Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FLORIDA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Hypergol Maintenance Facility North SWMU 090 Year 2 Air Sparge System Performance Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Performance Monitoring Report (PMR) presents Year 2 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. HMFN has been designated Solid Waste Management Unit (SWMU) 090 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from August 2021 to August 2022.

Christopher Hook↗

Launch Complex 39A, SWMU 008 and Launch Complex 39B, SWMU 009 Performance Monitoring Report Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents the findings, observations, and results for Air Sparging (AS) operations and sitewide groundwater monitoring for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, and Launch Complex 39B (LC39B), SWMU 009, at Kennedy Space Center (KSC), Florida. Results from direct push technology (DPT) sampling at LC39B are also included in this report. The reporting period for AS operations covered under this PMR is from January 1, 2022, to December 31, 2022.

groundwater↗

Measuring, mapping, and anticipating climate gentrification in Florida: Miami and Tampa case studies

This article introduces an experimental methodology to identify proxy indicators that are conceptually consistent with the processes of Climate Gentrification (“CG”), in which a change in demand preferences among consumers and investors drives the increased consumption for real estate, in part, on lower measures of physical risk from climate change. Evaluated through case studies in the state of Florida, this article builds on the integration of multiple datasets concerning rental properties, evictions, and socioeconomic data, as well as environmental risk indices to build a Climate Gentrification Risk Index (CGRI). In the Miami case study, we find that the CGRI identifies a hotly contested neighborhood that is already known to be in a state of transition consistent with the processes of CG. In the Tampa case, the index highlights a district that exhibits strong metrics for the future accelerated occurrence of CG. Our findings suggest that transitional land uses and flexible zoning in low-exposure areas are key elements for attracting new development consistent with CG and offer insight into the challenges that local governments face understanding the types and rates of change that may be catalyzed in the broader urban processes of public and private sector climate adaptation in the built environment.

Climate change↗

South Repeater Building (Swmu 121) Pilot Study Work Plan, Kennedy Space Center, Florida

This document is a Pilot Study Work Plan for a groundwater remediation system at the South Repeater Building (N6-1118) located at the John F. Kennedy Space Center (KSC), Florida. Aqueous fire-fighting foam was applied near the building in the late 1990s during a wildfire. Per- and polyfluoroalkyl substances (PFAS) are components of the foam. Sampling completed at and near the South Repeater Building identified PFAS in groundwater, surface water and soil. KSC is planning to design and install a groundwater remediation system to address the potential for off-Center migration of PFAS compounds in groundwater. This Pilot Study Work Plan outlines subsurface hydrogeologic data that will be collected to use in the construction of a groundwater flow model that will guide the design of a full-scale remediation system. This document was prepared by AECOM Technical Services, Inc., for NASA under Indefinite Delivery Indefinite Quantity Contract 80KSC019D0010, Task Order 80KSC019F0096.

PFAS↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM activities completed in November 2022, and March through May 2023 including results from existing and newly installed groundwater monitoring wells and direct push technology (DPT) groundwater sampling in the Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. HBF has been designated as Solid Waste Management Unit (SWMU) 007 under the KSC Resource Conservation and Recovery Act Corrective Action Program.

Jennifer Buel↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

2022 Through April 2023 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, Interim Measures and Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (Swmu 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2022 through April 2023 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

VOCs↗

Sarasota Climate: Monitoring Heat and Assessing Heat Vulnerability to Identify Locations for Heat Mitigation Efforts in Sarasota, Florida

The coastal county of Sarasota, Florida, is located within the humid subtropical climate region and experiences an average of 250 days of sunshine every year. The county has large, urbanized communities which are vulnerable to urban heat island (UHI) effects. These rapidly growing communities contribute to the increasing surface temperatures and placing more residents at risk of heat-related illness. In partnership with Sarasota County Sustainability, the Sarasota Climate team utilized Earth observation data from NASA Landsat 8 and Landsat 9’s Thermal Infrared Sensors (TIRS), and the International Space Station’s Ecosystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS) to model UHI effects within the county during the Summer for the last five years, 2019 to 2023. Data analysis with the Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) and Urban Heat Exposure Assessment Tempe 1.0 (UHEAT 1.0) models and within ModelBuilder produced maps that identified the land surface temperature (LST) variance within the county, the regions that are most susceptible to extreme heat, and areas least capable of mitigating the effects of UHI. The results revealed that heat intensity varies significantly across Sarasota County with the highest temperatures in the more developed western part of the county. Additionally, the team identified that there are at least three vulnerable communities that exist in high-heat regions, including North Sarasota, Venice, and North Port. These regions have an overlap between socioeconomic sensitivity and environmental hazard that indicate a high priority in future heat mitigation efforts.

