Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “GPM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Midlatitude Continental Convective Clouds Experiment (MC3E)

The Midlatitude Continental Convective Clouds Experiment (MC3E) will take place in central Oklahoma during the April–May 2011 period. The experiment is a collaborative effort between the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility and the National Aeronautics and Space Administration’s (NASA) Global Precipitation Measurement (GPM) mission Ground Validation (GV) program. The field campaign leverages the unprecedented observing infrastructure currently available in the central United States, combined with an extensive sounding array, remote sensing and in situ aircraft observations, NASA GPM ground validation remote sensors, and new ARM instrumentation purchased with American Recovery and Reinvestment Act funding. The overarching goal is to provide the most complete characterization of convective cloud systems, precipitation, and the environment that has ever been obtained, providing constraints for model cumulus parameterizations and space-based rainfall retrieval algorithms over land that have never before been available.

Jensen, MP↗

Initial Flowsheet for the Next Generation GSSX Process in the MCU: Report for FY2010

The Next Generation Caustic Side Solvent Extraction (NG-CSSX) flowsheet is being developed in a collaboration among Oak Ridge National Laboratory (ORNL), Argonne National Laboratory (ANL), and Savannah River National Laboratory (SRNL) for the Modular CSSX Unit (MCU) facility at the Savannah River Site (SRS). This work is being done in cooperation with two groups at SRS (my principal contacts there are Mark Geeting, SRR, and Sam Fink, SRNL) and with one group at Oak Ridge National Laboratory (my principal contact there is Bruce Moyer). The evaluation of the various NG-CSSX solvent candidates was done using the SASSE (Spreadsheet Algorithm for Stagewise Solvent Extraction) program with cesium distribution coefficient (D Cs ) values supplied by ORNL. The final optimized solvent composition has 50 mM MaxCalix as the extractant. Using the SASSE spreadsheet to calculate the Cs decontamination factor (D.F.) as well as ROTOR program to evaluate contactor rotor throughputs, an initial flowsheet was developed for the optimized NG-CSSX solvent. The current CSSX flowsheet for the MCU at its maximum salt feed flow rate is shown in Fig. 1. The initial NG-CSSX flowsheet for the MCU at its targeted maximum salt feed flow rate is shown in Fig. 2. Comparing these two flowsheets, one can see that, for the NG-CSSX flowsheet, the maximum flow rate of the salt feed (DF) is increased 41%, from 8.5 gpm to 12.0 gpm. At the same time, because of the high concentration of the MaxCalix extractant in the NG-CSSX solvent, the Cs decontamination factor (D.F.) for the aqueous effluent from the extraction section (DW, the aqueous raffinate) is increased from 12 to 40,000. As required, the Cs concentration factor (C.F.) for the aqueous effluent from the strip section (EW) is maintained at 15.

Leonard, Ralph↗

Solvent Dispersion and Flow Meter Calculation Results

Savannah River National Laboratory (SRNL) found that the dispersion numbers for the six combinations of CSSX:Next Generation Solvent (NGS) “blend” and pure NGS versus salt solution, caustic wash, and strip aqueous solutions are all good. The dispersion numbers are indications of processability with centrifugal contactors. A comparison of solvent physical and thermal properties shows that the Intek™ solvent flow meter in the plant has a reading biased high versus calibrated flow when NGS is used, versus the standard CSSX solvent. The flow meter, calibrated for CSSX solvent, is predicted to read 2.8 gpm of NGS in a case where the true flow of NGS is 2.16 gpm.

