Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Generation scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

IGOS improvements for Seasat

Modifications to Battelle's Interactive Graphics Orbit Selection (IGOS) computer program to assist in the planning and evaluation of the Seasat-A Scatterometer System (SASS) flight program were studied. To meet the planning needs of the LaRC Seasat-A Scatterometer team, the following features/modifications were implemented in IGOS: (1) display and specification of time increments in orbital passes represented by the cross-hatching of ground swaths; (2) addition of pass number annotations on the horizontal axis of the STPLNG and STPTOD plots; (3) modification of the sensor model to include more than two swaths associated with a single sensor to approximate the SASS cell pattern; (4) inclusion of down range and cross-track swath geometry to display the characteristic skewed SASS pattern; (5) addition of a swath schedule to allow the display of the SASS mode changes and to calibrate gaps; and (6) development of a set of commands to generate the detailed swath data from sensor characteristics and orbit/earth motion.

Warmke, J. M.↗

Task sequence planning in a robot workcell using AND/OR nets

An approach to task sequence planning for a generalized robotic manufacturing or material handling workcell is described. Given the descriptions of the objects in this system and all feasible geometric relationships among these objects, an AND/OR net which describes the relationships of all feasible geometric states and associated feasibility criteria for net transitions is generated. This AND/OR net is mapped into a Petri net which incorporates all feasible sequences of operations. The resulting Petri net is shown to be bounded and have guaranteed properties of liveness, safeness, and reversibility. Sequences are found from the reachability tree of the Petri net. Feasibility criteria for net transitions may be used to generate an extended Petri net representation of lower level command sequences. The resulting Petri net representation may be used for on-line scheduling and control of the system of feasible sequences. A simulation example of the sequences is described.

Cao, Tiehua↗

Short-range precipitation forecasts using assimilation of simulated satellite water vapor profiles and column cloud liquid water amounts

These observing system simulation experiments investigate the assimilation of satellite-observed water vapor and cloud liquid water data in the initialization of a limited-area primitive equations model with the goal of improving short-range precipitation forecasts. The assimilation procedure presented includes two aspects: specification of an initial cloud liquid water vertical distribution and diabatic initialization. The satellite data is simulated for the next generation of polar-orbiting satellite instruments, the Advanced Microwave Sounding Unit (AMSU) and the High-Resolution Infrared Sounder (HIRS), which are scheduled to be launched on the NOAA-K satellite in the mid-1990s. Based on cloud-top height and total column cloud liquid water amounts simulated for satellite data a diagnostic method is used to specify an initial cloud water vertical distribution and to modify the initial moisture distribution in cloudy areas. Using a diabatic initialization procedure, the associated latent heating profiles are directly assimilated into the numerical model. The initial heating is estimated by time averaging the latent heat release from convective and large-scale condensation during the early forecast stage after insertion of satellite-observed temperature, water vapor, and cloud water formation. The assimilation of satellite-observed moisture and cloud water, together withy three-mode diabatic initialization, significantly alleviates the model precipitation spinup problem, especially in the first 3 h of the forecast. Experimental forecasts indicate that the impact of satellite-observed temperature and water vapor profiles and cloud water alone in the initialization procedure shortens the spinup time for precipitation rates by 1-2 h and for regeneration of the areal coverage by 3 h. The diabatic initialization further reduces the precipitation spinup time (compared to adiabatic initialization) by 1 h.

Wu, Xiaohua↗

MRO High Resolution Imaging Science Experiment (HiRISE): Instrument Development

The primary functional requirement of the HiRISE imager is to allow identification of both predicted and unknown features on the surface of Mars to a much finer resolution and contrast than previously possible. This results in a camera with a very wide swath width, 6km at 300km altitude, and a high signal to noise ratio, >100:1. Generation of terrain maps, 30 cm vertical resolution, from stereo images requires very accurate geometric calibration. The project limitations of mass, cost and schedule make the development challenging. In addition, the spacecraft stability must not be a major limitation to image quality. The nominal orbit for the science phase of the mission is a 3pm orbit of 255 by 320 km with periapsis locked to the south pole. The track velocity is approximately 3,400 m/s.