Remote sensing↗

Interim Measure Report False Cape Data Collection Annex Solid Waste Management Unit (SWMU) # 113 Kennedy Space Center, Florida

This report documents the Interim Measure (IM) completed at False Cape Data Collection Annex, Solid Waste Management Unit (SWMU) #113 (formerly potential release location [PRL] 217), at Kennedy Space Center (KSC), Florida. This document has been prepared for the National Aeronautics and Space Administration (NASA), in accordance with HydroGeoLogic, Inc.’s (HGL) Contract 80KSC019D0012, Task Order 80KSC019F0224.

False Cape Data Collection Annex↗

False Cape Data Collection Annex, Solid Waste Management Unit 113, Limited Resource Conservation and Recovery Act Facility Investigation Report, Kennedy Space Center, Florida

This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) Report summarizes groundwater investigation activities performed between July 2020 and October 2023 at the False Cape Data Collection Annex (FCDC) (Solid Waste Management Unit [SWMU] 113) located at Kennedy Space Center, Florida. The purpose of the RFI is to characterize the nature and extent of volatile organic compound (VOC)-contaminated groundwater at FCDC; evaluate the fate and transport of VOC contamination; collect sufficient data to evaluate potential future requirements for the site, such as corrective measures, long term monitoring, or No Further Action; and conduct a human health preliminary risk evaluation (PRE) based on the groundwater data.

False Cape Data Collection Annex↗

Area South of K7-516, SWMU 100 Performance Monitoring Report Kennedy Space Center, Florida

This Performance Monitoring Report (PMR) presents operations, maintenance, and monitoring information and performance monitoring results for the air sparging (AS) groundwater Interim Measure at the Area South of K7-516 (516S) located at Kennedy Space Center (KSC), Florida. AS expansion activities are also included in this PMR. The 516S site has been designated Solid Waste Management Unit 100 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities included in this report extends from January 1, 2023, through December 31, 2023.

Mark J. Jonnet↗

Interim Measures Work Plan: South Repeater Building: Solid Waste Management Unit 121: Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances: Kennedy Space Center, Florida

This document presents the design details of a granular activated carbon (GAC) hydraulic containment and groundwater treatment system Interim Measures Work Plan for the South Repeater Building site (South Repeater, Solid Waste Management Unit 121), located at John F. Kennedy Space Center (KSC), Florida. The interim measures (IM) treatment area includes the source area and downgradient property boundary, which have been impacted by per- and polyfluoroalkyl substances (PFAS). The objectives of the IM are to treat the source area and mitigate PFAS migration to areas outside of KSC boundaries. This document was prepared by AECOM Technical Services, Inc., for the National Aeronautics and Space Administration under Contract 80KSC019D0010, Task Order 80KSC021F0096. The IM consists of the installation and operation of 19 extraction wells and an associated groundwater treatment system. A total of 13 wells will be installed to a depth of 34 feet below land surface (bls) to target the upper medium-grained sand with shell layer. A total of six wells will be installed to a depth of 56 feet bls to target the lower layer of poorly graded sand with shell fragments. The system will be designed to operate each extraction well simultaneously using submersible pumps at flow rates of 5 or 10 gallons per minute (gpm), excluding one extraction well with a flow rate of 30 gpm. The extracted groundwater will be conveyed to a groundwater treatment system, where it will be treated via GAC prior to disposal via infiltration. To evaluate treatment system performance, baseline groundwater sampling will be conducted prior to treatment system startup. Performance monitoring will be completed quarterly for the first year. A total of eight performance monitoring wells will be installed to a depth of 12 feet bls, and eight performance monitoring wells will be installed to a depth of 30 feet bls. In addition to the installation of 16 performance monitoring wells, 12 existing monitoring wells will be incorporated into the performance monitoring program.

