytically predict the load interaction effects. Furthermore, a methodology has been developed to realistically simulate the actual mission mix loading on a fleet of engines over their lifetime. A sequence of missions is randomly selected and the number of repeats of each mission in the sequence is determined assuming a Poisson distributed random variable with a given mean occurrence rate. Multiple realizations of random mission histories are generated in this manner and are used to produce stress, temperature, and time points for fracture mechanics calculations. The result is a cumulative distribution of crack propagation lives for a given, life limiting, component location. This information can be used to determine a safe retirement life or inspection interval for the given location.

P J Bonacuse↗

WIPP - February 2014 operational events and the compliance re-certification application (CRA) 2014 - 15293

On Wednesday, February 5, 2014, an underground mine fire involving a salt haul truck occurred at the Waste Isolation Pilot Plant (WIPP). There were 86 workers in the mine when the fire occurred. All workers were evacuated. Nine days later, on Friday, February 14, 2014, there was an incident in the underground repository at WIPP which resulted in the release of americium and plutonium from one or more transuranic (TRU) waste containers into the environment. The release was detected by an underground continuous air monitor and then directed through high-efficiency particulate air (HEPA) filter banks located in the surface exhaust building. However, a measurable portion bypassed the HEPA filters via leakage through two ventilation system dampers and was discharged directly to the environment from an exhaust duct. No personnel were determined to have received external contamination; however, some individuals that were on site were identified through bioassay to have initially tested positive for low level amounts of internal contamination. Trace amounts of americium and plutonium were detected off-site.While significant to day-to-day operations, these events have no impact to the long-term performance of the repository. Because WIPP's re-certification is based solely on the post-closure performance of the repository (40 CFR 191, Subparts B and C), these recent events do not affect the long-term performance predictions or its technical and scientific basis. In this paper we will further explore the requirements for WIPP's re-certification, and the basis for our contention that the recent WIPP operational events do not impact long-term repository performance or have any implications on salt as a geologic disposal media, and that re-certification efforts should continue uninterrupted. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost-effective Remediation of Legacy Uranium Mines in Canada - 19279

Canada's legacy uranium mines were developed and operated in the 1950's and the 1960's when environmental regulations applied to mining activities were not as stringent as they are today. Fortunately, the ore was very low grade and, most of these sites do not currently pose a significant risk. However, the mining practices used at the time would not be considered acceptable today and there is a need to ensure these sites are being managed properly, especially in the context of gaining public support for the development of new uranium mines. At the beginning of the Cold War nuclear arms race, uranium was in high demand. In 1948, bans on private uranium exploration and mining were lifted, resulting in extensive exploration activity across the country, with Canada's second uranium mine beginning production in 1953. By 1958, 19 uranium mills were operating and Canadian production peaked at 12,239 tonnes of uranium metal (tU). The uranium mining boom was short-lived as the United States, the major purchaser, soon had sufficient quantities of uranium to meet its needs and the Canadian contracts were not extended. Uranium mines began closing, and by 1965, only 4 remained in operation. Closure requirements were minimal at that time, and other than sealing shafts and other safety measures, the sites were abandoned by their owners and the wastes were not addressed. In many cases, the company that operated the mine, or its successor, still exists and is now addressing the wastes on its sites. However, sites for which a former operator cannot be found have become a government responsibility. It is not often practical or cost-effective to remediate legacy sites to the standards applied to modern uranium mines. Most of the sites pose a very low risk, due to the very low-grades of ore, their remote locations, and the fact that contamination has spread and dissipated over the last 50 years and the environment will continue to improve through natural attenuation. Owners of legacy uranium mine sites in Canada have developed and successfully carried out cost-effective remediation plans that meet regulatory requirements. Experience from the legacy sites that have been remediated to date in Canada has shown that costs for remediating legacy uranium mines need not be excessive, and should be similar to the cost of remediating other metal mines of comparable size. The main factor in the cost of remediating these sites is the amount of tailings that were generated. On a per unit cost basis (current U.S. dollars), costs of remediation, have ranged from US$0.83 to US$2.57 per tonne of tailings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Theoretical analysis of energetic-ion-driven resistive interchange mode stabilization strategies using a Landau closure model