Alan Delamere↗

Open-Loop Pitch Table Optimization for the Maximum Dynamic Pressure Orion Abort Flight Test

NASA has scheduled the retirement of the space shuttle orbiter fleet at the end of 2010. The Constellation program was created to develop the next generation of human spaceflight vehicles and launch vehicles, known as Orion and Ares respectively. The Orion vehicle is a return to the capsule configuration that was used in the Mercury, Gemini, and Apollo programs. This configuration allows for the inclusion of an abort system that safely removes the capsule from the booster in the event of a failure on launch. The Flight Test Office at NASA's Dryden Flight Research Center has been tasked with the flight testing of the abort system to ensure proper functionality and safety. The abort system will be tested in various scenarios to approximate the conditions encountered during an actual Orion launch. Every abort will have a closed-loop controller with an open-loop backup that will direct the vehicle during the abort. In order to provide the best fit for the desired total angle of attack profile with the open-loop pitch table, the table is tuned using simulated abort trajectories. A pitch table optimization program was created to tune the trajectories in an automated fashion. The program development was divided into three phases. Phase 1 used only the simulated nominal run to tune the open-loop pitch table. Phase 2 used the simulated nominal and three simulated off nominal runs to tune the open-loop pitch table. Phase 3 used the simulated nominal and sixteen simulated off nominal runs to tune the open-loop pitch table. The optimization program allowed for a quicker and more accurate fit to the desired profile as well as allowing for expanded resolution of the pitch table.

Stillwater, Ryan A.↗

Landsat Data Continuity Mission

The Landsat Data Continuity Mission (LDCM) is currently under development and is on schedule to launch the 8th satellite in the Landsat series in December of 2012. LDCM is a joint project between the National Aeronautics and Space Administration (NASA) and the United States Geological Survey (USGS). NASA is responsible for developing and launching the flight hardware and on-orbit commissioning and USGS is responsible for developing the ground system and operating the system onorbit after commissioning. Key components of the flight hardware are the Operational Land Imager (OLI), nearing completion by Ball Aerospace & Technologies Corp in Boulder, CO, the Thermal Infrared Sensor (TIRS), being built by NASA's Goddard Space Flight Center and the spacecraft, undergoing integration at Orbital Sciences Corp in Gilbert, Arizona. The launch vehicle will be an Atlas-5 with launch services provided by NASA's Kennedy Space Center. Key ground systems elements are the Mission Operations Element, being developed by the Hammers Corporation, and the Collection Activity Planning Element, Ground Network Element, and Data Processing and Archive System, being developed internally by the USGS Earth Resources Observations and Science (EROS) Center. The primary measurement goal of LDCM is to continue the global coverage of moderate spatial resolution imagery providing continuity with the existing Landsat record. The science goal for this imagery is to monitor land use and land cover, particularly as it relates to global climate change. Together the OLI and TIRS instruments on LDCM replace the ETM+ instrument on Landsat-7 with significant enhancements. The OLI is a pushbroom design instrument where the scanning mechanism of the ETM+ is effectively replaced by a long line of detectors. The OLI has 9 spectral bands with similar spatial resolution to ETM+: 7 of them similar to the reflective spectral bands on ETM+ and two new bands. The two new bands cover (1) the shorter wavelength blue part of the spectrum to help with coastal studies and aerosol analyses/atmospheric correction and (2) an atmospheric water absorption band, where the Earth surface is generally not visible, but Cirrus clouds are, to aid in cloud detection and screening. The radiometry of OLI benefits from improved SNR, dynamic range and quantization. OLI is undergoing system testing with a delivery scheduled for Spring 2011. The TIRS is also a pushbroom design and used QWIPS detectors that require cooling to 43K using a cryocooler. It.has two spectral bands, effectively splitting the ETM+ band 6 in half, that can be used as a split window to aid in atmospheric correction. It has nominally 100 m spatial resolution as opposed to the 60 m of Landsat-7 ETM+: TIRS has commenced integration and test, with a delivery to the spacecraft vendor scheduled for Winter 2011-2012. The Orbital spacecraft currently being integrated for LDCM will have improved capabilities for pointing over previous missions. These capabilities will allow the OLI and TIRS instruments to point off-nadir the equivalent of one WRS-2 path to increase the chances of coverage for high priority targets, particularly in the event of natural disasters. Also, the pointing capability will allow the calibration of the OLI using the sun (roughly weekly), the moon (monthly), stars (during commissioning) and the Earth (at 90 deg from normal orientation, a.k.a., side slither) quarterly. The solar calibration will be used for OLI absolute and relative calibration, the moon for trending the stability of the OLI response, the stars will be used for Line of Sight determination and the side slither will be an alternate OLI and relative gain determination methodology. The spacecraft is scheduled to begin integration with the OLI instrument in Summer 2011. The LDCM data processing and archive system (DPAS), located at USGS EROS, generates the products for distribution to users. Like Landsat-7 this includes an image assessment system for characrizing instrument performance and updating calibration parameters. Products will be generated that include the spectral bands from both instruments, terrain corrected and registered to the geoid. Also, like Landsat-7, data products will be distributed at no charge to the user. The current status and plans of the space and ground segments of the LDCM project will be presented along with performance predictions as available. More detailed information on the two instruments is intended to be presented in separate papers.