groundwater treatment↗

Assessment of landscape-scale fluxes of carbon dioxide and methane in subtropical coastal wetlands of South Florida

Coastal wetlands play a significant role in the storage of “blue carbon,” indicating their importance in the carbon biogeochemistry in the coastal zone and in global climate change mitigation strategies. We present airborne eddy covariance observations of CO 2 and CH 2 fluxes collected in southern Florida as part of the NASA BlueFlux mission during April 2022, October 2022, February 2023, and April 2023. The flux data generated from this mission consists of over 100 flight hours and more than 6,000 km of horizontal distance over coastal saline and freshwater wetlands. We find that the spatial and temporal heterogeneity in CO 2 and CH 2 exchange is primarily influenced by season, vegetation type, ecosystem productivity, and soil inundation. The largest CO 2 uptake fluxes of more than 20 μmol m -2 s -1 were observed over mangroves during all deployments and over swamp forests during flights in April. The greatest CH 4 effluxes of more than 250 nmol m -2 s -1 were measured at the end of the wet season in October 2022 over freshwater marshes and swamp shrublands. Although the combined Everglades National Park and Big Cypress National Preserve region was a net sink for carbon, CH 4 emissions reduced the ecosystem carbon uptake capacity (net CO 2 exchange rates) by 11%–91%. Average total net carbon exchange rates during the flight periods were −4 to −0.2 g CO 2 -eq m -2 d -1 . Our results highlight the importance of preserving mangrove forests and point to potential avenues of further research for greenhouse gas mitigation strategies.

atmosphere↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Monitoring and Assessing Heat Vulnerability to Identify Locations for Heat Mitigation Efforts in Sarasota, Florida

Located in the coastal subtropical region, Florida’s Sarasota County receives plenty of sunlight for more than half of the year. However, the ongoing rise in summer temperatures attributed to climate change poses an increasing vulnerability to extreme heat for the residents. Moreover, the area's high relative humidity exacerbates the discomfort of high temperatures, thereby intensifying the severity of heat events and elevating the risks of heat-related illnesses. Our collaborations with Sarasota County Sustainability underscore shared concerns about the impact of urban heat island (UHI) on the community. We utilized Earth observation data from NASA Landsat 8 and Landsat 9’s Thermal Infrared Sensors (TIRS) and the International Space Station’s Ecosystem Spaceborne Thermal Radiometer Experiment on Space Station (ECOSTRESS) to model UHI effects within the county during the summer from 2019 to 2023. By implementing the open-source Integrated Valuation of Ecosystem Services and Tradeoffs (InVEST) Urban Cooling software model, ArcGIS ModelBuilder, and principal component analysis, we identified the land surface temperature variance within the county and areas that are least capable of mitigating the effects of UHI. In addition, we use socioeconomic and demographic data as indicators to quantify vulnerability at the census tract level. The results revealed that heat intensity varies significantly across Sarasota County, with the highest temperatures being in the more developed western part of the region. We pinpointed that at least three vulnerable communities reside in high-heat regions: North Sarasota, Venice, and North Port. These areas demonstrate a confluence between socioeconomic sensitivity and environmental hazard, indicating a high priority in future heat mitigation efforts.

Theresia Phoa↗

Base Support Building and Kennedy Athletic, Recreation, and Social Park II, SWMU 014 and SWMU 118 PFAS 2023 Site Assessment Progress Report, Kennedy Space Center, Florida

This Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) 2023 Site Assessment Progress Report presents the findings from the 2023 investigation activities, completed between October 12, 2022, and January 24, 2024, at the Base Support Building, Solid Waste Management Unit (SWMU) 014 and at the Kennedy Athletic, Recreation, and Social (KARS) Park II SWMU 118 located within Kennedy Space Center, Florida.

Richard G Smith↗