The aim of the present study is to perform a theoretical analysis of different strategies to stabilize energetic-ion-driven resistive interchange mode (EIC) in Large Helical Device (LHD) plasma. In this work, we use a reduced MHD for the thermal plasma coupled with a gyrofluid model for the energetic particles (EP) species. The hellically trapped EP component is introduced through a modification of the drift frequency to include their precessional drift. The stabilization trends of the 1/1 EIC observed experimentally with respect to the thermal plasma density and temperature are reproduced by the simulations, showing a reasonable agreement with the data. The LHD operation scenarios with stable 1/1 EIC are identified, leading to the stabilization of the 1/1 EIC if the thermal plasma density and temperature are above a given threshold. Additionally, the 1/1 EIC are also stabilized if the rotational transform is modified in a way that the 1/1 rational surface is located further away than 0.9 times the normalized radius, or the magnetic shear in the plasma periphery is enhanced. Also, LHD discharges with large magnetic fields show a higher EIC destabilization threshold with respect to the thermal plasma density. If the perpendicular NBI deposition region is moved further inward than 0.875 times the normalized radius the 1/1 EIC are also stabilized. Furthermore, increasing the perpendicular NBI voltage such that the EP energy is higher than 30 keV stabilizes the 1/1 EIC. Moreover, deuterium plasmas show a higher stability threshold for the 1/1 EIC than hydrogen plasmas. The experimental data shows a larger time interval between EIC events as the power of the tangential NBI is increased providing that the perpendicular NBI power is at least 13 MW. This implies a stabilizing effect of the tangential NBI.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Wallula Basalt Pilot Demonstration Project: Post-injection Results and Conclusions

Deep underground geologic formations are emerging as a reasonable option for long-term storage of CO 2 , including large continental flood basalt formations. At the GHGT-11 and GHGT-12 conferences, progress was reported on the initial phases for Wallula Basalt Pilot demonstration test (located in Eastern Washington state), where nearly 1,000 metric tons of CO 2 were injected over a 3-week period during July/August 2013. The target CO 2 injection intervals were two permeable basalt interflow reservoir zones with a combined thickness of ~20 m that occur within a layered basalt sequence between a depth of 830-890 m below ground surface. During the two-year post-injection period, downhole fluid samples were periodically collected during this post-injection monitoring phase, coupled with limited wireline borehole logging surveys that provided indirect evidence of on-going chemical geochemical reactions/alterations and CO 2 disposition. A final detailed post-closure field characterization program that included downhole fluid sampling, and performance of hydrologic tests and wireline geophysical surveys. Included as part of the final wireline characterization activities was the retrieval of side-wall cores from within the targeted injection zones. These cores were examined for evidence of in-situ mineral carbonization. Visual observations of the core material identified small globular nodules, translucent to yellow in color, residing within vugs and small cavities of the recovered basalt side-wall cores, which were not evident in pre-injection side-wall cores obtained from the native basalt formation. Characterization by x-ray diffraction identified these nodular precipitates as ankerite, a commonly occurring iron and calcium rich carbonate. Isotopic characterization (δ 13 C, δ 18 O) conducted on the ankerite nodules indicate a distinct isotopic signature that is closely aligned with that of the injected CO 2 . Both the secondary mineral nodules and injected CO 2 are measurably different from the isotopic content of basalt, injection zone groundwater and for naturally occurring calcite. Final post-injection wireline geophysical logging results also indicate the presence of free-phase CO 2 at the top of the two injection interflow zones, with no vertical migration of CO 2 above the injection horizons. Furthermore, these findings are significant and demonstrate the feasibility of sequestering CO 2 in a basalt formation.

54 ENVIRONMENTAL SCIENCES↗

A Hybrid Numerical Method for Turbulent Mixing Layers

A hybrid method has been developed for simulations of compressible turbulent mixing layers. Such mixing layers dominate the flows in exhaust systems of modern day aircraft and also those of hypersonic vehicles currently under development. The method configurations in which a dominant structural feature provides an unsteady mechanism to drive the turbulent development in the mixing layer. The hybrid method uses a Reynolds-averaged Navier-Stokes (RANS) procedure to calculate wall bounded regions entering a mixing section, and a Large Eddy Simulation (LES) procedure to calculate the mixing dominated regions. A numerical technique was developed to enable the use of the hybrid RANS-LES method on stretched, non-Cartesian grids. Closure for the RANS equations was obtained using the Cebeci-Smith algebraic turbulence model in conjunction with the wall-function approach of Ota and Goldberg. The wall-function approach enabled a continuous computational grid from the RANS regions to the LES region. The LES equations were closed using the Smagorinsky subgrid scale model. The hybrid RANS-LES method is applied to a benchmark compressible mixing layer experiment. Preliminary two dimensional calculations are used to investigate the effects of axial grid density and boundary conditions. Vortex shedding from the base region of a splitter plate separating the upstream flows was observed to eventually transition to turbulence. The location of the transition, however, was much further downstream than indicated by experiments. Actual LES calculations, performed in three spatial directions, also indicated vortex shedding, but the transition to turbulence was found to occur much closer to the beginning of the mixing section. which is in agreement with experimental observations. These calculations demonstrated that LES simulations must be performed in three dimensions. Comparisons of time-averaged axial velocities and turbulence intensities indicated reasonable agreement with experimental data.