42 ENGINEERING↗

Engineering scale demonstration of a prospective Cast Stone process

This report documents an engineering-scale demonstration with non-radioactive simulants that was performed at SRNL using the Scaled Continuous Processing Facility (SCPF) to fill an 8.5 ft container with simulated Cast Stone grout. The Cast Stone formulation was chosen from the previous screening tests. Legacy salt solution from previous Hanford salt waste testing was adjusted to correspond to the average composition generated from the Hanford Tank Waste Operation Simulator (HTWOS). The dry blend materials, ordinary portland cement (OPC), Class F fly ash, and ground granulated blast furnace slag (GGBFS or BFS), were obtained from Lafarge North America in Pasco, WA. Over three days, the SCPF was used to fill a 1600 gallon container, staged outside the facility, with simulated Cast Stone grout. The container, staged outside the building approximately 60 ft from the SCPF, was instrumented with x-, y-, and z-axis thermocouples to monitor curing temperature. The container was also fitted with two formed core sampling vials. For the operation, the targeted grout production rate was 1.5 gpm. This required a salt solution flow rate of approximately 1 gpm and a premix feed rate of approximately 580 lb/h. During the final day of operation, the dry feed rate was increased to evaluate the ability of the system to handle increased throughput. Although non-steady state operational periods created free surface liquids, no bleed water was observed either before or after operations. The final surface slope at a fill height of 39.5 inches was 1-1.5 inches across the 8.5 foot diameter container, highest at the final fill point and lowest diametrically opposed to the fill point. During processing, grout was collected in cylindrical containers from both the mixer discharge and the discharge into the container. These samples were stored in a humid environment either in a closed box proximal to the container or inside the laboratory. Additional samples collected at these sampling points were analyzed for rheological properties and density. Both the rheological properties (plastic viscosity and yield strength) and density were consistent with previous and later SCPF runs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Precipitation and Hydrology Experiment (IPHEx)/Orographic Precipitation Processes Study Field Campaign Report

Three Microwave Radiometers (two 3-channel and one 2-channel) were deployed in the Southern Appalachian Mountains in western North Carolina as part of the Integrated Precipitation and Hydrology Experiment (IPHEx), which was the first National Aeronautics and Space Administration (NASA) Global Precipitation Mission (GPM) Ground Validation (GV) field campaign after the launch of the GPM Core Satellite (Barros et al. 2014). The radiometers were used along with other instrumentation to estimate the liquid water content of low-level clouds and fog. Specifically, data from the radiometers were collected to help, with other instrumentation, to characterize fog formation, evolution, and dissipation in the region (by monitoring the liquid water path in the column) and observe the effect of that fog on the precipitation regime. Data were collected at three locations in the Southern Appalachians, specifically western North Carolina: a valley in the inner mountain region, a valley in the open mountain pass region, and a ridge in the inner region. This project contributes to the U.S. Department of Energy (DOE)’s Atmospheric Radiation Measurement (ARM) Climate Research Facility mission by providing in situ observations designed to improve the understanding of clouds and precipitation processes in complex terrain. The end goal is to use this improved understanding of physical processes to improve remote-sensing algorithms and representations of orographic precipitation microphysics in climate and earth system models.

58 GEOSCIENCES↗

Research and Development Toward Massive Liquid Argon Time Projection Chambers for Neutrino Detection

Liquid argon (LAr) time projection chambers (TPC) have rapidly increased in importance as particle detectors throughout the past four decades. While much research has been completed, there are still many areas which require further development to build and operate the next generation LAr TPC experiment, such as the Deep Underground Neutrino Experiment (DUNE). These include high voltage breakdown, argon purification and purity monitoring, and vacuum ultraviolet (VUV) scintillation light measurement. Visual monitoring of high voltage breakdown is helpful in allowing assessment of the performance of high voltage component design. Thus, a system of cryogenic cameras, the first of its kind, was developed for use in a large LAr cryostat, without the need for additional electronics heating. The system functioned without problem for 50 days at cryogenic temperature, with some degradation of image quality, and provided a useful monitor for the DUNE 35-ton cryogenics systems. The system did not observe any high voltage breakdowns during the run. Further development of the concept is ongoing for future installation in other experiments. The monitoring of LAr purity using TPC data is a fundamental study for LAr TPC experiments. However, the study has not been performed for a large LAr TPC in the presence of high electronic noise. Custom software was developed and validated for the accurate reconstruction of signals in noisy TPC data. The results of the reconstruction were used to successfully measure the LAr electron lifetime with an uncertainty comparable to alternate methods of measurement. The electron lifetime of the 35-ton Phase II run is determined to be 4.12 ± 0.17 (stat.) ±0.40 (syst.) ms. For general purpose research and development of high purity LAr as a particle detection medium, a dedicated test stand was designed, constructed, and commissioned. The system is used to test the gaseous photomultiplier (GPM) performance at cryogenic temperatures. The GPM functions with photoelectron multiplication at 77 K, at a reduced gain. Further study is required to show the detector’s direct sensitivity to LAr VUV scintillation light.