Markham, Brian↗

Main Engine Prototype Development for 2nd Generation RLV RS-83

This presentation reports on the NASA project to develop a prototype for RS-83 engine designed for use on reusable launch vehicles (RLV). Topics covered include: program objectives, overview schedule, organizational chart, integrated systems engineering processes, requirement analysis, catastrophic engine loss, maintainability analysis tools, and prototype design analysis.

John Vilja↗

Next Generation NASA Initiative for Space Geodesy

Space geodesy measurement requirements have become more and more stringent as our understanding of the physical processes and our modeling techniques have improved. In addition, current and future spacecraft will have ever-increasing measurement capability and will lead to increasingly sophisticated models of changes in the Earth system. Ground-based space geodesy networks with enhanced measurement capability will be essential to meeting these oncoming requirements and properly interpreting the sate1!ite data. These networks must be globally distributed and built for longevity, to provide the robust data necessary to generate improved models for proper interpretation ofthe observed geophysical signals. These requirements have been articulated by the Global Geodetic Observing System (GGOS). The NASA Space Geodesy Project (SGP) is developing a prototype core site as the basis for a next generation Space Geodetic Network (SGN) that would be NASA's contribution to a global network designed to produce the higher quality data required to maintain the Terrestrial Reference Frame and provide information essential for fully realizing the measurement potential of the current and coming generation of Earth Observing spacecraft. Each of the sites in the SGN would include co-located, state of-the-art systems from all four space geodetic observing techniques (GNSS, SLR, VLBI, and DORIS). The prototype core site is being developed at NASA's Geophysical and Astronomical Observatory at Goddard Space Flight Center. The project commenced in 2011 and is scheduled for completion in late 2013. In January 2012, two multiconstellation GNSS receivers, GODS and GODN, were established at the prototype site as part of the local geodetic network. Development and testing are also underway on the next generation SLR and VLBI systems along with a modern DORIS station. An automated survey system is being developed to measure inter-technique vector ties, and network design studies are being performed to define the appropriate number and distribution of these next generation space geodetic core sites that are required to achieve the driving ITRF requirements. We present the status of this prototype next generation space geodetic core site, results from the analysis of data from the established geodetic stations, and results from the ongoing network design studies.

Merkowitz, S. M.↗

Expert system for scheduling simulation lab sessions

Implementation and results of an expert system used for scheduling session requests for the Systems Engineering Simulator (SES) laboratory at the NASA Johnson Space Center (JSC) are discussed. Weekly session requests are received from astronaut crew trainers, procedures developers, engineering assessment personnel, software developers, and various others who wish to access the computers, scene generators, and other simulation equipment available to them in the SES lab. The expert system under discussion is comprised of a data acquisition portion - two Pascal programs run on a personal computer - and a CLIPS program installed on a minicomputer. A brief introduction to the SES lab and its scheduling background is given. A general overview of the system is provided, followed by a detailed description of the constraint-reduction process and of the scheduler itself. Results from a ten-week trial period using this approach are discussed. Finally, a summary of the expert system's strengths and shortcomings are provided.