Georgiadis, Nicholas J.↗

Geographic Information System Tools for Management of US DOE Sites - 13489

The DOE Office of Legacy Management (LM) uses a variety of GIS tools to support long-term surveillance and maintenance (LTS and M) activities at DOE closure sites. These geo-spatial applications provide access to data both for external public viewing and for internal analysis and decision making. LM uses a custom geo-spatial application called geo-spatial Environmental Mapping System (GEMS) that draws validated information from a database of 4.6 million analytical results and 232,000 water level measurements for 58 LTS and M sites. These data were collected from transferred sites over a period of 40 years. The database is used to capture and store historical environmental information such as analytical chemistry data, groundwater depths and elevations, well logs, well construction data, geo-referenced boundaries, site physical features, and sampling locations from LTS and M sites. Stakeholders, regulators, and project personnel can use this Web-based application and data to display information in several forms, such as a tabular report, a graph, and a geo-spatial display, or the data can be labeled or highlighted in a map view. Institutional controls, with their LTS and M requirements and documentation, have recently been incorporated into a prototype GEMS Web page for the Weldon Spring, Missouri, Site. LM uses multiple internal GIS viewers to help ensure the future protection of human health and the environment. For example, at the Rocky Flats, Colorado, Site, LM uses a GIS application to display real property interests on authoritative maps. Another project is used to facilitate discussions at stakeholder meetings for the Rocky Flats site's Original Landfill. The Uranium Leasing Program uses multiple interactive maps that assist in ongoing monitoring and the oversight of lease-holders' activities. (authors)

54 ENVIRONMENTAL SCIENCES↗

Incompressible Turbulent Wing-Body Junction Flow

The overall objective of this study is to contribute to the optimized design of fan bypass systems in advanced turbofan engines. Increasing the engine bypass ratios have provided a major boost in engine performance improvement over the last fifty years. An engine with high bypass ratio (11-16:1) such as the Advanced Ducted Propulsion (ADP) is being developed and is expected to provide an additional 25% improvement in overall efficiency over the early turbofans. Such significant improvements in overall efficiency would reduce the cost per seat mile, which is a major government and Industry challenge for the 21th century. The research is part of the Advanced Subsonic Technology (AST) program that involves a NASA, U.S. Industry and FAA partnership with the goal of a safe and highly productive global air transportation system. The immediate objective of the study is to perform numerical simulation of duct-strut interactions to elucidate the loss mechanisms associated with this configuration that is typical of advanced turbofan engines such as ADP. However, at present experimental data for a duct-strut configuration are not available. Thus, as a first step a wing-body junction flow would be studied and is the specific objective of the present study. At the outset it is to be recognized that while duct-strut interaction flow is similar to that of wing-body junction flows, there are some differences owing to the presence of a wall at both ends of the strut. Likewise, some differences are due to the sheared inflow (as opposed to a uniform inflow) velocity profile. It is however expected that some features of a wing-body junction flow would persist. Next, some of the salient aspects of the complex flow near a wing-body junction, as revealed by various studies reported in the literature will be reviewed. One of the principle characteristics of the juncture flow, is the presence of the mean flow components in a plane perpendicular to the direction of the oncoming free-stream flow. The lateral curvature of the wing/strat causes the oncoming turbulent layer to skew about am axis (x-axis) parallel to the plane (xz-plane) of the mean shear. This is the principle mechanism for the generation of secondary flow. Such skew-induced secondary flows are slow to be attenuated by Reynolds stresses. Additional contribution to the generation of secondary flow comes from anisotropies in Reynolds stresses. Upstream of the strut, the mean-vorticity is directed span wise (along the y-direction). The presence of secondary flow in the vicinity of the strut causes the vorticity to stretch around the obstacle in a horse-shoe shape, with each leg having a vorticity of the opposite sense. The blockage effect of the strut imposes a severe adverse pressure gradient on the oncoming turbulent shear layer, causing boundary layer separation ahead of the leading edge, resulting in a vortex that rolls up and flows downstream into the juncture region. The separation vortices trailing in the wake of the wing can alter the lift or drag characteristics of the surfaces downstream of the wing-body juncture. Likewise, on submarines, the wake flow behind the appendage can degrade the performance of the propeller located downstream. The complex nature of this flow is caused by the presence of all six components of Reynolds stresses. Devenport and Simpson report that in the vicinity of the horse-shoe vortex there is intense recirculation with turbulent stresses being much larger than those normally observed in turbulent flows. These features contribute to making this flow a challenge to predict numerically. Some of the past studies provide useful insights into this flow that would guide our numerical efforts. In measurements reported by Shabaka and Bradshaw, the eddy viscosity tensor is seen to be non-isotropic and has negative components in certain regions. In an effort to evaluate the closure assumptions of various turbulence models, Devenport and Simpson used their own extensive measurements in juncture flows around the nose of a wing-body junction. Measured values of mean-velocity and/or turbulence kinetic energy was used to predict the magnitude of the shear stress vector. Algebraic stress models performed the best followed by Cebeci-Smith eddy viscosity model. The flow is reported to be dominated by a pressure field produced by the wing and the velocity field generated by the horseshoe vortex that is wrapped around the junction between the wing and wall. Kubendran et al. conclude from an experimental study that the shape of leading edge of the wing as characterized by its slenderness ratio is a major factor in determining the flow fields in the juncture region. The more thinner the leading edge of the juncture, the weaker the horseshoe vortex is. Also, with a slender leading edge, the secondary flow in the juncture would be due mainly to the cross-stream gradients of Reynolds stresses rather than due to a lateral skewing of the shear layer.