Thiesse, Matthew↗

Hydraulic Testing of Lost Lake Aquifer Near Recovery Wells RWM018, RWM 3, and RWM 5

An aquifer pumping test was conducted on the Lost Lake Aquifer Zone (LLAZ) at the recently installed recovery well RWM018 in accordance with the approved test plan (Dixon, 2018). The objective of the testing was to determine baseline well performance parameters and aquifer hydraulic conductivity. Well performance parameters determined included specific capacity, well efficiency, and head loss coefficients. The specific capacity of RWM018 was determined to be approximately 3.2 gpm/ft of drawdown. At baseline conditions (all active recovery wells operating except RWM018), RWM018 has approximately 26 ft of head above the well screen. This suggests that RWM018 can sustain a maximum pumping rate of 83 gpm with drawdown at the top of screen. Well efficiency was inversely related to pumping rate and decreased from 97% to 91% over a pumping range of approximately 20 to 55 gpm. These results suggest that RWM018 is an efficient well and does not require any further well development activities. The aquifer head loss coefficient was determined to be 2.1 ft/ft 3 /min and the well loss coefficient was determined to be 0.03 min 2 /ft 5 .

42 ENGINEERING↗

Hydraulic Testing of Lost Lake Aquifer Near Recovery Wells RWM018, RWM 3, and RWM 5

An aquifer pumping test was conducted on the Lost Lake Aquifer Zone (LLAZ) at the recently installed recovery well RWM018 in accordance with the approved test plan (Dixon, 2018). The objective of the testing was to determine baseline well performance parameters and aquifer hydraulic conductivity. Well performance parameters determine d included specific capacity, well efficiency, and head loss coefficients. The specific capacity of RWM018 was determined to be approximately 3.2 gpm/ft of drawdown. At baseline conditions (all active recovery wells operating except RWM018), RWM018 has approximately 26 ft of head above the well screen. This suggests that RWM018 can sustain a maximum pumping rate of 83 gpm with drawdown at the top of screen. Well efficiency was inversely related to pumping rate and decreased from 97% to 91% over a pumping range of approximately 20 to 55 gpm. These results suggest that RWM018 is an efficient well and does not require any further well development activities. The aquifer head loss coefficient was determined to be 2.1 ft/ft 3 /min and the well loss coefficient was determined to be 0.03 min 2 /ft 5 .

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydraulic Testing of the Lost Lake Aquifer Near Recovery Well RWM 8