Lund, Chet↗

The development and validation of command schedules for SeaWiFS

An automated method for developing and assessing spacecraft and instrument command schedules is presented for the Sea-viewing Wide Field-of-view Sensor (SeaWiFS) project. SeaWiFS is to be carried on the polar-orbiting SeaStar satellite in 1995. The primary goal of the SeaWiFS mission is to provide global ocean chlorophyll concentrations every four days by employing onboard recorders and a twice-a-day data downlink schedule. Global Area Coverage (GAC) data with about 4.5 km resolution will be used to produce the global coverage. Higher resolution (1.1 km resolution) Local Area Coverage (LAC) data will also be recorded to calibrate the sensor. In addition, LAC will be continuously transmitted from the satellite and received by High Resolution Picture Transmission (HRPT) stations. The methods used to generate commands for SeaWiFS employ numerous hierarchical checks as a means of maximizing coverage of the Earth's surface and fulfilling the LAC data requirements. The software code is modularized and written in Fortran with constructs to mirror the pre-defined mission rules. The overall method is specifically developed for low orbit Earth-observing satellites with finite onboard recording capabilities and regularly scheduled data downlinks. Two software packages using the Interactive Data Language (IDL) for graphically displaying and verifying the resultant command decisions are presented. Displays can be generated which show portions of the Earth viewed by the sensor and spacecraft sub-orbital locations during onboard calibration activities. An IDL-based interactive method of selecting and testing LAC targets and calibration activities for command generation is also discussed.

Woodward, Robert H.↗

Automated Scenario Generation for Meeting Human-in-the-Loop Simulation Requirements

A two-step automated Multi-Aircraft Control System traffic scenario generation process for Human-in-the-Loop evaluations of air traffic management concepts is described. The first step of the two-step process employs the scenario generation capability currently available in NASA's Air Traffic Management Testbed. The second step refines the scenario by filtering flights from the traffic scenario based on route length, cruise speed, cruise altitude, entry time and the desired ratio of internal to external flights. A solution for achieving the desired ratio of internal to external flights, where internal flights are shorter flights and external flights are longer flights based on a distance threshold, is described. Finally, schedulers are described for shaping the hourly arrival traffic count as a function of time in response to airport capacity constraint or for increasing the traffic demand with respect to the available arrival capacity. Results generated for arrival traffic to the four major airports in the New York Metroplex on a busy day using the two-step procedure are discussed. These results show that traffic scenarios for Multi-Aircraft Control System that meet the Human-in-the-Loop and fast-time simulation requirements can be created automatically following the procedures described in the paper. The automated process will improve the accuracy and efficiency by eliminating the tedious manual process for scenario generation.

Automated Scenario Generation↗

Automated Scenario Generation for Meeting Human-In-The-Loop Simulation Requirements

A two-step automated Multi-Aircraft Control System traffic scenario generation process for Human-in-the-Loop evaluations of air traffic management concepts is described. The first step of the two-step process employs the scenario generation capability currently available in NASA's Air Traffic Management Testbed. The second step refines the scenario by filtering flights from the traffic scenario based on route length, cruise speed, cruise altitude, entry time and the desired ratio of internal to external flights. A solution for achieving the desired ratio of internal to external flights, where internal flights are shorter flights and external flights are longer flights based on a distance threshold, is described. Finally, schedulers are described for shaping the hourly arrival traffic count as a function of time in response to airport capacity constraint or for increasing the traffic demand with respect to the available arrival capacity. Results generated for arrival traffic to the four major airports in the New York Metroplex on a busy day using the two-step procedure are discussed. These results show that traffic scenarios for Multi-Aircraft Control System that meet the Human-in-the-Loop and fast-time simulation requirements can be created automatically following the procedures described in the paper. The automated process will improve the accuracy and efficiency by eliminating the tedious manual process for scenario generation.

Automated Scenario Generation↗

Operations analysis (study 2.1): Program manual and users guide for the LOVES computer code

Information is provided necessary to use the LOVES Computer Program in its existing state, or to modify the program to include studies not properly handled by the basic model. The Users Guide defines the basic elements assembled together to form the model for servicing satellites in orbit. As the program is a simulation, the method of attack is to disassemble the problem into a sequence of events, each occurring instantaneously and each creating one or more other events in the future. The main driving force of the simulation is the deterministic launch schedule of satellites and the subsequent failure of the various modules which make up the satellites. The LOVES Computer Program uses a random number generator to simulate the failure of module elements and therefore operates over a long span of time typically 10 to 15 years. The sequence of events is varied by making several runs in succession with different random numbers resulting in a Monte Carlo technique to determine statistical parameters of minimum value, average value, and maximum value.