Krishnamurthy, R.↗

Summary Report for the NEPA Impact Analysis. Revision 1

The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been developed by the U.S. Department of Energy (DOE) for the geologic (deep underground) disposal of defense-related transuranic (TRU) waste. Containment of TRU waste at the WIPP facility is derived from standards set forth in Title 40 of the Code of Federal Regulations (CFR), Part 191. The DOE assesses compliance with the containment standards according to the Certification Criteria in Title 40 CFR Part 194 by means of Performance Assessment (PA) calculations performed by Sandia National Laboratories (SNL). WIPP PA calculations estimate the probability of radionuclide releases from the repository to the accessible environment for a regulatory period of 10,000 years after facility closure. The DOE Carlsbad Field Office (CBFO) has initiated a National Environmental Policy Act (NEPA) action for a proposal to excavate and use additional transuranic (TRU) waste disposal panels at the WIPP facility. This report documents an analysis undertaken as part of an effort to evaluate the potential environmental consequences of the proposed action. Although not explicitly required for a NEPA analysis, evaluations of a dose indicator to hypothetical members of the public after final facility closure are presented in this report. The analysis is carried out in two stages: first, Performance Assessment (PA) calculations quantify the potential releases to the accessible environment over a 10,000-year post-closure period. Second, dose was evaluated for three hypothetical exposure pathways using the conservative radionuclide concentrations assumed to be released to the accessible environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Campaign datasets for Two-Column Aerosol Project (TCAP)

This campaign was designed to provide a detailed set of observations with which to 1) perform radiative and cloud condensation nuclei (CCN) closure studies, 2) evaluate a new retrieval algorithm for aerosol optical depth (AOD) in the presence of clouds using passive remote sensing 3) extend a previously developed technique to investigate aerosol indirect effects, and 4) evaluate the performance of a detailed regional-scale model and a more parameterized global-scale model in simulating particle activation and AOD associated with the aging of anthropogenic aerosols. To meet these science objectives, the ARM Mobile Facility (AMF) and the Mobile Aerosol Observing System (MAOS) was deployed on Cape Cod, Massachusetts for a 12-month period starting in the summer of 2012 in order to quantify aerosol properties, radiation and cloud characteristics at a location subject to both clear- and cloudy- conditions, and clean- and polluted-conditions. These observations were supplemented by two aircraft intensive observation periods (IOPS), one in the summer and a second in the winter. Each IOP required two aircraft.