Groundwater beneath the M-Area HWMF is contaminated with chlorinated ethenes including trichloroethylene (TCE) and tetrachloroethylene (PCE). SRS operates a network of recovery wells designed to hydraulically contain and capture the high concentration VOC plume in the Lost Lake Aquifer Zone (LLAZ) (Figure 1). The recovery wells are connected to the M-1 Air Stripper and the system is permitted by the South Carolina Department of Environmental Control (SCDHEC) to operate at a total flow of 610 gpm. RWM 8, which is one of ten operational recovery wells, has historically operated at a flow rate of approximately 40 gpm. RWM 8 was installed with four separate 10-ft screens that spanned the LLAZ with a continuous gravel pack spaced as shown in Figure 2. The three uppermost screens are located within the LLAZ whereas the deepest screen is located within the middle sand of the Crouch Branch Confining Unit (CBCU). Area Closure Projects (ACP) installed a permanent packer in May 2019 to isolate the lowest screen from the pump with the goal being to target the zone of highest concentration in the LLAZ. ACP expressed concern that a substantial portion of the flow from RWM 8 comes from the lower screen. With this screen isolated from service, flow from the well may be below the desired operational envelope for the well. The reconfiguration of RWM 8 presented an opportunity to re-evaluate the performance characteristics of the well. Following placement of the packer and relocation of the pump, the well was redeveloped. To assess the effects of eliminating the lower screen, a step-drawdown test was planned. The purpose of this test was to establish new baseline well performance properties including specific capacity, well efficiency, and well loss coefficients. Data from the step-drawdown testing was also used to estimate a maximum pumping rate for RWM 8 under the new configuration. The setup for the step-drawdown test facilitated a subsequent constant rate aquifer pumping test aimed at determining aquifer hydraulic properties. Properties estimated for the LLAZ included transmissivity and storativity. Following shutdown of RWM 8, recovery data were also collected and analyzed to estimate aquifer properties. This report discusses the hydrologic tests conducted following the reconfiguration of RWM 8. The information provided in this report may serve as input to subsequent updates to the groundwater flow and contaminant transport model for A/M Area.

42 ENGINEERING↗

Precision Measurement of the Proton Magnetic Form Factor at High Q2

Elastic electromagnetic form factors characterize the distribution of electric charge and magnetization current inside the nucleon and reflect the internal structure determined by Quantum Chromodynamics. Existing data on the proton magnetic form factor at high Q2 (the 4-momentum transfer squared) have large statistical and systematic uncertainties. The GMp experiment E12-07-108 was one of the first set of experiments to run in Hall A at Jefferson Lab after the 12 GeV upgrade with the goal of this experiment to precisely measure the electron-proton elastic cross section for Q2 up to 17 GeV2 with an accuracy of better than 2% - several times better than existing data in this Q2 range. This will allow further tests of form factor scaling predicted by pQCD and, additionally, will be an important benchmark for many other experiments where elastic electron-proton scattering is used for normalization. Since, GMp data were taken at lower ?(virtual photon polarization) than SLAC data, the measured cross sections recieve a smaller contribution from the electric form factor. This dissertation analyzed the GMp experiment data for five different kinematic settings determining the form factor with total uncertainties nearly two times smaller than the existing data at these Q2. This dissertation also presents the results of all Fall 2016 and Spring 2016 GMp experiment data. The proton magnetic form factors were extracted using both the Rosenbluth separation method and a parameterization of the form factor ratio (?pGpE=GpM) obtained from a fit to the existing cross section data. At the end of this thesis, the extracted GMp form factor data is compared to the existing data. The results for ?pGpE=GpM from Rosenbluth separations are found to be consistent with previous extractions, but with significantly reduced uncertainties, further highlighting the discrepancy with the polarization transfer technique. This data set can provide significant additional constraints on contributions from two-photon exchange.

Narayan Gautam, Thir↗

The Application of Hydraulic and Thermal Stimulation Techniques to Create Enhanced Geothermal Systems

Geothermal energy production requires temperature at depth, a working fluid to transport heat to the surface, and a network of fluid pathways connecting injection and production wells. These requirements constrain the availability of geothermal energy resources. Enhanced Geothermal System (EGS) development expands geothermal resource availability by artificially generating networks of fluid pathways in the reservoir. This is accomplished through hydraulic and thermal stimulation of the geothermal reservoir. Hydraulic and thermal techniques were applied at the Raft River geothermal field as part of a Department of Energy (DOE) EGS development project. The test well RRG-9 ST1 was hydraulically stimulated three times between February 2012 and April 2014. Since June, 2013 continuous injection of sub-reservoir temperature plant water has been used to thermally stimulate the well. The stimulation program has resulted in a large increase in the injectivity of the well, an increase from less than 20 gpm in June 2013 to nearly 1,000 gpm in April 2016. Wellbore imaging and temperature analysis identified a northeast striking fracture zone intersecting the well between 5,640 and 5,660 ft. measured depth (MD) has nominally accepted all of the injected fluid. Microseismic activity, related to stimulation program and plant activity was used to track possible fluid pathways within the reservoir. The microseismic data indicates that the injected fluid moves primarily to the northeast through the Narrows Zone, a northeast striking fault structure that bisects the field. Tracers injected into RRG-9 ST1 and recovered at the production wells RRG-2 and RRG-4, located to the northeast of RRG-9 ST1, support this theory. It is hypothesized that water injected into RRG-9 ST1 moves through the intersecting fracture zone which connects into the Narrows Zone, and then moves along the Narrows Zone to the northeast. This conceptual model was numerical simulated using FALCON a finite element reservoir simulation code developed by Idaho National Laboratory. The modeling suggests that both thermal and hydraulic fracturing mechanisms played an important role in improving the injectivity at RRG-9 ST1. The stimulation program at Raft River has successfully demonstrated the effectiveness of hydraulic and thermal stimulation techniques. RRG-9 ST1 is now in commercial use.