Wray, S. T., Jr.↗

Flight test of a digital controller used in a helicopter autoland system

This paper describes the flight test evaluation of an advanced digital helicopter flight control system. The controller was designed using an optimal control design procedure for a fully coupled lateral and longitudinal vehicle model. Explicit integrals of the guidance error were included to produce a type 1 characteristic. Gain scheduling was used to account for changes in the vehicle dynamics. The digital controller was exercised by combining it with state estimators, a trajectory generator, and a closed-loop guidance algorithm to form a helicopter autoland system. A CH-47 tandem rotor helicopter was equipped with sensors, on-board digital flight computers, and electrohydraulic actuators. The system was exercised by automatically flying straight-in descending decelerating trajectories typcial of VFR manual landing approaches. A description of the test-ground facilities, the flight hardware and software, and the velocity and position tracking performance is included.

Downing, David R.↗

The multi-attribute task battery for human operator workload and strategic behavior research

The Multi-Attribute Task (MAT) Battery provides a benchmark set of tasks for use in a wide range of lab studies of operator performance and workload. The battery incorporates tasks analogous to activities that aircraft crewmembers perform in flight, while providing a high degree of experimenter control, performance data on each subtask, and freedom to use nonpilot test subjects. Features not found in existing computer based tasks include an auditory communication task (to simulate Air Traffic Control communication), a resource management task permitting many avenues or strategies of maintaining target performance, a scheduling window which gives the operator information about future task demands, and the option of manual or automated control of tasks. Performance data are generated for each subtask. In addition, the task battery may be paused and onscreen workload rating scales presented to the subject. The MAT Battery requires a desktop computer with color graphics. The communication task requires a serial link to a second desktop computer with a voice synthesizer or digitizer card.

Comstock, J. Raymond, Jr.↗

Multi-Attribute Task Battery - Applications in pilot workload and strategic behavior research

The Multi-Attribute Task (MAT) Battery provides a benchmark set of tasks for use in a wide range of lab studies of operator performance and workload. The battery incorporates tasks analogous to activities that aircraft crewmembers perform in flight, while providing a high degree of experimenter control, performance data on each subtask, and freedom to nonpilot test subjects. Features not found in existing computer based tasks include an auditory communication task (to simulate Air Traffic Control communication), a resource management task permitting many avenues or strategies of maintaining target performance, a scheduling window which gives the operator information about future task demands, and the option of manual or automated control of tasks. Performance data are generated for each subtask. In addition, the task battery may be paused and onscreen workload rating scales presented to the subject. The MAT Battery requires a desktop computer with color graphics. The communication task requires a serial link to a second desktop computer with a voice synthesizer or digitizer card.

Arnegard, Ruth J.↗

The ASAC Air Carrier Investment Model (Second Generation)

To meet its objective of assisting the U.S. aviation industry with the technological challenges of the future, NASA must identify research areas that have the greatest potential for improving the operation of the air transportation system. To accomplish this, NASA is building an Aviation System Analysis Capability (ASAC). The ASAC differs from previous NASA modeling efforts in that the economic behavior of buyers and sellers in the air transportation and aviation industries is central to its conception. To link the economics of flight with the technology of flight, ASAC requires a parametrically based mode with extensions that link airline operations and investments in aircraft with aircraft characteristics. This model also must provide a mechanism for incorporating air travel demand and profitability factors into the airlines' investment decisions. Finally, the model must be flexible and capable of being incorporated into a wide-ranging suite of economic and technical models that are envisioned for ASAC. We describe a second-generation Air Carrier Investment Model that meets these requirements. The enhanced model incorporates econometric results from the supply and demand curves faced by U.S.-scheduled passenger air carriers. It uses detailed information about their fleets in 1995 to make predictions about future aircraft purchases. It enables analysts with the ability to project revenue passenger-miles flown, airline industry employment, airline operating profit margins, numbers and types of aircraft in the fleet, and changes in aircraft manufacturing employment under various user-defined scenarios.

Wingrove, Earl R., III↗

The Geo Quick Ride (GQR) Program: Providing Inexpensive and Frequent Access to Space

This paper examines piggybacking NASA, university, and industry payloads on commercial geosynchronous satellites. NASA's RSDO Office awarded Geo Quick Ride (GQR) study contracts in 1998 to spacecraft manufactures to examine the issues with flying secondary payloads. The study results were very promising. Commercial communication satellites have frequent flights and significant unused resources that could be used to fly secondary payloads. However, manifesting secondary payloads on a commercial revenue-generating satellite is a complex problem to solve. The solution requires multiple simultaneous approaches in order to be successful. There are business, economic, technical, schedule, and organizational issues to be resolved. This paper examines the Geo Quick Ride (GQR) concept, discusses the development issues, and describes how this concept solves many of these issues.

Caffrey, Robert↗