54 ENVIRONMENTAL SCIENCES↗

Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2018

Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Site Contamination Area (CA) as a result of storm runoff. This activity supports U.S. Department of Energy (DOE) Environmental Management Nevada Program (EM NV) efforts to establish post-closure monitoring plans for the Smoky Site Soils Corrective Action Unit (CAU) 550. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause the movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the design of the appropriate post-closure monitoring program. In 2011, DRI installed a meteorological monitoring station on the west side of the Smoky Site CA and a hydrologic (runoff) monitoring station within the CA, near the east side. The meteorological station collects air temperature, wind speed, wind direction, relative humidity, precipitation, solar radiation, barometric pressure, soil temperature, and soil water content data. The maximum, minimum, and average or total values (as appropriate) for each of these parameters are recorded for each 10-minute interval. The maximum, minimum, and average water depth in the flume installed at the hydrologic station are also recorded for each 10-minute interval. This report presents the data collected from these stations during fiscal year (FY) 2018. During the FY2018 reporting period, the warmest months were June, July, and August and the coldest were December through March. Solar radiation showed the same seasonal trend. Monthly mean wind speeds were highest in the spring (March through May) and early summer (June). Winds were generally from the west during the summer and from the north throughout the fall and winter. The monthly average relative humidity ranged from the mid-teens to approximately 50 percent. Humidity was lowest in the fall and highest in the winter. Monthly total precipitation ranged from 0 in October, December, and June to approximately 1.38 inches (in) (35.05 millimeters [mm]) in July. Total precipitation for FY2018 was 3.86 in (98.04 mm). During the reporting period, two runoff events were recorded at the flume. One occurred on July 14, 2018, in response to precipitation earlier the same day. This event produced a peak water depth of 11.26 in (28.60 centimeters [cm]) in the flume, which is equivalent to a discharge of 1.86 cubic feet per second (cfs) (0.05 cubic meters per second [cm/s]) and a velocity of 3.97 feet per second (fps) (1.21 meters per second [m/s]) through the flume. Applying the flume hydraulic measurements to the channel geometry at the nearest surveyed cross-section it was determined that the velocity through the channel was 1.29 fps (0.39 m/s), which is sufficient to transport silts and fine sands. The second flow event occurred in response to earlier precipitation on September 4, 2018. This event produced a peak water depth of 0.78 in (1.98 cm) in the flume, which is equivalent to a discharge of 0.03 cfs (0.001 cm/s) and a velocity of 1.17 fps (0.36 m/s) through the flume. Applying the flume hydraulic measurements to the channel geometry at the nearest surveyed cross-section it was determined that the velocity through the channel was 0.03 fps (0.01 m/s). Although neither runoff event produced sufficient flow velocities through the natural channel to cause local erosion and transport of coarser bedload materials, the velocity of the first runoff event was sufficient to transport silts and fine sands, which have been shown to be preferentially associated with radionuclide contaminants. Therefore, a sampling event was planned after the first flow event in conjunction with a periodic maintenance inspection. As no suspended load sampling is available at this location, bedload samples were collected from the vicinity of the flume on August 7, 2018. The collected sediment was separated into three particle size fractions and each fraction was analyzed for americium-241 (Am-241), plutonium-238 (Pu-238), and plutonium-239/240 (Pu-239/240) by alpha spectrometry. The two smaller particle size fractions had higher concentrations of all three radionuclides than the largest particle size fraction. Additionally, Pu-239/240 had the highest concentration and Pu-238 had the lowest concentration in all samples. The same relationship between the concentrations of Pu-238 and Pu-239/240 was seen in samples reported in FY2013 and FY2014. Observation of meteorological and environmental conditions that lead to storm runoff will help identify parameters and threshold conditions that should be incorporated into postclosure monitoring plans for this and similar sites as well as aid in determining appropriate closure strategies for other Soils CAUs.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada (Rev.1)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Elastomeric Thermal Insulation Design Considerations in Long, Aluminized Solid Rocket Motors