15 GEOTHERMAL ENERGY↗

Mixing Study for the Modification of H-Canyon Tank 31 and 32 Recirculation Lines Via M-Star®

As a part of the Accelerated Basin De-Inventory (ABD) program Tanks 31 or 32 will be re-purposed to support increasing the number of annual Material Test Reactor (MTR) and High Flux Isotope Reactor (HFIR) dissolutions. The proposed plan will allow Tanks 31 or 32 to be used as the dissolver cold chemical solution makeup tank and storage tank. The dissolver cold chemicals are 50% nitric acid, process water, mercuric nitrate, and gadolinium nitrate. Tanks 31 and 32 are 9 ft. (outer diameter) x 36 ft, horizontal, and can hold approximately 56,000 liters (15,000 gallons) each. One full volume of Tanks 31 or 32 can support 4 HFIR 6.4D equivalent batches. Both tanks are equipped with liquid level instrumentation. Tank 31 is equipped with 1 pump used for transfer and recirculation while Tank 32 is equipped with two pumps, one for transfer and the other for recirculation. Each of the pumps is equipped with sample taps. The tanks do not have specific gravity instrumentation, an agitator, or a sampler. Piping modifications will also be performed to supply the tank with cold chemicals. The current dissolver chemical composition is 5.0 -8.5M HNO3 and ~0.2 g Gd/L. The recirculating pump connected to Tank 31 is rated for a flowrate 175 gpm while the pump connected to Tank 32 is rated for a flowrate 50 gpm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

F-AREA PUMP TANK 1 MIXING ANALYSIS

The F-area pump tanks are used to transfer supernate, sludge, and other materials. In any transfer, the solution must stay well mixed without allowing particulate matter to settle out of the liquid and, thus, accumulate in the bottom of the pump tank. Recently, the pulse jet mixing in F-area Pump Tank 1 (FPT1) has been decommissioned. An analysis of the liquid transfer through FPT1 has been performed using computational fluid dynamics (CFD) methods to assess whether or not the velocities throughout the tank will remain high enough to keep all particulate suspended using only transfer and recirculation pumps. The following paragraph is an abbreviated synopsis of the transfer procedure for FPT1 [1, 2]. Prior to a transfer, FPT1 begins to be filled with inhibited water through the inlet transfer line (TI). When the tank liquid level reaches 52.5 inches above the absolute tank bottom, the recirculation pump (RI and RO) is activated. At a tank liquid level of 72.5 inches above the absolute tank bottom, the outlet transfer line (TO) is activated to reduce the liquid level in FPT1 and transfer inhibited water to H-area Pump Tank 7 (HPT7). The liquid level is reduced down to 39.5 inches, with an allowable range from 37.5 to 41.5 inches above the absolute tank bottom. HPT7 goes through a similar procedure as FPT1 until both have tank liquid levels of approximately 39.5 inches above the absolute tank bottom. The transfer of inhibited water continues until a steady-state has been reached in both pump tanks. At this point, the supernate/sludge transfer begins with a minimum flow rate of 70 gpm and an average flow rate of 150 gpm. After the transfer is complete, the pump tanks (both FPT1 and HPT7) are pumped down to between 20.5 and 22.5 inches (above absolute bottom) and then flushed with 25,000 gallons of inhibited water to remove any possible sludge heal. After the flushing, the pump tanks are emptied. Note that the tank liquid level is measured using diptubes. Figure 2.1 provides a simplified sketch (not to scale) of FPT1 during the steady-state transfer condition, which consists of two inlet flows that impact the liquid surface as plunging jets and two outlet flows drawn from near the bottom of the tank. During the transfer, the supernate level is held at 39.5 inches above the absolute bottom of the tank [1, 2]. In addition, the FPT1 can contain up to 16.7 wt.% sludge particles within the supernate for a given transfer [2]. Test results from Tank 40 sludge Batch 3 [3] provide a typical range of particulate diameters between 0.1 and 25 {micro}m, with approximately 20 vol.% of the sludge distribution consisting of particles less than 1 {micro}m in diameter. The purpose of this analysis is to estimate FPT1 flow field during the steady-state transfer conditions to ensure that the tank remains mixed and that the velocities throughout the tank are sufficient to keep all sludge particulate suspended.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Midlatitude Continental Convective Clouds Experiment (MC3E)