An all-new sounding rocket was designed at NASA's Marshall Space Flight Center that featured an aft finocyl, aluminized solid propellant grain and silica-filled ethylene-propylene-diene monomer (SFEPDM) internal insulation. Upon the initial static firing of the first of this new design, the solid rocket motor (SRM) case failed thermally just upstream of the aft closure early in the burn time. Subsequent fluid modeling indicated that the high-velocity combustion-product jets emanating from the fin-slots in the propellant grain were likely inducing a strongly swirling flow, thus substantially increasing the severity of the convective environment on the exposed portion of the SFEPDM insulation in this region. The aft portion of the fin-slots in another of the motors were filled with propellant to eliminate the possibility of both direct jet impingement on the exposed SFEPDM and the appearance of strongly swirling flow in the aft region of the motor. When static-fired, this motor's case still failed in the same axial location, and, though somewhat later than for the first static firing, still in less than 1/3rd of the desired burn duration. These results indicate that the extreme material decomposition rates of the SFEPDM in this application are not due to gas-phase convection or shear but rather to interactions with burning aluminum or alumina slag. Further comparisons with between SFEPDM performance in this design and that in other hot-fire tests provide insight into the mechanisms of SFEPDM decomposition in SRM aft domes that can guide the upcoming redesign effort, as well as other future SRM designs. These data also highlight the current limitations of modeling elastomeric insulators solely with diffusion-controlled, gas-phase thermochemistry in SRM regions with significant viscous shear and/or condense-phase impingement or flow.

Martin, Heath T.↗

Scrutinizing entrainment and mass flux closures in shallow cumulus parameterizations using cloud-radar observations and large-eddy simulation (Final Report)

Representing warm, shallow clouds is a challenge for Global Climate Models, which leads to uncertainty in model projections of future climate. Our study was particularly concerned with how climate models represent the effects of shallow, non-precipitating cumulus clouds. Climate models must make certain assumptions when representing low clouds such as how much dry air from outside the cloud is mixed into the warm, moist cloud updraft. This process is called “entrainment” and tends to weaken the cloud updraft and dry out the cloud, compared to a theoretical cloud with no mixing. This project was a joint observational and modeling study to derive estimates of entrainment from field observations and use high-resolution modeling to evaluate the assumptions used in climate model representations of shallow cumulus. Our research took advantage of a wide variety of Department of Energy measurements from fixed climate-monitoring locations over the Southern Great Plains of the U.S. and the in the Eastern North Atlantic, along with short-term field projects (MAGIC, CAP–MBL, ACE–ENA). During the project, the PI maintained regular collaborations with Department of Energy Scientists at Brookhaven and Argonne National Laboratories. The project funded two students, who both obtained their M.S. in Atmospheric Science and are currently in the Atmospheric Science Ph.D. program. Both were lead authors on research papers funded by this grant.

54 ENVIRONMENTAL SCIENCES↗

Common View Time Transfer Using Worldwide GPS and DMA Monitor Stations

Analysis of the on-orbit Navstar clocks and the Global Positioning System (GPS) monitor station reference clocks is performed by the Naval Research Laboratory using both broadcast and postprocessed precise ephemerides. The precise ephemerides are produced by the Defense Mapping Agency (DMA) for each of the GPS space vehicles from pseudo-range measurements collected at five GPS and at five DMA monitor stations spaced around the world. Recently, DMA established an additional site co-located with the US Naval Observatory precise time site. The time reference for the new DMA site is the DoD Master Clock. Now, for the first time, it is possible to transfer time every 15 minutes via common view from the DoD Master Clock to the 11 GPS and DMA monitor stations. The estimated precision of a single common-view time transfer measurement taken over a 15-minute interval was between 1.4 and 2.7 nanoseconds. Using the measurements from all Navstar space vehicles in common view during the 15-minute interval, typically 3-7 space vehicles, improved the estimate of the precision to between 0.65 and 1.13 nanoseconds. The mean phase error obtained from closure of the time transfer around the world using the 11 monitor stations and the 25 space vehicle clocks over a period of 4 months had a magnitude of 31 picoseconds. Analysis of the low noise time transfer from the DoD Master Clock to each of the monitor stations yields not only the bias in the time of the reference clock, but also focuses attention on structure in the behaviour of the reference clock not previously seen. Furthermore, the time transfer provides a a uniformly sampled database of 15-minute measurements that make possible, for the first time, the direct and exhaustive computation of the frequency stability of the monitor station reference clocks. To lend perspective to the analysis, a summary is given of the discontinuities in phase and frequency that occurred in the reference clock at the Master Control Station during the period covered by the analysis.

Reid, Wilson G.↗

Proceedings of the 10th US/German Workshop on Salt Repository Research Design and Operation. Rev. 1

The 10th US/German Workshop on Salt Repository Research, Design, and Operation was hosted by RESPEC and South Dakota School of Mines & Technology, both located in the Black Hills of South Dakota. Over 60 registered participants representing Germany, United States, the Netherlands, and the United Kingdom availed themselves to excellent facilities on the School of Mines campus. As the 10th annual workshop, this occasion is a milestone of the modern era of collaboration between the US and Germany, which has extended to other countries with potential for radioactive waste disposal in salt. Thrust areas covered in the annual workshops are selected by participants and typically include elements of continuity from year to year. This year's themes included siting, modeling challenges, seal systems and materials, operational safety, and special topics. Two major breakout sessions addressed test sample conditioning and natural closure of salt openings. When the new-generation US/German workshops were conceived, one goal was to identify challenging issues related to salt repository sciences and then conduct open discussions in special breakout sessions. These timely sessions achieve the workshop paradigm and provide in-depth dialogue on important salt repository considerations. In many respects, general themes of these salt repository workshops reflect advances in the scientific basis for nuclear-waste disposal in salt formations and develop naturally as a consequence of unremitting attention largely as a result of the workshop commitment. Technical capabilities in the laboratory and field continue to improve in concert with accumulating experience. Because we are working together, mechanical deformation at the micro-scale can be interpreted at a large scale, which is fundamental to predictive modeling of salt repository evolution. This document records the Proceedings of the 2019 gathering of salt repository nations and has been compiled by RESPEC, demonstrating an adopted protocol in which the host organization creates that year's Proceedings. To assist with organization and compilation, individual chapters are summarized by volunteer subject-matter experts from the participatory audience; these contributors are recognized in the Acknowledgements. All formal presentations are included in this document, thus providing a resource for referencing and many excellent photographic images. Appendices include the agenda, list of participants, abstracts, and presentations. A primary purpose for recording workshop activities is to create and sustain an accessible record of salt repository research. These archives also illustrate transparent development of research areas each year.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Design and Construction of a Loess-Cement Cushion as an Integral Component of an SL-LILW Repository - 16077

The Bulgarian State Enterprise for Radioactive Waste Management (SERAW) is planning the construction of a near-surface repository for short-lived low and intermediate level radioactive waste, the National Disposal Facility (NDF), adjacent to the Kozloduy Nuclear Power Plant (KNPP). The NDF will be constructed as a reinforced concrete vault-type repository system, where prefabricated cubic waste packages (2 m on a side) will be emplaced in large reinforced concrete disposal cells. Waste emplacement operations will be conducted in three phases over a total of 60 years of operations. After the last waste packages have been disposed, an engineered multilayer cover will be installed over the site to further isolate the waste from the accessible environment. The Radiana Site where the NDF will be constructed is a sloping area located between the second and sixth loess terraces above the River Danube with elevations ranging from approximately +40 m to elevation +95 m. The unsaturated zone at the location selected for waste disposal ranges from 13 m to 16 m in thickness. After construction, the unsaturated zone will consist of a 5 m thick, engineered loess-cement cushion installed over naturally occurring Pliocene clays and sandy clayey sediments of the Brusarci Formation with a thickness above the top of groundwater ranging from 8 m to 11 m. The loess-cement cushion is a key component of the 'engineered fill' barrier as identified in the Intermediate Safety Assessment Report (ISAR) for the NDF. This barrier consists of engineered fill both below the disposal cells, i.e., the loess-cement cushion, and above the disposal cells, i.e. the final multilayer cover to be installed at closure of the facility. The loess-cement cushion component of this barrier will act to provide a geo-technically stable foundation for the disposal system. In addition, the barrier will raise the base of the disposal cells and increases the unsaturated zone thickness above the top of the groundwater table, as well as to serve as a chemical barrier that will act to sorb radionuclides thereby retarding their migration to the underlying groundwater. In addition to its assigned barrier functions the loess cement cushion also houses key embedded components required as part of the overall NDF safety concept, including systems necessary for operational and post-closure performance monitoring as well as the support foundation structures required for the mobile roofs, which are designed to handle and protect the waste during emplacement operations. The post-closure monitoring period, i.e., the period of institutional control, is given by as 300 years. While similar although less massive cushions have been previously constructed as foundations for various structures at the KNPP, the loess-cement cushion planned for construction at the NDF including the embedded structures will represent a first of its kind construction in terms of both its physical dimensioning as well as its requirements for long-term performance. This paper describes the design of the cushion, its functions and its construction as planned for the NDF as an integral component of the site safety concept. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