Convective processes play a critical role in the Earth’s energy balance through the redistribution of heat and moisture in the atmosphere and subsequent impacts on the hydrologic cycle. Global observation and accurate representation of these processes in numerical models is vital to improving our current understanding and future simulations of Earth’s climate system. Despite improvements in computing power, current operational weather and global climate models are unable to resolve the natural temporal and spatial scales that are associated with convective and stratiform precipitation processes; therefore, they must turn to parameterization schemes to represent these processes. In turn, the physical basis for these parameterization schemes needs to be evaluated for general application under a variety of atmospheric conditions. Analogously, space-based remote sensing algorithms designed to retrieve related cloud and precipitation information for use in hydrological, climate, and numerical weather prediction applications often rely on physical “parameterizations” that reliably translate indirectly related instrument measurements to the physical quantity of interest (e.g., precipitation rate). Importantly, both spaceborne retrieval algorithms and model convective parameterization schemes traditionally rely on field campaign data sets as a basis for evaluating and improving the physics of their respective approaches. The Midlatitude Continental Convective Clouds Experiment (MC3E) will take place in central Oklahoma during the April–May 2011 period. The experiment is a collaborative effort between the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility and the National Aeronautics and Space Administration’s (NASA) Global Precipitation Measurement (GPM) mission Ground Validation (GV) program. The field campaign leverages the unprecedented observing infrastructure currently available in the central United States, combined with an extensive sounding array, remote sensing and in situ aircraft observations, NASA GPM ground validation remote sensors, and new ARM instrumentation purchased with American Recovery and Reinvestment Act funding. The overarching goal is to provide the most complete characterization of convective cloud systems, precipitation, and the environment that has ever been obtained, providing constraints for model cumulus parameterizations and space-based rainfall retrieval algorithms over land that have never before been available. Several different components of convective cloud and precipitation processes tangible to both the convective parameterization and precipitation retrieval algorithm problem are targeted, such as preconvective environment and convective initiation, updraft/downdraft dynamics, condensate transport and detrainment, precipitation and cloud microphysics, spatial and temporal variability of precipitation, influence on the environment and radiation, and a detailed description of the large-scale forcing.

54 ENVIRONMENTAL SCIENCES↗

Compound hydraulic shear-modulated vortex amplifiers

A novel two-stage shear-modulated hydraulic vortex amplifier (U.S. patent 3,520,317) has been fabricated and put through preliminary steady-state testing at the 1000 psi supply pressure level with flows up to 15 gpm. The invention comprises a conventional fluidic vortex power stage and a shear-modulated pilot stage. In the absence of any mechanical moving parts, water may be used as the hydraulic medium thus opening the way to many underseas applications. At blocked load, a control input from 0 to 150 psi was required to achieve an output from 0 to 900 psi; at wide-open load, a control input of 0 to 120 psi was needed to achieve an output from 0 to 15 gpm. The power stage has been found unsuitable for the proportional control mode because of its nonlinear performance in the intermediate load range and because of strong pressure fluctuations (plus or minus 150 psi) in the intermediate control range. The addition of the shear-modulated pilot stage improves intermediate load linearity.

Goldschmied, F. R.↗

The tropospheric-stratospheric polar vortex breakdown of January 1977

An extraordinary warming of the stratosphere in December-January 1976-77 was followed by tropospheric warming in the polar region and cooling in middle latitudes. During January 10-20, the associated polar anticyclone extended from the surface to 10 mb. Antecedents of the polar vortex breakdown are reviewed with the aid of results of zonal-harmonic analyses of planetary waves, for heights of the pressure surfaces (700-10 mb), temperature, and mean stratospheric temperature (the latter determined from satellite radiation measurements). Wave 1 in height and temperature played a dominant role in the stratosphere, attaining amplitudes of 1600 gpm and 25 C, respectively, at 10 mb. On the other hand, superposition of retrogressing wave 1 and quasi-stationary wave 2 in the height of the 300-mb surface, with individual amplitudes exceeding 300 gpm, is judged to have been an important factor in the overall development.

Quiroz, R. S.↗

Rossby wavetrains in the stratosphere forced by localised disturbances in the troposphere

Studies have linked elements of the stratospheric circulation with particular localized features in the tropospheric circulation. This suggests a study of the response of the stratosphere to forcing by localized disturbances in the troposphere. A multilevel, primitive equation model is used of the stratosphere and mesosphere the height of whose lower boundary at 300 mb can be prescribed. Localized height disturbances which grow to steady amplitude are applied at this lower boundary, and the response of the initially axially symmetric stratosphere is studied. The perturbation, centered at 45 deg N, has a Gaussian distribution with a half width of 15 deg., corresponding roughly to the size of persistent troughs and blocking ridges in the troposphere. The forcing is nearly at fully amplitude 10 days after being switched on, and thereafter remains steady. Two types of experiments are conducted: in one the forcing is of small amplitude (100 gpm) and in the other it is of large amplitude (600 gpm). These pairs of experiments are compared to determine how nonlinear processes affect the perturbation fields. This is done locally by defining the perturbation response to the forcing as an anomaly, i.e., as a departure from the response in a controlled experiment in which no asymmetric forcing was applied at the lower boundary of the model. Experiments have been conducted for a number of atmospheric states obtained as zonal means of observations made by a stratospheric sounding unit (SSU). In this summary, results for the zonal mean flow on January 19, 1982 are outlined.

Marks, C. J.↗

NASA Lewis Research Center's Preheated Combustor and Materials Test Facility

The Preheated Combustor and Materials Test Facility (PCMTF) in the Engine Research Building (ERB) at the NASA Lewis Research Center is one of two unique combustor facilities that provide a nonvitiated air supply to two test stands, where the air can be used for research combustor testing and high-temperature materials testing. Stand A is used as a research combustor stand, whereas stand B is used for cyclic and survivability tests of aerospace materials at high temperatures. Both stands can accommodate in-house and private industry research programs. The PCMTF is capable of providing up to 30 lb/s (pps) of nonvitiated, 450 psig combustion air at temperatures ranging from 850 to 1150 g F. A 5000 gal tank located outdoors adjacent to the test facility can provide jet fuel at a pressure of 900 psig and a flow rate of 11 gal/min (gpm). Gaseous hydrogen from a 70,000 cu ft (CF) tuber is also available as a fuel. Approximately 500 gpm of cooling water cools the research hardware and exhaust gases. Such cooling is necessary because the air stream reaches temperatures as high as 3000 deg F. The PCMTF provides industry and Government with a facility for studying the combustion process and for obtaining valuable test information on advanced materials. This report describes the facility's support systems and unique capabilities.

Nemets, Steve A.↗